Permit Application Status

PRCOM20193265


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20193265
Building Permit - Commercial
Final Completion
REPAIR REPLACE UPGRADE
ADDING LIGHTING AND RECEPTICALS TO NEW BUILDING BUILDING PERMIT - PRCOM20193281 CLOSE BOTH OUT ELECTRCIAL FOR BUILDING NOT HVAC DO FINAL BUILDING AT SAME TIME CLOSE BOTH OUT. WHEN STEVE (PARKS) HAS PLANS ON SITE
11/06/2019
11/06/2019
02/25/2020
Locations
Contacts
BRANDY ELECTRIC INC, Address:500 SW GULL POINT CT, Phone:(816) 716-4788  
BRANDYELECTRIC@COMCAST.NET  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 11/06/2019 11/06/2019
Development Center
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for Repair/Replace/Upgrade $30.00 $30.00 Paid 11/06/2019
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Rough Electrical Inspection - Commercial Passed 2/26/2020 2/26/2020 02/25/2020
Final Inspection - Commercial Passed 02/25/2020
Documents & Images
Date Uploaded File Type Document Name
11/06/2019 Receipt Receipt for transaction: 2019-007208
11/06/2019 Letter DS Building Permit
11/07/2019 Scope of Work DOC110719-009
11/07/2019 Drawing DOC110719-010
02/25/2020 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home