Summary
PRCOM20192706
Building Permit - Commercial
Final Completion
CITY OF LEES SUMMIT
PARTIAL COMMERCIAL
FOUNDATION ONLY PERMIT WITH PLUMBING AND ELECTRICAL UNDERSLAB FULL PERMIT - PRCOM20192096
09/20/2019
10/14/2019
04/30/2020
Locations
Contacts
BRINKMANN CONSTRUCTORS, Address:16650 CHESTERFIELD GROVE RD, Phone:(636) 537-9700  
BLUE RIVER PLUMBING INC, Address:9125 BARTON ST, Phone:(913) 701-6410  
LYNN ELECTRIC & COMMUNICATIONS INC, Address:725 N 2ND ST STE K, Phone:(785) 843-5709  
CFS ENGINEERS, Address:1421 EAST 104TH STREET STE 100, Phone:(816) 333-4477  
CITY OF LEES SUMMIT, Address:220 SE GREEN ST  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 10/11/2019 10/11/2019
Joe Frogge
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for Partial Commercial $9,307.28 $9,307.28 Paid 10/14/2019
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Commercial Partial 11/5/2019 11/5/2019 at 12:55 PM 11/05/2019
Misc
Partial Correction
11/05/2019
OK TO POUR WHEN READY WALL FOOTING & INTEGRAL COLUMN FOOTINGS AT: A/8.5 TO A/11.2;
Footing Inspection - Commercial Partial 11/6/2019 11/6/2019 at 2:35 PM 11/06/2019
Misc
Partial Correction
11/05/2019
OK TO POUR WHEN READY WALL FOOTING & INTEGRAL COLUMN FOOTINGS AT: A'/11.2 CCW TO A/8.5; A/8.5 TO 7.5/A';
Underslab Plumbing Inspection - Commercial Partial 11/7/2019 at 1:10 PM 11/07/2019
Misc
Partial Correction
11/07/2019
OK TO COVER WHEN READY UNDER-SLAB PVC SANITARY DRAIN, WASTE, & VENT PIPING AT: 16" SAN PVC FROM 5' O/S B/L TO 10' I/S B/L AT A'/11.5; ENSURE PRESSURE-TESTING OF PIPING SYSTEM IS PERFORMED PER IPC 312 / IRC P2503.5.1
Footing Inspection - Commercial Partial 11/7/2019 (1:00) 11/7/2019 at 1:25 PM 11/07/2019
Misc
Partial Correction
11/06/2019
OK TO POUR WHEN READY WALL FOOTING & INTEGRAL COLUMN FOOTINGS AT: A'/11.2 CCW TO A/8.5; A/8.5 TO 7.5/A'; 7.3/A.1 CCW TO 3.9/A;
Footing Inspection - Commercial Partial 11/8/2019 (1:00) 11/8/2019 at 1:00 PM 11/08/2019
Misc
Partial Correction
11/07/2019
OK TO POUR WHEN READY WALL FOOTING & INTEGRAL COLUMN FOOTINGS AT: A'/11.2 CCW TO A/8.5; A/8.5 TO 7.5/A'; 7.3/A.1 CCW TO 3.9/A; A/3.3 CCW TO A'/1.5;
Footing Inspection - Commercial Partial 11/12/2019 (10:00) 11/13/2019 at 9:50 AM 11/13/2019
Misc
Partial Correction
11/08/2019
OK TO POUR WHEN READY WALL FOOTING & INTEGRAL COLUMN FOOTINGS AT: A'/11.2 CCW TO A/8.5; A/8.5 TO 7.5/A'; 7.3/A.1 CCW TO 3.9/A; A/3.3 CCW TO A'/1.5; A'/11.2 TO 13/A' TO 12.2/E.5;
Footing Inspection - Commercial Partial 11/15/2019 (9:00) 11/15/2019 at 9:00 AM 11/15/2019
Misc
Partial Correction
11/13/2019
OK TO POUR WHEN READY WALL FOOTING & INTEGRAL COLUMN FOOTINGS AT: A'/11.2 CCW TO A/8.5; A/8.5 TO 7.5/A'; 7.3/A.1 CCW TO 3.9/A; A/3.3 CCW TO A'/1.5; A'/11.2 TO 13/A' TO 12/E.5; UFER GROUNDING JUMPER AT 12.7/A.5; 12/E.5 TO I/12 TO I/9.1;
Misc
Partial Correction
11/15/2019
OK TO POUR WHEN READY ISOLATED FOOTINGS AT FOLLOWING LOCATIONS: 11/C; 11/D; 11/E; 11/F; 11/G; 11/H;
Footing Inspection - Commercial Partial 11/19/2019 (1:30) 11/19/2019 at 1:30 PM 11/19/2019
Misc
Partial Correction
11/15/2019
OK TO POUR WHEN READY WALL FOOTING & INTEGRAL COLUMN FOOTINGS AT: A'/11.2 CCW TO A/8.5; A/8.5 TO 7.5/A'; 7.3/A.1 CCW TO 3.9/A; A/3.3 CCW TO A'/1.5; A'/11.2 TO 13/A' TO 12/E.5; UFER GROUNDING JUMPER AT 12.7/A.5; 12/E.5 TO I/12 TO I/9.1; I/9.1 to I/6.3;
Misc
Partial Correction
11/15/2019
OK TO POUR WHEN READY ISOLATED FOOTINGS AT FOLLOWING LOCATIONS: 11/C; 11/D; 11/E; 11/F; 11/G; 11/H; 10/C; 10/D; 10/E; 10/F; 10/G; 10/H;
Footing Inspection - Commercial Partial 11/20/2019 (11:00) 11/20/2019 at 10:45 AM 11/20/2019
Misc
Partial Correction
11/19/2019
OK TO POUR WHEN READY WALL FOOTING & INTEGRAL COLUMN FOOTINGS AT: A'/11.2 CCW TO A/8.5; A/8.5 TO 7.5/A'; 7.3/A.1 CCW TO 3.9/A; A/3.3 CCW TO A'/1.5; A'/11.2 TO 13/A' TO 12/E.5; UFER GROUNDING JUMPER AT 12.7/A.5; 12/E.5 TO I/12 TO I/9.1; I/9.1 to I/6.3; I/6.3 TO I/4.7;
Misc
Partial Correction
11/19/2019
OK TO POUR WHEN READY ISOLATED FOOTINGS AT FOLLOWING LOCATIONS: 11/C; 11/D; 11/E; 11/F; 11/G; 11/H; 10/C; 10/D; 10/E; 10/F; 10/G; 10/H; 9/C; 9/D; 9/E; 9/F; 9/G; 9/H;
Footing Inspection - Commercial Partial 11/22/2019 11/22/2019 at 10:15 AM 11/22/2019
Misc
Partial Correction
11/20/2019
OK TO POUR WHEN READY WALL FOOTING & INTEGRAL COLUMN FOOTINGS AT: A'/11.2 CCW TO A/8.5; A/8.5 TO 7.5/A'; 7.3/A.1 CCW TO 3.9/A; A/3.3 CCW TO A'/1.5; A'/11.2 TO 13/A' TO 12/E.5; UFER GROUNDING JUMPER AT 12.7/A.5; 12/E.5 TO I/12 TO I/9.1; I/9.1 to I/6.3; I/6.3 TO I/4.7;
Misc
Partial Correction
11/20/2019
OK TO POUR WHEN READY ISOLATED FOOTINGS AT FOLLOWING LOCATIONS: 11/C; 11/D; 11/E; 11/F; 11/G; 11/H; 10/C; 10/D; 10/E; 10/F; 10/G; 10/H; 9/C; 9/D; 9/E; 9/F; 9/G; 9/H; WHEN APPROVED BY SPECIAL INSPECTOR: 8/C; 8/D; 8/E; 8/F; 8/G; 8/H; 7/C; 7/D; 7/E; 7/F; 7/G; 7/H;
Footing Inspection - Commercial Partial 11/26/2019 11/26/2019 at 1:05 PM 11/26/2019
Misc
Partial Correction
11/22/2019
OK TO POUR WHEN READY ISOLATED FOOTINGS AT FOLLOWING LOCATIONS: 11/C; 11/D; 11/E; 11/F; 11/G; 11/H; 10/C; 10/D; 10/E; 10/F; 10/G; 10/H; 9/C; 9/D; 9/E; 9/F; 9/G; 9/H; 8/C; 8/D; 8/E; 8/F; 8/G; 8/H; 7/C; 7/D; 7/E; 7/F; 7/G; 7/H; STEP FOOTING FROM FTG E/8 EAST TO ELEVATOR PIT SLAB; 6/C; 6/D; 6/E; 6/F; 6/G; 6/H; 5/C; 5/D; 5/E;
Misc
Partial Correction
11/22/2019
OK TO POUR WHEN READY WALL FOOTING & INTEGRAL COLUMN FOOTINGS AT: A'/11.2 CCW TO A/8.5; A/8.5 TO 7.5/A'; 7.3/A.1 CCW TO 3.9/A; A/3.3 CCW TO A'/1.5; A'/11.2 TO 13/A' TO 12/E.5; UFER GROUNDING JUMPER AT 12.7/A.5; 12/E.5 TO I/12 TO I/9.1; I/9.1 to I/6.3; I/6.3 TO I/4.7;
Footing Inspection - Commercial Partial 11/27/2019 11/27/2019 at 8:55 AM 11/27/2019
Misc
Partial Correction
11/26/2019
OK TO POUR WHEN READY WALL FOOTING & INTEGRAL COLUMN FOOTINGS AT: A'/11.2 CCW TO A/8.5; A/8.5 TO 7.5/A'; 7.3/A.1 CCW TO 3.9/A; A/3.3 CCW TO A'/1.5; A'/11.2 TO 13/A' TO 12/E.5; UFER GROUNDING JUMPER AT 12.7/A.5; 12/E.5 TO I/12 TO I/9.1; I/9.1 to I/6.3; I/6.3 TO I/4.7;
Misc
Partial Correction
11/26/2019
OK TO POUR WHEN READY ISOLATED FOOTINGS AT FOLLOWING LOCATIONS: 11/C; 11/D; 11/E; 11/F; 11/G; 11/H; 10/C; 10/D; 10/E; 10/F; 10/G; 10/H; 9/C; 9/D; 9/E; 9/F; 9/G; 9/H; 8/C; 8/D; 8/E; 8/F; 8/G; 8/H; 7/C; 7/D; 7/E; 7/F; 7/G; 7/H; STEP FOOTING FROM FTG E/8 EAST TO ELEVATOR PIT SLAB; 6/C; 6/D; 6/E; 6/F; 6/G; 6/H; 5/C; 5/D; 5/E; FOOTINGS AND ELEVATOR PIT SLAB ON (5) FROM (F) TO (G.2); H/5;
Concrete Walls and Columns Inspection Partial 12/5/2019 at 9:40 AM 12/05/2019
Misc
Partial Correction
12/18/2019
Footing Inspection - Commercial Partial 12/5/2019 (11:00) 12/5/2019 at 11:25 AM 12/05/2019
Misc
Partial Correction
11/27/2019
OK TO POUR WHEN READY WALL FOOTING & INTEGRAL COLUMN FOOTINGS AT: A'/11.2 CCW TO A/8.5; A/8.5 TO 7.5/A'; 7.3/A.1 CCW TO 3.9/A; A/3.3 CCW TO A'/1.5; A'/11.2 TO 13/A' TO 12/E.5; UFER GROUNDING JUMPER AT 12.7/A.5; 12/E.5 TO I/12 TO I/9.1; I/9.1 to I/6.3; I/6.3 TO I/4.7;
Misc
Partial Correction
11/27/2019
OK TO POUR WHEN READY ISOLATED FOOTINGS AT FOLLOWING LOCATIONS: 11/C; 11/D; 11/E; 11/F; 11/G; 11/H; 10/C; 10/D; 10/E; 10/F; 10/G; 10/H; 9/C; 9/D; 9/E; 9/F; 9/G; 9/H; 8/C; 8/D; 8/E; 8/F; 8/G; 8/H; 7/C; 7/D; 7/E; 7/F; 7/G; 7/H; STEP FOOTING FROM FTG E/8 EAST TO ELEVATOR PIT SLAB; 6/C; 6/D; 6/E; 6/F; 6/G; 6/H; 5/C; 5/D; 5/E; FOOTINGS AND ELEVATOR PIT SLAB ON (5) FROM (F) TO (G.2); H/5; [4.5/C; 4.5/D; 4.5/E; 4.5/F; 4.3/C; 4.3/D; 4.3/E; 4.3/F; 4/C; 4/D; 4/E; 4/F; 4/G; 4/H; 3/C; 3/D; 3/E; 3/F; 3/G*; 3/H*; 2/C; 2/D; 2/E*; 2/F; 2/G; 2/H; 2/E*; 3/G*; 3/H*: CHECK BAR COUNT AND MAT SIZE
Underslab Plumbing Inspection - Commercial Failed 12/10/2019 12/10/2019 at 8:10 AM 12/10/2019
Misc
Partial Correction
11/07/2019
OK TO COVER WHEN READY UNDER-SLAB PVC SANITARY DRAIN, WASTE, & VENT PIPING AT: 16" SAN PVC FROM 5' O/S B/L TO 10' I/S B/L AT A'/11.5; ENSURE PRESSURE-TESTING OF PIPING SYSTEM IS PERFORMED PER IPC 312 / IRC P2503.5.1
Underslab Plumbing Inspection - Commercial Partial 12/11/2019 at 8:55 AM 12/11/2019
Misc
Partial Correction
12/10/2019
OK TO COVER WHEN READY UNDER-SLAB PVC SANITARY DRAIN, WASTE, & VENT PIPING AT: 16" SAN PVC FROM 5' O/S B/L TO 10' I/S B/L AT A'/11.5; ALL GD AND RD PIPING N OF (7.3) -- INTERCEPTOR AND CONNECTING PIPING NOT READY; ENSURE PRESSURE-TESTING OF PIPING SYSTEM IS PERFORMED PER IPC 312
Footing Inspection - Commercial Partial 12/12/2019 12/12/2019 at 2:00 PM 12/12/2019
Misc
Partial Correction
12/05/2019
OK TO POUR WHEN READY WALL FOOTING & INTEGRAL COLUMN FOOTINGS AT: A'/11.2 CCW TO A/8.5; A/8.5 TO 7.5/A'; 7.3/A.1 CCW TO 3.9/A; A/3.3 CCW TO A'/1.5; A'/11.2 TO 13/A' TO 12/E.5; UFER GROUNDING JUMPER AT 12.7/A.5; 12/E.5 TO I/12 TO I/9.1; I/9.1 to I/6.3; I/6.3 TO I/4.7; I/4.7 TO I/2;
Misc
Partial Correction
12/05/2019
OK TO POUR WHEN READY ISOLATED FOOTINGS AT FOLLOWING LOCATIONS: 11/C; 11/D; 11/E; 11/F; 11/G; 11/H; 10/C; 10/D; 10/E; 10/F; 10/G; 10/H; 9/C; 9/D; 9/E; 9/F; 9/G; 9/H; 8/C; 8/D; 8/E; 8/F; 8/G; 8/H; 7/C; 7/D; 7/E; 7/F; 7/G; 7/H; STEP FOOTING FROM FTG E/8 EAST TO ELEVATOR PIT SLAB; 6/C; 6/D; 6/E; 6/F; 6/G; 6/H; 5/C; 5/D; 5/E; FOOTINGS AND ELEVATOR PIT SLAB ON (5) FROM (F) TO (G.2); H/5; [4.5/C; 4.5/D; 4.5/E; 4.5/F; 4.3/C; 4.3/D; 4.3/E; 4.3/F; 4/C; 4/D; 4/E; 4/F; 4/G; 4/H; 3/C; 3/D; 3/E; 3/F; 3/G*; 3/H*; 2/C; 2/D; 2/E*; 2/F; 2/G; 2/H; 2/E*; 3/G*; 3/H*: CHECK BAR COUNT AND MAT SIZE
Footing Inspection - Commercial Partial 12/13/2019 (11:00) 12/13/2019 at 11:35 AM 12/13/2019
Misc
Partial Correction
12/12/2019
OK TO POUR WHEN READY ISOLATED FOOTINGS AT FOLLOWING LOCATIONS: 11/C; 11/D; 11/E; 11/F; 11/G; 11/H; 10/C; 10/D; 10/E; 10/F; 10/G; 10/H; 9/C; 9/D; 9/E; 9/F; 9/G; 9/H; 8/C; 8/D; 8/E; 8/F; 8/G; 8/H; 7/C; 7/D; 7/E; 7/F; 7/G; 7/H; STEP FOOTING FROM FTG E/8 EAST TO ELEVATOR PIT SLAB; 6/C; 6/D; 6/E; 6/F; 6/G; 6/H; 5/C; 5/D; 5/E; FOOTINGS AND ELEVATOR PIT SLAB ON (5) FROM (F) TO (G.2); H/5; [4.5/C; 4.5/D; 4.5/E; 4.5/F; 4.3/C; 4.3/D; 4.3/E; 4.3/F; 4/C; 4/D; 4/E; 4/F; 4/G; 4/H; 3/C; 3/D; 3/E; 3/F; 3/G*; 3/H*; 2/C; 2/D; 2/E*; 2/F; 2/G; 2/H; 2/E*; 3/G*; 3/H*: CHECK BAR COUNT AND MAT SIZE
Misc
Partial Correction
12/12/2019
OK TO POUR WHEN READY WALL FOOTING & INTEGRAL COLUMN FOOTINGS AT: A'/11.2 CCW TO A/8.5; A/8.5 TO 7.5/A'; 7.3/A.1 CCW TO 3.9/A; A/3.3 CCW TO A'/1.5; A'/11.2 TO 13/A' TO 12/E.5; UFER GROUNDING JUMPER AT 12.7/A.5; 12/E.5 TO I/12 TO I/9.1; I/9.1 to I/6.3; I/6.3 TO I/4.7; I/4.7 TO I/2; I/2 TO 1/I TO 1/D.7;
Foundation Inspection - Commercial Partial 12/18/2019 12/18/2019 at 1:50 PM 12/18/2019
Misc
Partial Correction
12/18/2019
OK TO POUR WHEN READY C.I.P. WALL AT: 12/H.5 TO I/12 TO I/10.4; 12/H.5 TO 12/B.3; ENSURE KEYWAY AND WATERSTOP ARE CLEAR AND CLEAN PRIOR TO BUTTONING-UP FORMS.
Underslab Plumbing Inspection - Commercial Partial 12/20/2019 at 9:15 AM 12/20/2019
Misc
Partial Correction
12/11/2019
OK TO COVER WHEN READY UNDER-SLAB PVC SANITARY DRAIN, WASTE, & VENT PIPING AT: 16" SAN PVC FROM 5' O/S B/L TO 10' I/S B/L AT A'/11.5; ALL GD AND RD PIPING N OF (7.3) -- INTERCEPTOR AND CONNECTING PIPING NOT READY; ONE 8" PVC & ONE 16" ON 1.5 FROM 5' O/S W B/L TO 1.5/E.8 ; ENSURE PRESSURE-TESTING OF PIPING SYSTEM IS PERFORMED PER IPC 312
Footing Inspection - Commercial Partial 12/20/2019 at 1:55 PM 12/20/2019
Misc
Partial Correction
12/13/2019
OK TO POUR WHEN READY ISOLATED FOOTINGS AT FOLLOWING LOCATIONS: 11/C; 11/D; 11/E; 11/F; 11/G; 11/H; 10/C; 10/D; 10/E; 10/F; 10/G; 10/H; 9/C; 9/D; 9/E; 9/F; 9/G; 9/H; 8/C; 8/D; 8/E; 8/F; 8/G; 8/H; 7/C; 7/D; 7/E; 7/F; 7/G; 7/H; STEP FOOTING FROM FTG E/8 EAST TO ELEVATOR PIT SLAB; 6/C; 6/D; 6/E; 6/F; 6/G; 6/H; 5/C; 5/D; 5/E; FOOTINGS AND ELEVATOR PIT SLAB ON (5) FROM (F) TO (G.2); H/5; [4.5/C; 4.5/D; 4.5/E; 4.5/F; 4.3/C; 4.3/D; 4.3/E; 4.3/F; 4/C; 4/D; 4/E; 4/F; 4/G; 4/H; 3/C; 3/D; 3/E; 3/F; 3/G*; 3/H*; 2/C; 2/D; 2/E*; 2/F; 2/G; 2/H; B/11; B/10; B/9; B/8; A/8; 2/E*; 3/G*; 3/H*: CHECK BAR COUNT AND MAT SIZE
Misc
Partial Correction
12/13/2019
OK TO POUR WHEN READY WALL FOOTING & INTEGRAL COLUMN FOOTINGS AT: A'/11.2 CCW TO A/8.5; A/8.5 TO 7.5/A'; 7.3/A.1 CCW TO 3.9/A; A/3.3 CCW TO A'/1.5; A'/11.2 TO 13/A' TO 12/E.5; UFER GROUNDING JUMPER AT 12.7/A.5; 12/E.5 TO I/12 TO I/9.1; I/9.1 to I/6.3; I/6.3 TO I/4.7; I/4.7 TO I/2; I/2 TO 1/I TO 1/D.7;
Underslab Plumbing Inspection - Commercial Partial 12/23/2019 12/23/2019 at 8:45 AM 12/23/2019
Misc
Partial Correction
12/20/2019
OK TO COVER WHEN READY UNDER-SLAB PVC SANITARY DRAIN, WASTE, & VENT PIPING AT: 16" SAN PVC FROM 5' O/S B/L TO 10' I/S B/L AT A'/11.5; ALL GD AND RD PIPING N OF (7.3) -- INTERCEPTOR AND CONNECTING PIPING NOT READY; ONE 8" PVC & ONE 16" ON 1.5 FROM 5' O/S W B/L TO 1.5/E.8 ; ALL EXCEPT LOCATIONS WHERE INTERCEPTOR AND OTHER STRUCTURES HAVE YET TO BE INSTALLED AND CONNECTED; ENSURE PRESSURE-TESTING OF PIPING SYSTEM IS PERFORMED PER IPC 312
Underslab Electrical Inspection - Commercial Failed 12/31/2019 12/31/2019 at 7:20 AM 12/31/2019
Foundation Inspection - Commercial Failed 12/31/2019 at 7:50 AM 12/31/2019
Misc
Partial Correction
12/18/2019
OK TO POUR WHEN READY C.I.P. WALL AT: 12/H.5 TO I/12 TO I/10.4; N WALL; I/10.4 TO ENSURE KEYWAY AND WATERSTOP ARE CLEAR AND CLEAN PRIOR TO BUTTONING-UP FORMS.
Foundation Inspection - Commercial Partial 12/31/2019 at 1:15 PM 12/31/2019
Misc
Partial Correction
12/31/2019
OK TO POUR WHEN READY C.I.P. WALL AT: 12/H.5 TO I/12 TO I/10.4; N WALL; I/10.4 TO i/8.2; ENSURE KEYWAY AND WATERSTOP ARE CLEAR AND CLEAN PRIOR TO BUTTONING-UP FORMS.
Underslab Electrical Inspection - Commercial Partial 12/31/2019 at 1:45 PM 12/31/2019
Misc
Partial Correction
12/31/2019
NO ISSUES FOUND ON UNDER-SLAB ELECTRICAL CONDUIT MATERIAL & WORKMANSHIP. OK TO COVER WHEN READY AT: NW CORNER OF BUILDING TO ~60' S/SE TWENTY-TWO 3" CONDUITS & TWO 2" CONDUITS; G.C. AND E.C. TO ENSURE LAYOUT IS CORRECT. OK TO COVER WHEN READY.
Underslab Electrical Inspection - Commercial Partial 1/3/2020 1/3/2020 at 7:50 AM 01/03/2020
Misc
Partial Correction
12/31/2019
NO ISSUES FOUND ON UNDER-SLAB ELECTRICAL CONDUIT MATERIAL & WORKMANSHIP. OK TO COVER WHEN READY AT: NW CORNER OF BUILDING TO ~60' S/SE TWENTY-TWO 3" CONDUITS & TWO 2" CONDUITS; FIVE 3" SOUTH TO (7) AT METER BANK 2B; G.C. AND E.C. TO ENSURE LAYOUT IS CORRECT. OK TO COVER WHEN READY.
Underslab Plumbing Inspection - Commercial Partial 1/7/2020 1/7/2020 at 10:40 AM 01/07/2020
Misc
Partial Correction
12/23/2019
OK TO COVER WHEN READY UNDER-SLAB PVC SANITARY DRAIN, WASTE, & VENT PIPING AT: 16" SAN PVC FROM 5' O/S B/L TO 10' I/S B/L AT A'/11.5; ALL GD AND RD PIPING N OF (7.3) -- INTERCEPTOR AND CONNECTING PIPING NOT READY; ONE 8" PVC & ONE 16" ON 1.5 FROM 5' O/S W B/L TO 1.5/E.8; 8" FROM A/5.7 SOUTH TO CONNECTION TO 10" AT A.2/1.5 (THREE 4" BRANCHES TO WEST WALL); ALL EXCEPT LOCATIONS WHERE INTERCEPTOR AND OTHER STRUCTURES HAVE YET TO BE INSTALLED AND CONNECTED; ENSURE PRESSURE-TESTING OF PIPING SYSTEM IS PERFORMED PER IPC 312
Foundation Inspection - Commercial Partial 1/7/2020 1/7/2020 at 10:00 AM 01/07/2020
Misc
Partial Correction
12/31/2019
OK TO POUR WHEN READY C.I.P. WALL AT: 12/H.5 TO I/12 TO I/10.4; N WALL; I/10.4 TO I/8.2; I/8.2 TO I/5.7; ENSURE KEYWAY AND WATERSTOP ARE CLEAR AND CLEAN AND WALL CHAIRS ARE IN PLACE PRIOR TO BUTTONING-UP FORMS.
Underslab Plumbing Inspection - Commercial Partial 1/7/2020 at 11:00 AM 01/07/2020
Misc
Partial Correction
01/07/2020
OK TO COVER WHEN READY UNDER-SLAB PVC SANITARY DRAIN, WASTE, & VENT PIPING AT: 16" SAN PVC FROM 5' O/S B/L TO 10' I/S B/L AT A'/11.5; ALL GD AND RD PIPING N OF (7.3) -- INTERCEPTOR AND CONNECTING PIPING NOT READY; ONE 8" PVC & ONE 16" ON 1.5 FROM 5' O/S W B/L TO 1.5/E.8; 8" FROM A/5.7 SOUTH TO CONNECTION TO 10" AT A.2/1.5 (THREE 4" BRANCHES TO WEST WALL); ALL EXCEPT LOCATIONS WHERE INTERCEPTOR AND OTHER STRUCTURES HAVE YET TO BE INSTALLED AND CONNECTED; SAND/OIL INTERCEPTOR AT C/L 1.8; ENSURE PRESSURE-TESTING OF PIPING SYSTEM IS PERFORMED PER IPC 312
Footing Inspection - Commercial Partial 1/9/2020 1/9/2020 at 11:00 AM 01/09/2020
Misc
Partial Correction
12/20/2019
OK TO POUR WHEN READY ISOLATED FOOTINGS AT FOLLOWING LOCATIONS: 11/C; 11/D; 11/E; 11/F; 11/G; 11/H; 10/C; 10/D; 10/E; 10/F; 10/G; 10/H; 9/C; 9/D; 9/E; 9/F; 9/G; 9/H; 8/C; 8/D; 8/E; 8/F; 8/G; 8/H; 7/C; 7/D; 7/E; 7/F; 7/G; 7/H; STEP FOOTING FROM FTG E/8 EAST TO ELEVATOR PIT SLAB; 6/C; 6/D; 6/E; 6/F; 6/G; 6/H; 5/C; 5/D; 5/E; FOOTINGS AND ELEVATOR PIT SLAB ON (5) FROM (F) TO (G.2); H/5; [4.5/C; 4.5/D; 4.5/E; 4.5/F; 4.3/C; 4.3/D; 4.3/E; 4.3/F; 4/C; 4/D; 4/E; 4/F; 4/G; 4/H; 3/C; 3/D; 3/E; 3/F; 3/G*; 3/H*; 2/C; 2/D; 2/E*; 2/F; 2/G; 2/H; B/11; B/10; B/9; B/8; A/8; [B/2; B/3; B/6; B/7; 2/E*; 3/G*; 3/H*: CHECK BAR COUNT AND MAT SIZE
Misc
Partial Correction
12/20/2019
OK TO POUR WHEN READY WALL FOOTING & INTEGRAL COLUMN FOOTINGS AT: A'/11.2 CCW TO A/8.5; A/8.5 TO 7.5/A'; 7.3/A.1 CCW TO 3.9/A; A/3.3 CCW TO A'/1.5; A'/11.2 TO 13/A' TO 12/E.5; UFER GROUNDING JUMPER AT 12.7/A.5; 12/E.5 TO I/12 TO I/9.1; I/9.1 to I/6.3; I/6.3 TO I/4.7; I/4.7 TO I/2; I/2 TO 1/I TO 1/D.7;
Underslab Electrical Inspection - Commercial Partial 1/9/2020 at 11:35 AM 01/09/2020
Misc
Partial Correction
01/03/2020
NO ISSUES FOUND ON UNDER-SLAB ELECTRICAL CONDUIT MATERIAL & WORKMANSHIP. OK TO COVER WHEN READY AT: NW CORNER OF BUILDING TO ~60' S/SE TWENTY-TWO 3" CONDUITS & TWO 2" CONDUITS; FIVE 3" SOUTH TO (7) AT METER BANK 2B; ONE 3" FROM NW CORNER TO W/I 20' OF ELEVATOR C; SEVEN 3" & TWO 2" FROM NW CORNER TO F/12; G.C. AND E.C. TO ENSURE LAYOUT IS CORRECT. OK TO COVER WHEN READY.
Footing Inspection - Commercial Partial 1/9/2020 at 2:55 PM 01/09/2020
Misc
Partial Correction
01/09/2020
OK TO POUR WHEN READY ISOLATED FOOTINGS AT FOLLOWING LOCATIONS: 11/C; 11/D; 11/E; 11/F; 11/G; 11/H; 10/C; 10/D; 10/E; 10/F; 10/G; 10/H; 9/C; 9/D; 9/E; 9/F; 9/G; 9/H; 8/C; 8/D; 8/E; 8/F; 8/G; 8/H; 7/C; 7/D; 7/E; 7/F; 7/G; 7/H; STEP FOOTING FROM FTG E/8 EAST TO ELEVATOR PIT SLAB; 6/C; 6/D; 6/E; 6/F; 6/G; 6/H; 5/C; 5/D; 5/E; FOOTINGS AND ELEVATOR PIT SLAB ON (5) FROM (F) TO (G.2); H/5; [4.5/C; 4.5/D; 4.5/E; 4.5/F; 4.3/C; 4.3/D; 4.3/E; 4.3/F; 4/C; 4/D; 4/E; 4/F; 4/G; 4/H; 3/C; 3/D; 3/E; 3/F; 3/G; 3/H; 2/C; 2/D; 2/E; 2/F; 2/G; 2/H; B/11; B/10; B/9; B/8; A/8; B/2; B/3; B/6; B/7; B/4; B/4.3; B/4.5; B/5; A/4.1; A/4.3; A/4.5; A/5
Misc
Partial Correction
01/09/2020
OK TO POUR WHEN READY WALL FOOTING & INTEGRAL COLUMN FOOTINGS AT: A'/11.2 CCW TO A/8.5; A/8.5 TO 7.5/A'; 7.3/A.1 CCW TO 3.9/A; A/3.3 CCW TO A'/1.5; A'/11.2 TO 13/A' TO 12/E.5; UFER GROUNDING JUMPER AT 12.7/A.5; 12/E.5 TO I/12 TO I/9.1; I/9.1 to I/6.3; I/6.3 TO I/4.7; I/4.7 TO I/2; I/2 TO 1/I TO 1/D.7;
Foundation Inspection - Commercial Partial 1/13/2020 (9:15) 1/13/2020 01/13/2020
Misc
Partial Correction
01/07/2020
OK TO POUR WHEN READY C.I.P. WALL AT: 12/H.5 TO I/12 TO I/10.4; N WALL; I/10.4 TO I/8.2; I/8.2 TO I/5.7; ENSURE KEYWAY AND WATERSTOP ARE CLEAR AND CLEAN AND WALL CHAIRS ARE IN PLACE PRIOR TO BUTTONING-UP FORMS.
Misc
Informational
01/13/2020
8 LINE E TO G FOUNDATION WALL NORTH END IN CENTER
Foundation Inspection - Commercial Partial 1/15/2020 1/15/2020 01/15/2020
Misc
Partial Correction
01/13/2020
OK TO POUR WHEN READY C.I.P. WALL AT: 12/H.5 TO I/12 TO I/10.4; N WALL; I/10.4 TO I/8.2; I/8.2 TO I/5.7; ENSURE KEYWAY AND WATERSTOP ARE CLEAR AND CLEAN AND WALL CHAIRS ARE IN PLACE PRIOR TO BUTTONING-UP FORMS.
Misc
Informational
01/13/2020
8 LINE E TO G FOUNDATION WALL NORTH END IN CENTER 1/15/20- >Columns-5line @E; 4line@E. >Foundation East wall - 5.6line to 1.1line.
Footing Inspection - Commercial Partial 1/16/2020 01/16/2020
Misc
Partial Correction
01/09/2020
OK TO POUR WHEN READY ISOLATED FOOTINGS AT FOLLOWING LOCATIONS: 11/C; 11/D; 11/E; 11/F; 11/G; 11/H; 10/C; 10/D; 10/E; 10/F; 10/G; 10/H; 9/C; 9/D; 9/E; 9/F; 9/G; 9/H; 8/C; 8/D; 8/E; 8/F; 8/G; 8/H; 7/C; 7/D; 7/E; 7/F; 7/G; 7/H; STEP FOOTING FROM FTG E/8 EAST TO ELEVATOR PIT SLAB; 6/C; 6/D; 6/E; 6/F; 6/G; 6/H; 5/C; 5/D; 5/E; FOOTINGS AND ELEVATOR PIT SLAB ON (5) FROM (F) TO (G.2); H/5; [4.5/C; 4.5/D; 4.5/E; 4.5/F; 4.3/C; 4.3/D; 4.3/E; 4.3/F; 4/C; 4/D; 4/E; 4/F; 4/G; 4/H; 3/C; 3/D; 3/E; 3/F; 3/G; 3/H; 2/C; 2/D; 2/E; 2/F; 2/G; 2/H; B/11; B/10; B/9; B/8; A/8; B/2; B/3; B/6; B/7; B/4; B/4.3; B/4.5; B/5; A/4.1; A/4.3; A/4.5; A/5
Misc
Partial Correction
01/09/2020
OK TO POUR WHEN READY WALL FOOTING & INTEGRAL COLUMN FOOTINGS AT: A'/11.2 CCW TO A/8.5; A/8.5 TO 7.5/A'; 7.3/A.1 CCW TO 3.9/A; A/3.3 CCW TO A'/1.5; A'/11.2 TO 13/A' TO 12/E.5; UFER GROUNDING JUMPER AT 12.7/A.5; 12/E.5 TO I/12 TO I/9.1; I/9.1 to I/6.3; I/6.3 TO I/4.7; I/4.7 TO I/2; I/2 TO 1/I TO 1/D.7; OK TO POUR FOOTING & COLUMN FOOTING GRID LINE 1 E TO B & C
Foundation Inspection - Commercial Partial 1/23/2020 (9:30) 1/23/2020 at 9:50 AM 01/23/2020
Misc
Partial Correction
01/15/2020
OK TO POUR WHEN READY C.I.P. WALL & INTEGRAL COLUMNS AT: 12/H.5 TO I/12 TO I/10.4; N WALL; I/10.4 TO I/8.2; I/8.2 TO I/5.7; 8 LINE E TO G FOUNDATION WALL NORTH END IN CENTER; East wall - 5.6line to 1.1line; 1/B.2 TO 1/C; ENSURE KEYWAY AND WATERSTOP ARE CLEAR AND CLEAN AND WALL CHAIRS ARE IN PLACE PRIOR TO BUTTONING-UP FORMS.
Misc
Partial Correction
01/23/2020
OK TO POUR WHEN READY C.I.P. CONCRETE COLUMNS @ LOCATIONS: 5line @ E; 4line@E;
Footing Inspection - Commercial Partial 1/24/2020 1/27/2020 at 10:50 AM 01/27/2020
Misc
Partial Correction
01/16/2020
OK TO POUR WHEN READY ISOLATED FOOTINGS AT FOLLOWING LOCATIONS: 11/C; 11/D; 11/E; 11/F; 11/G; 11/H; 10/C; 10/D; 10/E; 10/F; 10/G; 10/H; 9/C; 9/D; 9/E; 9/F; 9/G; 9/H; 8/C; 8/D; 8/E; 8/F; 8/G; 8/H; 7/C; 7/D; 7/E; 7/F; 7/G; 7/H; STEP FOOTING FROM FTG E/8 EAST TO ELEVATOR PIT SLAB; 6/C; 6/D; 6/E; 6/F; 6/G; 6/H; 5/C; 5/D; 5/E; FOOTINGS AND ELEVATOR PIT SLAB ON (5) FROM (F) TO (G.2); H/5; [4.5/C; 4.5/D; 4.5/E; 4.5/F; 4.3/C; 4.3/D; 4.3/E; 4.3/F; 4/C; 4/D; 4/E; 4/F; 4/G; 4/H; 3/C; 3/D; 3/E; 3/F; 3/G; 3/H; 2/C; 2/D; 2/E; 2/F; 2/G; 2/H; B/11; B/10; B/9; B/8; A/8; B/2; B/3; B/6; B/7; B/4; B/4.3; B/4.5; B/5; A/4.1; A/4.3; A/4.5; A/5; A/9;
Misc
Partial Correction
01/16/2020
OK TO POUR WHEN READY WALL FOOTING & INTEGRAL COLUMN FOOTINGS AT: A'/11.2 CCW TO A/8.5; A/8.5 TO 7.5/A'; 7.3/A.1 CCW TO 3.9/A; A/3.3 CCW TO A'/1.5; A'/11.2 TO 13/A' TO 12/E.5; UFER GROUNDING JUMPER AT 12.7/A.5; 12/E.5 TO I/12 TO I/9.1; I/9.1 to I/6.3; I/6.3 TO I/4.7; I/4.7 TO I/2; I/2 TO 1/I TO 1/D.7; OK TO POUR FOOTING & COLUMN FOOTING GRID LINE 1 E TO B & C; REMAINING WALL FOOTING AT SW CORNER NOT PREPPED PER PERMIT PRINTS.
Footing Inspection - Commercial Partial 1/27/2020 at 2:00 PM 01/27/2020
Misc
Partial Correction
01/27/2020
OK TO POUR WHEN READY ISOLATED FOOTINGS AT FOLLOWING LOCATIONS: 11/C; 11/D; 11/E; 11/F; 11/G; 11/H; 10/C; 10/D; 10/E; 10/F; 10/G; 10/H; 9/C; 9/D; 9/E; 9/F; 9/G; 9/H; 8/C; 8/D; 8/E; 8/F; 8/G; 8/H; 7/C; 7/D; 7/E; 7/F; 7/G; 7/H; STEP FOOTING FROM FTG E/8 EAST TO ELEVATOR PIT SLAB; 6/C; 6/D; 6/E; 6/F; 6/G; 6/H; 5/C; 5/D; 5/E; FOOTINGS AND ELEVATOR PIT SLAB ON (5) FROM (F) TO (G.2); H/5; [4.5/C; 4.5/D; 4.5/E; 4.5/F; 4.3/C; 4.3/D; 4.3/E; 4.3/F; 4/C; 4/D; 4/E; 4/F; 4/G; 4/H; 3/C; 3/D; 3/E; 3/F; 3/G; 3/H; 2/C; 2/D; 2/E; 2/F; 2/G; 2/H; B/11; B/10; B/9; B/8; A/8; B/2; B/3; B/6; B/7; B/4; B/4.3; B/4.5; B/5; A/4.1; A/4.3; A/4.5; A/5; A/9;
Misc
Partial Correction
01/27/2020
OK TO POUR WHEN READY WALL FOOTING & INTEGRAL COLUMN FOOTINGS AT: A'/11.2 CCW TO A/8.5; A/8.5 TO 7.5/A'; 7.3/A.1 CCW TO 3.9/A; A/3.3 CCW TO A'/1.5; A'/11.2 TO 13/A' TO 12/E.5; UFER GROUNDING JUMPER AT 12.7/A.5; 12/E.5 TO I/12 TO I/9.1; I/9.1 to I/6.3; I/6.3 TO I/4.7; I/4.7 TO I/2; I/2 TO 1/I TO 1/D.7; OK TO POUR FOOTING & COLUMN FOOTING GRID LINE 1 E TO B & C; REMAINDER OF PERIMETER FOOTING AT A-8'/1.3 CCW TO B.3/0.5;
Foundation Inspection - Commercial Partial 1/29/2020 (8:00) 1/29/2020 at 7:55 AM 01/29/2020
Misc
Partial Correction
01/23/2020
OK TO POUR WHEN READY C.I.P. WALL & INTEGRAL COLUMNS AT: 12/H.5 TO I/12 TO I/10.4; N WALL; I/10.4 TO I/8.2; I/8.2 TO I/5.7; 8 LINE E TO G FOUNDATION WALL NORTH END IN CENTER; East wall - 5.6line to 1.1line; 1/B.2 TO 1/C; 1/C TO 1/E.2; ENSURE KEYWAY AND WATERSTOP ARE CLEAR AND CLEAN AND WALL CHAIRS ARE IN PLACE PRIOR TO BUTTONING-UP FORMS.
Misc
Partial Correction
01/23/2020
OK TO POUR WHEN READY C.I.P. CONCRETE COLUMNS @ LOCATIONS: 5 line @ E; 4 line @ E;
Foundation Inspection - Commercial Partial 2/4/2020 (2:00) 2/4/2020 at 9:10 AM 02/04/2020
Misc
Partial Correction
01/29/2020
OK TO POUR WHEN READY C.I.P. WALL & INTEGRAL COLUMNS AT: 12/H.5 TO I/12 TO I/10.4; N WALL; I/10.4 TO I/8.2; I/8.2 TO I/5.7; 8 LINE E TO G FOUNDATION WALL NORTH END IN CENTER; East wall - 5.6line to 1.1line; 1/B.2 TO 1/C; 1/C TO 1/E.2; 1/E.2 TO 1/J TO J/1.3; ENSURE KEYWAY AND WATERSTOP ARE CLEAR AND CLEAN AND WALL CHAIRS ARE IN PLACE PRIOR TO BUTTONING-UP FORMS.
Misc
Partial Correction
01/29/2020
OK TO POUR WHEN READY C.I.P. CONCRETE COLUMNS @ LOCATIONS: 5 line @ E; 4 line @ E;
Foundation Inspection - Commercial Partial 2/7/2020 (1:00) 2/7/2020 at 1:25 PM 02/07/2020
Misc
Partial Correction
02/04/2020
OK TO POUR WHEN READY C.I.P. WALL & INTEGRAL COLUMNS AT: 12/H.5 TO I/12 TO I/10.4; N WALL; I/10.4 TO I/8.2; I/8.2 TO I/5.7; 8 LINE E TO G FOUNDATION WALL NORTH END IN CENTER; East wall - 5.6line to 1.1line; 1/B.2 TO 1/C; 1/C TO 1/E.2; 1/E.2 TO 1/J TO J/1.3; J/1.3 NORTH TO COMPLETE EAST WALL AND ENTIRE C.I.P. PERIMETER WALL; ENSURE KEYWAY AND WATERSTOP ARE CLEAR AND CLEAN AND WALL CHAIRS ARE IN PLACE PRIOR TO BUTTONING-UP FORMS.
Misc
Partial Correction
02/04/2020
OK TO POUR WHEN READY C.I.P. CONCRETE COLUMNS @ LOCATIONS: 5 line @ E; 4 line @ E;
Piers/Caissons Inspection - Commercial Partial 1/31/2020 at 2:30 PM 02/18/2020
Misc
Partial Correction
01/31/2020
OK TO POUR WHEN READY PIERS/PILASTERS OUTSIDE EAST FOUNDATION WALL: FROM C/L 11.6 SOUTH TO 8;
Piers/Caissons Inspection - Commercial Partial 2/18/2020 at 2:20 PM 02/18/2020
Misc
Partial Correction
02/18/2020
OK TO POUR WHEN READY PIERS/PILASTERS OUTSIDE EAST FOUNDATION WALL: FROM C/L 11.6 SOUTH TO 8;
Misc
Partial Correction
02/18/2020
OK TO POUR PIERS INSIDE BUILDING AT: G/5; G/5.2;
Concrete Walls and Columns Inspection Partial 2/18/2020 at 2:35 PM 02/18/2020
Misc
Partial Correction
02/18/2020
OK TO POUR WHEN READY C.I.P. WALL AT: 12/H.5 TO I/12 TO I/10; E.2/5 TO F.3/5; ENSURE KEYWAY AND WATERSTOP ARE CLEAR AND CLEAN PRIOR TO BUTTONING-UP FORMS.
Misc
Partial Correction
02/18/2020
OK TO POUR COLUMNS INSIDE BUILDING AT: 1/F;
Foundation Inspection - Commercial Partial 2/21/2020 (8:00) 2/21/2020 at 9:00 AM 02/21/2020
Misc
Partial Correction
02/07/2020
OK TO POUR WHEN READY C.I.P. FOUNDATION WALL & INTEGRAL COLUMNS/PILASTERS AT: 12/H.5 TO I/12 TO I/10.4; N WALL; I/10.4 TO I/8.2; I/8.2 TO I/5.7; 8 LINE E TO G FOUNDATION WALL NORTH END IN CENTER; East wall - 5.6line to 1.1line; 1/B.2 TO 1/C; 1/C TO 1/E.2; 1/E.2 TO 1/J TO J/1.3; J/1.3 NORTH TO COMPLETE EAST WALL AND ENTIRE C.I.P. PERIMETER WALL; ELEVATOR PIT WALL AT G/4.7; ENSURE KEYWAY AND WATERSTOP ARE CLEAR AND CLEAN AND WALL CHAIRS ARE IN PLACE PRIOR TO BUTTONING-UP FORMS.
Misc
Partial Correction
02/07/2020
OK TO POUR WHEN READY C.I.P. CONCRETE COLUMNS @ LOCATIONS: 5 line @ E; 4 line @ E;
Underslab Electrical Inspection - Commercial Partial 3/2/2020 2/28/2020 at 8:45 AM 02/28/2020
Misc
Partial Correction
01/09/2020
NO ISSUES FOUND ON UNDER-SLAB ELECTRICAL CONDUIT MATERIAL & WORKMANSHIP. OK TO COVER WHEN READY AT: NW CORNER OF BUILDING TO ~60' S/SE TWENTY-TWO 3" CONDUITS & TWO 2" CONDUITS; FIVE 3" SOUTH TO (7) AT METER BANK 2B; ONE 3" FROM NW CORNER TO W/I 20' OF ELEVATOR C; SEVEN 3" & TWO 2" FROM NW CORNER TO F/12; XXX RE-ROUTED FROM XXX TO B2A AT A/7.5; SEVEN 3" & TWO 2" FROM SW CORNER TO E SIDE OF COLUMN X/Y; G.C. AND E.C. TO ENSURE LAYOUT IS CORRECT. OK TO COVER WHEN READY.
Underslab Electrical Inspection - Commercial Partial 3/2/2020 at 8:05 AM 03/02/2020
Misc
Partial Correction
02/28/2020
NO ISSUES FOUND ON UNDER-SLAB ELECTRICAL CONDUIT MATERIAL & WORKMANSHIP. OK TO COVER WHEN READY AT: NW CORNER OF BUILDING TO ~60' S/SE TWENTY-TWO 3" CONDUITS & TWO 2" CONDUITS; FIVE 3" SOUTH TO (7) AT METER BANK 2B; ONE 3" FROM NW CORNER TO W/I 20' OF ELEVATOR C; SEVEN 3" & TWO 2" FROM NW CORNER TO F/12; SEVEN 3" & TWO 2" RE-ROUTED FROM F/12 TO B2A AT A/7.5; SEVEN 3" & TWO 2" FROM 1/A.5 TO E SIDE OF COLUMN 1/F; G.C. AND E.C. TO ENSURE LAYOUT IS CORRECT. OK TO COVER WHEN READY.
Suspended Slab Inspection Passed 3/5/2020 (11:15) 3/5/2020 at 1:50 PM 03/05/2020
Underslab Electrical Inspection - Commercial Partial 3/11/2020 3/11/2020 03/11/2020
Misc
Partial Correction
03/02/2020
NO ISSUES FOUND ON UNDER-SLAB ELECTRICAL CONDUIT MATERIAL & WORKMANSHIP. OK TO COVER WHEN READY AT: NW CORNER OF BUILDING TO ~60' S/SE TWENTY-TWO 3" CONDUITS & TWO 2" CONDUITS; FIVE 3" SOUTH TO (7) AT METER BANK 2B; ONE 3" FROM NW CORNER TO W/I 20' OF ELEVATOR C; SEVEN 3" & TWO 2" FROM NW CORNER TO F/12; SEVEN 3" & TWO 2" RE-ROUTED FROM F/12 TO B2A AT A/7.5; SEVEN 3" & TWO 2" FROM 1/A.5 TO E SIDE OF COLUMN 1/F; G.C. AND E.C. TO ENSURE LAYOUT IS CORRECT. OK TO COVER WHEN READY.
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
03/11/2020
SECONDARY FROM METER BANKS TO TURN UP IN PARKING GARAGE. SOUTH METER BANK-: B LINE1-4; ELEVATOR LINE- B-G,G 1.5-5.
Footing Inspection - Commercial Partial 3/12/2020 3/12/2020 03/12/2020
Misc
Partial Correction
01/27/2020
OK TO POUR WHEN READY ISOLATED FOOTINGS AT FOLLOWING LOCATIONS: 11/C; 11/D; 11/E; 11/F; 11/G; 11/H; 10/C; 10/D; 10/E; 10/F; 10/G; 10/H; 9/C; 9/D; 9/E; 9/F; 9/G; 9/H; 8/C; 8/D; 8/E; 8/F; 8/G; 8/H; 7/C; 7/D; 7/E; 7/F; 7/G; 7/H; STEP FOOTING FROM FTG E/8 EAST TO ELEVATOR PIT SLAB; 6/C; 6/D; 6/E; 6/F; 6/G; 6/H; 5/C; 5/D; 5/E; FOOTINGS AND ELEVATOR PIT SLAB ON (5) FROM (F) TO (G.2); H/5; [4.5/C; 4.5/D; 4.5/E; 4.5/F; 4.3/C; 4.3/D; 4.3/E; 4.3/F; 4/C; 4/D; 4/E; 4/F; 4/G; 4/H; 3/C; 3/D; 3/E; 3/F; 3/G; 3/H; 2/C; 2/D; 2/E; 2/F; 2/G; 2/H; B/11; B/10; B/9; B/8; A/8; B/2; B/3; B/6; B/7; B/4; B/4.3; B/4.5; B/5; A/4.1; A/4.3; A/4.5; A/5; A/9; EXTERIOR COLUMN PIERS O LINE-N @ 5.6-7.3
Misc
Partial Correction
01/27/2020
OK TO POUR WHEN READY WALL FOOTING & INTEGRAL COLUMN FOOTINGS AT: A'/11.2 CCW TO A/8.5; A/8.5 TO 7.5/A'; 7.3/A.1 CCW TO 3.9/A; A/3.3 CCW TO A'/1.5; A'/11.2 TO 13/A' TO 12/E.5; UFER GROUNDING JUMPER AT 12.7/A.5; 12/E.5 TO I/12 TO I/9.1; I/9.1 to I/6.3; I/6.3 TO I/4.7; I/4.7 TO I/2; I/2 TO 1/I TO 1/D.7; OK TO POUR FOOTING & COLUMN FOOTING GRID LINE 1 E TO B & C; REMAINDER OF PERIMETER FOOTING AT A-8'/1.3 CCW TO B.3/0.5;
Underslab Electrical Inspection - Commercial Partial 3/12/2020 3/12/2020 03/12/2020
Misc
Partial Correction
03/11/2020
NO ISSUES FOUND ON UNDER-SLAB ELECTRICAL CONDUIT MATERIAL & WORKMANSHIP. OK TO COVER WHEN READY AT: NW CORNER OF BUILDING TO ~60' S/SE TWENTY-TWO 3" CONDUITS & TWO 2" CONDUITS; FIVE 3" SOUTH TO (7) AT METER BANK 2B; ONE 3" FROM NW CORNER TO W/I 20' OF ELEVATOR C; SEVEN 3" & TWO 2" FROM NW CORNER TO F/12; SEVEN 3" & TWO 2" RE-ROUTED FROM F/12 TO B2A AT A/7.5; SEVEN 3" & TWO 2" FROM 1/A.5 TO E SIDE OF COLUMN 1/F; G.C. AND E.C. TO ENSURE LAYOUT IS CORRECT. OK TO COVER WHEN READY.
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
03/11/2020
SECONDARY FROM METER BANKS TO TURN UP IN PARKING GARAGE. SOUTH METER BANK-: B LINE1-4; ELEVATOR LINE- B-G,G 1.5-5.- A ELEVATOR.
Underslab Electrical Inspection - Commercial Partial 3/16/2020 3/16/2020 03/16/2020
Misc
Partial Correction
03/12/2020
NO ISSUES FOUND ON UNDER-SLAB ELECTRICAL CONDUIT MATERIAL & WORKMANSHIP. OK TO COVER WHEN READY AT: NW CORNER OF BUILDING TO ~60' S/SE TWENTY-TWO 3" CONDUITS & TWO 2" CONDUITS; FIVE 3" SOUTH TO (7) AT METER BANK 2B; ONE 3" FROM NW CORNER TO W/I 20' OF ELEVATOR C; SEVEN 3" & TWO 2" FROM NW CORNER TO F/12; SEVEN 3" & TWO 2" RE-ROUTED FROM F/12 TO B2A AT A/7.5; SEVEN 3" & TWO 2" FROM 1/A.5 TO E SIDE OF COLUMN 1/F; G.C. AND E.C. TO ENSURE LAYOUT IS CORRECT. OK TO COVER WHEN READY.
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
03/12/2020
SECONDARY FROM METER BANKS TO TURN UP IN PARKING GARAGE. SOUTH METER BANK-: B LINE1-4; ELEVATOR LINE- B-G,G 1.5-5.- A ELEVATOR.
Underslab Electrical Inspection - Commercial Partial 4/8/2020 4/8/2020 04/08/2020
Misc
Partial Correction
03/16/2020
NO ISSUES FOUND ON UNDER-SLAB ELECTRICAL CONDUIT MATERIAL & WORKMANSHIP. OK TO COVER WHEN READY AT: NW CORNER OF BUILDING TO ~60' S/SE TWENTY-TWO 3" CONDUITS & TWO 2" CONDUITS; FIVE 3" SOUTH TO (7) AT METER BANK 2B; ONE 3" FROM NW CORNER TO W/I 20' OF ELEVATOR C; SEVEN 3" & TWO 2" FROM NW CORNER TO F/12; SEVEN 3" & TWO 2" RE-ROUTED FROM F/12 TO B2A AT A/7.5; SEVEN 3" & TWO 2" FROM 1/A.5 TO E SIDE OF COLUMN 1/F; DISCONNECT #1SOUTWALL G.C. AND E.C. TO ENSURE LAYOUT IS CORRECT. OK TO COVER WHEN READY.
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
03/16/2020
SECONDARY FROM METER BANKS TO TURN UP IN PARKING GARAGE. SOUTH METER BANK-: B LINE1-4; ELEVATOR LINE- B-G,G 1.5-5.- A ELEVATOR.
Underslab Electrical Inspection - Commercial Passed 4/30/2020 4/30/2020 04/30/2020
Misc
Resolved
04/30/2020
NO ISSUES FOUND ON UNDER-SLAB ELECTRICAL CONDUIT MATERIAL & WORKMANSHIP. OK TO COVER WHEN READY AT: NW CORNER OF BUILDING TO ~60' S/SE TWENTY-TWO 3" CONDUITS & TWO 2" CONDUITS; FIVE 3" SOUTH TO (7) AT METER BANK 2B; ONE 3" FROM NW CORNER TO W/I 20' OF ELEVATOR C; SEVEN 3" & TWO 2" FROM NW CORNER TO F/12; SEVEN 3" & TWO 2" RE-ROUTED FROM F/12 TO B2A AT A/7.5; SEVEN 3" & TWO 2" FROM 1/A.5 TO E SIDE OF COLUMN 1/F; DISCONNECT #1SOUTWALL G.C. AND E.C. TO ENSURE LAYOUT IS CORRECT. OK TO COVER WHEN READY.
THE FOLLOWING AREAS ARE APPROVED
Resolved
04/30/2020
SECONDARY FROM METER BANKS TO TURN UP IN PARKING GARAGE. SOUTH METER BANK-: B LINE1-4; ELEVATOR LINE- B-G,G 1.5-5.- A ELEVATOR.
Final Inspection - Commercial Passed 4/30/2020 04/30/2020
Documents & Images
Date Uploaded File Type Document Name
10/14/2019 Receipt Receipt for transaction: 2019-006761
10/14/2019 Letter DS Building Permit
11/04/2019 wrong report - don't use
11/05/2019 Letter INSPECTION SUMMARY
11/06/2019 Letter INSPECTION SUMMARY
11/07/2019 Letter INSPECTION SUMMARY
11/07/2019 Letter INSPECTION SUMMARY
11/08/2019 Letter INSPECTION SUMMARY
11/13/2019 Letter INSPECTION SUMMARY
11/19/2019 Letter INSPECTION SUMMARY
11/20/2019 Letter INSPECTION SUMMARY
11/22/2019 Letter INSPECTION SUMMARY
11/26/2019 Letter INSPECTION SUMMARY
11/26/2019 19-1125-dr-4
11/26/2019 19-1125-dr-5
11/26/2019 19-1125-dr-6
11/26/2019 19-1125-dr-7
11/26/2019 19-1125-dr-8
11/26/2019 19-1125-dr-9
11/26/2019 19-1125-dr-10
11/26/2019 19-1125-dr-11
11/26/2019 19-1125-dr-12
11/26/2019 19-1125-dr-13
11/26/2019 19-1125-dr-14
11/26/2019 19-1125-dr-15
11/26/2019 19-1125-dr-16
11/26/2019 19-1125-dr-17
11/26/2019 19-1125-dr-2
11/26/2019 19-1125-dr-3
12/02/2019 19-1125-dr-18
12/02/2019 19-1125-dr-19
12/05/2019 Letter INSPECTION SUMMARY
12/05/2019 Letter INSPECTION SUMMARY
12/11/2019 Letter INSPECTION SUMMARY
12/12/2019 Letter INSPECTION SUMMARY
12/13/2019 Letter INSPECTION SUMMARY
12/18/2019 Letter INSPECTION SUMMARY
12/20/2019 Letter INSPECTION SUMMARY
12/23/2019 Letter INSPECTION SUMMARY
12/31/2019 Letter INSPECTION SUMMARY
12/31/2019 Letter INSPECTION SUMMARY
01/03/2020 Letter INSPECTION SUMMARY
01/07/2020 Letter INSPECTION SUMMARY
01/07/2020 Letter INSPECTION SUMMARY
01/07/2020 Letter INSPECTION SUMMARY
01/09/2020 Letter INSPECTION SUMMARY
01/09/2020 Letter INSPECTION SUMMARY
01/09/2020 Letter INSPECTION SUMMARY
01/10/2020 19-1125 CYL 1811
01/10/2020 19-1125 CYL 1748
01/10/2020 19-1125 CYL 1901
01/10/2020 19-1125 CYL 1878
01/10/2020 19-1125 CYL 1914
01/10/2020 19-1125 CYL 1926
01/10/2020 19-1125 CYL 1861
01/10/2020 19-1125 CYL 1759
01/10/2020 19-1125 CYL 1832
01/10/2020 19-1125 CYL 1790
01/13/2020 Letter INSPECTION SUMMARY
01/14/2020 19-1125-dr-32
01/14/2020 19-1125-dr-33
01/14/2020 19-1125-dr-35
01/14/2020 19-1125-dr-34
01/15/2020 Letter INSPECTION SUMMARY
01/16/2020 Letter INSPECTION SUMMARY
01/23/2020 Letter INSPECTION SUMMARY
01/24/2020 19-1125-dr-39
01/24/2020 19-1125-dr-36
01/24/2020 19-1125-dr-37
01/24/2020 19-1125-dr-38
01/24/2020 19-1125-dr-40
01/24/2020 19-1125-dr-30
01/24/2020 19-1125-dr-31
01/24/2020 19-1125-dr-28
01/24/2020 19-1125-dr-22
01/24/2020 19-1125-dr-21
01/24/2020 19-1125-dr-41
01/24/2020 19-1125-dr-42
01/24/2020 19-1125 CYL 1926
01/24/2020 19-1125-dr-23
01/24/2020 19-1125-dr-25
01/24/2020 19-1125-dr-24
01/24/2020 19-1125-dr-29
01/24/2020 19-1125-dr-20
01/24/2020 19-1125 CYL 1948 (Grout)
01/24/2020 Deviation List - 191125
01/24/2020 19-1125 CYL 1949 (Cubes)
01/24/2020 19-1125 CYL 2050
01/24/2020 19-1125 CYL 1926
01/24/2020 19-1125-dr-23
01/24/2020 19-1125-dr-25
01/24/2020 19-1125-dr-24
01/24/2020 19-1125-dr-29
01/24/2020 19-1125-dr-20
01/24/2020 19-1125-dr-26
01/24/2020 19-1125-dr-27
01/27/2020 Letter INSPECTION SUMMARY
01/27/2020 Letter INSPECTION SUMMARY
01/29/2020 Letter INSPECTION SUMMARY
02/04/2020 Letter INSPECTION SUMMARY
02/07/2020 Letter INSPECTION SUMMARY
02/18/2020 Letter INSPECTION SUMMARY
02/18/2020 Letter INSPECTION SUMMARY
02/28/2020 Letter INSPECTION SUMMARY
03/02/2020 Letter INSPECTION SUMMARY
03/02/2020 19-1125-dr-66
03/02/2020 19-1125-dr-65
03/02/2020 19-1125 CYL 102
03/02/2020 19-1125-dr-62
03/02/2020 19-1125 CYL 96
03/02/2020 19-1125 CYL 101
03/02/2020 19-1125 CYL 50 (Grout)
03/02/2020 Deviation List - 191125
03/02/2020 19-1125-dr-63
03/02/2020 19-1125-dr-64
03/02/2020 19-1125-dr-61
03/02/2020 19-1125-dr-61B (Site Pics)
03/02/2020 19-1125-dr-62B (Skidmore)
03/02/2020 19-1125-dr-57
03/02/2020 19-1125-dr-56
03/02/2020 19-1125-dr-55
03/02/2020 19-1125-dr-84
03/02/2020 19-1125 CYL 97
03/02/2020 19-1125 CYL 1948 (Grout)
03/02/2020 19-1125-dr-53
03/02/2020 19-1125 CYL 91
03/02/2020 19-1125 CYL 79
03/02/2020 19-1125 CYL 88
03/02/2020 19-1125 CYL 59
03/02/2020 19-1125 CYL 29
03/02/2020 19-1125-dr-52
03/02/2020 19-1125-dr-54
03/02/2020 19-1125 CYL 1878
03/02/2020 19-1125 CYL 2009
03/02/2020 19-1125 CYL 2050
03/02/2020 19-1125 CYL 64
03/02/2020 19-1125-dr-49
03/02/2020 19-1125-dr-48
03/02/2020 19-1125 CYL 2086
03/02/2020 19-1125 CYL 1811
03/02/2020 19-1125 CYL 1790
03/02/2020 19-1125 CYL 1767
03/02/2020 19-1125 CYL 1914
03/02/2020 19-1125 CYL 1901
03/02/2020 19-1125 CYL 2019
03/02/2020 19-1125 CYL 1861
03/02/2020 19-1125 CYL 1832
03/02/2020 19-1125 CYL 1964
03/02/2020 19-1125 CYL 1949 (Cubes)
03/02/2020 19-1125 CYL 1993
03/02/2020 19-1125-dr-59
03/02/2020 19-1125-dr-58
03/02/2020 19-1125-dr-60
03/02/2020 19-1125-dr-70B (RFI 122)
03/02/2020 19-1125-dr-68
03/02/2020 19-1125-dr-73
03/02/2020 19-1125-dr-67B (Site Pics)
03/02/2020 19-1125-dr-71
03/02/2020 Deviation List - 191125
03/02/2020 19-1125-dr-75
03/02/2020 19-1125-dr-67
03/02/2020 19-1125 CYL 79
03/02/2020 19-1125 CYL 91
03/02/2020 19-1125 CYL 146
03/02/2020 19-1125 CYL 126
03/02/2020 19-1125 CYL 96
03/02/2020 19-1125 CYL 124
03/02/2020 19-1125 CYL 97
03/02/2020 19-1125-dr-74
03/02/2020 19-1125-dr-69
03/02/2020 19-1125-dr-70
03/02/2020 19-1125 CYL 169
03/02/2020 19-1125 CYL 88
03/02/2020 19-1125-dr-80B (Site Pics)
03/02/2020 19-1125-dr-78
03/02/2020 19-1125-dr-76
03/02/2020 19-1125-dr-79
03/02/2020 19-1125-dr-77
03/02/2020 19-1125 CYL 101
03/02/2020 19-1125 CYL 102
03/02/2020 19-1125 CYL 179
03/02/2020 19-1125-dr-80
03/02/2020 19-1125 CYL 201
03/02/2020 19-1125-dr-82
03/02/2020 19-1125-dr-83B
03/02/2020 19-1125-dr-83
03/02/2020 19-1125-dr-81
03/02/2020 19-1125-dr-80
03/02/2020 19-1125 CYL 201
03/02/2020 19-1125-dr-82
03/02/2020 19-1125-dr-83B
03/02/2020 19-1125-dr-83
03/02/2020 19-1125-dr-81
03/05/2020 Letter INSPECTION SUMMARY
03/11/2020 Letter INSPECTION SUMMARY
03/12/2020 Letter INSPECTION SUMMARY
03/12/2020 Letter INSPECTION SUMMARY
03/16/2020 Letter INSPECTION SUMMARY
04/08/2020 Letter INSPECTION SUMMARY
04/30/2020 Letter INSPECTION SUMMARY
04/30/2020 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home