Permit Application Status

PRCOM20192581


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20192581
Building Permit - Commercial
Final Completion
SAINT LUKES EAST HOSPITAL
REPAIR REPLACE UPGRADE
EQUIPMENT REPLACEMENT FOR SAINT LUKES HOSPITAL
09/10/2019
10/10/2019
03/10/2020
11/25/2019
Locations
Contacts
SAINT LUKES EAST HOSPITAL, Address:901 E 104TH ST MAILSTOP 900N  
MCCARTHY BUILDING COMPANIES INC, Address:12851 MANCHESTER RD, Phone:(314) 646-4179  
ACI BOLAND, Address:1421 EAST 104TH ST; SUITE 100, Phone:(816) 763-9600  
P1 CONSTRUCTION LLC, Address:13605 W 96TH TERR, Phone:(913) 529-5000  
SHAW ELECTRIC COMPANY, Address:3600 FULLER, Phone:(816) 921-0033  
P1 CONSTRUCTION LLC, Address:13605 W 96TH TERR, Phone:(913) 529-5000  
Josh Halvorsen - McCarthy Building Companies, Phone:(913) 329-3282  
Reviews
Review Type Outcome Est. Completion Date Completed
Sprinkler Plan Review Released for Construction 10/22/2019
Michael Weissenbach
Misc
Corrective Action Required
10/22/2019

(Action Required) Current annual inspection tag posted on riser.
Licensed Contractors Approved 09/23/2019 10/09/2019
Joe Frogge
LC - General Contractor
Resolved
10/09/2019

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor. 9/19/19 - acknowledged in letter
LC - MEP Subs
Resolved
10/09/2019

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. 9/19/19 - acknowledged in letter
Building Plan Review Approved 09/23/2019 10/09/2019
Joe Frogge
Bldg - Premises identification/address 501.2
Resolved
09/19/2019

2018 IBC 502.1 Address identification. New and existing buildings shall be provided with approved address identification. The address identification shall be legible and placed in a position that is visible from the street or road fronting the property. Address identification characters shall contrast with their background. Address numbers shall be Arabic numbers or alphabetical letters. Numbers shall not be spelled out. Each character shall be a minimum of 4 inches high with a minimum stroke width of ½ inch. Where required by the fire code official, address identification shall be provided in additional approved locations to facilitate emergency response. Where access is by means of a private road and the building address cannot be viewed from the public way, a monument, pole or other approved sign or means shall be used to identify the structure. Address identification shall be maintained. Action required: Address submitted incorrect. Update records to show that this project is at 80 NE Saint Lukes Blvd. (not 100)
Project cost
Resolved
10/09/2019

The project cost, which is used to establish the permit fee, has not been provided. Action required: Comment is for informational purposes. 9/19/19 - acknowledged in letter
Fire Plan Review Approved with Conditions 09/23/2019 09/17/2019
Michael Weissenbach
Construction documents for fire alarm systems
Corrective Action Required
09/16/2019

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. (Informational Purposes) Any modifications to the alarm system, provide three sets of PE stamped shop drawings.
Construction documents - Fire protection systems
Corrective Action Required
09/16/2019

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. (Informational Purposes) Any modifications made to the fire sprinkler system, provide three sets of PE stamped shop drawings.
Installation acceptance testing
Corrective Action Required
09/16/2019

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule testing.
Building Plan Review Rejected 09/12/2019
Joe Frogge
Bldg - Premises identification/address 501.2
Corrective Action Required
09/12/2019

2018 IBC 502.1 Address identification. New and existing buildings shall be provided with approved address identification. The address identification shall be legible and placed in a position that is visible from the street or road fronting the property. Address identification characters shall contrast with their background. Address numbers shall be Arabic numbers or alphabetical letters. Numbers shall not be spelled out. Each character shall be a minimum of 4 inches high with a minimum stroke width of ½ inch. Where required by the fire code official, address identification shall be provided in additional approved locations to facilitate emergency response. Where access is by means of a private road and the building address cannot be viewed from the public way, a monument, pole or other approved sign or means shall be used to identify the structure. Address identification shall be maintained. Action required: Address submitted incorrect. Update records to show that this project is at 80 NE Saint Lukes Blvd. (not 100)
Project cost
Corrective Action Required
09/12/2019

The project cost, which is used to establish the permit fee, has not been provided. Action required: Comment is for informational purposes.
Licensed Contractors Rejected 09/10/2019 09/12/2019
Joe Frogge
LC - General Contractor
Corrective Action Required
09/12/2019

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor.
LC - MEP Subs
Corrective Action Required
09/12/2019

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Fire Plan Review Approved with Conditions 09/12/2019
Michael Weissenbach
Construction documents for fire alarm systems
Corrective Action Required
09/12/2019

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. (Informational Purposes) Any modifications to the alarm system, provide three sets of PE stamped shop drawings.
Construction documents - Fire protection systems
Corrective Action Required
09/12/2019

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. (Informational Purposes) Any modifications made to the fire sprinkler system, provide three sets of PE stamped shop drawings.
Installation acceptance testing
Corrective Action Required
09/12/2019

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule testing.
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for Repair/Replace/Upgrade $1,781.50 $1,781.50 Paid 10/10/2019
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
In-wall Inspection Passed 10/11/2019 at 11:05 AM 10/11/2019
Above Ceiling Inspection Partial 11/11/2019 11/11/2019 at 1:40 PM 11/11/2019
Misc
Partial Correction
11/11/2019
OK TO COVER WHEN READY ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: 1C202A; 1C204;
Above Ceiling Inspection Passed 11/13/2019 11/13/2019 at 8:10 AM 11/13/2019
Misc
Resolved
11/13/2019
OK TO COVER WHEN READY ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: 1C202A; 1C204;
Final Inspection - Commercial Passed 11/25/2019 11/25/2019 at 8:55 AM 11/25/2019
Occupancy Inspection - Fire Passed 11/25/2019
Documents & Images
Date Uploaded File Type Document Name
09/12/2019 Letter Fire Building Plan Review
09/12/2019 Letter DS P/R Corrections Document
09/17/2019 Letter Fire Building Plan Review
10/10/2019 Receipt Receipt for transaction: 2019-006713
10/10/2019 Letter DS Building Permit
10/11/2019 Letter INSPECTION SUMMARY
10/22/2019 Letter Fire (Sprinkler) Plan Review
11/11/2019 Letter INSPECTION SUMMARY
11/13/2019 Letter INSPECTION SUMMARY
11/25/2019 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home