Permit Application Status

PRCOM20192339


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20192339
Building Permit - Commercial
Certificate of Occupancy
LSMOB OWNER LLC
NEW TENANT FINISH
TENANT FINISH FOR MEDICAL OFFICE
08/22/2019
10/28/2019
02/25/2020
01/27/2020
Locations
Contacts
EXCEL CONSTRUCTORS, Address:8041 W 47TH ST , Phone:(913) 261-1000  
EDWARDS MCDOWELL INC, Address:400 E 10TH AVE, Phone:(816) 221-7878  
TEAGUE ELECTRIC CONSTRUCTION INC, Address:12425 W 92ND ST, Phone:(913) 529-4600  
VAUGHAN MECHANICAL INC, Address:4220 NE 34TH , Phone:(816) 453-3400  
GUY GRONBERG ARCHITECTS, Address:113 SE 3RD ST, Phone:(816) 524-0878  
  
LSMOB OWNER LLC, Address:11715 ADMINISTRATION DR STE 200  
Reviews
Review Type Outcome Est. Completion Date Completed
Sprinkler Plan Review Released for Construction 11/11/2019
Michael Weissenbach
Installation acceptance testing
Corrective Action Required
11/11/2019

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Action Required) Call (816)969-1300 to schedule a Hydrostatic Test.
Licensed Contractors Approved 09/12/2019 10/22/2019
Joe Frogge
LC - General Contractor
Resolved
10/22/2019

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor. 9/6/19 - acknowledged in letter
LC - MEP Subs
Resolved
10/22/2019

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. 9/6/19 - acknowledged in letter
Building Plan Review Approved with Conditions 09/12/2019 09/10/2019
Joe Frogge
License Tax Application
Resolved
10/29/2019

A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit. Action required: Comment is for informational purposes. 9/6/19 - acknowledged in letter
Misc
Corrective Action Required
09/05/2019

This permit is associated with an incomplete shell permit. Final occupancy shall not be granted until after construction under the shell permit is completed. Action required: Comment is for informational purposes. 9/6/19 - acknowledged in letter
Suite address
Resolved
09/06/2019

This structure has been assigned one address. All suites/apartments shall be assigned an address by the owner which can be numeric, alphabetic or a combination of both. If the building has multiple stories the suite/apartment number shall start with a number representing the floor on which the unit is located. Action required: Submit proposed suite numbering scenario. First level numbers must begin with 1 and 2nd level numbers must begin with 2.
Bldg - Door swing 1008.1.2
Resolved
09/09/2019

2018 IBC 1010.1.2.1 Direction of Swing. Pivot or side-hinged swinging doors shall swing in the direction of egress travel where serving a room or area containing an occupant load of 50 or more persons or a Group H occupancy. Action required: Revise door swings to comply. Doors in question are 03, 06, 19, 29, 34. (possible others - verify) 9/6/19 - see attached email from arch
Plumb - Minimum number of fixtures 403.1
Resolved
09/06/2019

2018 IPC 403.1 – Minimum number of fixtures. Plumbing fixtures shall be provided in the minimum number shown in Table 403.1, based on the actual use of the building or space. Uses not shown in Table 403.1 shall be considered individually by the code official. The number of occupants shall be determined by the International Building Code. Action required: Provide mop sink. 9/6/19 - provided at building shell common area
Misc
Resolved
09/10/2019

Existing 2 hour shaft wall must be modified in order to provide blocking for grab bars. Action required: Specify repairs. (original design calls for UL 415) 9/6/19 - Sorry for the lack of clarity. This comment was directed at the grab bars in Toilet Room 200.05. 9/10/19 - per architect, the blocking will be installed prior to tenant build-out. shell and tenant contractor are the same
Bldg - Emergency power for illumination 1006.3
Resolved
09/06/2019

2018 IBC 1008.3 – Emergency power for illumination. The power supply for means of egress illumination shall normally be provided by the premises’ electrical supply. 1008.3.1 General. In the event of power supply failure in rooms and spaces that require two or more means of egress, an emergency electrical system shall automatically illuminate all of the following areas: 1. Aisles. 2. Corridors. 3. Exit access stairways and ramps. 1008.3.2 Buildings. In the event of power supply failure in buildings that require two or more means of egress, an emergency electrical system shall automatically illuminate all of the following areas: 1. Interior exit access stairways and ramps. 2. Interior and exterior exit stairways and ramps. 3. Exit passageways. 4. Vestibules and areas on the level of discharge used for exit discharge in accordance with Section 1028.1. 5. Exterior landings as required by Section 1010.1.6 for exit doorways that lead directly to the exit discharge. 1008.3.3 Rooms and Spaces. In the event of power supply failure an emergency electrical system shall automatically illuminate all of the following areas: 1. Electrical equipment rooms. 2. Fire command centers. 3. Fire pump rooms. 4. Generator rooms. 5. Public restrooms with an area greater than 300 square feet. Action required: Provide emergency lighting at exterior (corridor) side of egress doors. 9/6/19 - to be provided by others (at shell?) Field verify.
Fire Plan Review Approved with Conditions 09/12/2019 09/09/2019
Joe Frogge
Construction documents for fire alarm systems
Corrective Action Required
09/05/2019

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. (Action Required) If modifications are made to the alarm system, provide three sets of stamped shop drawings.
Hazardous material identification
Resolved
09/06/2019

2018 IFC 407.3- Identification. Individual containers of hazardous materials, cartons or packages shall be marked or labeled in accordance with applicable federal regulations. Buildings, rooms and spaces containing hazardous materials shall be identified by hazard warning signs in accordance with Section 2703.5. (Action Required) Label all rooms with hazardous materials. X-ray room will need labeling.
Tenant identification
Corrective Action Required
09/05/2019

2018 IFC 403.11.1.5 - Tenant identification. Each occupied tenant space provided with a secondary exit to the exterior or exit corridor shall be provided with tenant identification by business name and/or address. Letters and numbers shall be posted on the corridor side of the door, be plainly legible and shall contrast with their background. (Verified At Inspection) Place signage for the suite on the corridor side leading into the space.
Address numbers required
Corrective Action Required
09/05/2019

2018 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). (Verified At Inspection)
Construction documents - Fire protection systems
Corrective Action Required
09/05/2019

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. (Action Required) If modifcations are made to the sprinkler system, provide three sets of stamped shop drawings.
Installation acceptance testing
Corrective Action Required
09/05/2019

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule testing.
Portable fire extinguishers - conspicuous locations
Corrective Action Required
09/05/2019

2018 IFC 906.5- Conspicuous location. Portable fire extinguishers shall be located in conspicuous locations where they will be readily accessible and immediately available for use. These locations shall be along normal paths of travel, unless the fire code official determines that the hazard posed indicates the need for placement away from normal paths of travel. (Verified At Inspection)
Duct smoke detectors
Resolved
09/06/2019

2018 IFC 907.3.1 Duct smoke detectors. Smoke detectors installed in ducts shall be listed for the air velocity, temperature and humidity present in the duct. Duct smoke detectors shall be connected to the building's fire alarm control unit when a fire alarm system is rquired by Section 907.2. Activation of a duct smoke detector shall initiate a visible and audible supervisory signal at a constantly attended location and shall perform the intended fire safety function in accordance with theis code and the International Mechanical Code. Duct smoke detectors shall not be used as a substitute for required open area detection. (Informational Purposes) Duct detection will be required over 2000 CFM
Door operations
Corrective Action Required
09/05/2019

2018 IFC 1010.1.9 Door operations. Except as specifically permitted by this section, egress doors shall be readily openable from the egress side without the use of a key or special knowledge or effort. (Verified At Inspection)
Direction of swing
Resolved
09/09/2019

2018 IFC 1010.1.2.1 Direction of swing. Doors shall swing in the direction of egress travel where serving a room or area containing an occupant load of 50 or more persons or a Group H occupancy. (Action Required) Change the swing of door 29 to the direction of egress travel.
Building Plan Review Rejected 09/04/2019 08/29/2019
Joe Frogge
License Tax Application
Corrective Action Required
08/29/2019

A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit. Action required: Comment is for informational purposes.
Misc
Corrective Action Required
08/29/2019

This permit is associated with an incomplete shell permit. Final occupancy shall not be granted until after construction under the shell permit is completed. Action required: Comment is for informational purposes.
Suite address
Corrective Action Required
08/29/2019

This structure has been assigned one address. All suites/apartments shall be assigned an address by the owner which can be numeric, alphabetic or a combination of both. If the building has multiple stories the suite/apartment number shall start with a number representing the floor on which the unit is located. Action required: Submit proposed suite numbering scenario. First level numbers must begin with 1 and 2nd level numbers must begin with 2.
Bldg - Door swing 1008.1.2
Corrective Action Required
08/29/2019

2018 IBC 1010.1.2.1 Direction of Swing. Pivot or side-hinged swinging doors shall swing in the direction of egress travel where serving a room or area containing an occupant load of 50 or more persons or a Group H occupancy. Action required: Revise door swings to comply. Doors in question are 03, 06, 19, 29, 34. (possible others - verify)
Plumb - Minimum number of fixtures 403.1
Corrective Action Required
08/29/2019

2018 IPC 403.1 – Minimum number of fixtures. Plumbing fixtures shall be provided in the minimum number shown in Table 403.1, based on the actual use of the building or space. Uses not shown in Table 403.1 shall be considered individually by the code official. The number of occupants shall be determined by the International Building Code. Action required: Provide mop sink.
Misc
Corrective Action Required
08/29/2019

Existing 2 hour shaft wall must be modified in order to provide blocking for grab bars. Action required: Specify repairs. (original design calls for UL 415)
Bldg - Emergency power for illumination 1006.3
Corrective Action Required
08/29/2019

2018 IBC 1008.3 – Emergency power for illumination. The power supply for means of egress illumination shall normally be provided by the premises’ electrical supply. 1008.3.1 General. In the event of power supply failure in rooms and spaces that require two or more means of egress, an emergency electrical system shall automatically illuminate all of the following areas: 1. Aisles. 2. Corridors. 3. Exit access stairways and ramps. 1008.3.2 Buildings. In the event of power supply failure in buildings that require two or more means of egress, an emergency electrical system shall automatically illuminate all of the following areas: 1. Interior exit access stairways and ramps. 2. Interior and exterior exit stairways and ramps. 3. Exit passageways. 4. Vestibules and areas on the level of discharge used for exit discharge in accordance with Section 1028.1. 5. Exterior landings as required by Section 1010.1.6 for exit doorways that lead directly to the exit discharge. 1008.3.3 Rooms and Spaces. In the event of power supply failure an emergency electrical system shall automatically illuminate all of the following areas: 1. Electrical equipment rooms. 2. Fire command centers. 3. Fire pump rooms. 4. Generator rooms. 5. Public restrooms with an area greater than 300 square feet. Action required: Provide emergency lighting at exterior (corridor) side of egress doors.
Licensed Contractors Rejected 09/04/2019 08/29/2019
Joe Frogge
LC - General Contractor
Corrective Action Required
08/29/2019

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor.
LC - MEP Subs
Corrective Action Required
08/29/2019

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Fire Plan Review Rejected 09/04/2019 08/29/2019
Michael Weissenbach
Construction documents for fire alarm systems
Corrective Action Required
08/29/2019

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. (Action Required) If modifications are made to the alarm system, provide three sets of stamped shop drawings.
Hazardous material identification
Corrective Action Required
08/29/2019

2018 IFC 407.3- Identification. Individual containers of hazardous materials, cartons or packages shall be marked or labeled in accordance with applicable federal regulations. Buildings, rooms and spaces containing hazardous materials shall be identified by hazard warning signs in accordance with Section 2703.5. (Action Required) Label all rooms with hazardous materials. X-ray room will need labeling.
Tenant identification
Corrective Action Required
08/29/2019

2018 IFC 403.11.1.5 - Tenant identification. Each occupied tenant space provided with a secondary exit to the exterior or exit corridor shall be provided with tenant identification by business name and/or address. Letters and numbers shall be posted on the corridor side of the door, be plainly legible and shall contrast with their background. (Verified At Inspection) Place signage for the suite on the corridor side leading into the space.
Address numbers required
Corrective Action Required
08/29/2019

2018 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). (Verified At Inspection)
Construction documents - Fire protection systems
Corrective Action Required
08/29/2019

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. (Action Required) If modifcations are made to the sprinkler system, provide three sets of stamped shop drawings.
Installation acceptance testing
Corrective Action Required
08/29/2019

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule testing.
Portable fire extinguishers - conspicuous locations
Corrective Action Required
08/29/2019

2018 IFC 906.5- Conspicuous location. Portable fire extinguishers shall be located in conspicuous locations where they will be readily accessible and immediately available for use. These locations shall be along normal paths of travel, unless the fire code official determines that the hazard posed indicates the need for placement away from normal paths of travel. (Verified At Inspection) Provide two 2A10BC fire extinguishers
Duct smoke detectors
Corrective Action Required
08/29/2019

2018 IFC 907.3.1 Duct smoke detectors. Smoke detectors installed in ducts shall be listed for the air velocity, temperature and humidity present in the duct. Duct smoke detectors shall be connected to the building's fire alarm control unit when a fire alarm system is rquired by Section 907.2. Activation of a duct smoke detector shall initiate a visible and audible supervisory signal at a constantly attended location and shall perform the intended fire safety function in accordance with theis code and the International Mechanical Code. Duct smoke detectors shall not be used as a substitute for required open area detection. (Informational Purposes) Duct detection will be required over 2000 CFM
Door operations
Corrective Action Required
08/29/2019

2018 IFC 1010.1.9 Door operations. Except as specifically permitted by this section, egress doors shall be readily openable from the egress side without the use of a key or special knowledge or effort. (Verified At Inspection)
Direction of swing
Corrective Action Required
08/29/2019

2018 IFC 1010.1.2.1 Direction of swing. Doors shall swing in the direction of egress travel where serving a room or area containing an occupant load of 50 or more persons or a Group H occupancy. (Action Required) Change the swing of the doors to the direction of egress travel.
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for New Tenent Finish $1,984.00 $1,984.00 Paid 10/28/2019
7232302-Commercial License Tax Fee $12,360.00 $12,360.00 Paid 01/21/2020
8331506-EFHB Maybrook, Full $383.49 $383.49 Paid 10/28/2019
8331507-Sewer Connection Fee $270.00 $270.00 Paid 10/28/2019
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
In-wall Inspection Partial 11/7/2019 11/7/2019 at 2:20 PM 11/07/2019
Misc
Partial Correction
11/07/2019
OK TO COVER WHEN READY LIGHT-GAUGE STEEL WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING SPACES: 2ND FLOOR EXCEPT [200.16; 200.33; 200.35; 200.36]; 200.03 E WALL & 200.05 N WALL OK; NOTE: ON FUTURE INSPECTIONS MC MUST BE *SECURELY* FASTENED WITHIN 12" OF BOXES.
In-wall Inspection Partial 11/22/2019 11/22/2019 at 2:30 PM 11/22/2019
Misc
Partial Correction
11/07/2019
OK TO COVER WHEN READY LIGHT-GAUGE STEEL WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING SPACES: 2ND FLOOR OK, EXCEPT [200.16; 200.33; 200.36]
In-wall Inspection Partial 12/3/2019 12/03/2019
Misc
Partial Correction
11/22/2019
OK TO COVER WHEN READY LIGHT-GAUGE STEEL WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING SPACES: 2ND FLOOR OK, EXCEPT [200.16; 200.33]
Above Ceiling Inspection Partial 1/2/2020 01/02/2020
Misc
Informational
01/02/2020
Above ceiling rooms 200.25 & 200.24
In-wall Inspection Partial 1/2/2020 01/02/2020
Misc
Partial Correction
12/03/2019
OK TO COVER WHEN READY LIGHT-GAUGE STEEL WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING SPACES: 2ND FLOOR OK, EXCEPT [200.16; 200.33] 200.16 ok to cover 3 walls & partition wall MH 1/2/20
In-wall Inspection Partial 1/6/2020 01/06/2020
Misc
Partial Correction
01/02/2020
OK TO COVER WHEN READY LIGHT-GAUGE STEEL WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING SPACES: 2ND FLOOR OK, EXCEPT [200.16; 200.33] 200.16 ok to cover 3 walls & partition wall MH 1/2/20
SECOND FLOOR
Corrective Action Required
01/06/2020
OK TO COVER WHEN READY LIGHT-GAUGE STEEL WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING SPACES: 2ND FLOOR OK, EXCEPT [200.16; 200.33] 200.16 ok to cover 3 walls & partition wall MH 1/2/20; 200,05;200.15;200.16 corridor wall HVAC.
Above Ceiling Inspection Partial 1/13/2020 1/13/2020 01/13/2020
Misc
Partial Correction
01/13/2020
ABOVE CEILING OK TO COVER: -RM 200.25 & 200.24; 200.06-15; 200.17-22
Above Ceiling Inspection Partial 1/17/2020 1/17/2020 at 1:20 PM 01/17/2020
Misc
Partial Correction
01/13/2020
ABOVE CEILING OK TO COVER: -RM 200.25 & 200.24; 200.06-15; 200.17-22; 200.35 AND CORRIDOR OUTSIDE
Above Ceiling Inspection Partial 1/21/2020 1/21/2020 01/21/2020
Misc
Partial Correction
01/17/2020
ABOVE CEILING OK TO COVER: -RM 200.25 & 200.24; 200.06-15; 200.16, 200.17-22; 200.35 AND CORRIDOR OUTSIDE **CAULK ALONG SMOKE WALL; VENT DRYER DUCT ABOVE RM 200.23 TO OUTSIDE
Alarm Test Partial 1/22/2020 01/22/2020
Occupancy Inspection - Fire Failed 1/22/2020 01/22/2020
In-wall Inspection Passed 01/22/2020
Misc
Resolved
01/22/2020
OK TO COVER WHEN READY LIGHT-GAUGE STEEL WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING SPACES: 2ND FLOOR OK, EXCEPT [200.16; 200.33] 200.16 ok to cover 3 walls & partition wall MH 1/2/20
SECOND FLOOR
Resolved
01/22/2020
OK TO COVER WHEN READY LIGHT-GAUGE STEEL WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING SPACES: 2ND FLOOR OK, EXCEPT [200.16; 200.33] 200.16 ok to cover 3 walls & partition wall MH 1/2/20; 200,05;200.15;200.16 corridor wall HVAC.
Above Ceiling Inspection Passed 01/22/2020
Misc
Resolved
01/22/2020
ABOVE CEILING OK TO COVER: -RM 200.25 & 200.24; 200.06-15; 200.16, 200.17-22; 200.35 AND CORRIDOR OUTSIDE **CAULK ALONG SMOKE WALL; VENT DRYER DUCT ABOVE RM 200.23 TO OUTSIDE
Occupancy Inspection - Codes Commercial Failed 1/22/2020 1/22/2020 01/22/2020
Misc
Corrective Action Required
01/22/2020
-Approval from Fire required -Resolve condition for shell permit TCO -Reconnect vent line above sterile area -Install strobes above restrooms
Occupancy Inspection - Codes Commercial Full C of O 1/27/2020 1/27/2020 01/27/2020
Misc
Resolved
01/27/2020
-Resolve outstanding deficiencies of shell permit
Documents & Images
Date Uploaded File Type Document Name
08/29/2019 Letter Fire Building Plan Review
08/29/2019 Letter DS P/R Corrections Document
09/06/2019 Letter Fire Building Plan Review
09/09/2019 flex space info
09/09/2019 Letter DS P/R Corrections Document
10/22/2019 Letter License Tax Bill
10/28/2019 Receipt Receipt for transaction: 2019-007045
10/28/2019 Letter DS Building Permit
10/29/2019 SANO Excise Tax Application_10.29.19
11/07/2019 Letter INSPECTION SUMMARY
11/11/2019 Letter Fire (Sprinkler) Plan Review
11/22/2019 Letter INSPECTION SUMMARY
12/03/2019 Letter INSPECTION SUMMARY
01/02/2020 Letter INSPECTION SUMMARY
01/02/2020 Letter INSPECTION SUMMARY
01/06/2020 Letter INSPECTION SUMMARY
01/13/2020 Letter INSPECTION SUMMARY
01/21/2020 Letter INSPECTION SUMMARY
01/21/2020 Receipt Receipt for transaction: 2020-000237
01/22/2020 Letter INSPECTION SUMMARY
01/22/2020 Letter INSPECTION SUMMARY
01/22/2020 Letter INSPECTION SUMMARY
01/22/2020 Letter INSPECTION SUMMARY
01/27/2020 Letter Field Certificate of Occupancy
01/28/2020 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home