Permit Application Status

PRCOM20192051


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20192051
Building Permit - Commercial
Final Completion
RED SUMMIT FAIR LLC
REPAIR REPLACE UPGRADE
INSTALLING OWNER PROVIDED HAND SINK
07/30/2019
07/30/2019
01/29/2020
Locations
Contacts
RED SUMMIT FAIR LLC, Address:1 E WASHINGTON ST STE 300  
B & H PLUMBING LLC, Address:535 SOUTH WALNUT, Phone:(816) 646-7363  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 07/30/2019 07/30/2019
Steve Conrick
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for Repair/Replace/Upgrade $30.00 $30.00 Paid 07/30/2019
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Investigation Inspection Complete 1/26/2020 01/29/2020
Final Plumbing Inspection - Commercial Passed 1/29/2020 at 10:50 AM 01/29/2020
Documents & Images
Date Uploaded File Type Document Name
07/30/2019 Receipt Receipt for transaction: 2019-005168
07/30/2019 Letter DS Building Permit
07/30/2019 Scope of Work DOC073019-07302019143114
07/30/2019 Letter DS Building Permit
12/17/2019 Letter Codes 140 Day Letter
01/29/2020 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home