Review Type |
Outcome |
Est. Completion Date |
Completed |
Licensed Contractors
|
Approved
|
07/26/2019
|
07/30/2019
|
|
Development Center
|
|
LC - MEP Subs
Corrective Action Required
Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt)
No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section.
Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
7/26/19 - acknowledged in letter
|
|
|
Fire Plan Review
|
Approved with Conditions
|
08/02/2019
|
07/26/2019
|
|
Joe Frogge
|
|
Construction documents for fire alarm systems
Corrective Action Required
2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions.
(Action Required)
Any modifications to the alarm system will require three sets of stamped shop drawings.
|
|
Construction documents - Fire protection systems
Corrective Action Required
2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation.
(Action Required)
Any modifications made to the fire sprinkler system will be required to provide three sets of stamped shop drawings.
|
|
Misc
Corrective Action Required
(Informational Purposes)
Maintain fire protection through construction process.
|
|
|
Building Plan Review
|
Approved
|
08/02/2019
|
07/26/2019
|
|
Joe Frogge
|
|
Bldg - Accessibility - Where required 1103.1
2018 IBC 1106.2 Group R-2. Accessible units, Type A units and Type B units shall be provided in Group R-2 occupancies in accordance with Sections 1106.2.1 through 1102.6.2.3.
Action required: Clarify which affected units are supposed to be 'Accessible' or 'Type A'. (Type B assumed for remainder) - This information is required to verify minimum clearnce behind water closets which would be 60" for Accessible units.
7/26/19 - acknowledged in letter - to be handled on campus wide approach and with an agreement to provide as needed
|
|
Miscellaneous Correction
Unit designations on plans are inaccurate.
Action required: Update drawings with actual unit designations. (1022, 2022, & 3022 per JKV staff)
|
|
Miscellaneous Correction
Fire rating clarifications required:
Provide the following:
- Nail/screw patterns for fire rated assemblies.
- Clarify purpose of rating door U15.
- Provide detail for patching of rated exterior wall where perpendicular wall is removed.
7/26/19 - not required
|
|
Accessibility - Turning space 603.2.1
ICC A117.1-2017 Section 1103.3.2 Turning Space. All rooms served by an accessible route shall provide a turning space. (see code for exceptions)
Action required: Provide turning space at new closet in unit currently labelled 203.
7/26/19 - not required
|
|
|
Building Plan Review
|
Rejected
|
07/12/2019
|
07/09/2019
|
|
Joe Frogge
|
|
Bldg - Accessibility - Where required 1103.1
Corrective Action Required
2018 IBC 1106.2 Group R-2. Accessible units, Type A units and Type B units shall be provided in Group R-2 occupancies in accordance with Sections 1106.2.1 through 1102.6.2.3.
Action required: Clarify which affected units are supposed to be 'Accessible' or 'Type A'. (Type B assumed for remainder) - This information is required to verify minimum clearnce behind water closets which would be 60" for Accessible units.
|
|
Miscellaneous Correction
Corrective Action Required
Unit designations on plans are inaccurate.
Action required: Update drawings with actual unit designations. (1022, 2022, & 3022 per JKV staff)
|
|
Miscellaneous Correction
Corrective Action Required
Fire rating clarifications required:
Provide the following:
- Nail/screw patterns for fire rated assemblies.
- Clarify purpose of rating door U15.
- Provide detail for patching of rated exterior wall where perpendicular wall is removed.
|
|
Accessibility - Swinging doors - maneuvering clearance 404.2.3.2
ICC A117.1-2017 Section 404.2.3.2 Swinging Doors and gates. Swinging doors and gates shall have maneuvering clearances complying with Table 404.2.3.2.
Action required: Provide minimum 18" clearance at door into restroom at bottom right of plan. (serving restroom in unit currently labeled 204)
|
|
Accessibility - Turning space 603.2.1
Corrective Action Required
ICC A117.1-2017 Section 1103.3.2 Turning Space. All rooms served by an accessible route shall provide a turning space. (see code for exceptions)
Action required: Provide turning space at new closet in unit currently labelled 203.
|
|
|
Licensed Contractors
|
Rejected
|
|
07/09/2019
|
|
Joe Frogge
|
|
LC - MEP Subs
Corrective Action Required
Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt)
No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section.
Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
|
|
|
Fire Plan Review
|
Approved with Conditions
|
07/12/2019
|
07/03/2019
|
|
Michael Weissenbach
|
|
Construction documents for fire alarm systems
Corrective Action Required
2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions.
(Action Required)
Any modifications to the alarm system will require three sets of stamped shop drawings.
|
|
Construction documents - Fire protection systems
Corrective Action Required
2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation.
(Action Required)
Any modifications made to the fire sprinkler system will be required to provide three sets of stamped shop drawings.
|
|
Misc
Corrective Action Required
(Informational Purposes)
Maintain fire protection through construction process.
|
|
|