Permit Application Status

PRCOM20191736


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20191736
Building Permit - Commercial
Final Completion
JOHN KNOX VILLAGE
ALTERATION COMMERCIAL
ALTERATIONS TO COMBINE TWO APARTMENT UNITS INTO ONE ON EACH OF THREE FLOORS
07/01/2019
07/30/2019
01/05/2020
10/28/2019
Locations
Contacts
HAREN LAUGHLIN RESTORATION COMPANY INC, Address:7700 WEDD ST STE 500, Phone:(913) 971-0500  
SFCS ARCHITECTS, Address:1927 SOUTH TRYON ST, SUITE 207, Phone:(704) 372-7327  
JOHN KNOX VILLAGE, Address:400 NW MURRAY RD  
HENRY MILLER MECHANICAL LLC, Address:6609 ROYAL ST, SUITE 104, Phone:(816) 883-8818  
LIGHTNING ELECTRIC LLC, Address:1009 OWEN MILL RD, Phone:(417) 955-1223  
HENRY MILLER MECHANICAL LLC, Address:6609 ROYAL ST, SUITE 104, Phone:(816) 883-8818  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 07/26/2019 07/30/2019
Development Center
LC - MEP Subs
Corrective Action Required
07/26/2019

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. 7/26/19 - acknowledged in letter
Fire Plan Review Approved with Conditions 08/02/2019 07/26/2019
Joe Frogge
Construction documents for fire alarm systems
Corrective Action Required
07/26/2019

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. (Action Required) Any modifications to the alarm system will require three sets of stamped shop drawings.
Construction documents - Fire protection systems
Corrective Action Required
07/26/2019

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. (Action Required) Any modifications made to the fire sprinkler system will be required to provide three sets of stamped shop drawings.
Misc
Corrective Action Required
07/26/2019

(Informational Purposes) Maintain fire protection through construction process.
Building Plan Review Approved 08/02/2019 07/26/2019
Joe Frogge
Bldg - Accessibility - Where required 1103.1
Resolved
07/26/2019

2018 IBC 1106.2 Group R-2. Accessible units, Type A units and Type B units shall be provided in Group R-2 occupancies in accordance with Sections 1106.2.1 through 1102.6.2.3. Action required: Clarify which affected units are supposed to be 'Accessible' or 'Type A'. (Type B assumed for remainder) - This information is required to verify minimum clearnce behind water closets which would be 60" for Accessible units. 7/26/19 - acknowledged in letter - to be handled on campus wide approach and with an agreement to provide as needed
Miscellaneous Correction
Resolved
07/26/2019

Unit designations on plans are inaccurate. Action required: Update drawings with actual unit designations. (1022, 2022, & 3022 per JKV staff)
Miscellaneous Correction
Resolved
07/26/2019

Fire rating clarifications required: Provide the following: - Nail/screw patterns for fire rated assemblies. - Clarify purpose of rating door U15. - Provide detail for patching of rated exterior wall where perpendicular wall is removed. 7/26/19 - not required
Accessibility - Turning space 603.2.1
Resolved
07/26/2019

ICC A117.1-2017 Section 1103.3.2 Turning Space. All rooms served by an accessible route shall provide a turning space. (see code for exceptions) Action required: Provide turning space at new closet in unit currently labelled 203. 7/26/19 - not required
Building Plan Review Rejected 07/12/2019 07/09/2019
Joe Frogge
Bldg - Accessibility - Where required 1103.1
Corrective Action Required
07/09/2019

2018 IBC 1106.2 Group R-2. Accessible units, Type A units and Type B units shall be provided in Group R-2 occupancies in accordance with Sections 1106.2.1 through 1102.6.2.3. Action required: Clarify which affected units are supposed to be 'Accessible' or 'Type A'. (Type B assumed for remainder) - This information is required to verify minimum clearnce behind water closets which would be 60" for Accessible units.
Miscellaneous Correction
Corrective Action Required
07/09/2019

Unit designations on plans are inaccurate. Action required: Update drawings with actual unit designations. (1022, 2022, & 3022 per JKV staff)
Miscellaneous Correction
Corrective Action Required
07/09/2019

Fire rating clarifications required: Provide the following: - Nail/screw patterns for fire rated assemblies. - Clarify purpose of rating door U15. - Provide detail for patching of rated exterior wall where perpendicular wall is removed.
Accessibility - Swinging doors - maneuvering clearance 404.2.3.2
Resolved
07/24/2019

ICC A117.1-2017 Section 404.2.3.2 Swinging Doors and gates. Swinging doors and gates shall have maneuvering clearances complying with Table 404.2.3.2. Action required: Provide minimum 18" clearance at door into restroom at bottom right of plan. (serving restroom in unit currently labeled 204)
Accessibility - Turning space 603.2.1
Corrective Action Required
07/09/2019

ICC A117.1-2017 Section 1103.3.2 Turning Space. All rooms served by an accessible route shall provide a turning space. (see code for exceptions) Action required: Provide turning space at new closet in unit currently labelled 203.
Licensed Contractors Rejected 07/09/2019
Joe Frogge
LC - MEP Subs
Corrective Action Required
07/09/2019

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Fire Plan Review Approved with Conditions 07/12/2019 07/03/2019
Michael Weissenbach
Construction documents for fire alarm systems
Corrective Action Required
07/03/2019

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. (Action Required) Any modifications to the alarm system will require three sets of stamped shop drawings.
Construction documents - Fire protection systems
Corrective Action Required
07/03/2019

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. (Action Required) Any modifications made to the fire sprinkler system will be required to provide three sets of stamped shop drawings.
Misc
Corrective Action Required
07/03/2019

(Informational Purposes) Maintain fire protection through construction process.
Fees
Paid Fees Amount Paid Owing Date Paid
Valuation Fee for Alteration to Commercial $900.80 $900.80 Paid 07/30/2019
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
All Rough Inspection - Commercial Partial 8/5/2019 8/5/2019 at 7:30 AM 08/05/2019
Misc
Partial Correction
08/05/2019
OK TO COVER WHEN READY WALL FRAMING AND IN-WALL SYSTEMS AT: ATTIC LEVEL AT EAST AND WEST NEW SHEAR WALLS; 3RD FLOOR TO 4' AFF AT EAST AND WEST NEW SHEAR WALLS;
All Rough Inspection - Commercial Partial 8/6/2019 8/6/2019 at 9:05 AM 08/06/2019
Misc
Partial Correction
08/05/2019
OK TO COVER WHEN READY WALL FRAMING AND IN-WALL SYSTEMS AT: 3022: OSB AT ATTIC OK; EAST AND WEST NEW SHEAR WALLS TO BOTTOM PLATE; CLOSET; DEN; LAUNDRY; 2022: LAUN; CLOSET; LR/DEN & LR/KIT DOWN TO 4' AFF;
All Rough Inspection - Commercial Partial 8/7/2019 at 8:05 AM 08/07/2019
Misc
Partial Correction
08/06/2019
OK TO COVER WHEN READY WALL FRAMING AND IN-WALL SYSTEMS AT: 3022: OSB AT ATTIC OK; EAST AND WEST NEW SHEAR WALLS TO BOTTOM PLATE; CLOSET; DEN; LAUNDRY; EAST BR & HALL; 2022: LAUN; CLOSET; LR/DEN & LR/KIT DOWN TO 4' AFF;
All Rough Inspection - Commercial Partial 8/8/2019 at 9:50 AM 08/08/2019
Misc
Partial Correction
08/07/2019
OK TO COVER WHEN READY AT: 3022: WALL FRAMING AND IN-WALL SYSTEMS: EAST AND WEST NEW SHEAR WALLS TO BOTTOM PLATE; CLOSET; DEN; LAUNDRY; EAST BR & HALL OSB SHEATHING: AT ATTIC; AT BOTH NEW SHEAR WALLS FULL HEIGHT 2022: WALL FRAMING AND IN-WALL SYSTEMS AT: LAUN; CLOSET; LR/DEN & LR/KIT DOWN TO 4' AFF; OSB SHEATHING:
All Rough Inspection - Commercial Partial 8/19/2019 08/19/2019
Misc
Partial Correction
08/08/2019
OK TO COVER WHEN READY AT: 3022: WALL FRAMING AND IN-WALL SYSTEMS: EAST AND WEST NEW SHEAR WALLS TO BOTTOM PLATE; CLOSET; DEN; LAUNDRY; EAST BR & HALL OSB SHEATHING: AT ATTIC; AT BOTH NEW SHEAR WALLS FULL HEIGHT 2022: WALL FRAMING AND IN-WALL SYSTEMS AT: LAUN; CLOSET; LR/DEN & LR/KIT DOWN TO FLOOR; BEDROOM/HALL; OSB SHEATHING: AT ATTIC
All Rough Inspection - Commercial Partial 8/21/2019 at 8:55 AM 08/21/2019
Misc
Partial Correction
08/19/2019
OK TO COVER WHEN READY AT: 3022: WALL FRAMING AND IN-WALL SYSTEMS: EAST AND WEST NEW SHEAR WALLS TO BOTTOM PLATE; CLOSET; DEN; LAUNDRY; EAST BR & HALL OSB SHEATHING: AT ATTIC; AT BOTH NEW SHEAR WALLS FULL HEIGHT 2022: WALL FRAMING AND IN-WALL SYSTEMS AT: LAUN; CLOSET; LR/DEN & LR/KIT DOWN TO FLOOR; BEDROOM/HALL; OSB SHEATHING: AT ATTIC
Foundation Inspection - Commercial Passed 9/10/2019 9/11/2019 at 9:25 AM 09/11/2019
All Rough Inspection - Commercial Partial 9/13/2019 9/13/2019 at 1:55 PM 09/13/2019
Misc
Partial Correction
08/21/2019
OK TO COVER WHEN READY AT: 3022: WALL FRAMING AND IN-WALL SYSTEMS: EAST AND WEST NEW SHEAR WALLS TO BOTTOM PLATE; CLOSET; DEN; LAUNDRY; EAST BR & HALL OSB SHEATHING: AT ATTIC; AT BOTH NEW SHEAR WALLS FULL HEIGHT 2022: WALL FRAMING AND IN-WALL SYSTEMS AT: LAUN; CLOSET; LR/DEN & LR/KIT DOWN TO FLOOR; BEDROOM/HALL; BOTH SHEAR WALLS; WEST WALL OF WEST BA; OSB SHEATHING: AT ATTIC
Rough Framing Inspection - Commercial Partial 8/20/2019 8/20/2019 at 10:15 AM 09/17/2019
Misc
Partial Correction
08/20/2019
UNIT 2022: AFTER NAIL PATTERN IS CHECKED AND COMPLETED AT 6" & 12" OK TO COVER BOTH NEW SHEAR WALLS
Rough Framing Inspection - Commercial Partial 9/17/2019 at 7:30 AM 09/17/2019
Misc
Partial Correction
09/17/2019
UNIT 2022: AFTER NAIL PATTERN IS CHECKED AND COMPLETED AT 6" & 12" OK TO COVER BOTH NEW SHEAR WALLS UNIT 1022: OK TO COVER BOTH NEW SHEAR WALLS; DISPOSITION OF HOLD-DOWN AT N END OF EXISTING SHEAR WALL TO BE DETERMINED
All Rough Inspection - Commercial Partial 9/17/2019 9/17/2019 at 7:50 AM 09/17/2019
Misc
Partial Correction
09/13/2019
OK TO COVER WHEN READY AT: 3022: WALL FRAMING AND IN-WALL SYSTEMS: EAST AND WEST NEW SHEAR WALLS TO BOTTOM PLATE; CLOSET; DEN; LAUNDRY; EAST BR & HALL OSB SHEATHING: AT ATTIC; AT BOTH NEW SHEAR WALLS FULL HEIGHT 2022: WALL FRAMING AND IN-WALL SYSTEMS AT: LAUN; CLOSET; LR/DEN & LR/KIT DOWN TO FLOOR; BEDROOM/HALL; BOTH SHEAR WALLS; WEST WALL OF WEST BA; OSB SHEATHING: AT ATTIC 1022: OK TO COVER BOTH NEW SHEAR WALLS; OK TO COVER ALL CEILINGS AND WALLS EXCEPT WALL AT NE CORNER OF N BR (FRAMING & VENT PIPING) AND NE CORNER OF LR; DISPOSITION OF HOLD-DOWN AT N END OF EXISTING SHEAR WALL TO BE DETERMINED
All Rough Inspection - Commercial Passed 9/20/2019 9/20/2019 09/20/2019
Misc
Resolved
09/20/2019
OK TO COVER WHEN READY AT: 3022: WALL FRAMING AND IN-WALL SYSTEMS: EAST AND WEST NEW SHEAR WALLS TO BOTTOM PLATE; CLOSET; DEN; LAUNDRY; EAST BR & HALL OSB SHEATHING: AT ATTIC; AT BOTH NEW SHEAR WALLS FULL HEIGHT 2022: WALL FRAMING AND IN-WALL SYSTEMS AT: LAUN; CLOSET; LR/DEN & LR/KIT DOWN TO FLOOR; BEDROOM/HALL; BOTH SHEAR WALLS; WEST WALL OF WEST BA; OSB SHEATHING: AT ATTIC 1022: OK TO COVER BOTH NEW SHEAR WALLS; OK TO COVER ALL CEILINGS AND WALLS EXCEPT WALL AT NE CORNER OF N BR (FRAMING & VENT PIPING) AND NE CORNER OF LR; DISPOSITION OF HOLD-DOWN AT N END OF EXISTING SHEAR WALL TO BE DETERMINED
Rough Framing Inspection - Commercial Passed 9/17/2019 10/01/2019
Misc
Resolved
10/01/2019
UNIT 2022: AFTER NAIL PATTERN IS CHECKED AND COMPLETED AT 6" & 12" OK TO COVER BOTH NEW SHEAR WALLS UNIT 1022: OK TO COVER BOTH NEW SHEAR WALLS; DISPOSITION OF HOLD-DOWN AT N END OF EXISTING SHEAR WALL TO BE DETERMINED
Final Inspection - Commercial Partial 10/2/2019 10/2/2019 at 9:35 AM 10/02/2019
Misc
Partial Correction
10/02/2019
FOLLOWING MODIFIED UNIT(S) OK FOR OCCUPANCY: 3022 AFTER ELECTRICAL PANEL SCHEDULES ARE UPDATED CORRECTLY AND LEGIBLY;
Occupancy Inspection - Fire Partial 10/2/2019 10/02/2019
Occupancy Inspection - Fire Passed 10/23/2019 10/23/2019
Final Inspection - Commercial Partial 10/23/2019 10/23/2019 at 1:10 PM 10/23/2019
Misc
Partial Correction
10/02/2019
FOLLOWING MODIFIED UNIT(S) OK FOR OCCUPANCY: 3022; 1022; 2022 NOT APPROVED DUE TO ELECTRICAL RECEPTACLE AT EAST BA NOT TRIPPING ON TEST BY TESTING DEVICE.
Final Inspection - Commercial Passed 10/28/2019 10/28/2019 at 10:00 AM 10/28/2019
Misc
Resolved
10/28/2019
FOLLOWING MODIFIED UNIT(S) OK FOR OCCUPANCY: 3022; 1022; 2022 NOT APPROVED DUE TO ELECTRICAL RECEPTACLE AT EAST BA NOT TRIPPING ON TEST BY TESTING DEVICE.
Documents & Images

No documents are currently available for viewing.

Upload Documents
  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:
Browse..





    Portal Home