Permit Application Status

PRCOM20191192


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20191192
Building Permit - Commercial
Final Completion
SAINT LUKES EAST HOSPITAL
ALTERATION COMMERCIAL
DINING ROOM EXPANSION
05/08/2019
06/03/2019
11/10/2019
11/14/2019
Locations
Contacts
SAINT LUKES EAST HOSPITAL, Address:901 E 104TH ST MAILSTOP 900N  
MCCARTHY BUILDING COMPANIES INC, Address:12851 MANCHESTER RD, Phone:(314) 646-4179  
ACI BOLAND, Address:1421 EAST 104TH ST; SUITE 100, Phone:(816) 763-9600  
P1 CONSTRUCTION LLC, Address:13605 W 96TH TERR, Phone:(913) 529-5000  
R F FISHER ELECTRIC COMPANY LLC, Address:5299 DTC BLVD STE 600, Phone:(913) 384-1500  
P1 CONSTRUCTION LLC, Address:13605 W 96TH TERR, Phone:(913) 529-5000  
Reviews
Review Type Outcome Est. Completion Date Completed
Sprinkler Plan Review Released for Construction 07/16/2019
Michael Weissenbach
Licensed Contractors Approved 06/03/2019 06/03/2019
Joe Frogge
Building Plan Review Approved with Conditions 06/10/2019 06/03/2019
Joe Frogge
License Tax Application
Corrective Action Required
06/03/2019

A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit. Action required: Comment is for informational purposes.
Plan Submittal 2012 Codes
Corrective Action Required
06/03/2019

All plans submitted for review on or after April 1, 2019 shall be designed to the requirements of the 2018 International Building Code, 2018 International Mechanical Code, 2018 International Plumbing Code, 2018 International Fuel Gas Code, 2018 International Fire Code, 2017 National Electric Code and the ANSI A117.1-2017 as amended and adopted by the City of Lee’s Summit. Action required: comment is for informational purposes. Plans have been reviewed per and will be inspected per the 2017 ICC/ANSI
Health Dept Inspection
Corrective Action Required
06/03/2019

For the Health Department inspection contact Deb Sees with the Jackson County Public Works Department, Environmental Health Division at (816) 847-7070. Health Department approval is required prior to receiving any type of Occupancy from the City of Lee's Summit. Action required: Comment is for informational purposes.
Bldg - Toilet room wall finish 1210.2.2
Corrective Action Required
06/03/2019

2018 IBC 1209.2 Finish Materials. Walls, Floors and partitions in toilet and bathrooms shall comply with Sections 209.2.1 through 1209.2.4. 1209.2.1 Floors and wall bases. (see code for details) 1209.2.2 Walls and partitions. Walls and partitions with 2 feet of service sinks, urinals and water closets shall have a smooth, hard, nonabsorbent surface, to a height of not less than 4 feet above the floor, and except for structural elements, the materials used in such walls shall be of a type that is not adversely affected by moisture. (See code section for possible exceptions.) 1209.2.3 Showers. (see code for details) 1209.2.4 Waterproof joints. (see code for details) Action required: Wall finish materials at new mop sink specified to match existing. It is our assumption that the existing kitchen wall materials will comply. To be field verified.
Fire Plan Review Approved with Conditions 06/10/2019 06/03/2019
Joe Frogge
Posting of occupant load
Corrective Action Required
06/03/2019

2018 IFC 1004.3- Posting of occupant load. Every room or space that is an assembly occupancy shall have the occupant load of the room or space posted in a conspicuous place, near the main exit or exit access doorway from the room or space. Posted signs shall be of an approved legible permanent design and shall be maintained by the owner or authorized agent. ACTION REQUIRED:(verified at inspection) Post the occupant loads for the flex dining area and the dining area
Tenant identification
Corrective Action Required
06/03/2019

2018 IFC 408.11.2 - Tenant identification. Each occupied tenant space provided with a secondary exit to the exterior or exit corridor shall be provided with tenant identification by business name and/or address. Letters and numbers shall be posted on the corridor side of the door, be plainly legible and shall contrast with their background. ACTION REQUIRED:(verified at inspection) Identify dining areas from the corridor signage shall be readable from the corridor.
Construction documents - Fire protection systems
Corrective Action Required
06/03/2019

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. ACTION REQUIRED:(information purposes) Have the fire sprinkler system contractor provide shop drawings of any modification to be done to the fire sprinkler system.
Installation acceptance testing
Corrective Action Required
06/03/2019

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. ACTION REQUIRED:Inforamtion purposes) If any fire alarm system notification, activation devices are relocated, unhooked, or installed new an acceptance test will be required prior to the final occupancy inspection. Contact the fire department to schedule testing. (816)969-1300
Licensed Contractors Approved 06/03/2019
Joe Frogge
LC - General Contractor
Resolved
06/03/2019

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor.
LC - MEP Subs
Resolved
06/03/2019

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Fire Plan Review Approved with Conditions 05/30/2019
Joe Frogge
Posting of occupant load
Corrective Action Required
05/14/2019

2018 IFC 1004.3- Posting of occupant load. Every room or space that is an assembly occupancy shall have the occupant load of the room or space posted in a conspicuous place, near the main exit or exit access doorway from the room or space. Posted signs shall be of an approved legible permanent design and shall be maintained by the owner or authorized agent. ACTION REQUIRED:(verified at inspection) Post the occupant loads for the flex dining area and the dining area
Tenant identification
Corrective Action Required
05/14/2019

2018 IFC 408.11.2 - Tenant identification. Each occupied tenant space provided with a secondary exit to the exterior or exit corridor shall be provided with tenant identification by business name and/or address. Letters and numbers shall be posted on the corridor side of the door, be plainly legible and shall contrast with their background. ACTION REQUIRED:(verified at inspection) Identify dining areas from the corridor signage shall be readable from the corridor.
Construction documents - Fire protection systems
Corrective Action Required
05/14/2019

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. ACTION REQUIRED:(information purposes) Have the fire sprinkler system contractor provide shop drawings of any modification to be done to the fire sprinkler system.
Installation acceptance testing
Corrective Action Required
05/14/2019

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. ACTION REQUIRED:Inforamtion purposes) If any fire alarm system notification, activation devices are relocated, unhooked, or installed new an acceptance test will be required prior to the final occupancy inspection. Contact the fire department to schedule testing. (816)969-1300
Building Plan Review Approved with Conditions 05/30/2019
Joe Frogge
License Tax Application
Corrective Action Required
05/14/2019

A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit. Action required: Comment is for informational purposes.
Plan Submittal 2012 Codes
Corrective Action Required
05/14/2019

All plans submitted for review on or after April 1, 2019 shall be designed to the requirements of the 2018 International Building Code, 2018 International Mechanical Code, 2018 International Plumbing Code, 2018 International Fuel Gas Code, 2018 International Fire Code, 2017 National Electric Code and the ANSI A117.1-2017 as amended and adopted by the City of Lee’s Summit. Action required: comment is for informational purposes. Plans have been reviewed per and will be inspected per the 2017 ICC/ANSI
Health Dept Review
Resolved
05/30/2019

For the Health Department review contact Deb Sees with the Jackson County Public Works Department, Environmental Services Division, at (816) 847-7070. Health Department approval is required prior to receiving any type of building permit from the City of Lee's Summit. Action required: Comment is for informational purposes.
Health Dept Inspection
Corrective Action Required
05/14/2019

For the Health Department inspection contact Deb Sees with the Jackson County Public Works Department, Environmental Health Division at (816) 847-7070. Health Department approval is required prior to receiving any type of Occupancy from the City of Lee's Summit. Action required: Comment is for informational purposes.
Bldg - Toilet room wall finish 1210.2.2
Corrective Action Required
05/14/2019

2018 IBC 1209.2 Finish Materials. Walls, Floors and partitions in toilet and bathrooms shall comply with Sections 209.2.1 through 1209.2.4. 1209.2.1 Floors and wall bases. (see code for details) 1209.2.2 Walls and partitions. Walls and partitions with 2 feet of service sinks, urinals and water closets shall have a smooth, hard, nonabsorbent surface, to a height of not less than 4 feet above the floor, and except for structural elements, the materials used in such walls shall be of a type that is not adversely affected by moisture. (See code section for possible exceptions.) 1209.2.3 Showers. (see code for details) 1209.2.4 Waterproof joints. (see code for details) Action required: Wall finish materials at new mop sink specified to match existing. It is our assumption that the existing kitchen wall materials will comply. To be field verified.
Health Department Review Approved 05/30/2019
Joe Frogge
Building Plan Review Rejected 05/20/2019 05/14/2019
Joe Frogge
License Tax Application
Corrective Action Required
05/14/2019

A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit. Action required: Comment is for informational purposes.
Plan Submittal 2012 Codes
Corrective Action Required
05/14/2019

All plans submitted for review on or after April 1, 2019 shall be designed to the requirements of the 2018 International Building Code, 2018 International Mechanical Code, 2018 International Plumbing Code, 2018 International Fuel Gas Code, 2018 International Fire Code, 2017 National Electric Code and the ANSI A117.1-2017 as amended and adopted by the City of Lee’s Summit. Action required: comment is for informational purposes. Plans have been reviewed per and will be inspected per the 2017 ICC/ANSI
Health Dept Review
Corrective Action Required
05/14/2019

For the Health Department review contact Deb Sees with the Jackson County Public Works Department, Environmental Services Division, at (816) 847-7070. Health Department approval is required prior to receiving any type of building permit from the City of Lee's Summit. Action required: Comment is for informational purposes.
Health Dept Inspection
Corrective Action Required
05/14/2019

For the Health Department inspection contact Deb Sees with the Jackson County Public Works Department, Environmental Health Division at (816) 847-7070. Health Department approval is required prior to receiving any type of Occupancy from the City of Lee's Summit. Action required: Comment is for informational purposes.
Bldg - Toilet room wall finish 1210.2.2
Corrective Action Required
05/14/2019

2018 IBC 1209.2 Finish Materials. Walls, Floors and partitions in toilet and bathrooms shall comply with Sections 209.2.1 through 1209.2.4. 1209.2.1 Floors and wall bases. (see code for details) 1209.2.2 Walls and partitions. Walls and partitions with 2 feet of service sinks, urinals and water closets shall have a smooth, hard, nonabsorbent surface, to a height of not less than 4 feet above the floor, and except for structural elements, the materials used in such walls shall be of a type that is not adversely affected by moisture. (See code section for possible exceptions.) 1209.2.3 Showers. (see code for details) 1209.2.4 Waterproof joints. (see code for details) Action required: Wall finish materials at new mop sink specified to match existing. It is our assumption that the existing kitchen wall materials will comply. To be field verified.
Fire Plan Review Approved with Conditions 05/20/2019 05/13/2019
Joe Frogge
Posting of occupant load
Corrective Action Required
05/13/2019

2018 IFC 1004.3- Posting of occupant load. Every room or space that is an assembly occupancy shall have the occupant load of the room or space posted in a conspicuous place, near the main exit or exit access doorway from the room or space. Posted signs shall be of an approved legible permanent design and shall be maintained by the owner or authorized agent. ACTION REQUIRED:(verified at inspection) Post the occupant loads for the flex dining area and the dining area
Tenant identification
Corrective Action Required
05/13/2019

2018 IFC 408.11.2 - Tenant identification. Each occupied tenant space provided with a secondary exit to the exterior or exit corridor shall be provided with tenant identification by business name and/or address. Letters and numbers shall be posted on the corridor side of the door, be plainly legible and shall contrast with their background. ACTION REQUIRED:(verified at inspection) Identify dining areas from the corridor signage shall be readable from the corridor.
Construction documents - Fire protection systems
Corrective Action Required
05/13/2019

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. ACTION REQUIRED:(information purposes) Have the fire sprinkler system contractor provide shop drawings of any modification to be done to the fire sprinkler system.
Installation acceptance testing
Corrective Action Required
05/13/2019

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. ACTION REQUIRED:Inforamtion purposes) If any fire alarm system notification, activation devices are relocated, unhooked, or installed new an acceptance test will be required prior to the final occupancy inspection. Contact the fire department to schedule testing. (816)969-1300
Fire Plan Review Approved with Conditions 05/20/2019 05/10/2019
Joe Dir
Posting of occupant load
Corrective Action Required
05/10/2019

2018 IFC 1004.3- Posting of occupant load. Every room or space that is an assembly occupancy shall have the occupant load of the room or space posted in a conspicuous place, near the main exit or exit access doorway from the room or space. Posted signs shall be of an approved legible permanent design and shall be maintained by the owner or authorized agent. ACTION REQUIRED:(verified at inspection) Post the occupant loads for the flex dining area and the dining area
Tenant identification
Corrective Action Required
05/10/2019

2018 IFC 408.11.2 - Tenant identification. Each occupied tenant space provided with a secondary exit to the exterior or exit corridor shall be provided with tenant identification by business name and/or address. Letters and numbers shall be posted on the corridor side of the door, be plainly legible and shall contrast with their background. ACTION REQUIRED:(verified at inspection) Identify dining areas from the corridor signage shall be readable from the corridor.
Construction documents - Fire protection systems
Corrective Action Required
05/10/2019

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. ACTION REQUIRED:(information purposes) Have the fire sprinkler system contractor provide shop drawings of any modification to be done to the fire sprinkler system.
Installation acceptance testing
Corrective Action Required
05/10/2019

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. ACTION REQUIRED:Inforamtion purposes) If any fire alarm system notification, activation devices are relocated, unhooked, or installed new an acceptance test will be required prior to the final occupancy inspection. Contact the fire department to schedule testing. (816)969-1300
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for Alteration to Commercial $2,532.44 $2,532.44 Paid 06/03/2019
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
In-wall Inspection Partial 7/9/2019 7/9/2019 at 9:55 AM 07/09/2019
Misc
Partial Correction
07/09/2019
OK TO COVER WHEN READY LIGHT-GAUGE STEEL WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING SPACES: NEW AND MODIFIED WALLS AT PHASE 1 AREA;
Above Ceiling Inspection Partial 7/17/2019 7/17/2019 at 7:15 AM 07/17/2019
Misc
Partial Correction
07/17/2019
OK TO COVER WHEN READY CEILING FRAMING AND ABOVE-CEILING SYSTEMS AT: VESTIBULES AT CORRIDOR AT DOOR OPENINGS 1A017.1 & 1A017.2;
In-wall Inspection Partial 7/17/2019 at 7:45 AM 07/17/2019
Misc
Partial Correction
07/09/2019
OK TO COVER WHEN READY LIGHT-GAUGE STEEL WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING SPACES: NEW AND MODIFIED WALLS AT PHASE 1 AREA; DOOR OPENING 1A017.3
Above Ceiling Inspection Partial 7/23/2019 7/23/2019 at 9:25 AM 07/23/2019
Misc
Partial Correction
07/17/2019
OK TO COVER WHEN READY CEILING FRAMING AND ABOVE-CEILING SYSTEMS AT: VESTIBULES AT CORRIDOR AT DOOR OPENINGS 1A017.1 & 1A017.2;
Above Ceiling Inspection Partial 7/23/2019 at 1:35 PM 07/23/2019
Misc
Partial Correction
07/23/2019
OK TO COVER WHEN READY CEILING FRAMING AND ABOVE-CEILING SYSTEMS AT: VESTIBULES AT CORRIDOR AT DOOR OPENINGS 1A017.1 & 1A017.2; SPACE 1A017 COMPLETE;
Miscellaneous Inspection Partial 7/24/2019 at 1:55 PM 07/24/2019
Alarm Test Partial 8/8/2019 08/08/2019
Occupancy Inspection - Fire Partial 8/8/2019 08/08/2019
Final Inspection - Commercial Failed 8/8/2019 8/8/2019 at 10:30 AM 08/08/2019
Final Inspection - Commercial Partial 8/8/2019 at 11:35 AM 08/08/2019
Misc
Partial Correction
08/08/2019
PHASES 1&2 AREAS 1A017 & 1A022A SUBSTANTIALLY COMPLETED. CASEWORK INSTALLATION IN PROGRESS. BACKFLOW PROTECTION REQUIRED FOR SOFT DRINK EQUIPMENT
In-wall Inspection Partial 9/10/2019 9/10/2019 at 10:55 AM 09/10/2019
Misc
Partial Correction
07/17/2019
OK TO COVER WHEN READY LIGHT-GAUGE STEEL WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING SPACES: NEW AND MODIFIED WALLS AT PHASE 1 AREA; DOOR OPENING 1A017.3; OK TO ONE-SIDE WALL AT 1A020 EAST
In-wall Inspection Partial 9/13/2019 9/13/2019 at 1:15 PM 09/13/2019
Misc
Partial Correction
09/10/2019
OK TO COVER WHEN READY LIGHT-GAUGE STEEL WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING SPACES: NEW AND MODIFIED WALLS AT PHASE 1 AREA; DOOR OPENING 1A017.3; WALL AT 1A020 EAST;
Above Ceiling Inspection Passed 10/10/2019 10/10/2019 at 9:50 AM 10/10/2019
Misc
Resolved
10/10/2019
OK TO COVER WHEN READY CEILING FRAMING AND ABOVE-CEILING SYSTEMS AT: VESTIBULES AT CORRIDOR AT DOOR OPENINGS 1A017.1 & 1A017.2; SPACE 1A017 COMPLETE;
Final Inspection - Commercial Partial 10/18/2019 10/18/2019 at 10:55 AM 10/18/2019
Misc
Corrective Action Required
10/18/2019
BACKFLOW PROTECTION REQUIRED AT ALL EQUIPMENT PIPED WITH POTABLE WATER FOR CONSUMPTION.
Misc
Corrective Action Required
10/18/2019
OBTAIN FIRE DEPARTMENT APPROVAL
Misc
Partial Correction
10/18/2019
OCCUPANCY STATUS: OK TO SET UP FOR BUSINESS. STAFFING, TRAINING, FIXTURING, STOCKING OK. NO PUBLIC/CUSTOMERS PRIOR TO APPROVAL.
Alarm Test Passed 10/18/2019 10/18/2019
Occupancy Inspection - Fire Passed 10/18/2019 10/18/2019
Final Inspection - Commercial Passed 11/5/2019 11/5/2019 at 8:00 AM 11/05/2019
Misc
Resolved
11/05/2019
BACKFLOW PROTECTION REQUIRED AT ALL EQUIPMENT PIPED WITH POTABLE WATER FOR CONSUMPTION.
Misc
Resolved
11/05/2019
OBTAIN FIRE DEPARTMENT APPROVAL
Misc
Resolved
11/05/2019
OCCUPANCY STATUS: OK TO SET UP FOR BUSINESS. STAFFING, TRAINING, FIXTURING, STOCKING OK. NO PUBLIC/CUSTOMERS PRIOR TO APPROVAL.
Documents & Images
Date Uploaded File Type Document Name
05/09/2019 Letter License Tax Not Applicable
05/09/2019 Letter License Tax Not Applicable
05/10/2019 Letter Fire Building Plan Review
05/14/2019 Letter DS P/R Corrections Document
06/03/2019 Letter Codes Plan Review Conditions
06/03/2019 Receipt Receipt for transaction: 2019-003174
06/03/2019 Letter Codes Building Permit
07/09/2019 Letter INSPECTION SUMMARY
07/16/2019 Letter Fire (Sprinkler) Plan Review
07/17/2019 Letter INSPECTION SUMMARY
07/17/2019 Letter INSPECTION SUMMARY
07/23/2019 Letter INSPECTION SUMMARY
08/08/2019 Letter INSPECTION SUMMARY
09/10/2019 Letter INSPECTION SUMMARY
09/13/2019 Letter INSPECTION SUMMARY
10/10/2019 Letter INSPECTION SUMMARY
10/18/2019 Letter INSPECTION SUMMARY
11/05/2019 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home