Permit Application Status

PRCOM20191173


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20191173
Building Permit - Commercial
Final Completion
LANGSFORD DEVELOPMENT INC
REPAIR REPLACE UPGRADE
INSTALLING THREE OUTLETS
05/07/2019
05/07/2019
05/09/2019
Locations
Contacts
LANGSFORD DEVELOPMENT INC, Address:616 SW 3RD ST  
PACT CONSTRUCTION SERVICES, Address:1280 NE DELTA SCHOOL RD, Phone:(816) 287-3030  
SUBURBAN ELECTRIC , Address:PO BOX 275, Phone:(816) 517-6739  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 05/07/2019 05/07/2019
Development Center
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for Repair/Replace/Upgrade $30.00 $30.00 Paid 05/07/2019
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
In-wall Inspection Failed 5/8/2019 5/8/2019 05/08/2019
Misc
Corrective Action Required
05/08/2019
NO ACCESS OR LOCK BOX PROVIDED FOR INSPECTION.
Investigation Inspection Complete 05/08/2019
Final Electrical Inspection - Commercial Passed 5/9/2019 05/09/2019
Documents & Images
Date Uploaded File Type Document Name
05/07/2019 Receipt Receipt for transaction: 2019-001798
05/07/2019 Letter Codes Building Permit
05/08/2019 Letter INSPECTION SUMMARY
05/08/2019 Scope of Work DOC050819-05082019131234
05/09/2019 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home