Permit Application Status

PRCOM20191159


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20191159
Building Permit - Commercial
Certificate of Occupancy
CITY OF LEES SUMMIT
NEW COMMERCIAL
WAVE POOL AND EQUIPMENT BUILDING WITH RESTROOMS ADDITION TO EXISTING WATER PARK
05/06/2019
10/03/2019
01/22/2020
12/16/2020
Locations
Contacts
CITY OF LEES SUMMIT, Address:PO BOX 1600  
KIMLEY-HORN, Address:13455 NOEL RD, GALLERIA TOWER TWO, Phone:(469) 914-8722  
B DEAN CONSTRUCTION LLC, Address:2401 SW US HIGHWAY 40 STE B, Phone:(816) 795-3733  
YATES ELECTRIC CO INC, Address:1401 BURLINGTON C, Phone:(816) 421-8343  
F & G MECHANICAL SERVICES INC, Address:17219 BEL RAY PLACE, Phone:(816) 322-0810  
MAYES PLUMBING INC, Address:501 S MCCLEARY RD STE A, Phone:(816) 792-5400  
Reviews
Review Type Outcome Est. Completion Date Completed
Health Department Review Approved 09/10/2019
Joe Frogge
Licensed Contractors Approved 08/07/2019 09/06/2019
Joe Frogge
LC - General Contractor
Resolved
08/08/2019

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor. 6/18/19 - acknowledged in letter
LC - MEP Subs
Resolved
09/06/2019

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. 6/18/19 - acknowledged in letter
Final Development Plan Review Approved 08/14/2019
Joe Frogge
Building Plan Review Approved with Conditions 08/07/2019 08/08/2019
Joe Frogge
Final Development Plan
Resolved
08/14/2019

The building permit for this project can not be issued until the Codes Administration Department has received the approved Final Development Plan from the Planning and Development Department. Action required: Comment is for informational purposes. 6/18/19 - acknowledged in letter
Health Dept Review
Resolved
09/10/2019

For the Health Department review contact Deb Sees with the Jackson County Public Works Department, Environmental Services Division, at (816) 847-7070. Health Department approval is required prior to receiving any type of building permit from the City of Lee's Summit. Action required: Comment is for informational purposes. 6/18/19 - acknowledged in letter
Health Dept Inspection
Corrective Action Required
08/04/2019

For the Health Department inspection contact Deb Sees with the Jackson County Public Works Department, Environmental Health Division at (816) 847-7070. Health Department approval is required prior to receiving any type of Occupancy from the City of Lee's Summit. Action required: Comment is for informational purposes. 6/18/19 - acknowledged in letter
Engineered truss package
Corrective Action Required
08/04/2019

Copies of the engineered shade structures and roof truss packages were not provided at the time of permit application. Action required: Provide designs or request deferral. 6/18/19 - deferred per request
NEC - Spaces about electrical equipment 110.26
Corrective Action Required
08/04/2019

2017 NEC Article 110.26 Spaces About Electrical Equipment. Access and working space shall be provided and maintained about all electrical equipment to permit ready and safe operation and maintenance of such equipment. (see code for details) Action required: Maintain minimum clearances at electrical equipment. To be field verified. 6/18/19 - acknowledged in letter - to be field verified
Miscellaneous Correction
Resolved
08/08/2019

2018 IPC 605.4 Water service pipe. Water service pipe and tubing shall conform to NSF 61 and shall conform to one of the standards listed in Table 605.3. (see code for additional requirements. 2018 IPC 605.4 Water distribution pipe. Water distribution pipe shall conform to NSF 61 and shall conform to one of the standards listed in Table 605.4. Hot water distribution pipe and tubing shall have a pressure rating of not less than 100 psi at 180degF. 2018 IPC 702.1 Above-ground sanitary drainage and vent pipe. Above-ground soil, waste and vent pipe shall conform to one of the standards listed in Table 702.1 2018 IPC 702.2 Underground building sanitary drainage and vent pipe. Underground building sanitary drainage and vent pipe shall conform to one of the standards listed in Table 702.2. Action required: Provide pipe material schedule. 6/18/19 - not addressed. 7/26/19 - directed to spec that we still do not have 8/6/19 - Section of spec provided does not address materials.
Fire Plan Review Approved with Conditions 08/09/2019 08/04/2019
Joe Frogge
Miscellaneous Correction
Corrective Action Required
08/04/2019

2018 IFC 1004.3- Posting of occupant load. Every room or space that is an assembly occupancy shall have the occupant load of the room or space posted in a conspicuous place, near the main exit or exit access doorway from the room or space. Posted signs shall be of an approved legible permanent design and shall be maintained by the owner or authorized agent. ACTION REQUIRED:(verified at inspection) Provide an occupant load for the wave pool area and post the occupant load at the entrances
Miscellaneous Correction
Corrective Action Required
08/04/2019

2018 IFC 1010.1.10 Panic and fire exit hardware. Doors serving a Group H occupancy and doors serving rooms or spaces with an occupant load of 50 or more in a Group A or E occupancy shall not be provided with a latch or lock unless it is a panic hardware or fire exit hardware. ACTION REQUIRED:(verified at inspection) Panic hardware to be placed on all single gates exits
Miscellaneous Correction
Corrective Action Required
08/04/2019

2018 IFC 1010.1.2.1 Direction of swing. Doors shall swing in the direction of egress travel where serving a room or area containing an occupant load of 50 or more persons or a Group H occupancy. ACTION REQUIRED:(verified at inspection) All of the exits gates shall swing in the direction of egress travel.
Miscellaneous Correction
Corrective Action Required
08/04/2019

2018 IFC 407.2- Material Safety Data Sheets. Material Safety Data Sheets (MSDS) for all hazardous materials shall be readily available on the premises. ACTION REQUIRED:(information purposes) Safety data sheets shall be maintained of all pool cleaning chemicals that are used and or stored on site. The data sheets shall be on site and in a accessable location.
Miscellaneous Correction
Corrective Action Required
08/04/2019

2018 IFC 407.3- Identification. Individual containers of hazardous materials, cartons or packages shall be marked or labeled in accordance with applicable federal regulations. Buildings, rooms and spaces containing hazardous materials shall be identified by hazard warning signs in accordance with Section 2703.5. ACTION REQUIRED:(verified at inspection) All pool rooms and chemical rooms storing or utilizing acids, chlorines or other pool chemicals shall be properly placarded with NFPA 704 placards with the proper MSDS hazard ratings of the chemicals on the placards.
Miscellaneous Correction
Corrective Action Required
08/04/2019

GATES ACTION REQUIRED:(information purposes) [B] 1008.2 Gates. Gates serving the means of egress system shall comply with the requirements of this section. Gates used as a component in a means of egress shall conform to the applicable requirements for doors.
Fire Plan Review Approved with Conditions 08/02/2019 07/31/2019
Michael Weissenbach
Miscellaneous Correction
Corrective Action Required
07/31/2019

2018 IFC 1004.3- Posting of occupant load. Every room or space that is an assembly occupancy shall have the occupant load of the room or space posted in a conspicuous place, near the main exit or exit access doorway from the room or space. Posted signs shall be of an approved legible permanent design and shall be maintained by the owner or authorized agent. ACTION REQUIRED:(verified at inspection) Provide an occupant load for the wave pool area and post the occupant load at the entrances
Miscellaneous Correction
Corrective Action Required
07/31/2019

2018 IFC 1010.1.10 Panic and fire exit hardware. Doors serving a Group H occupancy and doors serving rooms or spaces with an occupant load of 50 or more in a Group A or E occupancy shall not be provided with a latch or lock unless it is a panic hardware or fire exit hardware. ACTION REQUIRED:(verified at inspection) Panic hardware to be placed on all single gates exits
Miscellaneous Correction
Corrective Action Required
07/31/2019

2018 IFC 1010.1.2.1 Direction of swing. Doors shall swing in the direction of egress travel where serving a room or area containing an occupant load of 50 or more persons or a Group H occupancy. ACTION REQUIRED:(verified at inspection) All of the exits gates shall swing in the direction of egress travel.
Miscellaneous Correction
Corrective Action Required
07/31/2019

2018 IFC 407.2- Material Safety Data Sheets. Material Safety Data Sheets (MSDS) for all hazardous materials shall be readily available on the premises. ACTION REQUIRED:(information purposes) Safety data sheets shall be maintained of all pool cleaning chemicals that are used and or stored on site. The data sheets shall be on site and in a accessable location.
Miscellaneous Correction
Corrective Action Required
07/31/2019

2018 IFC 407.3- Identification. Individual containers of hazardous materials, cartons or packages shall be marked or labeled in accordance with applicable federal regulations. Buildings, rooms and spaces containing hazardous materials shall be identified by hazard warning signs in accordance with Section 2703.5. ACTION REQUIRED:(verified at inspection) All pool rooms and chemical rooms storing or utilizing acids, chlorines or other pool chemicals shall be properly placarded with NFPA 704 placards with the proper MSDS hazard ratings of the chemicals on the placards.
Miscellaneous Correction
Corrective Action Required
07/31/2019

GATES ACTION REQUIRED:(information purposes) [B] 1008.2 Gates. Gates serving the means of egress system shall comply with the requirements of this section. Gates used as a component in a means of egress shall conform to the applicable requirements for doors.
Fire Plan Review Approved with Conditions 08/02/2019 07/26/2019
Joe Frogge
Miscellaneous Correction
Corrective Action Required
07/26/2019

2018 IFC 1004.3- Posting of occupant load. Every room or space that is an assembly occupancy shall have the occupant load of the room or space posted in a conspicuous place, near the main exit or exit access doorway from the room or space. Posted signs shall be of an approved legible permanent design and shall be maintained by the owner or authorized agent. ACTION REQUIRED:(verified at inspection) Provide an occupant load for the wave pool area and post the occupant load at the entrances
Miscellaneous Correction
Corrective Action Required
07/26/2019

2018 IFC 1010.1.10 Panic and fire exit hardware. Doors serving a Group H occupancy and doors serving rooms or spaces with an occupant load of 50 or more in a Group A or E occupancy shall not be provided with a latch or lock unless it is a panic hardware or fire exit hardware. ACTION REQUIRED:(verified at inspection) Panic hardware to be placed on all single gates exits
Miscellaneous Correction
Corrective Action Required
07/26/2019

2018 IFC 1010.1.2.1 Direction of swing. Doors shall swing in the direction of egress travel where serving a room or area containing an occupant load of 50 or more persons or a Group H occupancy. ACTION REQUIRED:(verified at inspection) All of the exits gates shall swing in the direction of egress travel.
Miscellaneous Correction
Corrective Action Required
07/26/2019

2018 IFC 407.2- Material Safety Data Sheets. Material Safety Data Sheets (MSDS) for all hazardous materials shall be readily available on the premises. ACTION REQUIRED:(information purposes) Safety data sheets shall be maintained of all pool cleaning chemicals that are used and or stored on site. The data sheets shall be on site and in a accessable location.
Miscellaneous Correction
Corrective Action Required
07/26/2019

2018 IFC 407.3- Identification. Individual containers of hazardous materials, cartons or packages shall be marked or labeled in accordance with applicable federal regulations. Buildings, rooms and spaces containing hazardous materials shall be identified by hazard warning signs in accordance with Section 2703.5. ACTION REQUIRED:(verified at inspection) All pool rooms and chemical rooms storing or utilizing acids, chlorines or other pool chemicals shall be properly placarded with NFPA 704 placards with the proper MSDS hazard ratings of the chemicals on the placards.
Miscellaneous Correction
Corrective Action Required
07/26/2019

GATES ACTION REQUIRED:(information purposes) [B] 1008.2 Gates. Gates serving the means of egress system shall comply with the requirements of this section. Gates used as a component in a means of egress shall conform to the applicable requirements for doors.
Building Plan Review Rejected 08/02/2019 07/26/2019
Joe Frogge
Final Development Plan
Corrective Action Required
07/26/2019

The building permit for this project can not be issued until the Codes Administration Department has received the approved Final Development Plan from the Planning and Development Department. Action required: Comment is for informational purposes. 6/18/19 - acknowledged in letter
Health Dept Review
Corrective Action Required
07/26/2019

For the Health Department review contact Deb Sees with the Jackson County Public Works Department, Environmental Services Division, at (816) 847-7070. Health Department approval is required prior to receiving any type of building permit from the City of Lee's Summit. Action required: Comment is for informational purposes. 6/18/19 - acknowledged in letter
Health Dept Inspection
Corrective Action Required
07/26/2019

For the Health Department inspection contact Deb Sees with the Jackson County Public Works Department, Environmental Health Division at (816) 847-7070. Health Department approval is required prior to receiving any type of Occupancy from the City of Lee's Summit. Action required: Comment is for informational purposes. 6/18/19 - acknowledged in letter
Engineered truss package
Corrective Action Required
07/26/2019

Copies of the engineered shade structures and roof truss packages were not provided at the time of permit application. Action required: Provide designs or request deferral. 6/18/19 - deferred per request
NEC - Spaces about electrical equipment 110.26
Corrective Action Required
07/26/2019

2017 NEC Article 110.26 Spaces About Electrical Equipment. Access and working space shall be provided and maintained about all electrical equipment to permit ready and safe operation and maintenance of such equipment. (see code for details) Action required: Maintain minimum clearances at electrical equipment. To be field verified. 6/18/19 - acknowledged in letter - to be field verified
Miscellaneous Correction
Corrective Action Required
07/26/2019

2018 IPC 605.4 Water service pipe. Water service pipe and tubing shall conform to NSF 61 and shall conform to one of the standards listed in Table 605.3. (see code for additional requirements. 2018 IPC 605.4 Water distribution pipe. Water distribution pipe shall conform to NSF 61 and shall conform to one of the standards listed in Table 605.4. Hot water distribution pipe and tubing shall have a pressure rating of not less than 100 psi at 180degF. 2018 IPC 702.1 Above-ground sanitary drainage and vent pipe. Above-ground soil, waste and vent pipe shall conform to one of the standards listed in Table 702.1 2018 IPC 702.2 Underground building sanitary drainage and vent pipe. Underground building sanitary drainage and vent pipe shall conform to one of the standards listed in Table 702.2. Action required: Provide pipe material schedule. 6/18/19 - not addressed. 7/26/19 - directed to spec that we still do not have
Miscellaneous Correction
Resolved
07/26/2019

2018 IPC 608.1 General. A potable water supply system shall be designed, installed and maintained in such a manner so as to prevent contamination from nonpotable liquids, solids or gases being introduced into the potable water supply through cross-connections or any other piping connections to the system. Backflow preventer applications shall conform to Table 608.1, except as specifically stated in Sections 608.2 through 608.17.10. Action required: Provide backflow prevention device at water service entry to building. Device to be RPZ type compliant with 608.14.2 6/18/19 - not addressed.
Licensed Contractors Rejected 07/26/2019 07/26/2019
Joe Frogge
LC - General Contractor
Corrective Action Required
07/26/2019

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor. 6/18/19 - acknowledged in letter
LC - MEP Subs
Corrective Action Required
07/26/2019

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. 6/18/19 - acknowledged in letter
Building Plan Review Rejected 06/18/2019
Joe Frogge
Final Development Plan
Corrective Action Required
06/03/2019

The building permit for this project can not be issued until the Codes Administration Department has received the approved Final Development Plan from the Planning and Development Department. Action required: Comment is for informational purposes. 6/18/19 - acknowledged in letter
Health Dept Review
Corrective Action Required
06/03/2019

For the Health Department review contact Deb Sees with the Jackson County Public Works Department, Environmental Services Division, at (816) 847-7070. Health Department approval is required prior to receiving any type of building permit from the City of Lee's Summit. Action required: Comment is for informational purposes. 6/18/19 - acknowledged in letter
Health Dept Inspection
Corrective Action Required
06/03/2019

For the Health Department inspection contact Deb Sees with the Jackson County Public Works Department, Environmental Health Division at (816) 847-7070. Health Department approval is required prior to receiving any type of Occupancy from the City of Lee's Summit. Action required: Comment is for informational purposes. 6/18/19 - acknowledged in letter
Project cost
Resolved
06/19/2019

The project cost, which is used to establish the permit fee, has not been provided. Action required: Comment is for informational purposes. 6/18/19 - not addressed.
Engineered truss package
Corrective Action Required
06/03/2019

Copies of the engineered shade structures and roof truss packages were not provided at the time of permit application. Action required: Provide designs or request deferral. 6/18/19 - deferred per request
NEC - Size of alternating current ground electrode conductor 250.66
Resolved
06/18/2019

2017 NEC Article 250.50 Grounding Electrode System. All Grounding electrodes as described in 250.52(A)(1) through (A)(7) that are present at each building or structure served shall be bonded together to form the grounding electrodes system. Where none of these grounding electrodes exist, one or more of the grounding electrodes specified in 250.52(A)(4) through (A)(8) shall be installed and used. (see code section for exception) Action required: Provide grounding to water service piping as well as ground rod.
NEC - Spaces about electrical equipment 110.26
Corrective Action Required
06/03/2019

2017 NEC Article 110.26 Spaces About Electrical Equipment. Access and working space shall be provided and maintained about all electrical equipment to permit ready and safe operation and maintenance of such equipment. (see code for details) Action required: Maintain minimum clearances at electrical equipment. To be field verified. 6/18/19 - acknowledged in letter - to be field verified
Miscellaneous Correction
Corrective Action Required
06/03/2019

2018 IPC 605.4 Water service pipe. Water service pipe and tubing shall conform to NSF 61 and shall conform to one of the standards listed in Table 605.3. (see code for additional requirements. 2018 IPC 605.4 Water distribution pipe. Water distribution pipe shall conform to NSF 61 and shall conform to one of the standards listed in Table 605.4. Hot water distribution pipe and tubing shall have a pressure rating of not less than 100 psi at 180degF. 2018 IPC 702.1 Above-ground sanitary drainage and vent pipe. Above-ground soil, waste and vent pipe shall conform to one of the standards listed in Table 702.1 2018 IPC 702.2 Underground building sanitary drainage and vent pipe. Underground building sanitary drainage and vent pipe shall conform to one of the standards listed in Table 702.2. Action required: Provide pipe material schedule. 6/18/19 - not addressed.
Miscellaneous Correction
Corrective Action Required
06/03/2019

2018 IPC 608.1 General. A potable water supply system shall be designed, installed and maintained in such a manner so as to prevent contamination from nonpotable liquids, solids or gases being introduced into the potable water supply through cross-connections or any other piping connections to the system. Backflow preventer applications shall conform to Table 608.1, except as specifically stated in Sections 608.2 through 608.17.10. Action required: Provide backflow prevention device at water service entry to building. Device to be RPZ type compliant with 608.14.2 6/18/19 - not addressed.
Licensed Contractors Rejected 06/24/2019 06/18/2019
Joe Frogge
LC - General Contractor
Corrective Action Required
06/17/2019

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor. 6/18/19 - acknowledged in letter
LC - MEP Subs
Corrective Action Required
06/17/2019

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. 6/18/19 - acknowledged in letter
Fire Plan Review Approved with Conditions 06/24/2019 06/18/2019
Joe Frogge
Fire Plan Review Approved with Conditions 06/17/2019
Michael Weissenbach
Posting of occupant load
Corrective Action Required
06/03/2019

2018 IFC 1004.3- Posting of occupant load. Every room or space that is an assembly occupancy shall have the occupant load of the room or space posted in a conspicuous place, near the main exit or exit access doorway from the room or space. Posted signs shall be of an approved legible permanent design and shall be maintained by the owner or authorized agent. ACTION REQUIRED:(verified at inspection) Provide an occupant load for the wave pool area and post the occupant load at the entrances
Panic and fire exit hardware
Corrective Action Required
06/03/2019

2018 IFC 1010.1.10 Panic and fire exit hardware. Doors serving a Group H occupancy and doors serving rooms or spaces with an occupant load of 50 or more in a Group A or E occupancy shall not be provided with a latch or lock unless it is a panic hardware or fire exit hardware. ACTION REQUIRED:(verified at inspection) Panic hardware to be placed on all single gates exits
Direction of swing
Corrective Action Required
06/03/2019

2018 IFC 1010.1.2.1 Direction of swing. Doors shall swing in the direction of egress travel where serving a room or area containing an occupant load of 50 or more persons or a Group H occupancy. ACTION REQUIRED:(verified at inspection) All of the exits gates shall swing in the direction of egress travel.
Material safety and data sheets
Corrective Action Required
06/03/2019

2018 IFC 407.2- Material Safety Data Sheets. Material Safety Data Sheets (MSDS) for all hazardous materials shall be readily available on the premises. ACTION REQUIRED:(information purposes) Safety data sheets shall be maintained of all pool cleaning chemicals that are used and or stored on site. The data sheets shall be on site and in a accessable location.
Hazardous material identification
Corrective Action Required
06/03/2019

2018 IFC 407.3- Identification. Individual containers of hazardous materials, cartons or packages shall be marked or labeled in accordance with applicable federal regulations. Buildings, rooms and spaces containing hazardous materials shall be identified by hazard warning signs in accordance with Section 2703.5. ACTION REQUIRED:(verified at inspection) All pool rooms and chemical rooms storing or utilizing acids, chlorines or other pool chemicals shall be properly placarded with NFPA 704 placards with the proper MSDS hazard ratings of the chemicals on the placards.
Misc
Corrective Action Required
06/03/2019

GATES ACTION REQUIRED:(information purposes) [B] 1008.2 Gates. Gates serving the means of egress system shall comply with the requirements of this section. Gates used as a component in a means of egress shall conform to the applicable requirements for doors.
Building Plan Review Rejected 05/20/2019 05/13/2019
Joe Frogge
Final Development Plan
Corrective Action Required
05/13/2019

The building permit for this project can not be issued until the Codes Administration Department has received the approved Final Development Plan from the Planning and Development Department. Action required: Comment is for informational purposes.
Health Dept Review
Corrective Action Required
05/13/2019

For the Health Department review contact Deb Sees with the Jackson County Public Works Department, Environmental Services Division, at (816) 847-7070. Health Department approval is required prior to receiving any type of building permit from the City of Lee's Summit. Action required: Comment is for informational purposes.
Health Dept Inspection
Corrective Action Required
05/13/2019

For the Health Department inspection contact Deb Sees with the Jackson County Public Works Department, Environmental Health Division at (816) 847-7070. Health Department approval is required prior to receiving any type of Occupancy from the City of Lee's Summit. Action required: Comment is for informational purposes.
Project cost
Corrective Action Required
05/13/2019

The project cost, which is used to establish the permit fee, has not been provided. Action required: Comment is for informational purposes.
Engineered truss package
Corrective Action Required
05/13/2019

Copies of the engineered shade structures and roof truss packages were not provided at the time of permit application. Action required: Provide designs or request deferral.
NEC - Size of alternating current ground electrode conductor 250.66
Corrective Action Required
05/13/2019

2017 NEC Article 250.50 Grounding Electrode System. All Grounding electrodes as described in 250.52(A)(1) through (A)(7) that are present at each building or structure served shall be bonded together to form the grounding electrodes system. Where none of these grounding electrodes exist, one or more of the grounding electrodes specified in 250.52(A)(4) through (A)(8) shall be installed and used. (see code section for exception) Action required: Provide grounding to water service piping as well as ground rod.
NEC - Spaces about electrical equipment 110.26
Corrective Action Required
05/13/2019

2017 NEC Article 110.26 Spaces About Electrical Equipment. Access and working space shall be provided and maintained about all electrical equipment to permit ready and safe operation and maintenance of such equipment. (see code for details) Action required: Maintain minimum clearances at electrical equipment. To be field verified.
Miscellaneous Correction
Corrective Action Required
05/13/2019

2018 IPC 605.4 Water service pipe. Water service pipe and tubing shall conform to NSF 61 and shall conform to one of the standards listed in Table 605.3. (see code for additional requirements. 2018 IPC 605.4 Water distribution pipe. Water distribution pipe shall conform to NSF 61 and shall conform to one of the standards listed in Table 605.4. Hot water distribution pipe and tubing shall have a pressure rating of not less than 100 psi at 180degF. 2018 IPC 702.1 Above-ground sanitary drainage and vent pipe. Above-ground soil, waste and vent pipe shall conform to one of the standards listed in Table 702.1 2018 IPC 702.2 Underground building sanitary drainage and vent pipe. Underground building sanitary drainage and vent pipe shall conform to one of the standards listed in Table 702.2. Action required: Provide pipe material schedule.
Miscellaneous Correction
Corrective Action Required
05/13/2019

2018 IPC 608.1 General. A potable water supply system shall be designed, installed and maintained in such a manner so as to prevent contamination from nonpotable liquids, solids or gases being introduced into the potable water supply through cross-connections or any other piping connections to the system. Backflow preventer applications shall conform to Table 608.1, except as specifically stated in Sections 608.2 through 608.17.10. Action required: Provide backflow prevention device at water service entry to building. Device to be RPZ type compliant with 608.14.2
Licensed Contractors Rejected 05/13/2019
Joe Frogge
LC - General Contractor
Corrective Action Required
05/13/2019

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor.
LC - MEP Subs
Corrective Action Required
05/13/2019

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Fire Plan Review Approved with Conditions 05/20/2019 05/07/2019
Joe Dir
Posting of occupant load
Corrective Action Required
05/07/2019

2018 IFC 1004.3- Posting of occupant load. Every room or space that is an assembly occupancy shall have the occupant load of the room or space posted in a conspicuous place, near the main exit or exit access doorway from the room or space. Posted signs shall be of an approved legible permanent design and shall be maintained by the owner or authorized agent. ACTION REQUIRED:(verified at inspection) Provide an occupant load for the wave pool area and post the occupant load at the entrances
Panic and fire exit hardware
Corrective Action Required
05/07/2019

2018 IFC 1010.1.10 Panic and fire exit hardware. Doors serving a Group H occupancy and doors serving rooms or spaces with an occupant load of 50 or more in a Group A or E occupancy shall not be provided with a latch or lock unless it is a panic hardware or fire exit hardware. ACTION REQUIRED:(verified at inspection) Panic hardware to be placed on all single gates exits
Direction of swing
Corrective Action Required
05/07/2019

2018 IFC 1010.1.2.1 Direction of swing. Doors shall swing in the direction of egress travel where serving a room or area containing an occupant load of 50 or more persons or a Group H occupancy. ACTION REQUIRED:(verified at inspection) All of the exits gates shall swing in the direction of egress travel.
Material safety and data sheets
Corrective Action Required
05/07/2019

2018 IFC 407.2- Material Safety Data Sheets. Material Safety Data Sheets (MSDS) for all hazardous materials shall be readily available on the premises. ACTION REQUIRED:(information purposes) Safety data sheets shall be maintained of all pool cleaning chemicals that are used and or stored on site. The data sheets shall be on site and in a accessable location.
Hazardous material identification
Corrective Action Required
05/07/2019

2018 IFC 407.3- Identification. Individual containers of hazardous materials, cartons or packages shall be marked or labeled in accordance with applicable federal regulations. Buildings, rooms and spaces containing hazardous materials shall be identified by hazard warning signs in accordance with Section 2703.5. ACTION REQUIRED:(verified at inspection) All pool rooms and chemical rooms storing or utilizing acids, chlorines or other pool chemicals shall be properly placarded with NFPA 704 placards with the proper MSDS hazard ratings of the chemicals on the palcards.
Misc
Corrective Action Required
05/07/2019

GATES ACTION REQUIRED:(information purposes) [B] 1008.2 Gates. Gates serving the means of egress system shall comply with the requirements of this section. Gates used as a component in a means of egress shall conform to the applicable requirements for doors.
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for New Other $20,250.00 $20,250.00 Paid 09/13/2019
8331507-Sewer Connection Fee $630.00 $630.00 Paid 09/13/2019
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Underslab Plumbing Inspection - Commercial Partial 10/28/2019 10/28/2019 at 7:45 AM 10/28/2019
Misc
Partial Correction
10/28/2019
OK TO COVER WHEN READY UNDER-SLAB PLUMBING: AT DEEP END OF POOL: TWO (M1) DRAINS; P4, P6, AND P10 PIPING ENSURE PRESSURE-TESTING OF PIPING SYSTEM IS PERFORMED PER IPC 312
Footing Inspection - Commercial Partial 10/29/2019 (11:00) 10/29/2019 at 10:45 AM 10/29/2019
Misc
Partial Correction
10/29/2019
OK TO POUR WHEN READY: SURGE TANK SLAB;
Underslab Plumbing Inspection - Commercial Partial 11/7/2019 11/7/2019 at 8:25 AM 11/07/2019
Misc
Partial Correction
10/28/2019
OK TO COVER WHEN READY UNDER-SLAB PLUMBING: AT DEEP END OF POOL: TWO (M1) DRAINS; P4, P6, AND P10 PIPING; RETURN PIPING AT MAIN SLAB (ONE REPAIR IN PROGRESS DUE TO PRESSURE TEST LEAK); ENSURE PRESSURE-TESTING OF PIPING SYSTEM IS PERFORMED PER IPC 312
Footing Inspection - Commercial Partial 11/7/2019 at 8:45 AM 11/07/2019
Misc
Partial Correction
10/29/2019
OK TO POUR WHEN READY: SURGE TANK SLAB (WITH BONDING CONDUCTOR TERMINATED AT TOP MAT AND STUBBED ABOVE POUR; GUTTER CHANNEL AT SHALLOW END PREPPED FOR POUR EXCEPT CONSTRUCTION ACCESS AT SW
Footing Inspection - Commercial Partial 11/11/2019 at 4:10 PM 11/11/2019
Misc
Partial Correction
11/07/2019
OK TO POUR WHEN READY: SURGE TANK SLAB (WITH BONDING CONDUCTOR TERMINATED AT TOP MAT AND STUBBED ABOVE POUR; GUTTER CHANNEL AT SHALLOW END PREPPED FOR POUR EXCEPT CONSTRUCTION ACCESS AT SW
Pool Steel/Bonding - Commercial Partial 11/20/2019 11/20/2019 at 7:40 AM 11/20/2019
Pool Steel/Bonding - Commercial Partial 3/2/2020 2/28/2020 at 3:10 PM 11/20/2019
Misc
Partial Correction
11/20/2019
NO ISSUES FOUND ON EQUIPOTENTIAL BONDING AT: POOL BOTTOM SLAB - LEADS STUBBED UP ABOVE POUR LINE;
Underslab Plumbing Inspection - Commercial Partial 12/4/2019 12/4/2019 12/04/2019
Misc
Partial Correction
11/07/2019
OK TO COVER WHEN READY UNDER-SLAB PLUMBING: AT DEEP END OF POOL: TWO (M1) DRAINS; P4, P6, AND P10 PIPING; RETURN PIPING AT MAIN SLAB (ONE REPAIR IN PROGRESS DUE TO PRESSURE TEST LEAK); P8, P10, P12 TRENCH DRAIN SOUTH END OF POOL ENSURE PRESSURE-TESTING OF PIPING SYSTEM IS PERFORMED PER IPC 312
Footing Inspection - Commercial Partial 12/11/2019 at 2:05 PM 12/11/2019
Misc
Resolved
12/11/2019
OK TO POUR WHEN READY: SURGE TANK SLAB (WITH BONDING CONDUCTOR TERMINATED AT TOP MAT AND STUBBED ABOVE POUR; GUTTER CHANNEL AT SHALLOW END PREPPED FOR POUR EXCEPT CONSTRUCTION ACCESS AT SW
Misc
Partial Correction
12/11/2019
OK TO POUR WHEN READY WALL FOOTINGS AT EXTERIOR OF: POOL RESTROOMS, PARK RESTROOMS, FILTRATION, FAN ROOM
Pool Steel/Bonding - Commercial Partial 12/16/2019 12/16/2019 at 9:55 AM 12/16/2019
Misc
Partial Correction
11/20/2019
NO ISSUES FOUND ON EQUIPOTENTIAL BONDING AT: POOL BOTTOM SLAB - LEADS STUBBED UP ABOVE POUR LINE;
Concrete Walls and Columns Inspection Partial 12/16/2019 at 9:15 AM 12/16/2019
Misc
Partial Correction
12/16/2019
OK TO CLOSE FORMS AND POUR WHEN READY WALLS: THREE CAISSON CHAMBER DIVIDER WALLS WEST POOL WALL FROM NORTH ALONG WIDTH OF SURGE TANK; EAST POOL WALL NORTH 25';
Pool Steel/Bonding - Commercial Partial 12/16/2019 at 9:55 AM 12/16/2019
Misc
Partial Correction
12/16/2019
NO ISSUES FOUND ON EQUIPOTENTIAL BONDING AT: POOL BOTTOM SLAB - LEADS STUBBED UP ABOVE POUR LINE; WEST POOL WALL FROM NORTH ALONG WIDTH OF SURGE TANK; EAST POOL WALL NORTH 25';
Concrete Walls and Columns Inspection Partial 1/7/2020 at 8:20 AM 01/07/2020
Misc
Partial Correction
12/16/2019
OK TO CLOSE FORMS AND POUR WHEN READY C.I.P. WALLS: THREE CAISSON CHAMBER DIVIDER WALLS; WEST POOL WALL FROM NORTH ALONG WIDTH OF SURGE TANK; EAST POOL WALL NORTH 25'; REAR WALL OF CAISSON CHAMBERS; BUILDING FOUNDATION WALLS EAST OF WEST POOL WALL;
Rough Electrical Inspection - Commercial Partial 1/7/2020 at 8:50 AM 01/07/2020
Misc
Partial Correction
01/07/2020
UFER GROUND JUMPER TERMINATED TO WALL RE-BAR AT WEST FOUNDATION WALL;
Concrete Walls and Columns Inspection Partial 1/8/2020 at 7:05 AM 01/08/2020
Misc
Partial Correction
01/07/2020
OK TO CLOSE FORMS AND POUR WHEN READY C.I.P. WALLS: THREE CAISSON CHAMBER DIVIDER WALLS; WEST POOL WALL FROM NORTH ALONG WIDTH OF SURGE TANK; EAST POOL WALL NORTH 25'; REAR WALL OF CAISSON CHAMBERS; BUILDING FOUNDATION WALLS EAST OF WEST POOL WALL; BUILDING FOUNDATION WALLS EXCEPT AT PUMP PIT & SW 15' OF FILTRATION;
Concrete Walls and Columns Inspection Partial 1/14/2020 (8:00) 1/14/2020 at 8:20 AM 01/14/2020
Misc
Partial Correction
01/08/2020
OK TO CLOSE FORMS AND POUR WHEN READY C.I.P. WALLS: THREE CAISSON CHAMBER DIVIDER WALLS; WEST POOL WALL FROM NORTH ALONG WIDTH OF SURGE TANK; EAST POOL WALL NORTH 25'; REAR WALL OF CAISSON CHAMBERS; BUILDING FOUNDATION WALLS EAST OF WEST POOL WALL; BUILDING FOUNDATION WALLS EXCEPT AT PUMP PIT & SW 15' OF FILTRATION; **SURGE TANK WALLS-OK. 2 ACCESS OPENINGS WILL BE CLOSED. PICTURE VERIFICATION WILL BE PROVIDED FOR NEXT INSPECTION
Concrete Walls and Columns Inspection Partial 1/21/2020 at 11:10 AM 01/21/2020
Misc
Partial Correction
01/14/2020
OK TO CLOSE FORMS AND POUR WHEN READY C.I.P. WALLS: THREE CAISSON CHAMBER DIVIDER WALLS; WEST POOL WALL FROM NORTH ALONG WIDTH OF SURGE TANK; EAST POOL WALL NORTH 25'; REAR WALL OF CAISSON CHAMBERS; BUILDING FOUNDATION WALLS EAST OF WEST POOL WALL; BUILDING FOUNDATION WALLS EXCEPT AT PUMP PIT & SW 15' OF FILTRATION; FRONT WALL OF CAISSIONS; **SURGE TANK WALLS-OK. 2 ACCESS OPENINGS WILL BE CLOSED. PICTURE VERIFICATION WILL BE PROVIDED FOR NEXT INSPECTION
Suspended Slab Inspection Partial 2/3/2020 at 10:10 AM 02/03/2020
Misc
Partial Correction
02/03/2020
PREP FOR POUR OF SUSPENDED SLABS: - SURGE TANK LID: ENSURE MINIMUM 1" RE-BAR COVERAGE AT PERIMETER FORMS - PUMP PIT SLAB: COMPLETE CHAIR INSTALLATION TO SEPARATE T&B RE-BAR MATS - CAISSION LIDS: ENSURE SPLICE LAPS ARE MINIMUM OF 40 DIAMETERS
Concrete Walls and Columns Inspection Partial 2/3/2020 (9:45) 2/10/2020 at 1:20 PM 02/10/2020
Misc
Partial Correction
01/21/2020
OK TO CLOSE FORMS AND POUR WHEN READY C.I.P. WALLS: THREE CAISSON CHAMBER DIVIDER WALLS; WEST POOL WALL FROM NORTH ALONG WIDTH OF SURGE TANK; EAST POOL WALL NORTH 25'; REAR WALL OF CAISSON CHAMBERS; BUILDING FOUNDATION WALLS EAST OF WEST POOL WALL; BUILDING FOUNDATION WALLS EXCEPT AT PUMP PIT & SW 15' OF FILTRATION; FRONT WALL OF CAISSIONS; REMAINDER OF EAST POOL WALL; **SURGE TANK WALLS-OK. 2 ACCESS OPENINGS WILL BE CLOSED. PICTURE VERIFICATION WILL BE PROVIDED FOR NEXT INSPECTION
Suspended Slab Inspection Passed 2/10/2020 02/10/2020
Misc
Resolved
02/10/2020
PREP FOR POUR OF SUSPENDED SLABS: - SURGE TANK LID: ENSURE MINIMUM 1" RE-BAR COVERAGE AT PERIMETER FORMS - PUMP PIT SLAB: COMPLETE CHAIR INSTALLATION TO SEPARATE T&B RE-BAR MATS - CAISSION LIDS: ENSURE SPLICE LAPS ARE MINIMUM OF 40 DIAMETERS
Pool Steel/Bonding - Commercial Partial 2/21/2020 2/21/2020 at 10:45 AM 02/21/2020
Misc
Partial Correction
12/16/2019
NO ISSUES FOUND ON EQUIPOTENTIAL BONDING AT: POOL BOTTOM SLAB - LEADS STUBBED UP ABOVE POUR LINE; WEST POOL WALL FROM NORTH ALONG WIDTH OF SURGE TANK; EAST POOL WALL NORTH 25'; WEST POOL WALL;
Concrete Walls and Columns Inspection Partial 2/21/2020 at 11:00 AM 02/21/2020
Misc
Partial Correction
02/10/2020
OK TO CLOSE FORMS AND POUR WHEN READY C.I.P. WALLS: THREE CAISSON CHAMBER DIVIDER WALLS; WEST POOL WALL FROM NORTH ALONG WIDTH OF SURGE TANK; EAST POOL WALL NORTH 25'; REAR WALL OF CAISSON CHAMBERS; BUILDING FOUNDATION WALLS EAST OF WEST POOL WALL; BUILDING FOUNDATION WALLS EXCEPT AT PUMP PIT & SW 15' OF FILTRATION; FRONT WALL OF CAISSIONS; REMAINDER OF EAST POOL WALL INCLUDING BONDING FOR LADDER & FIVE NICHE LIGHT SHELLS; WEST POOL WALL INCLUDING BONDING FOR LADDER & FIVE NICHE LIGHT SHELLS; **SURGE TANK WALLS-OK. 2 ACCESS OPENINGS WILL BE CLOSED. PICTURE VERIFICATION WILL BE PROVIDED FOR NEXT INSPECTION
Underground Plumbing Inspection - Commercial Passed 2/24/2020 2/24/2020 at 3:00 PM 02/21/2020
Pool Steel/Bonding - Commercial Partial 2/27/2020 2/28/2020 at 8:00 AM 02/28/2020
Misc
Partial Correction
02/21/2020
NO ISSUES FOUND ON EQUIPOTENTIAL BONDING AT: POOL BOTTOM SLAB - LEADS STUBBED UP ABOVE POUR LINE; WEST POOL WALL FROM NORTH ALONG WIDTH OF SURGE TANK; EAST POOL WALL NORTH 25'; WEST POOL WALL; SOUTH EXTREMITY OF POOL SLAB REINFORCING & PLUMBING CASTINGS
Underslab Plumbing Inspection - Commercial Partial 2/28/2020 at 3:05 PM 02/28/2020
Misc
Partial Correction
12/04/2019
OK TO COVER WHEN READY UNDER-SLAB PLUMBING: AT DEEP END OF POOL: TWO (M1) DRAINS; P4, P6, AND P10 PIPING; RETURN PIPING AT MAIN SLAB (ONE REPAIR IN PROGRESS DUE TO PRESSURE TEST LEAK); P8, P10, P12 TRENCH DRAIN SOUTH END OF POOL ; U/S DWV PIPING FOR RESTROOMS AT NE CORNER; ENSURE PRESSURE-TESTING OF PIPING SYSTEM IS PERFORMED PER IPC 312
Underslab Plumbing Inspection - Commercial Partial 3/2/2020 3/2/2020 at 7:25 AM 03/02/2020
Misc
Partial Correction
02/28/2020
OK TO COVER WHEN READY UNDER-SLAB PLUMBING: AT DEEP END OF POOL: TWO (M1) DRAINS; P4, P6, AND P10 PIPING; RETURN PIPING AT MAIN SLAB (ONE REPAIR IN PROGRESS DUE TO PRESSURE TEST LEAK); P8, P10, P12 TRENCH DRAIN SOUTH END OF POOL ; RESTROOM/TOILET SPACES 106-112 AT NE CORNER; FILTRATION & CHEMICAL SPACES 101, 104, 105 AT NW CORNER; ENSURE PRESSURE-TESTING OF PIPING SYSTEM IS PERFORMED PER IPC 312
Concrete Walls and Columns Inspection Passed 3/3/2020 (8:45) 3/3/2020 at 9:30 AM 03/03/2020
Misc
Resolved
03/03/2020
OK TO CLOSE FORMS AND POUR WHEN READY C.I.P. WALLS: THREE CAISSON CHAMBER DIVIDER WALLS; WEST POOL WALL FROM NORTH ALONG WIDTH OF SURGE TANK; EAST POOL WALL NORTH 25'; REAR WALL OF CAISSON CHAMBERS; BUILDING FOUNDATION WALLS EAST OF WEST POOL WALL; BUILDING FOUNDATION WALLS EXCEPT AT PUMP PIT & SW 15' OF FILTRATION; FRONT WALL OF CAISSIONS; REMAINDER OF EAST POOL WALL INCLUDING BONDING FOR LADDER & FIVE NICHE LIGHT SHELLS; WEST POOL WALL INCLUDING BONDING FOR LADDER & FIVE NICHE LIGHT SHELLS; **SURGE TANK WALLS-OK. 2 ACCESS OPENINGS WILL BE CLOSED. PICTURE VERIFICATION WILL BE PROVIDED FOR NEXT INSPECTION
Footing Inspection - Commercial Passed 03/03/2020
Misc
Resolved
03/03/2020
OK TO POUR WHEN READY WALL FOOTINGS AT EXTERIOR OF: POOL RESTROOMS, PARK RESTROOMS, FILTRATION, FAN ROOM
Underslab Plumbing Inspection - Commercial Passed 5/8/2020 5/8/2020 03/03/2020
Misc
Resolved
03/03/2020
OK TO COVER WHEN READY UNDER-SLAB PLUMBING: AT DEEP END OF POOL: TWO (M1) DRAINS; P4, P6, AND P10 PIPING; RETURN PIPING AT MAIN SLAB (ONE REPAIR IN PROGRESS DUE TO PRESSURE TEST LEAK); P8, P10, P12 TRENCH DRAIN SOUTH END OF POOL ; \ FILTRATION & CHEMICAL SPACES 101, 104, 105 AT NW CORNER; ENSURE PRESSURE-TESTING OF PIPING SYSTEM IS PERFORMED PER IPC 312
Underslab Electrical Inspection - Commercial Partial 3/4/2020 3/4/2020 at 7:15 AM 03/04/2020
Misc
Partial Correction
03/04/2020
NO ISSUES FOUND ON UNDER-SLAB ELECTRICAL CONDUIT MATERIAL & WORKMANSHIP. G.C. AND E.C. TO ENSURE LAYOUT IS CORRECT. OK TO COVER WHEN READY AT: ALCOVE & RESTROOM SPACES 108-112 AT NE CORNER;
Foundation Inspection - Commercial Partial 3/6/2020 3/6/2020 03/06/2020
Underslab Electrical Inspection - Commercial Passed 3/11/2020 03/11/2020
Misc
Resolved
03/11/2020
NO ISSUES FOUND ON UNDER-SLAB ELECTRICAL CONDUIT MATERIAL & WORKMANSHIP. G.C. AND E.C. TO ENSURE LAYOUT IS CORRECT. OK TO COVER WHEN READY AT: ALCOVE & RESTROOM SPACES 108-112 AT NE CORNER;WEST END POOL HOUSE COMPLETE.
Underground Plumbing Inspection - Commercial Partial 2/28/2020 3/11/2020 03/11/2020
Misc
Corrective Action Required
03/11/2020
8" DRAIN EAST CENTER
Underground Plumbing Inspection - Commercial Partial 3/12/2020 3/12/2020 03/12/2020
Misc
Corrective Action Required
03/11/2020
8" DRAIN EAST CENTER;8",10" west side from south to pump room.
Underground Plumbing Inspection - Commercial Passed 3/17/2020 3/17/2020 03/16/2020
Misc
Resolved
03/16/2020
8" DRAIN EAST CENTER;8",10" west side from south to pump room.
Underground Electrical Inspection - Commercial Partial 4/20/2020 04/20/2020
Misc
Partial Correction
04/20/2020
-REROUTE OF EXISTING UNDERGROUND LIGHT POLE CIRCUIT RACEWAY TO NEW LP PIER LOCATED UNDER WATER SLIDER
Underslab Electrical Inspection - Commercial Partial 4/20/2020 4/20/2020 at 2:55 PM 04/20/2020
Misc
Partial Correction
04/20/2020
UNDERGROUND RACEWAYS OK: 8 POOL LIGHT RACEWAYS AND RACEWAYS TO LIGHT POLE
Underground Electrical Inspection - Commercial Partial 4/22/2020 4/22/2020 04/22/2020
Misc
Partial Correction
04/20/2020
4 light pole bases of east side wave pool.
Piers/Caissons Inspection - Commercial Partial 4/23/2020 (11:00) 4/23/2020 04/23/2020
Misc
Corrective Action Required
04/23/2020
5 light pole bases of east side wave pool.
Piers/Caissons Inspection - Commercial Passed 4/28/2020 (8:45) 4/28/2020 04/28/2020
Misc
Informational
04/28/2020
Shade structures 6 piers
Pool Steel/Bonding - Commercial Partial 4/30/2020 4/30/2020 04/30/2020
Misc
Partial Correction
02/28/2020
NO ISSUES FOUND ON EQUIPOTENTIAL BONDING AT: POOL BOTTOM SLAB - LEADS STUBBED UP ABOVE POUR LINE; WEST POOL WALL FROM NORTH ALONG WIDTH OF SURGE TANK; EAST POOL WALL NORTH 25'; WEST POOL WALL; SOUTH EXTREMITY OF POOL SLAB REINFORCING & PLUMBING CASTINGS
Misc
Corrective Action Required
04/30/2020
THE FOLLOWING AREAS ARE APPROVED: EAST SIDE OF POOL DECK NEXT TO BUILDING WORKING SOUTH EAST.
Pool Steel/Bonding - Commercial Partial 5/1/2020 5/1/2020 05/01/2020
Misc
Partial Correction
04/30/2020
NO ISSUES FOUND ON EQUIPOTENTIAL BONDING AT: POOL BOTTOM SLAB - LEADS STUBBED UP ABOVE POUR LINE; WEST POOL WALL FROM NORTH ALONG WIDTH OF SURGE TANK; EAST POOL WALL NORTH 25'; WEST POOL WALL; SOUTH EXTREMITY OF POOL SLAB REINFORCING & PLUMBING CASTINGS- 5/1/20 LIFT,LADDER,SHADE STRUCTURE,DECK
Misc
Corrective Action Required
04/30/2020
THE FOLLOWING AREAS ARE APPROVED: EAST SIDE OF POOL DECK NEXT TO BUILDING WORKING SOUTH EAST.
Piers/Caissons Inspection - Commercial Partial 5/7/2020 5/7/2020 05/07/2020
Misc
Corrective Action Required
05/07/2020
4 light pole bases of east side wave pool. 5 light pole bases on south side 2 light pole bases on east side Bonding for shower
Misc
Resolved
05/07/2020
Misc
Resolved
05/07/2020
Pool Steel/Bonding - Commercial Partial 5/8/2020 05/08/2020
Misc
Partial Correction
05/01/2020
NO ISSUES FOUND ON EQUIPOTENTIAL BONDING AT: POOL BOTTOM SLAB - LEADS STUBBED UP ABOVE POUR LINE; WEST POOL WALL FROM NORTH ALONG WIDTH OF SURGE TANK; EAST POOL WALL NORTH 25'; WEST POOL WALL; SOUTH EXTREMITY OF POOL SLAB REINFORCING & PLUMBING CASTINGS- 5/1/20 LIFT,LADDER,SHADE STRUCTURE,DECK
Misc
Corrective Action Required
05/01/2020
THE FOLLOWING AREAS ARE APPROVED: EAST SIDE OF POOL DECK NEXT TO BUILDING WORKING SOUTH EAST. SOUTHEAST CORNER OF POOL ENTRANCE
Underslab Electrical Inspection - Commercial Partial 5/8/2020 05/08/2020
Misc
Partial Correction
04/20/2020
UNDERGROUND RACEWAYS OK: 8 POOL LIGHT RACEWAYS AND RACEWAYS TO LIGHT POLE LIGHT POLE AT SOUTHEAST BY POOL ENTRANCE LIGHT POLES IN FRONT OF ZERO ENTRANCE TIE IN TO SOUTH LIGHT POLE
Pool Steel/Bonding - Commercial Partial 5/11/2020 5/11/2020 05/11/2020
Misc
Partial Correction
05/08/2020
NO ISSUES FOUND ON EQUIPOTENTIAL BONDING AT: POOL BOTTOM SLAB - LEADS STUBBED UP ABOVE POUR LINE; WEST POOL WALL FROM NORTH ALONG WIDTH OF SURGE TANK; EAST POOL WALL NORTH 25'; WEST POOL WALL; SOUTH EXTREMITY OF POOL SLAB REINFORCING & PLUMBING CASTINGS- 5/1/20 LIFT,LADDER,SHADE STRUCTURE,DECK
Misc
Corrective Action Required
05/08/2020
THE FOLLOWING AREAS ARE APPROVED: EAST SIDE OF POOL DECK NEXT TO BUILDING WORKING SOUTH EAST. SOUTHEAST CORNER OF POOL ENTRANCE BONDING FROM POOL AND SOUTHEAST CORNER LIGHT POLE
Piers/Caissons Inspection - Commercial Passed 5/11/2020 5/11/2020 05/11/2020
Misc
Corrective Action Required
05/07/2020
4 light pole bases of east side wave pool. 5 light pole bases on south side 2 light pole bases on east side Bonding for shower Grounding of 5 South Pole bases
Pool Steel/Bonding - Commercial Partial 5/12/2020 5/12/2020 05/12/2020
Misc
Partial Correction
05/11/2020
NO ISSUES FOUND ON EQUIPOTENTIAL BONDING AT: POOL BOTTOM SLAB - LEADS STUBBED UP ABOVE POUR LINE; WEST POOL WALL FROM NORTH ALONG WIDTH OF SURGE TANK; EAST POOL WALL NORTH 25'; WEST POOL WALL; SOUTH EXTREMITY OF POOL SLAB REINFORCING & PLUMBING CASTINGS- 5/1/20 LIFT,LADDER,SHADE STRUCTURE,DECK
Misc
Corrective Action Required
05/11/2020
THE FOLLOWING AREAS ARE APPROVED: EAST SIDE OF POOL DECK NEXT TO BUILDING WORKING SOUTH EAST. SOUTHEAST CORNER OF POOL ENTRANCE BONDING FROM POOL AND SOUTHEAST CORNER LIGHT POLE BONDING OF POOL LOOP AND 2 SHADE POLES
Underground Electrical Inspection - Commercial Partial 05/13/2020
Misc
Partial Correction
04/22/2020
4 light pole bases of east side wave pool. 2 light pole bases sw corner of pool and sw outlet
Pool Steel/Bonding - Commercial Partial 5/13/2020 05/13/2020
Misc
Partial Correction
05/12/2020
NO ISSUES FOUND ON EQUIPOTENTIAL BONDING AT: POOL BOTTOM SLAB - LEADS STUBBED UP ABOVE POUR LINE; WEST POOL WALL FROM NORTH ALONG WIDTH OF SURGE TANK; EAST POOL WALL NORTH 25'; WEST POOL WALL; SOUTH EXTREMITY OF POOL SLAB REINFORCING & PLUMBING CASTINGS- 5/1/20 LIFT,LADDER,SHADE STRUCTURE,DECK
Misc
Corrective Action Required
05/12/2020
THE FOLLOWING AREAS ARE APPROVED: EAST SIDE OF POOL DECK NEXT TO BUILDING WORKING SOUTH EAST. SOUTHEAST CORNER OF POOL ENTRANCE BONDING FROM POOL AND SOUTHEAST CORNER LIGHT POLE BONDING OF POOL LOOP AND 2 SHADE POLES BONDING OF REMAINING 3 SOUTH SHADE POLES BONDING OF POOL LOOP AND POOL MAT TO SW CORNER
Piers/Caissons Inspection - Commercial Passed 5/14/2020 (10:00) 5/14/2020 05/14/2020
Miscellaneous Correction
Informational
05/14/2020
3 LIght pole bases west side
Underground Electrical Inspection - Commercial Partial 5/15/2020 05/15/2020
Misc
Partial Correction
05/13/2020
4 light pole bases of east side wave pool. 2 light pole bases sw corner of pool and sw outlet 3 light pole bases and ground rods west side of pool Underwater lighting Light poles into building
Rough Plumbing Inspection - Commercial Passed 5/15/2020 5/15/2020 05/15/2020
Misc
Informational
05/15/2020
MEN’S & WOMEN’S BATH 2 EMPLOYEE BATHS FAMILY BATH FAN ROOM MECHANICAL ROOM JANITOR’S CLOSET
Above Ceiling Inspection Passed 5/20/2020 5/20/2020 05/20/2020
Pool Steel/Bonding - Commercial Partial 5/21/2020 5/21/2020 05/21/2020
Misc
Corrective Action Required
05/13/2020
THE FOLLOWING AREAS ARE APPROVED: EAST SIDE OF POOL DECK NEXT TO BUILDING WORKING SOUTH EAST. SOUTHEAST CORNER OF POOL ENTRANCE BONDING FROM POOL AND SOUTHEAST CORNER LIGHT POLE BONDING OF POOL LOOP AND 2 SHADE POLES BONDING OF REMAINING 3 SOUTH SHADE POLES BONDING OF POOL LOOP AND POOL MAT TO SW CORNER BONDING OF. POOL LOOP WEST SIDE BONDING OF 3 WEST SHADE STRUCTURES BONDING OF 2 LIGHT POLES BONDING LOWER MAT WEST SIDE
Misc
Partial Correction
05/13/2020
NO ISSUES FOUND ON EQUIPOTENTIAL BONDING AT: POOL BOTTOM SLAB - LEADS STUBBED UP ABOVE POUR LINE; WEST POOL WALL FROM NORTH ALONG WIDTH OF SURGE TANK; EAST POOL WALL NORTH 25'; WEST POOL WALL; SOUTH EXTREMITY OF POOL SLAB REINFORCING & PLUMBING CASTINGS- 5/1/20 LIFT,LADDER,SHADE STRUCTURE,DECK
Pool Steel/Bonding - Commercial Partial 5/28/2020 5/28/2020 05/28/2020
Misc
Corrective Action Required
05/21/2020
THE FOLLOWING AREAS ARE APPROVED: EAST SIDE OF POOL DECK NEXT TO BUILDING WORKING SOUTH EAST. SOUTHEAST CORNER OF POOL ENTRANCE BONDING FROM POOL AND SOUTHEAST CORNER LIGHT POLE BONDING OF POOL LOOP AND 2 SHADE POLES BONDING OF REMAINING 3 SOUTH SHADE POLES BONDING OF POOL LOOP AND POOL MAT TO SW CORNER BONDING OF. POOL LOOP WEST SIDE BONDING OF 3 WEST SHADE STRUCTURES BONDING OF 2 LIGHT POLES BONDING LOWER MAT WEST SIDE BONDING OF LIGHT POLE NW BONDING OF POOL LIGHTS BONDING OF POOL LOOP BACK TO BUILDING
Misc
Partial Correction
05/21/2020
NO ISSUES FOUND ON EQUIPOTENTIAL BONDING AT: POOL BOTTOM SLAB - LEADS STUBBED UP ABOVE POUR LINE; WEST POOL WALL FROM NORTH ALONG WIDTH OF SURGE TANK; EAST POOL WALL NORTH 25'; WEST POOL WALL; SOUTH EXTREMITY OF POOL SLAB REINFORCING & PLUMBING CASTINGS- 5/1/20 LIFT,LADDER,SHADE STRUCTURE,DECK
Underground Electrical Inspection - Commercial Partial 5/29/2020 5/29/2020 05/29/2020
Misc
Partial Correction
05/15/2020
4 light pole bases of east side wave pool. 2 light pole bases sw corner of pool and sw outlet 3 light pole bases and ground rods west side of pool Underwater lighting Ground Rods and Wires for Transformer, dp panel, and service
Pool Steel/Bonding - Commercial Partial 6/8/2020 6/8/2020 06/08/2020
Misc
Corrective Action Required
05/28/2020
THE FOLLOWING AREAS ARE APPROVED: EAST SIDE OF POOL DECK NEXT TO BUILDING WORKING SOUTH EAST. SOUTHEAST CORNER OF POOL ENTRANCE BONDING FROM POOL AND SOUTHEAST CORNER LIGHT POLE BONDING OF POOL LOOP AND 2 SHADE POLES BONDING OF REMAINING 3 SOUTH SHADE POLES BONDING OF POOL LOOP AND POOL MAT TO SW CORNER BONDING OF. POOL LOOP WEST SIDE BONDING OF 3 WEST SHADE STRUCTURES BONDING OF 2 LIGHT POLES BONDING LOWER MAT WEST SIDE BONDING OF LIGHT POLE NW BONDING OF POOL LIGHTS BONDING OF POOL LOOP BACK TO BUILDING BONDING OF 4 POOL LADDERS 16 UNDERWATER LIGHTS AND BONDING SCREW
Misc
Partial Correction
05/28/2020
NO ISSUES FOUND ON EQUIPOTENTIAL BONDING AT: POOL BOTTOM SLAB - LEADS STUBBED UP ABOVE POUR LINE; WEST POOL WALL FROM NORTH ALONG WIDTH OF SURGE TANK; EAST POOL WALL NORTH 25'; WEST POOL WALL; SOUTH EXTREMITY OF POOL SLAB REINFORCING & PLUMBING CASTINGS- 5/1/20 LIFT,LADDER,SHADE STRUCTURE,DECK
Electrical Service Inspection Passed 6/9/2020 6/9/2020 06/09/2020
Occupancy Inspection - Engineering Failed 6/16/2020 06/16/2020
Misc
Corrective Action Required
06/16/2020
1. Waiting on approved detention basin plan and as-builds. The structure has been built with un-approved plans. Waiting on the plans to be approved. 2. Final grading needs to be completed.
Occupancy Inspection - Codes Commercial Failed 6/16/2020 6/16/2020 06/16/2020
Misc
Corrective Action Required
06/16/2020
*install approved restroom signage north bathrooms. * install vertical grab bar 39-41" north restroom. * complete concrete walk around north side of building. * complete concrete at west exit at fence. * Provide GFCI protection on Food truck 50 amp circuit east side of wave pool at pedestal. * support and secrue DVW in pool room, at mid story and along wall. Provide approval from other City Divisions on seperate letter.
Occupancy Inspection - Fire Failed 6/16/2020 06/17/2020
Occupancy Inspection - Fire Passed 6/23/2020 06/23/2020
Occupancy Inspection - Codes Commercial Temporary C of O 6/23/2020 6/23/2020 06/23/2020
Misc
Corrective Action Required
06/16/2020
OK to TCO-2 weeks for electrical issue. Please contact Mark Harding when complete. * Provide GFCI protection on Food truck 50 amp circuit east side of wave pool at pedestal. Breaker to be removed or shut down at main panel in pool equipment room until circuit is GFCI protected. Provide approval from other City Divisions on seperate letter.
Occupancy Inspection - Engineering Temporary C of O 6/23/2020 06/23/2020
Misc
Corrective Action Required
06/16/2020
1. Waiting on approved detention basin plan and as-builds. The structure has been built with un-approved plans. Waiting on the plans to be approved. 2. Final grading needs to be completed.
Occupancy Inspection - Engineering Temporary C of O 6/26/2020 06/30/2020
Misc
Corrective Action Required
06/23/2020
1. Waiting on approved detention basin plan and as-builds. The structure has been built with un-approved plans. Waiting on the plans to be approved. 2. Final grading needs to be completed.
Misc
Corrective Action Required
06/23/2020
1.Need as-builds for the detention basin. The basin has been approved. 2. The grading needs to be completed on the entire site. 3. The end section needs to be installed that goes onto Jefferson st. 4. 70% Vegetation needs to be established throughout the entire site.-This is to be done by the Parks Department. 5. A drain lid needs to be replaced on the north side of the building. 6. The construction entrance needs to be removed and graded.
Corrective Action Required
06/30/2020
It has been discovered that the service water line was not installed correctly. It has been installed with a tap for a 3" copper line. I have contacted Jeff Thorn and i have contacted the contractor . Jeff Thorn will be getting back to me to let me how we will procede with the situation. We may have to cut in a tee and install in properly. The contractor has been notified. The water dept. has allowed them to open and posssibly make corrections after the summer.
Occupancy Inspection - Codes Commercial Failed 7/1/2020 7/1/2020 07/01/2020
Misc
Corrective Action Required
06/23/2020
Codes approved pending all other departments.
Occupancy Inspection - Engineering Temporary C of O 7/6/2020 07/06/2020
Misc
Corrective Action Required
07/06/2020
It has now been verified that the water service line has been installed by the water dept. and it is a 2" copper line from the main to the meter. There was a change to the plans. I now have a new list of items that need to be taken care of. 1. As-builds for the detention basin. 2. Public fire hydrant that was installed needs to be turned so it is facing Jefferson St. 3. Hydrant needs to be painted yellow. We do not accept Red. 4. Please lower valve lid so it is flush with the ground. 5. The outlet structure for the detention basin has mud inside of it and it does not drain to the swale that is on Jefferson St. We are having standing water.
Occupancy Inspection - Engineering Passed 11/30/2020 11/30/2020
Misc
Corrective Action Required
07/06/2020
It has now been verified that the water service line has been installed by the water dept. and it is a 2" copper line from the main to the meter. There was a change to the plans. I now have a new list of items that need to be taken care of. 1. As-builds for the detention basin. 2. Public fire hydrant that was installed needs to be turned so it is facing Jefferson St. 3. Hydrant needs to be painted yellow. We do not accept Red. 4. Please lower valve lid so it is flush with the ground. 5. The outlet structure for the detention basin has mud inside of it and it does not drain to the swale that is on Jefferson St. We are having standing water.
Pool Steel/Bonding - Commercial Passed 11/30/2020
Misc
Resolved
11/30/2020
THE FOLLOWING AREAS ARE APPROVED: EAST SIDE OF POOL DECK NEXT TO BUILDING WORKING SOUTH EAST. SOUTHEAST CORNER OF POOL ENTRANCE BONDING FROM POOL AND SOUTHEAST CORNER LIGHT POLE BONDING OF POOL LOOP AND 2 SHADE POLES BONDING OF REMAINING 3 SOUTH SHADE POLES BONDING OF POOL LOOP AND POOL MAT TO SW CORNER BONDING OF. POOL LOOP WEST SIDE BONDING OF 3 WEST SHADE STRUCTURES BONDING OF 2 LIGHT POLES BONDING LOWER MAT WEST SIDE BONDING OF LIGHT POLE NW BONDING OF POOL LIGHTS BONDING OF POOL LOOP BACK TO BUILDING BONDING OF 4 POOL LADDERS 16 UNDERWATER LIGHTS AND BONDING SCREW
Misc
Resolved
11/30/2020
NO ISSUES FOUND ON EQUIPOTENTIAL BONDING AT: POOL BOTTOM SLAB - LEADS STUBBED UP ABOVE POUR LINE; WEST POOL WALL FROM NORTH ALONG WIDTH OF SURGE TANK; EAST POOL WALL NORTH 25'; WEST POOL WALL; SOUTH EXTREMITY OF POOL SLAB REINFORCING & PLUMBING CASTINGS- 5/1/20 LIFT,LADDER,SHADE STRUCTURE,DECK
Underground Electrical Inspection - Commercial Passed 11/30/2020
Misc
Resolved
11/30/2020
4 light pole bases of east side wave pool. 2 light pole bases sw corner of pool and sw outlet 3 light pole bases and ground rods west side of pool Underwater lighting Ground Rods and Wires for Transformer, dp panel, and service
Underslab Electrical Inspection - Commercial Passed 5/15/2020 11/30/2020
Misc
Resolved
11/30/2020
UNDERGROUND RACEWAYS OK: 8 POOL LIGHT RACEWAYS AND RACEWAYS TO LIGHT POLE LIGHT POLE AT SOUTHEAST BY POOL ENTRANCE LIGHT POLES IN FRONT OF ZERO ENTRANCE TIE IN TO SOUTH LIGHT POLE
Rough Electrical Inspection - Commercial Passed 11/30/2020
Misc
Resolved
11/30/2020
UFER GROUND JUMPER TERMINATED TO WALL RE-BAR AT WEST FOUNDATION WALL;
Occupancy Inspection - Codes Commercial Full C of O 12/16/2020
Misc
Resolved
12/16/2020
Codes approved pending all other departments.
Documents & Images
Date Uploaded File Type Document Name
05/07/2019 Letter Fire Building Plan Review
05/13/2019 Letter DS P/R Corrections Document
06/03/2019 LT info
06/17/2019 Letter Fire Building Plan Review
06/18/2019 Letter DS P/R Corrections Document
06/19/2019 Letter DS P/R Corrections Document
07/26/2019 Letter DS P/R Corrections Document
07/31/2019 Letter Fire Building Plan Review
08/07/2019 Letter DS P/R Corrections Document
09/10/2019 health dept
09/13/2019 Receipt Receipt for transaction: 2019-006212
10/03/2019 Letter DS Building Permit
10/28/2019 Letter INSPECTION SUMMARY
10/29/2019 Letter INSPECTION SUMMARY
11/07/2019 Letter INSPECTION SUMMARY
11/20/2019 Letter INSPECTION SUMMARY
12/04/2019 Letter INSPECTION SUMMARY
12/11/2019 Letter INSPECTION SUMMARY
12/16/2019 Letter INSPECTION SUMMARY
12/16/2019 Letter INSPECTION SUMMARY
01/07/2020 Letter INSPECTION SUMMARY
01/07/2020 Letter INSPECTION SUMMARY
01/07/2020 Letter INSPECTION SUMMARY
01/08/2020 Letter INSPECTION SUMMARY
01/14/2020 Letter INSPECTION SUMMARY
01/21/2020 Letter INSPECTION SUMMARY
02/03/2020 Letter INSPECTION SUMMARY
02/10/2020 Letter INSPECTION SUMMARY
02/21/2020 Letter INSPECTION SUMMARY
02/21/2020 Letter INSPECTION SUMMARY
02/21/2020 Letter INSPECTION SUMMARY
02/28/2020 Letter INSPECTION SUMMARY
02/28/2020 Letter INSPECTION SUMMARY
03/02/2020 Letter INSPECTION SUMMARY
03/03/2020 Letter INSPECTION SUMMARY
03/04/2020 Letter INSPECTION SUMMARY
03/06/2020 Letter INSPECTION SUMMARY
03/11/2020 Letter INSPECTION SUMMARY
03/11/2020 Letter INSPECTION SUMMARY
03/12/2020 Letter INSPECTION SUMMARY
03/16/2020 Letter INSPECTION SUMMARY
04/20/2020 Letter INSPECTION SUMMARY
04/20/2020 Letter INSPECTION SUMMARY
04/22/2020 Letter INSPECTION SUMMARY
04/22/2020 Letter Codes Plan Review Conditions
04/22/2020 Letter INSPECTION SUMMARY
04/22/2020 Letter INSPECTION SUMMARY
04/22/2020 Letter INSPECTION SUMMARY
04/22/2020 Letter INSPECTION SUMMARY
04/22/2020 Letter INSPECTION SUMMARY
04/22/2020 Letter INSPECTION SUMMARY
04/22/2020 Letter INSPECTION SUMMARY
04/22/2020 Letter INSPECTION SUMMARY
04/23/2020 Letter INSPECTION SUMMARY
04/28/2020 Letter INSPECTION SUMMARY
04/30/2020 Letter INSPECTION SUMMARY
05/01/2020 Letter INSPECTION SUMMARY
05/07/2020 Letter INSPECTION SUMMARY
05/08/2020 Letter INSPECTION SUMMARY
05/08/2020 Letter INSPECTION SUMMARY
05/11/2020 Letter INSPECTION SUMMARY
05/11/2020 Letter INSPECTION SUMMARY
05/12/2020 Letter INSPECTION SUMMARY
05/13/2020 Letter INSPECTION SUMMARY
05/13/2020 Letter INSPECTION SUMMARY
05/14/2020 Letter INSPECTION SUMMARY
05/15/2020 Letter INSPECTION SUMMARY
05/15/2020 Letter INSPECTION SUMMARY
05/20/2020 Letter INSPECTION SUMMARY
05/21/2020 Letter INSPECTION SUMMARY
05/21/2020 Letter INSPECTION SUMMARY
05/28/2020 Letter INSPECTION SUMMARY
05/29/2020 Letter INSPECTION SUMMARY
06/08/2020 Letter INSPECTION SUMMARY
06/09/2020 Letter INSPECTION SUMMARY
06/16/2020 Letter INSPECTION SUMMARY
06/16/2020 Letter DE-Daily Inspection Summary
06/23/2020 Letter Codes Temporary Certificate of Occupancy
06/23/2020 Letter DE-Daily Inspection Summary
07/01/2020 Letter INSPECTION SUMMARY
07/06/2020 Letter DE-Daily Inspection Summary
06/30/2020 Letter DE-Daily Inspection Summary
07/17/2020 Engineer Report/Study 2020.06.16_120 SW Blue Parkway_LSMO_DIR_Soils
07/17/2020 Engineer Report/Study 2020.06.16_120 SW Blue Parkway_LSMO_DIR_Reinforcing Steel and Bolts
11/30/2020 Letter INSPECTION SUMMARY
11/30/2020 Letter INSPECTION SUMMARY
11/30/2020 Letter INSPECTION SUMMARY
11/30/2020 Letter INSPECTION SUMMARY
12/16/2020 Letter Field Certificate of Occupancy
12/16/2020 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home