Summary
PRCOM20191085
Building Permit - Commercial
Final Completion
TUSTIN LLC
PARTIAL COMMERCIAL
FOUNDATION AND UNDERSLAB PLUMBING PERMIT FOR FUTURE OFFICE BUILDING FULL PERMIT - PRCOM20190679
04/26/2019
05/02/2019
12/23/2019
Locations
Contacts
DAHMER CONTRACTING GROUP, Address:8375 NIEMAN RD, Phone:(913) 274-9982  
TUSTIN LLC, Address:8375 NIEMAN RD  
ALPHA-OMEGA GEOTECH, Address:1701 STATE AVE, Phone:(913) 371-0000  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 04/26/2019 04/26/2019
Joe Frogge
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for Partial Commercial $240.00 $240.00 Paid 05/02/2019
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Commercial Partial 5/13/2019 at 3:40 PM 05/13/2019
Footing Inspection - Commercial Partial 5/14/2019 at 9:50 AM 05/14/2019
Misc
Partial Correction
05/14/2019
OK TO POUR WHEN READY SECTIONS OF CONCRETE GRADE BEAM + INTEGRAL COLUMN FOOTINGS AS FOLLOWS: 1/D.6 TO 1/E TO 3/E TO 3/C.3:
Footing Inspection - Commercial Partial 5/14/2019 at 2:00 PM 05/14/2019
Misc
Partial Correction
05/14/2019
OK TO POUR WHEN READY SECTIONS OF CONCRETE GRADE BEAM + INTEGRAL COLUMN FOOTINGS AS FOLLOWS: 1/D.6 TO 1/E TO 3/E TO 3/C.3 WITH UFER GROUND JUMPER NEAR SW CORNER;
Footing Inspection - Commercial Partial 5/15/2019 5/15/2019 at 10:10 AM 05/15/2019
Misc
Partial Correction
05/14/2019
OK TO POUR WHEN READY SECTIONS OF CONCRETE GRADE BEAM + INTEGRAL COLUMN FOOTINGS AS FOLLOWS: 1/D.6 TO 1/E TO 3/E TO 3/C.3 WITH UFER GROUND JUMPER NEAR SW CORNER; FROM 3/C.3 TO 3/A.2;
Footing Inspection - Commercial Partial 5/16/2019 (10:00) 5/16/2019 at 10:15 AM 05/16/2019
Misc
Partial Correction
05/15/2019
OK TO POUR WHEN READY SECTIONS OF CONCRETE GRADE BEAM + INTEGRAL COLUMN FOOTINGS AS FOLLOWS: 1/D.6 TO 1/E TO 3/E TO 3/C.3 WITH UFER GROUND JUMPER NEAR SW CORNER; FROM 3/C.3 TO 3/A.2;
Misc
Partial Correction
05/16/2019
OK TO POUR WHEN READY ISOLATED FOOTINGS AT FOLLOWING LOCATIONS: B/2; C/2;
Footing Inspection - Commercial Partial 5/20/2019 (10:30) 5/20/2019 at 10:35 AM 05/20/2019
Misc
Partial Correction
05/16/2019
OK TO POUR WHEN READY SECTIONS OF CONCRETE GRADE BEAM + INTEGRAL COLUMN FOOTINGS AS FOLLOWS: 1/D.6 TO 1/E TO 3/E TO 3/C.3 WITH UFER GROUND JUMPER NEAR SW CORNER; FROM 3/C.3 TO 3/A.2; FROM 3/A.2 TO A/3 TO A/2.2;
Misc
Partial Correction
05/16/2019
OK TO POUR WHEN READY ISOLATED FOOTINGS AT FOLLOWING LOCATIONS: B/2; C/2;
Footing Inspection - Commercial Partial 5/28/2019 5/28/2019 at 1:10 PM 05/28/2019
Misc
Partial Correction
05/20/2019
OK TO POUR WHEN READY SECTIONS OF CONCRETE GRADE BEAM + INTEGRAL COLUMN FOOTINGS AS FOLLOWS: 1/D.6 TO 1/E TO 3/E TO 3/C.3 WITH UFER GROUND JUMPER NEAR SW CORNER; FROM 3/C.3 TO 3/A.2; FROM 3/A.2 TO A/3 TO A/2.2;
Misc
Partial Correction
05/20/2019
OK TO POUR WHEN READY ISOLATED FOOTINGS AT FOLLOWING LOCATIONS: B/2; C/2;
Misc
Partial Correction
05/28/2019
FOOTING FOR ELEVATOR APPROVED TO POUR
Foundation Inspection - Commercial Partial 5/29/2019 (1:00) 5/29/2019 at 12:55 PM 05/29/2019
Misc
Partial Correction
05/29/2019
FOUNDATION FOR ELEVATOR APPROVED TO POUR
Footing Inspection - Commercial Partial 5/31/2019 (1:00) 5/31/2019 at 12:45 PM 05/31/2019
Misc
Partial Correction
05/28/2019
OK TO POUR WHEN READY SECTIONS OF CONCRETE GRADE BEAM + INTEGRAL COLUMN FOOTINGS AS FOLLOWS: 1/D.6 TO 1/E TO 3/E TO 3/C.3 WITH UFER GROUND JUMPER NEAR SW CORNER; FROM 3/C.3 TO 3/A.2; FROM 3/A.2 TO A/3 TO A/2.2;
Misc
Partial Correction
05/28/2019
OK TO POUR WHEN READY ISOLATED FOOTINGS AT FOLLOWING LOCATIONS: B/2; C/2; FROM E LINE TO C LINE ON 1 LINE INCLUDING BUMP OUT
Misc
Partial Correction
05/28/2019
FOOTING FOR ELEVATOR APPROVED TO POUR
Miscellaneous Inspection Partial 5/31/2019 05/31/2019
Informational
05/31/2019
Joe Starlin 05/31/2019 3:38 PM They removed the manhole and abandoned two sections of pipe by filling the pipes in with concrete. Soil test will done for compaction.
Footing Inspection - Commercial Partial 6/4/2019 (1:00) 6/4/2019 at 12:45 PM 06/04/2019
Misc
Partial Correction
05/31/2019
OK TO POUR WHEN READY SECTIONS OF CONCRETE GRADE BEAM + INTEGRAL COLUMN FOOTINGS AS FOLLOWS: 1/D.6 TO 1/E TO 3/E TO 3/C.3 WITH UFER GROUND JUMPER NEAR SW CORNER; FROM 3/C.3 TO 3/A.2; FROM 3/A.2 TO A/3 TO A/2.2; REMAINDER AT EAST WALL AND NORTH WALL TO COMPLETE PERIMETER
Misc
Partial Correction
05/31/2019
OK TO POUR WHEN READY ISOLATED FOOTINGS AT FOLLOWING LOCATIONS: B/2; C/2; FROM E LINE TO C LINE ON 1 LINE INCLUDING BUMP OUT
Misc
Partial Correction
05/31/2019
FOOTING FOR ELEVATOR APPROVED TO POUR
Footing Inspection - Commercial Passed 6/7/2019 6/7/2019 06/04/2019
Misc
Resolved
06/04/2019
OK TO POUR WHEN READY SECTIONS OF CONCRETE GRADE BEAM + INTEGRAL COLUMN FOOTINGS AS FOLLOWS: 1/D.6 TO 1/E TO 3/E TO 3/C.3 WITH UFER GROUND JUMPER NEAR SW CORNER; FROM 3/C.3 TO 3/A.2; FROM 3/A.2 TO A/3 TO A/2.2; REMAINDER AT EAST WALL AND NORTH WALL TO COMPLETE PERIMETER
Misc
Resolved
06/04/2019
OK TO POUR WHEN READY ISOLATED FOOTINGS AT FOLLOWING LOCATIONS: B/2; C/2; FROM E LINE TO C LINE ON 1 LINE INCLUDING BUMP OUT
Misc
Resolved
06/04/2019
FOOTING FOR ELEVATOR APPROVED TO POUR
Foundation Inspection - Commercial Partial 7/22/2019 (1:00) 7/23/2019 at 1:10 PM 07/23/2019
Misc
Resolved
06/04/2019
OK TO POUR WHEN READY FOUNDATION WALL: ELEVATOR PIT WALLS; AT (A) LINE;
Underslab Plumbing Inspection - Commercial Passed 8/1/2019 8/1/2019 at 9:10 AM 08/01/2019
Underslab Electrical Inspection - Commercial Passed 8/5/2019 8/5/2019 at 7:05 AM 08/05/2019
Final Inspection - Commercial Passed 12/23/2019 at 1:25 PM 12/23/2019
Misc
Resolved
12/23/2019
5/16: OK TO POUR WHEN READY ISOLATED FOOTINGS AT FOLLOWING LOCATIONS: B/2; C/2;
Foundation Inspection - Commercial Passed 7/23/2019 12/23/2019
Investigation Inspection Complete 12/23/2019
Miscellaneous Inspection Passed 12/23/2019
In-wall Inspection Partial 1/22/2020 1/22/2020 at 10:05 AM 01/22/2020
Documents & Images
Date Uploaded File Type Document Name
04/26/2019 Reece Nichols Building Special Inspections Engagement Letter
05/02/2019 Receipt Receipt for transaction: 2019-001712
05/02/2019 Letter Codes Building Permit
05/14/2019 Letter INSPECTION SUMMARY
05/14/2019 Letter INSPECTION SUMMARY
05/15/2019 Letter INSPECTION SUMMARY
05/16/2019 Letter INSPECTION SUMMARY
05/20/2019 Letter INSPECTION SUMMARY
05/28/2019 Letter INSPECTION SUMMARY
05/29/2019 Letter INSPECTION SUMMARY
05/31/2019 image abandon pipe
05/31/2019 image grout for abandonment
05/31/2019 image line plunged on N side
05/31/2019 image line abandoned W side
05/31/2019 image manhole removed
05/31/2019 Letter DE-Daily Inspection Summary
06/04/2019 Letter INSPECTION SUMMARY
07/23/2019 Letter INSPECTION SUMMARY
08/01/2019 Letter INSPECTION SUMMARY
08/01/2019 Letter INSPECTION SUMMARY
08/05/2019 Letter INSPECTION SUMMARY
08/09/2019 DOC052919-05292019123908
12/23/2019 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home