Permit Application Status

PRCOM20191072


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20191072
Building Permit - Commercial
Final Completion
SAINT LUKES EAST HOSPITAL
ALTERATION COMMERCIAL
INTERIOR ALTERATIONS - ED WAITING ROOMS AND NURSE STATION REMODEL
04/25/2019
05/06/2019
09/05/2019
Locations
Contacts
SAINT LUKES EAST HOSPITAL, Address:901 E 104TH ST MAILSTOP 900N  
JE DUNN CONSTRUCTION CO, Address:120 S CENTRAL AVE STE 350, Phone:(816) 474-8600  
ACI BOLAND, Address:1421 EAST 104TH ST; SUITE 100, Phone:(816) 763-9600  
P1 CONSTRUCTION LLC, Address:13605 W 96TH TERR, Phone:(913) 529-5000  
SHAW ELECTRIC COMPANY, Address:3600 FULLER, Phone:(816) 921-0033  
P1 CONSTRUCTION LLC, Address:13605 W 96TH TERR, Phone:(913) 529-5000  
Reviews
Review Type Outcome Est. Completion Date Completed
Fire Plan Review Approved with Conditions 05/07/2019 05/02/2019
Joe Dir
Construction documents for fire alarm systems
Corrective Action Required
05/02/2019

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. ACTION REQUIRED: (information purposes) Have the fire alarm system contractor provide three sets of PE stamped shop drawings of any modifications to be done to the fire alarm system.
Construction documents - Fire protection systems
Corrective Action Required
05/02/2019

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. ACTION REQUIRED: (information purposes) Have the fire sprinkler system contractor provide three sets of PE stamped shop drawings of any modifications to be done to the fire sprinkler system
Installation acceptance testing
Corrective Action Required
05/02/2019

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. ACTION REQUIRED:(information purposes) Any modification done to the fire alarm system will be required to be tested prior to the final occupancy inspection. Contact the fire department to schedule testing.(816)969-1300
Misc
Corrective Action Required
05/02/2019

Med Gas ACTION REQUIRED: (information purposes) Any med gas lines and or pressure monitoring devices relocated or installed new will require a pressure test on the system. Documentation of the testing shall be provided to the fire department at the conclusion of testing prior to the final occupancy inspection.
Building Plan Review Approved 05/07/2019 04/26/2019
Joe Frogge
License Tax Application
Corrective Action Required
04/26/2019

A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit. Action required: Comment is for informational purposes.
Licensed Contractors Approved 04/26/2019 04/26/2019
Joe Frogge
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for Alteration to Commercial $1,368.78 $1,368.78 Paid 05/06/2019
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Final Inspection - Commercial Partial 8/1/2019 8/1/2019 at 11:15 AM 08/01/2019
Misc
Partial Correction
08/01/2019
PHASE FINAL AREAS OK FOR USE & OCCUPANCY: PHASE 1;
Final Inspection - Commercial Partial 8/15/2019 8/15/2019 at 2:15 PM 08/15/2019
Misc
Partial Correction
08/01/2019
PHASE FINAL AREAS OK FOR USE & OCCUPANCY: PHASE 1; NURSE POD PHASE 2;
In-wall Inspection Partial 8/29/2019 8/29/2019 at 11:10 AM 08/29/2019
Misc
Partial Correction
08/29/2019
OK TO COVER FRAMING AND M/E/P SYSTEMS TO BE CONCEALED AT NEW/MODIFIED WALLS AT: PHASE 3 AREA;
Final Inspection - Commercial Passed 9/5/2019 9/5/2019 at 12:40 PM 09/05/2019
Misc
Resolved
09/05/2019
PHASE FINAL AREAS OK FOR USE & OCCUPANCY: PHASE 1; NURSE POD PHASE 2;
In-wall Inspection Passed 9/5/2019 09/05/2019
Misc
Resolved
09/05/2019
OK TO COVER FRAMING AND M/E/P SYSTEMS TO BE CONCEALED AT NEW/MODIFIED WALLS AT: PHASE 3 AREA;
Documents & Images
Date Uploaded File Type Document Name
05/02/2019 Letter Fire Building Plan Review
05/02/2019 Letter Codes Plan Review Conditions
05/06/2019 Receipt Receipt for transaction: 2019-001763
05/06/2019 Letter Codes Building Permit
08/15/2019 Letter INSPECTION SUMMARY
08/29/2019 Letter INSPECTION SUMMARY
09/05/2019 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home