Permit Application Status

PRCOM20190970


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20190970
Building Permit - Commercial
Final Completion
SAINT LUKES EAST HOSPITAL
ALTERATION COMMERCIAL
MODIFICATION OF STORAGE ROOMS INTO OPERATING ROOMS
04/17/2019
05/06/2019
08/26/2019
Locations
Contacts
SAINT LUKES EAST HOSPITAL, Address:901 E 104TH ST MAILSTOP 900N  
JE DUNN CONSTRUCTION CO, Address:120 S CENTRAL AVE STE 350, Phone:(816) 474-8600  
ACI BOLAND, Address:1421 EAST 104TH ST; SUITE 100, Phone:(816) 763-9600  
MMC CONTRACTORS NATIONAL INC, Address:13800 WYANDOTTE, Phone:(816) 941-5300  
SHAW ELECTRIC COMPANY, Address:3600 FULLER, Phone:(816) 921-0033  
MMC CONTRACTORS NATIONAL INC, Address:13800 WYANDOTTE, Phone:(816) 941-5300  
RUSTY.BINDER@JEDUNN.COM  
Reviews
Review Type Outcome Est. Completion Date Completed
Sprinkler Plan Review Released for Construction 06/11/2019
Michael Weissenbach
Building Plan Review Approved 04/29/2019 04/24/2019
Joe Frogge
Fire Plan Review Approved with Conditions 04/29/2019 04/19/2019
Joe Dir
Construction documents for fire alarm systems
Corrective Action Required
04/19/2019

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. ACTION REQUIRED:(information purposes) Have the fire alarm system contractor provide three sets of PE stamped shop drawings of any modifications to be done to the fire alarm system.
Tenant identification
Corrective Action Required
04/19/2019

2018 IFC 408.11.2 - Tenant identification. Each occupied tenant space provided with a secondary exit to the exterior or exit corridor shall be provided with tenant identification by business name and/or address. Letters and numbers shall be posted on the corridor side of the door, be plainly legible and shall contrast with their background. ACTION REQUIRED:(verification at inspection) All rooms off the corridors shall be identified by room use. Room labeling shall be readable from the corridors.
Construction documents - Fire protection systems
Corrective Action Required
04/19/2019

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. ACTION REQUIRED:(information purposes) Have the fire sprinkler contractor provide three sets of PE stamped shop drawing of any modification to be done to the fire sprinkler system.
Installation acceptance testing
Corrective Action Required
04/19/2019

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. ACTION REQUIRED:(information purposes) Any modification to the fire alarm system or any devices that are relocated and or unhooked, will be required to be tested prior to the final occupancy inspection. Contact the fire department to schedule testing. (816)969-1300
Miscellaneous Correction
Corrective Action Required
04/19/2019

Med gas lines ACTION REQUIRED: (information purposes) All med gas lines that will be added or relocated will require a pressure test. A copy of the test will be supplied to the fire department prior to the final occupancy inspection.
Licensed Contractors Approved 04/17/2019 04/17/2019
Joe Frogge
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for Alteration to Commercial $1,934.36 $1,934.36 Paid 05/06/2019
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
In-wall Inspection Partial 5/28/2019 at 2:15 PM 05/28/2019
Misc
Partial Correction
05/28/2019
O.R. ROOM 7 AND 8: FRAMING ONLY, APPROVED TO TOP OUT ABOVE CEILING LINE
In-wall Inspection Partial 6/6/2019 6/6/2019 at 10:15 AM 06/06/2019
Misc
Partial Correction
05/28/2019
OK TO COVER WHEN READY WALL FRAMING AND SYSTEMS TO BE CONCEALED AT O.R. 7 AND O.R. 8 EXCEPT TWO CHASES AT WEST EXT WALL AND TWO BUMP-OUTS AT EAST;
Above Ceiling Inspection Partial 6/21/2019 6/21/2019 at 10:20 AM 06/21/2019
Misc
Partial Correction
06/21/2019
OK TO COVER WHEN READY GWB CEILING / SOFFIT / BULKHEAD FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: BOTH OR'S;
In-wall Inspection Passed 6/28/2019 6/28/2019 at 9:10 AM 06/28/2019
Misc
Resolved
06/28/2019
OK TO COVER WHEN READY WALL FRAMING AND SYSTEMS TO BE CONCEALED AT O.R. 7 AND O.R. 8 EXCEPT TWO CHASES AT WEST EXT WALL AND TWO BUMP-OUTS AT EAST;
Above Ceiling Inspection Partial 7/8/2019 7/8/2019 at 7:10 AM 07/08/2019
Misc
Resolved
07/08/2019
OK TO COVER WHEN READY GWB CEILING / SOFFIT / BULKHEAD FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: BOTH OR'S;
Misc
Partial Correction
07/08/2019
OK TO COVER WHEN READY CEILING FRAMING + ABOVE-CEILING SYSTEMS AT CENTER AREA OF BOTH OR'S + ABOVE CEILING AT SUBSTERILE 1A259
Above Ceiling Inspection Passed 7/8/2019 08/15/2019
Misc
Resolved
08/15/2019
OK TO COVER WHEN READY CEILING FRAMING + ABOVE-CEILING SYSTEMS AT CENTER AREA OF BOTH OR'S + ABOVE CEILING AT SUBSTERILE 1A259
Final Inspection - Commercial Partial 8/26/2019 8/16/2019 at 8:20 AM 08/16/2019
Misc
Partial Correction
08/16/2019
PRELIMINARY INSPECTION IN ADVANCE OF FINAL: - ELECTRICAL RECEPTACLES TESTED OK FOR EQUIPMENT TO BE SET AND PLUGGED IN - UPDATED ABOVE-CEILING INSPECTION APPROVED
Final Inspection - Commercial Passed 8/26/2019 at 8:40 AM 08/26/2019
Misc
Resolved
08/26/2019
PRELIMINARY INSPECTION IN ADVANCE OF FINAL: - ELECTRICAL RECEPTACLES TESTED OK FOR EQUIPMENT TO BE SET AND PLUGGED IN - UPDATED ABOVE-CEILING INSPECTION APPROVED
Miscellaneous Inspection Passed 5/27/2019 08/26/2019
Alarm Test Passed 8/26/2019 08/26/2019
Occupancy Inspection - Fire Passed 8/26/2019 08/26/2019
Documents & Images
Date Uploaded File Type Document Name
04/19/2019 Letter Fire Building Plan Review
04/24/2019 Letter Codes Plan Review Conditions
05/06/2019 Receipt Receipt for transaction: 2019-001762
05/06/2019 Letter Codes Building Permit
05/28/2019 Letter INSPECTION SUMMARY
06/06/2019 Letter INSPECTION SUMMARY
06/11/2019 Letter Fire (Sprinkler) Plan Review
06/28/2019 Letter INSPECTION SUMMARY
07/08/2019 Letter INSPECTION SUMMARY
08/26/2019 Letter INSPECTION SUMMARY
08/26/2019 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home