Permit Application Status

PRCOM20190138


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20190138
Building Permit - Commercial
Certificate of Occupancy
MID-CONTINENT PUBLIC LIBRARY
NEW COMMERCIAL
NEW PUBLIC LIBRARY
01/24/2019
05/09/2019
07/30/2019
04/22/2020
Locations
Contacts
MID-CONTINENT PUBLIC LIBRARY, Address:15616 E US HWY 24  
JE DUNN CONSTRUCTION CO, Address:120 S CENTRAL AVE STE 350, Phone:(816) 474-8600  
SAPP DESIGN ARCHITECTS, Address:3750 S FREMONT, Phone:(417) 877-9600  
GREEN FIELD ENERGY GROUP INC, Address:5 SW 4TH ST, Phone:(816) 524-5616  
STACO ELECTRIC CONSTRUCTION COMPANY INC, Address:11030 HICKMAN MILLS DR, Phone:(816) 765-7112  
KANSAS CITY MECHANICAL INC, Address:6822 KANSAS AVE, Phone:(913) 334-1101  
Intertek-PSI, Address:2828 S. 44th Street, Phone:(913) 310-1600  
Rick Meyer, Address:JE Dunn Construction, Phone:(660) 924-6465  
Reviews
Review Type Outcome Est. Completion Date Completed
Alarm Plan Review Released for Construction 11/13/2019
Michael Weissenbach
Installation acceptance testing
Corrective Action Required
11/13/2019

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule testing.
Miscellaneous Correction
Corrective Action Required
11/13/2019

(Action Required) Mount outside horn/strobe by FDC Strobes only in Men's and Women's Restrooms
Special Inspections Review Approved 09/11/2019
Mike Weisenborn
Final Development Plan Review Approved 05/06/2019
Joe Frogge
Sprinkler Plan Review Released for Construction 03/12/2019
Joe Dir
Installation acceptance testing
Corrective Action Required
03/12/2019

2012 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. ACTION REQUIRED:(information purposes) All field testing and acceptance testing will be required to be completed prior to the final occupancy inspection. Contact the fire department to schedule testing. (816)969-1300
Fire Plan Review Approved with Conditions 02/28/2019 02/25/2019
Joe Dir
Posting of occupant load
Corrective Action Required
02/21/2019

2012 IFC 1004.3- Posting of occupant load. Every room or space that is an assembly occupancy shall have the occupant load of the room or space posted in a conspicuous place, near the main exit or exit access doorway from the room or space. Posted signs shall be of an approved legible permanent design and shall be maintained by the owner or authorized agent. ACTION REQUIRED: (verified at inspection) Post occupant load signs in rooms 118 and 119.
Construction documents for fire alarm systems
Corrective Action Required
02/21/2019

2012 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. ACTION REQUIRED: (information purposes) Have the fire alarm system contractor provide shop drawings of the Fire Alarm System to be installed. Duct detection will be monitored by the fire alarm system.
Address numbers required
Corrective Action Required
02/21/2019

2012 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). ACTION REQUIRED: (verified at inspection) Numeric address of (2240) shall be readable from Blue Parkway.
Knox box required
Corrective Action Required
02/21/2019

2012 IFC 506.1- Where required. Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type and shall contain keys to gain necessary access as required by the fire code official. ACTION REQUIRED:(verified at inspection) Placement will be made on the wall above FDC.
Construction documents - Fire protection systems
Corrective Action Required
02/21/2019

2012 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. ACTION REQUIRED:(information purposes) Have the fire sprinkler system contractor provide shop drawings of the fire sprinkler system to be installed.
Installation acceptance testing
Corrective Action Required
02/21/2019

2012 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. ACTION REQUIRED:(information purposes) Field tests and acceptance testing of the fire sprinkler and fire alarm system will be required prior to the final occupancy inspection. Contact the fire department to schedule testing. (816)969-1300
Portable fire extinguishers - conspicuous locations
Corrective Action Required
02/21/2019

2012 IFC 906.5- Conspicuous location. Portable fire extinguishers shall be located in conspicuous locations where they will be readily accessible and immediately available for use. These locations shall be along normal paths of travel, unless the fire code official determines that the hazard posed indicates the need for placement away from normal paths of travel. ACTION REQUIRED:(verified at inspection) Provide a minimum of six 2A10BC fire extinguishers. To be mounted on walls or cabinets on normal path of travel close to exits.
Miscellaneous Correction
Resolved
02/25/2019

2012 IFC 1008.1.9 Door operations. ACTION REQUIRED:(verified at inspection) NO keyed locks on the egress side of an exit. Except as specifically permitted by this section egress doors shall be readily openable from the egress side without the use of a key or special knowledge or effort. ACTION REQUIRED:(verified at inspection) Panic hardware to be installed on all hinged exit doors.
Misc
Corrective Action Required
02/21/2019

2012 IFC 1006.1 Illumination required. The means of egress, including the exit discharge, shall be illuminated at all times the building space served by the means of egress is occupied. ACTION REQUIRED:(verified at inspection) Receiving exit door needs exterior emergency illumination.
Building Plan Review Approved with Conditions 02/28/2019 02/22/2019
Joe Frogge
Final Development Plan
Resolved
05/06/2019

The building permit for this project can not be issued until the Codes Administration Department has received the approved Final Development Plan from the Planning and Development Department. Action required: Comment is for informational purposes. 2/22/19 - Acknowledged in letter.
Miscellaneous Correction
Resolved
02/22/2019

2012 IBC 1704.2 Special inspections. Where application is made for construction as described in this section, the owner or the registered design professional in responsible charge acting as the owner’s agent shall employ one or more approved agencies to perform inspections during construction on the types of work listed under Section 1705. These inspections are in addition to the inspections identified in Lee’s Summit Code of Ordinances Chapter 7. (see code section for exceptions) Action required: Provide statement of special inspections / letter of responsibility from company contracted to perform special inspections.
Miscellaneous Correction
Resolved
02/22/2019

2012 IBC 1013.6 Mechanical equipment. Guards shall be provided where appliances, equipment, fans, roof hatch openings or other components that require service are located within 10 feet of a roof edge or open side of a walking surface and such edge or open side is located more than 30 inches above the floor, roof or grade below. The guard shall be constructed so as to prevent the passage of a sphere 21 inches in diameter. The guard shall extend not less than 30 inches beyond each end of such appliance, equipment, fan, or component. Action required: Either relocate roof hatch or provide guards at roof edge.
Bldg - Occupant load posting 1004.3
Corrective Action Required
02/21/2019

2012 IBC 1004.3 - Posting of occupant load. Every room or space that is an assembly occupancy shall have the occupant load of the room or space posted in a conspicuous place, near the main exit or exit access doorway from the room or space. Posted signs shall be of an approved legible permanent design and shall be maintained by the owner or authorized agent. Action required: Comment is for informational purposes. To be field verified. 2/22/19 - Acknowledged in letter.
Bldg - Toilet room wall finish 1210.2.2
Resolved
02/22/2019

2012 IBC 1210.2.2 – Walls and partitions. Walls and partitions with 2 feet of service sinks, urinals and water closets shall have a smooth, hard, nonabsorbent surface, to a height of not less than 4 feet above the floor, and except for structural elements, the materials used in such walls shall be of a type that is not adversely affected by moisture. (See code section for possible exceptions.) Action required: Specify compliant wall finish material at mop sink.
Mech - Materials within plenums 602.2.1
Corrective Action Required
02/21/2019

2012 IMC 602.2.1 Materials within plenums. Except as required by Sections 602.2.1.1 through 602.2.1.5, materials within plenums shall be noncombustible or shall be listed and labeled as having a flame spread index of not more than 25 and a smoke-developed index of not more than 50 when tested in accordance with ASTM E84 or UL 723. (see code section for exceptions) Action required: Comment is for informational purposes. PVC will not be allowed in plenums. To be field verified. 2/22/19 - Acknowledged in letter.
Licensed Contractors Approved 02/21/2019 02/22/2019
Joe Frogge
LC - MEP Subs
Resolved
02/22/2019

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. (unable to locate license for KC Mechanical)
Building Plan Review Rejected 02/07/2019 01/30/2019
Joe Frogge
Final Development Plan
Corrective Action Required
01/30/2019

The building permit for this project can not be issued until the Codes Administration Department has received the approved Final Development Plan from the Planning and Development Department. Action required: Comment is for informational purposes.
Miscellaneous Correction
Corrective Action Required
01/30/2019

2012 IBC 1704.2 Special inspections. Where application is made for construction as described in this section, the owner or the registered design professional in responsible charge acting as the owner’s agent shall employ one or more approved agencies to perform inspections during construction on the types of work listed under Section 1705. These inspections are in addition to the inspections identified in Lee’s Summit Code of Ordinances Chapter 7. (see code section for exceptions) Action required: Provide statement of special inspections / letter of responsibility from company contracted to perform special inspections.
Miscellaneous Correction
Corrective Action Required
01/31/2019

2012 IBC 1013.6 Mechanical equipment. Guards shall be provided where appliances, equipment, fans, roof hatch openings or other components that require service are located within 10 feet of a roof edge or open side of a walking surface and such edge or open side is located more than 30 inches above the floor, roof or grade below. The guard shall be constructed so as to prevent the passage of a sphere 21 inches in diameter. The guard shall extend not less than 30 inches beyond each end of such appliance, equipment, fan, or component. Action required: Either relocate roof hatch or provide guards at roof edge.
Bldg - Occupant load posting 1004.3
Corrective Action Required
01/31/2019

2012 IBC 1004.3 - Posting of occupant load. Every room or space that is an assembly occupancy shall have the occupant load of the room or space posted in a conspicuous place, near the main exit or exit access doorway from the room or space. Posted signs shall be of an approved legible permanent design and shall be maintained by the owner or authorized agent. Action required: Comment is for informational purposes. To be field verified.
Bldg - Toilet room wall finish 1210.2.2
Corrective Action Required
01/31/2019

2012 IBC 1210.2.2 – Walls and partitions. Walls and partitions with 2 feet of service sinks, urinals and water closets shall have a smooth, hard, nonabsorbent surface, to a height of not less than 4 feet above the floor, and except for structural elements, the materials used in such walls shall be of a type that is not adversely affected by moisture. (See code section for possible exceptions.) Action required: Specify compliant wall finish material at mop sink.
Mech - Materials within plenums 602.2.1
Corrective Action Required
01/31/2019

2012 IMC 602.2.1 Materials within plenums. Except as required by Sections 602.2.1.1 through 602.2.1.5, materials within plenums shall be noncombustible or shall be listed and labeled as having a flame spread index of not more than 25 and a smoke-developed index of not more than 50 when tested in accordance with ASTM E84 or UL 723. (see code section for exceptions) Action required: Comment is for informational purposes. PVC will not be allowed in plenums. To be field verified.
Licensed Contractors Rejected 02/07/2019 01/30/2019
Joe Frogge
LC - MEP Subs
Corrective Action Required
01/30/2019

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. (unable to locate license for KC Mechanical)
Fire Plan Review Approved with Conditions 02/07/2019 01/25/2019
Michael Weissenbach
Posting of occupant load
Corrective Action Required
01/25/2019

2012 IFC 1004.3- Posting of occupant load. Every room or space that is an assembly occupancy shall have the occupant load of the room or space posted in a conspicuous place, near the main exit or exit access doorway from the room or space. Posted signs shall be of an approved legible permanent design and shall be maintained by the owner or authorized agent. (Action Required) Post occupant load signs in rooms 118 and 119.
Construction documents for fire alarm systems
Corrective Action Required
01/25/2019

2012 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. (Action Required) Provide shop drawings of the Fire Alarm System. Duct detection will be monitored.
Address numbers required
Corrective Action Required
01/25/2019

2006 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). (Action Required) Post address readable from Blue Parkway.
Knox box required
Corrective Action Required
01/25/2019

2006 IFC 506.1- Where required. Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type and shall contain keys to gain necessary access as required by the fire code official. (Action Required) A Knox Box can be obtained through KnoxBox.com. Placement will be made on the wall above FDC.
Construction documents - Fire protection systems
Corrective Action Required
01/25/2019

2006 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. (Action Required) Provide shop drawings of the system to be installed.
Installation acceptance testing
Corrective Action Required
01/25/2019

2006 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Action Required) Testing of the fire protection systems before final occupancy inspection. Call (816)969-1300 to schedule testing.
Portable fire extinguishers - conspicuous locations
Corrective Action Required
01/25/2019

2012 IFC 906.5- Conspicuous location. Portable fire extinguishers shall be located in conspicuous locations where they will be readily accessible and immediately available for use. These locations shall be along normal paths of travel, unless the fire code official determines that the hazard posed indicates the need for placement away from normal paths of travel. (Action Required) Provide a minimum of 6 2A10BC fire extinguishers.
Miscellaneous Correction
Corrective Action Required
01/25/2019

1008.1.9 Door operations. Except as specifically per mitted by this section egress doors shall be readily openable from the egress side without the use of a key or special knowledge or effort. (Action Required) Panic hardware to be installed on all hinged exit doors.
Misc
Corrective Action Required
01/25/2019

1006.1 Illumination required. The means of egress, including the exit discharge, shall be illuminated at all times the building space served by the means of egress is occupied. (Action Required) Receiving exit door needs exterior emergency illumination.
Fees
Paid Fees Amount Paid Owing Date Paid
Valuation Fee for New Commercial $16,428.04 $16,428.04 Paid 05/09/2019
8331507-Sewer Connection Fee $540.00 $540.00 Paid 05/09/2019
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Commercial Partial 5/30/2019 5/30/2019 at 11:45 AM 05/30/2019
THE FOLLOWING AREAS ARE APPROVED
Partial Correction
05/30/2019
G LINE APPROVED TO POUR
Footing Inspection - Commercial Partial 5/31/2019 5/31/2019 at 3:20 PM 05/31/2019
THE FOLLOWING AREAS ARE APPROVED
Partial Correction
05/30/2019
G LINE APPROVED TO POUR EXT. GRADE BEAM AND INTEGRATED COLUMN PADS: LINE 1.1 FROM G TO B INTERIOR COLUMN PADS: E/1.9&3; F/1.9&3
Footing Inspection - Commercial Partial 6/3/2019 6/3/2019 at 2:00 PM 06/03/2019
THE FOLLOWING AREAS ARE APPROVED
Partial Correction
05/30/2019
G LINE APPROVED TO POUR EXT. GRADE BEAM AND INTEGRATED COLUMN PADS: LINE 1.1 FROM G TO B INTERIOR COLUMN PADS: E/1.9&3; F/1.9&3 5 line approved to O line
Footing Inspection - Commercial Partial 6/4/2019 6/4/2019 at 2:10 PM 06/04/2019
THE FOLLOWING AREAS ARE APPROVED
Partial Correction
06/03/2019
G LINE APPROVED TO POUR EXT. GRADE BEAM AND INTEGRATED COLUMN PADS: LINE 1.1 FROM G TO B INTERIOR COLUMN PADS: E/1.9&3; F/1.9&3 5 line approved to O line; 5/B.5 CLOCKWISE ALL TO A.3.5;
Footing Inspection - Commercial Partial 6/5/2019 (1:00) 6/5/2019 at 1:00 PM 06/05/2019
THE FOLLOWING AREAS ARE APPROVED
Partial Correction
06/04/2019
G LINE APPROVED TO POUR EXT. GRADE BEAM AND INTEGRATED COLUMN PADS: LINE 1.1 FROM G TO B INTERIOR COLUMN PADS: E/1.9&3; F/1.9&3 5 line approved to O line; 5/B.5 CLOCKWISE ALL TO A/3.5;
Footing Inspection - Commercial Partial 6/7/2019 (1:00) 6/7/2019 at 12:45 PM 06/07/2019
THE FOLLOWING AREAS ARE APPROVED
Partial Correction
06/05/2019
ALL APPROVED EXCEPT TWO PADS FOR CANOPY
Footing Inspection - Commercial Passed 6/10/2019 (11:00) 6/10/2019 at 11:00 AM 06/10/2019
THE FOLLOWING AREAS ARE APPROVED
Resolved
06/10/2019
ALL APPROVED EXCEPT TWO PADS FOR CANOPY
Underslab Plumbing Inspection - Commercial Passed 6/10/2019 at 3:00 PM 06/10/2019
Underslab Electrical Inspection - Commercial Passed 6/14/2019 6/14/2019 06/14/2019
Underground Electrical Inspection - Commercial Partial 7/24/2019 7/24/2019 07/24/2019
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
07/24/2019
From the building all 13 light pole underground electrical is approved
Footing Inspection - Commercial Partial 9/20/2019 09/20/2019
Misc
Informational
09/20/2019
Rebar inspection for trash enclosure is approved, ok to pour
Footing Inspection - Commercial Partial 9/24/2019 09/24/2019
Misc
Informational
09/20/2019
Rebar inspection for trash enclosure is approved, ok to pour Rebar inspection for 2 stoops on the east side, one stoop on the north side are approved, ok to pour
In-wall Inspection Failed 10/22/2019 10/22/2019 at 11:10 AM 10/22/2019
Misc
Corrective Action Required
10/22/2019
**TRAILER LOCKED. NO ACCESS TO APPROVED PLAN -Protect plumbing (DVW and water lines) where located within 1.25” of surface of stud/track. Shield plate shall extend min 2” above bottom wall track. -Secure MC within 12” of some of the boxes -Secure water lines at mud-wall height -Fasten wall track to floor -Complete electrical at west side of building
In-wall Inspection Failed 10/25/2019 10/25/2019 at 1:25 PM 10/25/2019
Misc
Corrective Action Required
10/22/2019
In-wall from col. line 3 to 1: -Protect plumbing (DVW and water lines) where located within 1.25” of surface of stud/track. Shield plate shall extend min 2” above bottom wall track. -Secure water lines at mid-wall height -Complete P9 wall at manager office rm 108
In-wall Inspection Failed 10/29/2019 10/29/2019 at 1:10 PM 10/29/2019
Misc
Corrective Action Required
10/25/2019
In-wall from col. line 3 to 1: -Protect plumbing (DVW and water lines) where located within 1.25” of surface of stud/track. Shield plate shall extend min 2” above bottom wall track.
In-wall Inspection Partial 10/30/2019 10/30/2019 at 11:25 AM 10/30/2019
Misc
Partial Correction
10/30/2019
In-wall from col. line 3 to 1 ok to cover when ready;
In-wall Inspection Partial 11/22/2019 11/22/2019 11/22/2019
Misc
Partial Correction
10/30/2019
In-wall from col. line 3 to 1 ok to cover when ready; ; east exterior wall to Glass front ok to cover when water line is insulated.
In-wall Inspection Partial 11/25/2019 11/25/2019 at 2:50 PM 11/25/2019
Misc
Partial Correction
11/22/2019
In-wall from col. line 3 to 1 ok to cover when ready; ; east and west exterior wall to Glass front ok to cover
Above Ceiling Inspection Failed 12/10/2019 12/10/2019 at 3:15 PM 12/10/2019
Misc
Corrective Action Required
12/10/2019
NOT READY. SUPPORT GRID ABOVE THE RESTROOM AND COMPLETE MECHANICAL DUCTING
In-wall Inspection Partial 12/10/2019 12/10/2019
Misc
Partial Correction
11/25/2019
In-wall from col. line 3 to 1 ok to cover when ready; ; east and west exterior wall to Glass front ok to cover -row 3 soffit wall ok
In-wall Inspection Partial 12/12/2019 12/12/2019 12/12/2019
Misc
Partial Correction
12/10/2019
In-wall from col. line 3 to 1 ok to cover when ready; ; east and west exterior wall to Glass front ok to cover -row 3 soffit wall, kiosk wall in 107- ok
Above Ceiling Inspection Partial 12/12/2019 12/12/2019 at 1:05 PM 12/12/2019
Misc
Corrective Action Required
12/10/2019
ABOVE CEILING OK: -RM 103-107; 113
Electrical Service Inspection Passed 12/12/2019 12/12/2019
Gas Service Inspection - Commercial Passed 12/20/2019 at 3:00 PM 12/20/2019
Above Ceiling Inspection Partial 1/21/2020 1/21/2020 at 12:40 PM 01/21/2020
Misc
Corrective Action Required
12/12/2019
ABOVE CEILING OK: -RM 103-107; 113 REMAINING ROOMS: SUPPORT GRID; COMPLETE CONDENSATE LINES FROM VRF UNITS; COMPLETE VRF DISCHARGE LINE TO APPROVED POINT OF DISPOSAL
Above Ceiling Inspection Partial 1/23/2020 1/23/2020 01/23/2020
Misc
Resolved
01/23/2020
ABOVE CEILING OK: -RM 103-107; 113 : ABOVE CEILING OK ROOMS 102 108 THRU 111 116 119 THRU 125:
Sprinkler - Hydrostatic Test Passed 1/29/2020 01/29/2020
Sprinkler - Flow Test Passed 2/27/2020 02/27/2020
Alarm Test Failed 2/27/2020 02/27/2020
Alarm Test Passed 3/3/2020 03/03/2020
Occupancy Inspection - Planning Passed 3/9/2020 03/09/2020
Occupancy Inspection - Fire Passed 3/9/2020 03/09/2020
Occupancy Inspection - Water Utilities Failed 3/9/2020 03/09/2020
Miscellaneous Correction
Corrective Action Required
03/09/2020
Provide certification for the fire line backflow.
Occupancy Inspection - Engineering Failed 3/9/2020 03/09/2020
Miscellaneous Correction
Corrective Action Required
03/09/2020
Complete vegetation.
Miscellaneous Correction
Corrective Action Required
03/09/2020
Make necessary corrections to the storm water system. This has to be completed and approved prior to receiving any type of occupancy.
Occupancy Inspection - Codes Commercial Failed 3/10/2020 3/9/2020 03/09/2020
Misc
Corrective Action Required
03/09/2020
Provide wrap for exposed plumbing in men’s & women’s restroom & break room sink - Check grounding clamp light pole bases parking lot. -
Occupancy Inspection - Codes Commercial Failed 3/11/2020 03/11/2020
Misc
Corrective Action Required
03/09/2020
Provide wrap for exposed plumbing in men’s & women’s restroom & break room sink - Check grounding clamp light pole bases parking lot. -
Misc
Corrective Action Required
03/11/2020
OK TO STOCK EQUIPMENT AND MOVE BOOKS FROM OTHER LOCAITON. NOT TO BE OPEN TO THE PUBLIC.
Occupancy Inspection - Codes Commercial Failed 3/12/2020 03/12/2020
Misc
Resolved
03/12/2020
Provide wrap for exposed plumbing in men’s & women’s restroom & break room sink - Check grounding clamp light pole bases parking lot. -
Misc
Corrective Action Required
03/11/2020
OK TO STOCK EQUIPMENT AND MOVE BOOKS FROM OTHER LOCAITON. NOT TO BE OPEN TO THE PUBLIC. BUILDING INSPECTIONS COMPLETE OK FOR COFO WHEN APPROVED BY OTHER DEPARTMENTS.
Occupancy Inspection - Engineering Temporary C of O 4/17/2020 04/17/2020
Occupancy Inspection - Engineering Passed 4/22/2020 04/22/2020
Occupancy Inspection - Water Utilities Passed 04/22/2020
Occupancy Inspection - Codes Commercial Full C of O 04/22/2020
Misc
Corrective Action Required
03/12/2020
OK TO STOCK EQUIPMENT AND MOVE BOOKS FROM OTHER LOCAITON. NOT TO BE OPEN TO THE PUBLIC. BUILDING INSPECTIONS COMPLETE OK FOR COFO WHEN APPROVED BY OTHER DEPARTMENTS.
Documents & Images
Date Uploaded File Type Document Name
01/25/2019 Letter Fire Building Plan Review
01/31/2019 Letter Codes P/R Corrections Document
02/25/2019 Letter Fire Building Plan Review
03/12/2019 Letter Fire (Sprinkler) Plan Review
05/09/2019 Receipt Receipt for transaction: 2019-001863
05/09/2019 Letter Codes Building Permit
05/30/2019 Letter INSPECTION SUMMARY
05/31/2019 Letter INSPECTION SUMMARY
06/03/2019 Letter INSPECTION SUMMARY
06/04/2019 Letter INSPECTION SUMMARY
06/05/2019 Letter INSPECTION SUMMARY
06/07/2019 Letter INSPECTION SUMMARY
06/10/2019 Letter INSPECTION SUMMARY
06/10/2019 Letter INSPECTION SUMMARY
06/14/2019 Letter INSPECTION SUMMARY
07/24/2019 Letter INSPECTION SUMMARY
09/20/2019 Letter INSPECTION SUMMARY
09/24/2019 Letter INSPECTION SUMMARY
10/22/2019 Letter INSPECTION SUMMARY
10/25/2019 Letter INSPECTION SUMMARY
10/29/2019 Letter INSPECTION SUMMARY
10/30/2019 Letter INSPECTION SUMMARY
11/13/2019 Letter Fire (Alarm) Plan Review Notice
11/22/2019 Letter INSPECTION SUMMARY
11/25/2019 Letter INSPECTION SUMMARY
12/10/2019 Letter INSPECTION SUMMARY
12/10/2019 Letter INSPECTION SUMMARY
12/12/2019 Letter INSPECTION SUMMARY
12/12/2019 Letter INSPECTION SUMMARY
12/12/2019 Letter INSPECTION SUMMARY
12/20/2019 Letter INSPECTION SUMMARY
01/21/2020 Letter INSPECTION SUMMARY
01/23/2020 Letter INSPECTION SUMMARY
03/09/2020 Letter INSPECTION SUMMARY
03/11/2020 Letter INSPECTION SUMMARY
03/12/2020 Letter INSPECTION SUMMARY
04/22/2020 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home