Permit Application Status

PRCOM20183738


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20183738
Building Permit - Commercial
Final Completion
SUMMIT NORTHRIDGE LLC
ALTERATION COMMERCIAL
ELECTRIC AND GAS SERVICES FOR FUTURE RESTAURANT
10/29/2018
11/08/2018
05/20/2019
Locations
Contacts
KASA ELECTRIC LLC, Address:1206 NW VALLEY RIDGE DR, Phone:(816) 228-4886  
SUMMIT NORTHRIDGE LLC, Address:605 W 47TH ST STE 200  
LUXE ARCHITECTS, Address:10528 CHEROKEE LN, Phone:(913) 309-3882  
STEVE THE PLUMBER INC, Address:601 S STELLA, Phone:(913) 226-6140  
CAMM CONSTRUCTION INC, Address:PO BOX 1417, Phone:(816) 607-3602  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 10/30/2018
Joe Frogge
Fees
Paid Fees Amount Paid Owing Date Paid
Valuation Fee for Alteration to Commercial $98.00 $98.00 Paid 11/08/2018
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Electrical Service Inspection Partial 12/20/2018 at 11:40 AM 12/20/2018
Gas Service Inspection - Commercial Failed 12/21/2018 at 1:05 PM 12/21/2018
Misc
Corrective Action Required
12/21/2018
NOT READY FOR INSPECTION. PER CONVERSATION WITH PLUMBING CONTRACTOR 12/20 PIPE WAS TO BE PAINTED FOR INSPECTION THIS DATE. NOT PAINTED.
Gas Service Inspection - Commercial Failed 1/2/2019 at 11:20 AM 01/02/2019
Misc
Corrective Action Required
12/21/2018
NOT READY FOR INSPECTION. PER CONVERSATION WITH PLUMBING CONTRACTOR 12/20 PIPE WAS TO BE PAINTED FOR INSPECTION THIS DATE. NOT PAINTED. 2nd INSPECTION, STILL NOT PAINTED EXTERIOR. PRESSURE TEST HELD FOR EXTERIOR GAS PIPING THROUGH TO INSIDE CEILING LINE. INFORMED CONTRACTOR THE REST OF THE PIPE NEEDS TO BE TESTED BEFORE SERVICE WILL BE RELEASED.
Gas Piping Inspection - Commercial Failed 1/15/2019 01/15/2019
Misc
Corrective Action Required
01/15/2019
EXTERIOR EXPOSED PIPE NOT PAINTED
Gas Service Inspection - Commercial Passed 1/16/2019 1/15/2019 01/15/2019
Misc
Resolved
01/15/2019
NOT READY FOR INSPECTION. PER CONVERSATION WITH PLUMBING CONTRACTOR 12/20 PIPE WAS TO BE PAINTED FOR INSPECTION THIS DATE. NOT PAINTED. 2nd INSPECTION, STILL NOT PAINTED EXTERIOR. PRESSURE TEST HELD FOR EXTERIOR GAS PIPING THROUGH TO INSIDE CEILING LINE. INFORMED CONTRACTOR THE REST OF THE PIPE NEEDS TO BE TESTED BEFORE SERVICE WILL BE RELEASED.
Gas Piping Inspection - Commercial Partial 1/17/2019 at 3:45 PM 01/17/2019
Misc
Partial Correction
01/17/2019
EXTERIOR EXPOSED PIPE FOUND TO BE PAINTED AT SOUTH WALL OF BUILDING. ROOFTOP PIPING YET TO BE INSPECTED. NO ACCESS TO ROOFTOP PRESENTLY.
Electrical Service Inspection Passed 1/28/2019 1/28/2019 at 9:35 AM 01/28/2019
Gas Piping Inspection - Commercial Failed 5/10/2019 at 9:00 AM 05/10/2019
Misc
Partial Correction
01/17/2019
PAINT NEW ROOFTOP GAS PIPING 100% INCLUDING AT PIPE SUPPORTS.
Gas Piping Inspection - Commercial Passed 5/20/2019 5/20/2019 05/17/2019
Misc
Resolved
05/17/2019
PAINT NEW ROOFTOP GAS PIPING 100% INCLUDING AT PIPE SUPPORTS.
Final Inspection - Commercial Passed 5/8/2019 5/20/2019 at 1:40 PM 05/20/2019
Documents & Images
Date Uploaded File Type Document Name
10/30/2018 RE test
11/08/2018 Receipt Receipt for transaction: 2018-007170
11/08/2018 Letter Codes Building Permit
12/31/2018 Letter INSPECTION SUMMARY
01/02/2019 Letter INSPECTION SUMMARY
01/24/2019 2
01/28/2019 Letter INSPECTION SUMMARY
05/10/2019 Letter INSPECTION SUMMARY
05/20/2019 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home