Summary
PRCOM20183264
Building Permit - Commercial
Final Completion
TOWNSEND SUMMIT LLC
PARTIAL COMMERCIAL
FOUNDATION AND UNDERSLAB FOR 4 STORY APARTMENT BUILDING *FULL PERMIT - PRCOM20182609
09/25/2018
11/19/2018
11/11/2019
Locations
Contacts
NEIGHBORS CONSTRUCTION COMPANY INC, Address:1708 E 123RD ST, Phone:(913) 422-5555  
LYNN ELECTRIC & COMMUNICATIONS INC, Address:725 N 2ND ST STE K, Phone:(785) 843-5709  
BLUE RIVER PLUMBING INC, Address:9125 BARTON ST, Phone:(913) 701-6410  
NSPJ ARCHITECTS, Address:3515 W 75TH ST, SUITE 201, Phone:(913) 831-1415 Ext:278  
TERRACON CONSULTANTS INC, Address:10841 S RIDGEVIEW ROAD, Phone:(913) 599-6886  
TOWNSEND SUMMIT LLC, Address:1311 MCCORMICK RD STE 470, Phone:(303) 947-2044  
  
CITY OF LEES SUMMIT MO, Address:220 SE GREEN ST  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 11/28/2018 09/28/2018
Joe Frogge
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for Partial Commercial $1,320.00 $1,320.00 Paid 11/09/2018
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Commercial Partial 2/27/2019 (1:00) 2/27/2019 at 1:25 PM 02/27/2019
Footing Inspection - Commercial Partial 2/27/2019 at 3:05 PM 02/27/2019
Misc
Partial Correction
02/27/2019
OK TO POUR WHEN READY WALL FOOTING: ON D.4/D.5 FROM D.A TO D.S+4';
Foundation Inspection - Commercial Partial 3/7/2019 at 3:00 PM 03/07/2019
Misc
Partial Correction
03/07/2019
OK TO POUR WHEN READY FOUNDATION WALL FROM SW CORNER TO NW CORNER;
Foundation Inspection - Commercial Partial 3/8/2019 at 3:35 PM 03/08/2019
Misc
Partial Correction
03/07/2019
OK TO POUR WHEN READY FOUNDATION WALL FROM D.A TO D.K + D.L TO D.S; ELEVATOR SHAFT WALL D.K TO D.L;
Footing Inspection - Commercial Partial 3/6/2019 (11:00) 3/8/2019 03/08/2019
Misc
Partial Correction
02/27/2019
OK TO POUR WHEN READY WALL FOOTING ON D.4/D.5 FROM D.A TO D.K & D.L TO D.S+4'; ELEVATOR PIT BASE & SURROUNDING FOUNDATION WALL FOOTINGS D.K-D.L; FOUNDATION WALL FOOTING STEPS AT D.K and D.L;
Footing Inspection - Commercial Partial 3/21/2019 3/22/2019 at 7:10 AM 03/22/2019
Misc
Partial Correction
03/08/2019
OK TO POUR WHEN READY WALL FOOTING ON D.4/D.5 FROM D.A TO D.K & D.L TO D.S+4'; ELEVATOR PIT BASE & SURROUNDING FOUNDATION WALL FOOTINGS D.K-D.L; FOUNDATION WALL FOOTING STEPS AT D.K AND D.L; EXTERIOR WALL TRENCH FOOTING @ N,E,S
Underslab Electrical Inspection - Commercial Partial 4/29/2019 4/29/2019 04/26/2019
Misc
Partial Correction
04/26/2019
OK TO COVER WHEN READY: TRENCHED CONDUIT INSIDE BUILDING LINE;
Underslab Electrical Inspection - Commercial Partial 5/2/2019 at 8:50 AM 05/02/2019
Misc
Partial Correction
04/26/2019
OK TO COVER WHEN READY: TRENCHED CONDUIT INSIDE BUILDING LINE; COPPER LEADS CONNECTED TO RE-BAR UFER JUMPERS AT S.E. AND N.E. CORNERS OF BLDG;
Footing Inspection - Commercial Partial 6/10/2019 (10:00) 6/10/2019 at 10:00 AM 06/10/2019
Misc
Partial Correction
03/22/2019
OK TO POUR WHEN READY WALL FOOTING ON D.4/D.5 FROM D.A TO D.K & D.L TO D.S+4'; ELEVATOR PIT BASE & SURROUNDING FOUNDATION WALL FOOTINGS D.K-D.L; FOUNDATION WALL FOOTING STEPS AT D.K AND D.L; LOWER LEVEL EXTERIOR WALL TRENCH FOOTING @ N,E,S; UPPER LEVEL EXTERIOR WALL TRENCH FOOTING @ N,W,S;
Underslab Plumbing Inspection - Commercial Partial 6/20/2019 at 8:10 AM 06/20/2019
Misc
Partial Correction
06/20/2019
OK TO COVER WHEN READY UNDER-SLAB PVC SANITARY DRAIN, WASTE, & VENT PIPING AT UPPER LEVEL. ENSURE PRESSURE-TESTING OF PIPING SYSTEM IS PERFORMED PER IPC 312 / IRC P2503.5.1
Underslab Plumbing Inspection - Commercial Partial 6/21/2019 6/21/2019 at 7:10 AM 06/21/2019
Misc
Partial Correction
06/20/2019
OK TO COVER WHEN READY UNDER-SLAB PVC SANITARY DRAIN, WASTE, & VENT PIPING AT UPPER LEVEL. ENSURE PRESSURE-TESTING OF PIPING SYSTEM IS PERFORMED PER IPC 312 / IRC P2503.5.1
Misc
Partial Correction
06/21/2019
RADON COLLECTION PIPE SYSTEM IN PLACE. REMAINDER OF ROOF DRAIN PIPING COMPLETED.
Underslab Electrical Inspection - Commercial Partial 6/21/2019 6/21/2019 at 1:05 PM 06/21/2019
Misc
Resolved
06/21/2019
OK TO COVER WHEN READY: TRENCHED CONDUIT INSIDE BUILDING LINE; COPPER LEADS CONNECTED TO RE-BAR UFER JUMPERS AT S.E. AND N.E. CORNERS OF BLDG;
Misc
Partial Correction
06/21/2019
OK TO COVER UNDER-SLAB CONDUIT AND BOXES
Foundation Inspection - Commercial Passed 3/8/2019 11/11/2019
Misc
Resolved
11/11/2019
OK TO POUR WHEN READY FOUNDATION WALL FROM D.A TO D.K + D.L TO D.S; ELEVATOR SHAFT WALL D.K TO D.L;
Footing Inspection - Commercial Passed 6/10/2019 11/11/2019
Misc
Resolved
11/11/2019
OK TO POUR WHEN READY WALL FOOTING ON D.4/D.5 FROM D.A TO D.K & D.L TO D.S+4'; ELEVATOR PIT BASE & SURROUNDING FOUNDATION WALL FOOTINGS D.K-D.L; FOUNDATION WALL FOOTING STEPS AT D.K AND D.L; LOWER LEVEL EXTERIOR WALL TRENCH FOOTING @ N,E,S; UPPER LEVEL EXTERIOR WALL TRENCH FOOTING @ N,W,S;
Underslab Electrical Inspection - Commercial Passed 6/21/2019 11/11/2019
Misc
Resolved
11/11/2019
OK TO COVER UNDER-SLAB CONDUIT AND BOXES
Underslab Plumbing Inspection - Commercial Passed 6/21/2019 11/11/2019
Misc
Resolved
11/11/2019
OK TO COVER WHEN READY UNDER-SLAB PVC SANITARY DRAIN, WASTE, & VENT PIPING AT UPPER LEVEL. ENSURE PRESSURE-TESTING OF PIPING SYSTEM IS PERFORMED PER IPC 312 / IRC P2503.5.1
Misc
Resolved
11/11/2019
RADON COLLECTION PIPE SYSTEM IN PLACE. REMAINDER OF ROOF DRAIN PIPING COMPLETED.
Final Inspection - Commercial Passed 11/11/2019 at 3:15 PM 11/11/2019
Documents & Images
Date Uploaded File Type Document Name
11/09/2018 Receipt Receipt for transaction: 2018-007174
11/19/2018 Letter Codes Building Permit
02/27/2019 Letter INSPECTION SUMMARY
03/08/2019 Letter INSPECTION SUMMARY
03/08/2019 Letter INSPECTION SUMMARY
03/22/2019 Letter INSPECTION SUMMARY
04/26/2019 Letter INSPECTION SUMMARY
05/02/2019 Letter INSPECTION SUMMARY
06/10/2019 Letter INSPECTION SUMMARY
06/20/2019 Letter INSPECTION SUMMARY
06/21/2019 Letter INSPECTION SUMMARY
06/21/2019 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home