Permit Application Status

PRCOM20183263


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20183263
Building Permit - Commercial
Final Completion
TOWNSEND SUMMIT LLC
PARTIAL COMMERCIAL
FOUNDATION AND UNDERSLAB FOR 4 STORY APARTMENT BUILDING *FULL PERMIT - PRCOM20182607
09/25/2018
11/19/2018
11/01/2019
Locations
Contacts
NEIGHBORS CONSTRUCTION COMPANY INC, Address:1708 E 123RD ST, Phone:(913) 422-5555  
LYNN ELECTRIC & COMMUNICATIONS INC, Address:725 N 2ND ST STE K, Phone:(785) 843-5709  
BLUE RIVER PLUMBING INC, Address:9125 BARTON ST, Phone:(913) 701-6410  
NSPJ ARCHITECTS, Address:3515 W 75TH ST, SUITE 201, Phone:(913) 831-1415 Ext:278  
TERRACON CONSULTANTS INC, Address:10841 S RIDGEVIEW ROAD, Phone:(913) 599-6886  
TOWNSEND SUMMIT LLC, Address:1311 MCCORMICK RD STE 470, Phone:(303) 947-2044  
  
CITY OF LEES SUMMIT MO, Address:220 SE GREEN ST  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 11/28/2018 09/28/2018
Joe Frogge
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for Partial Commercial $1,320.00 $1,320.00 Paid 11/09/2018
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Commercial Partial 2/22/2019 (1:00) 2/22/2019 at 1:15 PM 02/22/2019
Misc
Corrective Action Required
02/22/2019
OK TO POUR WHEN READY WALL SPREAD FOOTING AT: ON D.5 FROM D.4 TO D.S + 4'; UFER GROUNDING JUMPER IS IN PLACE AT XXXXXXXXXXXX.
Footing Inspection - Commercial Partial 3/6/2019 (11:00) 3/6/2019 at 11:25 AM 03/06/2019
Misc
Partial Correction
03/06/2019
OK TO POUR WHEN READY WALL SPREAD FOOTING AT: ON D.5 FROM D.4 TO D.S + 4'; UFER GROUNDING JUMPER IS IN PLACE AT XXXXXXXXXXXX.
Misc
Partial Correction
03/06/2019
OK TO POUR WHEN READY FOOTING FOR RETAINING WALL BETWEEN BLDGS #2 & #3
Foundation Inspection - Commercial Partial 3/8/2019 (3:00) 3/8/2019 at 3:00 PM 03/08/2019
Misc
Partial Correction
03/08/2019
OK TO POUR WHEN READY: CANTILEVERED SITE WALL KEYWAY FROM BUILDING 2 TO BUILDING 3; WEST FOUNDATION WALL TO BE APPROVED AS PREPARATION PROCEEDS;
Foundation Inspection - Commercial Partial 3/11/2019 at 9:45 AM 03/11/2019
Misc
Partial Correction
03/08/2019
OK TO POUR WHEN READY: CANTILEVERED SITE WALL KEYWAY FROM BUILDING 2 TO BUILDING 3; WEST FOUNDATION WALL TO BE APPROVED AS PREPARATION PROCEEDS;
Foundation Inspection - Commercial Partial 3/12/2019 at 9:15 AM 03/12/2019
Misc
Partial Correction
03/11/2019
OK TO POUR WHEN READY: CANTILEVERED SITE WALL KEYWAY FROM BUILDING 2 TO BUILDING 3; WEST FOUNDATION WALL TO BE APPROVED AS PREPARATION PROCEEDS;
Retaining Wall Inspection Passed 3/18/2019 at 10:25 AM 03/18/2019
Footing Inspection - Commercial Partial 4/17/2019 (1:00) 4/17/2019 at 11:40 AM 04/17/2019
Misc
Partial Correction
03/06/2019
OK TO POUR WHEN READY WALL SPREAD FOOTING AT: ON D.5 FROM D.4 TO D.S + 4'; FOOTING STEPS AT D.K and D.L; CANTILEVERED SITE WALL FOOTING; PERIMETER TRENCH FOOTING FROM SOUTH END TO WITHIN 25' FROM NE CORNER; UFER GROUND JUMPER IS IN PLACE AT SOUTH END;
Misc
Partial Correction
03/06/2019
OK TO POUR WHEN READY FOOTING FOR RETAINING WALL BETWEEN BLDGS #2 & #3
Footing Inspection - Commercial Partial 4/17/2019 4/17/2019 at 2:45 PM 04/17/2019
Misc
Partial Correction
04/17/2019
OK TO POUR WHEN READY WALL SPREAD FOOTING AT: ON D.5 FROM D.4 TO D.S + 4'; FOOTING STEPS AT D.K and D.L; CANTILEVERED SITE WALL FOOTING; PERIMETER TRENCH FOOTING COMPLETE; UFER GROUND JUMPERS IN PLACE AT SOUTH AND NORTH ENDS
Misc
Partial Correction
04/17/2019
OK TO POUR WHEN READY FOOTING FOR RETAINING WALL BETWEEN BLDGS #2 & #3
Underslab Electrical Inspection - Commercial Passed 4/26/2019 4/26/2019 at 9:55 AM 04/26/2019
Footing Inspection - Commercial Partial 6/7/2019 (9:30) 6/7/2019 at 9:30 AM 06/07/2019
Misc
Partial Correction
04/17/2019
OK TO POUR WHEN READY WALL SPREAD FOOTING AT: ON D.5 FROM D.4 TO D.S + 4'; FOOTING STEPS AT D.K and D.L; CANTILEVERED SITE WALL FOOTING; PERIMETER TRENCH FOOTING: LOWER LEVEL WITH UFER GROUND JUMPERS IN PLACE AT SOUTH AND NORTH ENDS; UPPER LEVEL
Misc
Partial Correction
04/17/2019
OK TO POUR WHEN READY FOOTING FOR RETAINING WALL BETWEEN BLDGS #2 & #3
Underslab Plumbing Inspection - Commercial Partial 6/13/2019 6/13/2019 at 1:40 PM 06/13/2019
Misc
Partial Correction
06/13/2019
OK TO COVER WHEN READY UNDER-SLAB PVC SANITARY DRAIN, WASTE, & VENT PIPING AT: UPPER LEVEL ENSURE PRESSURE-TESTING OF PIPING SYSTEM IS PERFORMED PER IPC 312 / IRC P2503.5.1
Underslab Plumbing Inspection - Commercial Partial 6/14/2019 at 10:30 AM 06/14/2019
Misc
Partial Correction
06/13/2019
OK TO COVER WHEN READY UNDER-SLAB PVC SANITARY DRAIN, WASTE, & VENT PIPING AT: UPPER LEVEL ENSURE PRESSURE-TESTING OF PIPING SYSTEM IS PERFORMED PER IPC 312 / IRC P2503.5.1
Misc
Partial Correction
06/14/2019
NO ISSUES FOUND WITH UNDER-SLAB RADON PIPING NETWORK AT UPPER LEVEL
Underslab Plumbing Inspection - Commercial Passed 11/01/2019
Misc
Resolved
11/01/2019
OK TO COVER WHEN READY UNDER-SLAB PVC SANITARY DRAIN, WASTE, & VENT PIPING AT: UPPER LEVEL ENSURE PRESSURE-TESTING OF PIPING SYSTEM IS PERFORMED PER IPC 312 / IRC P2503.5.1
Misc
Resolved
11/01/2019
NO ISSUES FOUND WITH UNDER-SLAB RADON PIPING NETWORK AT UPPER LEVEL
Foundation Inspection - Commercial Passed 11/01/2019
Misc
Resolved
11/01/2019
OK TO POUR WHEN READY: CANTILEVERED SITE WALL KEYWAY FROM BUILDING 2 TO BUILDING 3; WEST FOUNDATION WALL TO BE APPROVED AS PREPARATION PROCEEDS;
Footing Inspection - Commercial Passed 11/01/2019
Misc
Resolved
11/01/2019
OK TO POUR WHEN READY WALL SPREAD FOOTING AT: ON D.5 FROM D.4 TO D.S + 4'; FOOTING STEPS AT D.K and D.L; CANTILEVERED SITE WALL FOOTING; PERIMETER TRENCH FOOTING: LOWER LEVEL WITH UFER GROUND JUMPERS IN PLACE AT SOUTH AND NORTH ENDS; UPPER LEVEL
Misc
Resolved
11/01/2019
OK TO POUR WHEN READY FOOTING FOR RETAINING WALL BETWEEN BLDGS #2 & #3
Final Inspection - Commercial Passed 11/1/2019 at 7:05 AM 11/01/2019
Documents & Images
Date Uploaded File Type Document Name
11/09/2018 Receipt Receipt for transaction: 2018-007174
11/19/2018 Letter Codes Building Permit
02/22/2019 Letter INSPECTION SUMMARY
03/06/2019 Letter INSPECTION SUMMARY
03/18/2019 Letter INSPECTION SUMMARY
04/17/2019 Letter INSPECTION SUMMARY
04/17/2019 Letter INSPECTION SUMMARY
04/17/2019 Letter INSPECTION SUMMARY
04/26/2019 Letter INSPECTION SUMMARY
06/07/2019 Letter INSPECTION SUMMARY
06/13/2019 Letter INSPECTION SUMMARY
06/14/2019 Letter INSPECTION SUMMARY
11/01/2019 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home