Permit Application Status

PRCOM20182242


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20182242
Building Permit - Commercial
Final Completion
REORGANIZED SCHOOL DIST NO 7
NEW OTHER (COMMERCIAL)
MOBILE CLASSROOM *drawings are in plan review file
07/17/2018
08/09/2018
01/20/2019
08/14/2018
Locations
Contacts
PALOMAR MODULAR BUILDINGS LLC, Address:P O BOX 909, Phone:(469) 727-0727  
LEE S SUMMIT R 7 SCHOOL DISTRICT, Address:301 NE TUDOR RD  
REORGANIZED SCHOOL DIST NO 7, Address:301 NE Tudor Rd, Phone:(816) 986-1000  
Reviews
Review Type Outcome Est. Completion Date Completed
Building Plan Review Approved with Conditions 07/31/2018 08/08/2018
Joe Frogge
Plan Submittal 2012 Codes
Corrective Action Required
07/24/2018

All plans submitted for review on or after January 1, 2014 shall be designed to the requirements of the 2012 International Building Code, 2012 International Mechanical Code, 2012 International Plumbing Code, 2012 International Fuel Gas Code, 2012 International Fire Code, 2011 National Electric Code and the ANSI A117.1-2009 as amended and adopted by the City of Lee’s Summit. Action required: Updated code analysis to show that building is designed per currently adopted codes. 8/8/18 - not addressed. Project has been reviewed and will be inspected by currently adopted codes
Misc
Resolved
08/08/2018

Insufficient information to complete review. Action required: Provide detailed information as concerns tie-down augers/anchors. Must be signed/sealed by architect of record.
Fire Plan Review Approved with Conditions 07/31/2018 07/19/2018
Joe Dir
Construction documents for fire alarm systems
Corrective Action Required
07/19/2018

2012 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. ACTION REQUIRED: (information purposes) Have the fire alarm system contractor provide shop drawings and manufacturers specs on the alarm system devices to be installed.
Installation acceptance testing
Corrective Action Required
07/19/2018

2012 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. ACTION REQUIRED:(information purposes) Testing of the alarm system devices is required prior to the final occupancy inspection.
Misc
Corrective Action Required
07/19/2018

Door operations ACTION REQUIRED: (veriifed at inspection) No keyed locks on the egress side of an exit.
Licensed Contractors Approved 07/17/2018 07/17/2018
Joe Frogge
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for New Other $90.00 $90.00 Paid 08/09/2018
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Rough Electrical Inspection - Commercial Passed 8/9/2018 at 1:50 PM 08/09/2018
Underground Electrical Inspection - Commercial Passed 8/9/2018 at 1:40 PM 08/09/2018
Final Inspection - Commercial Not Ready 8/10/2018 at 1:00 PM 08/10/2018
Occupancy Inspection - Fire Passed 8/14/2018 08/14/2018
Alarm Test Passed 8/14/2018 08/14/2018
Occupancy Inspection - Codes Commercial Full C of O 8/14/2018 8/14/2018 08/14/2018
Final Inspection - Commercial Passed 8/14/2018 08/14/2018
Documents & Images
Date Uploaded File Type Document Name
07/19/2018 Letter Fire Building Plan Review
07/24/2018 Letter Codes P/R Corrections Document
08/02/2018 Lee's Summit West High School Mobile Unit Structural Calculations
08/08/2018 MSC Letter RE Anchoring Component signed 8-8-18
08/08/2018 Letter Codes Plan Review Conditions
08/09/2018 RE LSW Mobile Classroom
08/09/2018 Receipt Receipt for transaction: 2018-005617
08/09/2018 Letter Codes Building Permit
08/09/2018 Letter Inspection Summary
08/10/2018 Letter Inspection Summary
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide: