Summary
PRCOM20181910
Building Permit - Commercial
Final Completion
CITY OF LEES SUMMIT
PARTIAL COMMERCIAL
FOUNDATION AND UNDERSLAB PERMIT FOR NEW 2 STORY APARTMENT WITH PARKING GARAGES BENEATH FULL PERMIT - PRCOM20172531**************MH CLOSED FND PERMIT
06/19/2018
06/22/2018
12/09/2019
Locations
Contacts
CITYSCAPE CONSTRUCTION VIEW HIGH LLC, Address:10 W CARMEL DR STE 200, Phone:(317) 574-1600 Ext:100  
LATIMER SOMMERS & ASSOCIATES PA, Address:3639 SW SUMMERFIELD DR STE A, Phone:(785) 233-3232  
GARRISON PLUMBING, Address:15430 S MAHAFFIE ST STE 102, Phone:(913) 768-1311  
CITY OF LEES SUMMIT, Address:220 SE GREEN ST  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 06/19/2018 06/19/2018
Joe Frogge
Fees
Paid Fees Amount Paid Owing Date Paid
Valuation Fee for Partial Commercial $501.48 $501.48 Paid 06/21/2018
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Underslab Plumbing Inspection - Commercial Failed 10/30/2019 10/30/2019 10/30/2019
Misc
Corrective Action Required
10/30/2019
no construction road, gravel or access to the building. inspection denied
Underslab Plumbing Inspection - Commercial Partial 11/4/2019 11/4/2019 11/04/2019
Misc
Corrective Action Required
10/30/2019
LOWER LEVEL SECTION
Sewer Service Inspection Passed 11/6/2019 (9:30) 11/6/2019 at 10:00 AM 11/06/2019
Misc
Informational
11/06/2019
The service line going to the building has been connected to the service line that was coming out of the main. The main already had a wye that was put in during construction of the sewer main.
Miscellaneous Inspection Partial 11/07/2019
Informational
11/07/2019
floor slab grade beam inspection
Footing Inspection - Commercial Partial 11/7/2019 (2:00) 11/7/2019 11/07/2019
Misc
Corrective Action Required
11/07/2019
lower slab grade beams
Final Plumbing Inspection - Commercial Passed 12/9/2019 12/09/2019
Documents & Images
Date Uploaded File Type Document Name
06/21/2018 Receipt Receipt for transaction: 2018-004101
06/22/2018 Letter Codes Building Permit
10/30/2019 Letter INSPECTION SUMMARY
11/04/2019 Letter INSPECTION SUMMARY
11/06/2019 Letter DE-Daily Inspection Summary
11/07/2019 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home