Permit Application Status

PRCOM20181496


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20181496
Building Permit - Commercial
Final Completion
SAINT LUKES EAST HOSPITAL
ALTERATION COMMERCIAL
ALTERATIONS TO EXISTING SURGICENTER - INCLUDES CONSTRUCTION OF NEW GI PROCEDURE ROOM AND EXPANDING WAITING AREA
05/16/2018
06/01/2018
03/27/2019
09/21/2018
Locations
Contacts
SAINT LUKES EAST HOSPITAL, Address:901 E 104TH ST MAILSTOP 900N  
DAVID E ROSS CONSTRUCTION CO, Address:10201 E 75TH ST, Phone:(816) 737-2953  
ACI BOLAND, Address:1421 EAST 104TH ST; SUITE 100, Phone:(816) 763-9600  
US ENGINEERING COMPANY, Address:3433 ROANOKE RD, Phone:(816) 753-6969  
US ENGINEERING COMPANY, Address:3433 ROANOKE RD, Phone:(816) 753-6969  
R F FISHER ELECTRIC COMPANY LLC, Address:5299 DTC BLVD STE 600, Phone:(913) 384-1500  
Reviews
Review Type Outcome Est. Completion Date Completed
Sprinkler Plan Review Released for Construction 07/26/2018
Joe Dir
Alarm Plan Review Released for Construction 07/03/2018
Joe Dir
Installation acceptance testing
Corrective Action Required
07/03/2018

2012 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. ACTION REQUIRED:(information purposes) Acceptance testing of the modifications done to the fire alarm system will be required prior to the final occupancy inspection. Contact the fire department to schedule testing. (816)969-1300
Misc
Corrective Action Required
08/09/2018

Sequence of operation ACTION REQUIREDL:(veriifed at testing) All alarm activation devices listed in the sequence of operation that actuate audible and visible evacuation signals are included to release the magnetically held smoke doors. Check the sequence of operation to confirm all devices.
Building Plan Review Approved 05/29/2018 05/22/2018
Joe Frogge
Fire Plan Review Approved with Conditions 05/29/2018 05/17/2018
Joe Dir
Construction documents for fire alarm systems
Corrective Action Required
05/17/2018

2012 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. ACTION REQUIRED:(information purposes) The fire alarm system shall remain operational in the renovation phase areas during construction Have the fire alarm system contractor provide shop drawings of any modifications to be done to the fire alarm system.
Construction documents - Fire protection systems
Corrective Action Required
05/17/2018

2012 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. ACTION REQUIRED:(information purposes) the fire sprinkler system shall remain operational in the renovation phase areas during construction. Have the fire sprinkler system contractor provide shop drawings of any modifications to be done to the fire sprinkler system.
Installation acceptance testing
Corrective Action Required
05/17/2018

2012 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. ACTION REQUIRED:(information purposes) Acceptance testing of the fire alarm system prior to the final occupancy inspection will be required if any alarm system devices have to disconnected, relocated and or new installation. Contact the fire department to schedule testing.(816)969-1300
Misc
Corrective Action Required
05/17/2018

Card access controlled doors ACTION REQUIRED: Loss of power to that part of the access control system which locks the doors shall automatically unlock the doors Activation of the building fire alarm system, if provided, shall automatically unlock the doors, and the doors shall remain unlocked until the fire alarm system has been reset. 5. Activation of the building automatic sprinkler or fire detection system, if provided, shall automatically unlock the doors. The doors shall remain unlocked until the fire alarm system has been reset
Misc
Corrective Action Required
05/17/2018

Emergency Power outlets ACTION REQUIRED:(information purposes) All electrical circuits within the renovation areas which are on the generator emergency power circuits shall have an acceptance test while on generator power.
Misc
Corrective Action Required
05/17/2018

Meg Gas pipe lines ACTION REQUIRED:(information purposes) Med gas lines within the renovation areas shall receive a third party pressure certification test. Fire department shall recieve a copy of the test results.
Misc
Corrective Action Required
05/17/2018

Med Gas pipie labeling ACTION REQUIRED:(verified at inspection) All med gas piping shall be labeled according to NFPA 99
Misc
Corrective Action Required
05/17/2018

Bio-hazard labeling ACTION REQUIRED:(verified at inspection) All room/areas containing contaminated clothing, operating instuments or other items shall be labeled with the proper bio-hazard labels at the entrance of the rooms/areas.
Licensed Contractors Approved 05/29/2018 05/16/2018
Joe Frogge
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for Alteration to Commercial $1,284.06 $1,284.06 Paid 06/01/2018
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
In-wall Inspection Partial 6/18/2018 6/18/2018 at 8:25 AM 06/18/2018
Misc
Partial Correction
06/18/2018
OK TO COVER WHEN READY LIGHT-GAUGE STEEL WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING SPACES: 1E01B ; NEW W WALL + IN-FILL AT S WALL EAST;
Rated Assembly Inspection Not Ready 6/18/2018 6/18/2018 06/18/2018
Misc
Corrective Action Required
06/18/2018
RATED WALL ASSEMBLY AT XXXXXXXXXXXXXXXXXXXX WAS REQUESTED FOR INSPECTION ON 6/18/18 BUT HAD BEEN FULLY CONSTRUCTED EARLIER WITHOUT INSPECTIONS BETWEEN LAYERS.
Underslab Plumbing Inspection - Commercial Passed 6/26/2018 6/26/2018 at 9:10 AM 06/26/2018
In-wall Inspection Not Ready 7/16/2018 7/16/2018 at 7:20 AM 07/16/2018
Misc
Partial Correction
06/18/2018
OK TO COVER WHEN READY LIGHT-GAUGE STEEL WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING SPACES: 1E01B ; NEW W WALL + IN-FILL AT S WALL EAST;
In-wall Inspection Partial 7/16/2018 at 10:10 AM 07/16/2018
Misc
Partial Correction
07/16/2018
OK TO COVER WHEN READY LIGHT-GAUGE STEEL WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING SPACES: 1E01B ; NEW W WALL + IN-FILL AT S WALL EAST; 1E39A, B,C;
Above Ceiling Inspection Failed 7/16/2018 7/16/2018 at 10:35 AM 07/16/2018
Misc
Corrective Action Required
07/16/2018
NEC 300-11, 330.30 & 334-10 INSTALLATION OF MC ELECTRICAL CABLE: 01BNOT SECURELY FASTENED WITHIN 12" OF ENTRY TO BOXES [ALLOWABLE EXCEPTION: FIXTURE WHIPS NOT IN EXCESS OF 6` LONG]: SPACE 1E01B
Above Ceiling Inspection Partial 7/17/2018 7/17/2018 at 11:05 AM 07/17/2018
Misc
Partial Correction
07/17/2018
OK TO COVER WHEN READY ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS @ LOCATIONS: SPACE 1E01B;
Occupancy Inspection - Fire Partial 7/24/2018 07/24/2018
Final Inspection - Commercial Partial 7/24/2018 at 2:50 PM 07/24/2018
Misc
Corrective Action Required
06/18/2018
**PHASE 1 ONLY** -INSPECTIONS STILL NOT FULLY RESOLVED: RATED WALL ASSY, IN-WALL, AND ABOVE-CEILING INSPECTIONS -FIRE DEPT APPROVAL REQUIRED -OK TO OCCUPY RM 1E01B. NO WORK IN RM 1E29&1E33
Underslab Plumbing Inspection - Commercial Partial 8/16/2018 at 12:45 PM 08/16/2018
Misc
Partial Correction
08/16/2018
OK TO COVER WHEN READY UNDER-SLAB PVC SANITARY DRAIN, WASTE, & VENT PIPING FROM TOILET 1E16-1 TO TIE-IN LOCATION AT CORR 1E82; NOTE IPC 312 / IRC P2503.5.1 REQUIREMENT FOR PRESSURE-TESTING PIPING SYSTEM.
Underslab Plumbing Inspection - Commercial Partial 8/17/2018 8/17/2018 at 7:10 AM 08/17/2018
Misc
Partial Correction
08/17/2018
OK TO COVER WHEN READY UNDER-SLAB PVC SANITARY DRAIN, WASTE, & VENT PIPING FROM TOILET 1E16-1 TO TIE-IN LOCATION AT CORR 1E82; CONNECTION COMPLETE AT CORR 1E82 NOTE IPC 312 / IRC P2503.5.1 REQUIREMENT FOR PRESSURE-TESTING PIPING SYSTEM.
Above Ceiling Inspection Partial 8/24/2018 8/24/2018 at 8:55 AM 08/24/2018
Misc
Partial Correction
07/17/2018
OK TO COVER WHEN READY ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS @ LOCATIONS: SPACE 1E01B; 1E39A; 1E39B; 1E39C;
Alarm Test Partial 08/29/2018
Final Inspection - Commercial Partial 8/30/2018 at 1:20 PM 08/30/2018
Partial Correction
08/30/2018
FOLLOWING RENOVATION PHASE AREA(S) OK FOR USE AND OCCUPANCY: PHASE 1A;
In-wall Inspection Partial 8/30/2018 8/30/2018 at 1:40 PM 08/30/2018
Misc
Partial Correction
07/16/2018
OK TO COVER WHEN READY LIGHT-GAUGE STEEL WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING SPACES: 1E01B ; NEW W WALL + IN-FILL AT S WALL EAST; 1E39A, B,C; PHASE AREA 2;
Occupancy Inspection - Fire Partial 8/30/2018 08/30/2018
Above Ceiling Inspection Partial 9/12/2018 9/12/2018 at 8:35 AM 09/12/2018
Misc
Partial Correction
08/24/2018
OK TO COVER WHEN READY ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS @ LOCATIONS: SPACE 1E01B; 1E39A; 1E39B; 1E39C; [1E13; 1E14; 1E16; 1E16-1;
Alarm Test Passed 9/19/2018 09/19/2018
Final Inspection - Commercial Passed 9/21/2018 at 7:05 AM 09/21/2018
Misc
Resolved
09/21/2018
**PHASE 1 ONLY** -INSPECTIONS STILL NOT FULLY RESOLVED: RATED WALL ASSY, IN-WALL, AND ABOVE-CEILING INSPECTIONS -FIRE DEPT APPROVAL REQUIRED -OK TO OCCUPY RM 1E01B. NO WORK IN RM 1E29&1E33
Above Ceiling Inspection Passed 9/12/2018 09/21/2018
Misc
Resolved
09/21/2018
OK TO COVER WHEN READY ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS @ LOCATIONS: SPACE 1E01B; 1E39A; 1E39B; 1E39C; [1E13; 1E14; 1E16; 1E16-1;
In-wall Inspection Passed 8/30/2018 09/21/2018
Misc
Resolved
09/21/2018
OK TO COVER WHEN READY LIGHT-GAUGE STEEL WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING SPACES: 1E01B ; NEW W WALL + IN-FILL AT S WALL EAST; 1E39A, B,C; PHASE AREA 2;
Rated Assembly Inspection Passed 6/18/2018 09/21/2018
Misc
Resolved
09/21/2018
RATED WALL ASSEMBLY AT XXXXXXXXXXXXXXXXXXXX WAS REQUESTED FOR INSPECTION ON 6/18/18 BUT HAD BEEN FULLY CONSTRUCTED EARLIER WITHOUT INSPECTIONS BETWEEN LAYERS.
Occupancy Inspection - Fire Passed 9/21/2018 09/21/2018
Underslab Plumbing Inspection - Commercial Passed 8/17/2018 09/21/2018
Misc
Resolved
09/21/2018
OK TO COVER WHEN READY UNDER-SLAB PVC SANITARY DRAIN, WASTE, & VENT PIPING FROM TOILET 1E16-1 TO TIE-IN LOCATION AT CORR 1E82; CONNECTION COMPLETE AT CORR 1E82 NOTE IPC 312 / IRC P2503.5.1 REQUIREMENT FOR PRESSURE-TESTING PIPING SYSTEM.
Final Inspection - Commercial Passed 9/21/2018 09/21/2018
Documents & Images

No documents are currently available for viewing.

Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home