Permit Application Status

PRCOM20180993


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20180993
Building Permit - Commercial
Voided
M-III LONGVIEW LLC
NEW SHELL BUILDING
NEW SHELL BUILDING FOR MERCANTILE AND POSSIBLE RESTAURANT 1/29/20 - project no longer moving forward - architect has been made aware - they have directed us to discard/recycle the documents - jdf
04/06/2018
10/13/2018
01/29/2020
Locations
Contacts
M-III LONGVIEW LLC, Address:4601 COLLEGE BLVD STE 300, Phone:(816) 561-3796  
KLOVER ARCHITECTS, Address:10955 LOWELL AVE, Phone:(913) 649-8181  
PROSSER WILBERT CONSTRUCTION INC, Address:13730 W 108TH ST, Phone:(913) 906-0104  
  
  
  
Reviews
Review Type Outcome Est. Completion Date Completed
Building Plan Review Approved with Conditions 05/10/2018 05/09/2018
Joe Frogge
Final Development Plan
Corrective Action Required
05/03/2018

The building permit for this project can not be issued until the Codes Administration Department has received the approved Final Development Plan from the Planning and Development Department. Action required: Comment is for informational purposes. 5/4/18 - acknowledged
Suite address
Resolved
05/09/2018

This structure has been assigned one address. Additional addresses will be needed to accommodate future tenants. Action required: Provide guidance as to how building is proposed to be used in the future in order for us to assign the appropriate addresses. Is it your intention to have separate suites on north and south?
Engineered truss package
Corrective Action Required
05/03/2018

Copies of the engineered truss package were not provided at the time of permit application. Action required: Provide truss package or request deferral to construction. 5/4/18 - deferred per request
Misc
Resolved
05/04/2018

2012 IBC 1803.1 General. Geotechnical investigations shall be conducted in accordance with Section 1803.2 and reported in accordance with Section 1803.6. Where required by the building official or where geotechnical investigations involve in-situ testing, laboratory testing or engineering calculations, such investigations shall be conducted by a registered design professional. Action required: Provide soils report to justify design assumption of soil bearing capacity greater than 2,000psf.
Bldg - Illumination required 1006.1
Resolved
05/04/2018

2012 IBC 1006.1 Illumination required. The means of egress, including the exit discharge, shall be illuminated at all times the building space served by the means of egress is occupied. Action required: Provide emergency lighting at exterior side of exits.
Mech - Equipment and appliances on roofs or elevated structures 306.5
Resolved
05/04/2018

2012 IMC 306.5 Equipment and appliances on roofs or elevated structures. Where equipment requiring access or appliances are located on an elevated structure or the roof of a building such that personnel will have to climb higher than 16 feet above grade to access such equipment or appliances, an interior or exterior means of access shall be provided. Such access shall not require climbing over obstructions greater than 30 inches in height or walking on roofs having a slope greater than 4 units vertical in 12 units horizontal. Such access shall not require the use of portable ladders. Where access involves climbing over parapet walls, the height shall be measured to the top of the parapet wall. (see code section for specific construction requirements) Item #7 - Climbing clearance. The distance from the centerline of the rungs to the nearest permanent object on the climbing side of the ladder shall be a minimum of 30 inches measured perpendicular to the rungs. This distance shall be maintained from the point of ladder access to the bottom of the roof hatch. A minimum clear width of 15 inches shall be provided on both sides of the ladder measured from the midpoint of and parallel with the rungs except where cages or wells are installed. Action required: Relocate either the ladder or phone equipment to maintain minimum clearances.
Plumb - Cleanouts - Building sewer 708.3.2
Resolved
05/04/2018

2012 IPC 708.3.5 Building drain and building sewer junction. There shall be a cleanout near the junction of the building drain and the building sewer. The cleanout shall be either inside or outside the building wall and shall be brought up to the finished ground level or to the basement floor level. (see code for additional information) Action required: Provide cleanout where grease waste leaves the building.
Gen - Submittal documents 7-137
Resolved
05/04/2018

Only one set of specs were provided in submittal. Action required: Provide additional copy of spec book.
Fire Plan Review Approved with Conditions 05/10/2018 05/08/2018
Joe Dir
Construction documents for fire alarm systems
Corrective Action Required
05/03/2018

2012 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. ACTION REQUIRED:(information purposes) Have the fire alarm system contractor provide shop drawings to the fire department for approval of the fire alarm system to be installed.
Address numbers required
Corrective Action Required
05/03/2018

2012 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). ACTION REQUIRED:(veriifed at inspection) All suite addresses shall be readable from the roadway.
Knox box required
Corrective Action Required
05/03/2018

2012 IFC 506.1- Where required. Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type and shall contain keys to gain necessary access as required by the fire code official. ACTION RERQUIRED:(veriifed at inspection) Knox Box can be obtained on line at knoxbox.com ACTION REQUIRED:(veriifed at inspection) The knox box shall be mounted above the FDC approximately 5'-6' off of finish grade.
Construction documents - Fire protection systems
Corrective Action Required
05/03/2018

2012IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. ACTION REQUIRED:(information purposes) Have the fire sprinkler system contractor provide shop drawings to the fire department for approval of the fire sprinkler system to be installed.
Installation acceptance testing
Corrective Action Required
05/03/2018

2012 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. ACTION REQUIRED:(information purposes) The fire sprinkler and fire alarm systems will require field and acceptance testing prior to the final occupancy inspection. contact the fire department to schedule testing. (816)969-1300.
Misc
Corrective Action Required
05/03/2018

HVAC/AHU's ACTION REQUIRED: Plans did not indicate HVAC/AHU installation or specs. Provide information as to when and who will be installing the AHU's for the building.
Licensed Contractors Rejected 05/03/2018 05/04/2018
Joe Frogge
LC - MEP Subs
Corrective Action Required
05/03/2018

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Building Plan Review Rejected 04/20/2018 04/16/2018
Joe Frogge
Final Development Plan
Corrective Action Required
04/16/2018

The building permit for this project can not be issued until the Codes Administration Department has received the approved Final Development Plan from the Planning and Development Department. Action required: Comment is for informational purposes.
Suite address
Corrective Action Required
04/16/2018

This structure has been assigned one address. Additional addresses will be needed to accommodate future tenants. Action required: Provide guidance as to how building is proposed to be used in the future in order for us to assign the appropriate addresses. Is it your intention to have separate suites on north and south?
Engineered truss package
Corrective Action Required
04/16/2018

Copies of the engineered truss package were not provided at the time of permit application. Action required: Provide truss package or request deferral to construction.
Misc
Corrective Action Required
04/16/2018

2012 IBC 1803.1 General. Geotechnical investigations shall be conducted in accordance with Section 1803.2 and reported in accordance with Section 1803.6. Where required by the building official or where geotechnical investigations involve in-situ testing, laboratory testing or engineering calculations, such investigations shall be conducted by a registered design professional. Action required: Provide soils report to justify design assumption of soil bearing capacity greater than 2,000psf.
Bldg - Illumination required 1006.1
Corrective Action Required
04/16/2018

2012 IBC 1006.1 Illumination required. The means of egress, including the exit discharge, shall be illuminated at all times the building space served by the means of egress is occupied. Action required: Provide emergency lighting at exterior side of exits.
Mech - Equipment and appliances on roofs or elevated structures 306.5
Corrective Action Required
04/16/2018

2012 IMC 306.5 Equipment and appliances on roofs or elevated structures. Where equipment requiring access or appliances are located on an elevated structure or the roof of a building such that personnel will have to climb higher than 16 feet above grade to access such equipment or appliances, an interior or exterior means of access shall be provided. Such access shall not require climbing over obstructions greater than 30 inches in height or walking on roofs having a slope greater than 4 units vertical in 12 units horizontal. Such access shall not require the use of portable ladders. Where access involves climbing over parapet walls, the height shall be measured to the top of the parapet wall. (see code section for specific construction requirements) Item #7 - Climbing clearance. The distance from the centerline of the rungs to the nearest permanent object on the climbing side of the ladder shall be a minimum of 30 inches measured perpendicular to the rungs. This distance shall be maintained from the point of ladder access to the bottom of the roof hatch. A minimum clear width of 15 inches shall be provided on both sides of the ladder measured from the midpoint of and parallel with the rungs except where cages or wells are installed. Action required: Relocate either the ladder or phone equipment to maintain minimum clearances.
Plumb - Cleanouts - Building sewer 708.3.2
Corrective Action Required
04/16/2018

2012 IPC 708.3.5 Building drain and building sewer junction. There shall be a cleanout near the junction of the building drain and the building sewer. The cleanout shall be either inside or outside the building wall and shall be brought up to the finished ground level or to the basement floor level. (see code for additional information) Action required: Provide cleanout where grease waste leaves the building.
Gen - Submittal documents 7-137
Corrective Action Required
04/16/2018

Only one set of specs were provided in submittal. Action required: Provide additional copy of spec book.
Licensed Contractors Rejected 08/15/2018 04/16/2018
Joe Frogge
LC - MEP Subs
Corrective Action Required
04/16/2018

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Fire Plan Review Approved with Conditions 04/20/2018 04/10/2018
Joe Dir
Construction documents for fire alarm systems
Corrective Action Required
04/10/2018

2012 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. ACTION REQUIRED:(information purposes) Have the fire alarm system contractor provide shop drawings to the fire department for approval of the fire alarm system to be installed.
Address numbers required
Corrective Action Required
04/10/2018

2012 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). ACTION REQUIRED:(veriifed at inspection) All suite addresses shall be readable from the roadway.
Knox box required
Corrective Action Required
04/10/2018

2012 IFC 506.1- Where required. Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type and shall contain keys to gain necessary access as required by the fire code official. ACTION RERQUIRED:(veriifed at inspection) Knox Box can be obtained on line at knoxbox.com ACTION REQUIRED:(veriifed at inspection) The knox box shall be mounted above the FDC approximately 5'-6' off of finish grade.
Construction documents - Fire protection systems
Corrective Action Required
04/10/2018

2012IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. ACTION REQUIRED:(information purposes) Have the fire sprinkler system contractor provide shop drawings to the fire department for approval of the fire sprinkler system to be installed.
Installation acceptance testing
Corrective Action Required
04/10/2018

2012 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. ACTION REQUIRED:(information purposes) The fire sprinkler and fire alarm systems will require field and acceptance testing prior to the final occupancy inspection. contact the fire department to schedule testing. (816)969-1300.
Misc
Corrective Action Required
04/10/2018

HVAC/AHU's ACTION REQUIRED: Plans did not indicate HVAC/AHU installation or specs. Provide information as to when and who will be installing the AHU's for the building.
Inspections

There are no inspections for this permit application.

Documents & Images
Date Uploaded File Type Document Name
04/10/2018 Letter Fire Building Plan Review
04/16/2018 Letter Codes P/R Corrections Document
05/08/2018 Letter Final Plan Review Conditions
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home