Review Type |
Outcome |
Est. Completion Date |
Completed |
Licensed Contractors
|
Approved
|
05/22/2018
|
05/23/2018
|
|
Development Center
|
|
LC - MEP Subs
Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt)
No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section.
Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
4/23/18 - added mechanical but still waiting on plumbing and electrical
5/17/18 - PC and EC still not licensed
|
|
|
Building Plan Review
|
Approved with Conditions
|
05/22/2018
|
05/22/2018
|
|
Joe Frogge
|
|
Health Dept Inspection
Corrective Action Required
For the Health Department inspection contact Deb Sees with the Jackson County Public Works Department, Environmental Health Division at (816) 847-7070. Health Department approval is required prior to receiving any type of Occupancy from the City of Lee's Summit.
Action required: Comment is for informational purposes.
4/23/18 - acknowledged
|
|
Misc
Not enough information to complete review.
Actions required:
-
-
-
|
|
Misc
Corrective Action Required
4/23/18 - This note has been added due to change in scope of work (original hood above oven was assumed to be type II)
Actions required:
-
- Provide roof plan to show new equipment, connections, etc.
5/17/18 - Exhaust must be minimum 10' away from any intakes. (ref: makeup air unit near existing RTU. Does makeup unit really have an exhaust option?)
5/22/18 - existing intake to be field modified per updated sheet printed and attached to drawings.
- Provide verification that roof structure has been evaluated for additional load at make up air unit.
5/17/18 - deferred to construction per request.
- Provide screening for new roof mounted equipment.
5/17/18 - existing parapet noted to be adequate. To be field verified. (Note: new equipment is subject to this ordinance regardless of existing conditions for adjacent equipment)
- Provide convenience receptacle within 25' of any new hvac equipment of roof
5/17/18 - noted. to be field verified
|
|
|
Fire Plan Review
|
Approved with Conditions
|
05/22/2018
|
05/16/2018
|
|
Joe Dir
|
|
Construction documents for fire alarm systems
Corrective Action Required
2012 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions.
ACTION REQUIRED:(information purposes)
Have the fire alarm system contractor provide shop drawings for any modification to be done to the fire alarm system
|
|
Address numbers required
Corrective Action Required
2012 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm).
ACTION REQUIRED: (verified at inspection)
Numeric address of 1196 shall be readable from the roadway.
|
|
Construction documents - Fire protection systems
Corrective Action Required
2012 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation.
ACTION REQUIRED:(information purposes)
Have the fire sprinkler system contractor provide shop drawings of any modification to be done to the fire sprinkler system.
|
|
Installation acceptance testing
Corrective Action Required
2012 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test.
ACTION REQUIRED:(information purposes)
Acceptance testing of the new type 1 hood system and any alarm system devices that had to be relocated, disconnected during the rennovation or newly installed devices will require an acceptance test prior to the final occupancy inspection. contact the fire depaertment prior to schedule testing (816)969-1300.
|
|
Portable fire extinguishers for commercial cooking equipment.
Corrective Action Required
2012 IFC 904.11.5- Portable fire extinguishers for commercial cooking equipment. Portable fire extinguishers shall be provided within a 30-foot (9144 mm) travel distance of commercial-type cooking equipment. Cooking equipment involving vegetable or animal oils and fats shall be protected by a Class K rated portable extinguisher.
ACTION REQUIRED:(verified at inspection)
Provide a second K-class fire extinguisher for the second Type-1 hood system. To be mounted under or close to the manual pull station
|
|
Misc
Corrective Action Required
Type-1 hood/suppression systems
ACTION REQUIRED:(verified at testing)
The suppression systems for the Type-1 hoods shall be monitored by the strip malls Fire Alarm Panel. Have the fire alarm system company make needed connections and programing. Testing required
|
|
|
Health Department Review
|
Approved
|
08/08/2018
|
04/27/2018
|
|
Joe Frogge
|
|
|
Fire Plan Review
|
Approved with Conditions
|
04/30/2018
|
04/24/2018
|
|
Joe Dir
|
|
Type I hood - Where required
2012 IFC 609.2- Where required. A Type I hood shall be installed at or above all commercial cooking appliances and domestic cooking appliances used for commercial purposes that produce grease vapors.
|
|
Construction documents for fire alarm systems
Corrective Action Required
2012 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions.
ACTION REQUIRED:(information purposes)
Have the fire alarm system contractor provide shop drawings for any modification to be done to the fire alarm system
|
|
Address numbers required
Corrective Action Required
2012 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm).
ACTION REQUIRED: (verified at inspection)
Numeric address of 1196 shall be readable from the roadway.
|
|
Construction documents - Fire protection systems
Corrective Action Required
2012 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation.
ACTION REQUIRED:(information purposes)
Have the fire sprinkler system contractor provide shop drawings of any modification to be done to the fire sprinkler system.
|
|
Installation acceptance testing
Corrective Action Required
2012 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test.
ACTION REQUIRED:(information purposes)
Acceptance testing of the new type 1 hood system and any alarm system devices that had to be relocated, disconnected during the rennovation or newly installed devices will require an acceptance test prior to the final occupancy inspection. contact the fire depaertment prior to schedule testing (816)969-1300.
|
|
Portable fire extinguishers for commercial cooking equipment.
Corrective Action Required
2012 IFC 904.11.5- Portable fire extinguishers for commercial cooking equipment. Portable fire extinguishers shall be provided within a 30-foot (9144 mm) travel distance of commercial-type cooking equipment. Cooking equipment involving vegetable or animal oils and fats shall be protected by a Class K rated portable extinguisher.
ACTION REQUIRED:(verified at inspection)
Provide a second K-class fire extinguisher for the second Type-1 hood system. To be mounted under or close to the manual pull station
|
|
Misc
Type-1 Hood/suppression system
ACTION REQUIRED:
Provide specifications for the new Type-hood/suppression system.
|
|
Misc
Corrective Action Required
Type-1 hood/suppression systems
ACTION REQUIRED:(verified at testing)
The suppression systems for the Type-1 hoods shall be monitored by the strip malls Fire Alarm Panel. Have the fire alarm system company make needed connections and programing. Testing required
|
|
|
Building Plan Review
|
Rejected
|
04/30/2018
|
04/23/2018
|
|
Joe Frogge
|
|
Health Dept Review
For the Health Department review contact Deb Sees with the Jackson County Public Works Department, Environmental Services Division, at (816) 847-7070. Health Department approval is required prior to receiving any type of building permit from the City of Lee's Summit.
Action required: Comment is for informational purposes.
4/23/18 - acknowledged
|
|
Health Dept Inspection
Corrective Action Required
For the Health Department inspection contact Deb Sees with the Jackson County Public Works Department, Environmental Health Division at (816) 847-7070. Health Department approval is required prior to receiving any type of Occupancy from the City of Lee's Summit.
Action required: Comment is for informational purposes.
4/23/18 - acknowledged
|
|
Code analysis required
A code analysis shall be provided which includes but is not limited to occupancy type, occupant load, construction type, actual area, height and floors, allowable area, height and floors, and the codes to which the project is designed.
Actions required:
- Modify drawings to reflect actual construction type which is 5B.
- Update code analysis to show occupant load.
|
|
Plan Submittal 2012 Codes
All plans submitted for review on or after January 1, 2014 shall be designed to the requirements of the 2012 International Building Code, 2012 International Mechanical Code, 2012 International Plumbing Code, 2012 International Fuel Gas Code, 2012 International Fire Code, 2011 National Electric Code and the ANSI A117.1-2009 as amended and adopted by the City of Lee’s Summit.
Action required: Modify drawings to reflect actual ICC/ANSI year which is 2009.
|
|
Misc
Corrective Action Required
Not enough information to complete review.
Actions required:
-
- Provide complete MEP designs as applicable.
4/23/18 - not provided.
- Provide complete design for new hood above oven.
4/23/18 - specify duct construction and fire rated wrap
|
|
Misc
2012 IBC 1210.4 Toilet room location. Toilet rooms shall not open directly into a room used for the preparation of food for service to the public.
Action required: Modify design to demonstrate compliance.
|
|
Bldg - Accessibility - Point of sales and service counters 1109.12.3
2012 IBC 1109.12.3 – Point of sale and service counters. Where counters are provided for sales or distribution of goods or services, at least one of each type provided shall be accessible. Where such counters are dispersed throughout the building or facility, accessible counters shall also be dispersed.
Action required: Specify compliant maximum height of countertop. (not relevant if not open to public - clarify)
|
|
Misc
2012 IMC 507.2.2 Type II hoods. Type II hoods shall be installed above dishwashers and appliances that produce heat or moisture and do not produce grease or smoke as a result of the cooking process, except where the heat and moisture loads from such appliances are incorporated into the HVAC system design or into the design of a separate removal system. (see code section for more specific requirements)
Action required: Provide hood over new dishwasher or provide verification that exemptions are met.
4/23/18 - deferred to construction
4/27/18 - dishwasher removed from project
|
|
Misc
Corrective Action Required
4/23/18 - This note has been added due to change in scope of work (original hood above oven was assumed to be type II)
Actions required:
- Provide verification that wall behind type I hood is non-combustible, i.e. metal studs
- Provide roof plan to show new equipment, connections, etc.
- Provide verification that roof structure has been evaluated for additional load at make up air unit.
- Provide screening for new roof mounted equipment.
- Provide convenience receptacle within 25' of any new hvac equipment of roof
|
|
|
Licensed Contractors
|
Rejected
|
04/23/2018
|
04/23/2018
|
|
Joe Frogge
|
|
LC - General Contractor
Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances.
Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor.
|
|
LC - MEP Subs
Corrective Action Required
Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt)
No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section.
Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
4/23/18 - added mechanical but still waiting on plumbing and electrical
|
|
|
Fire Plan Review
|
Rejected
|
04/03/2018
|
03/27/2018
|
|
Joe Dir
|
|
Type I hood - Where required
Corrective Action Required
2006 IFC 609.2- Where required. A Type I hood shall be installed at or above all commercial cooking appliances and domestic cooking appliances used for commercial purposes that produce grease vapors.
|
|
Construction documents for fire alarm systems
Corrective Action Required
2012 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions.
ACTION REQUIRED:
Have the fire alarm system contractor provide shop drawings for any modification to be done to the fire alarm system
|
|
Address numbers required
Corrective Action Required
2012 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm).
ACTION REQUIRED: (verified at inspection)
Numeric address of 1196 shall be readable from the roadway.
|
|
Construction documents - Fire protection systems
Corrective Action Required
2012 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation.
ACTION REQUIRED:
Have the fire sprinkler system contractor provide shop drawings of any modification to be done to the fire sprinkler system.
|
|
Installation acceptance testing
Corrective Action Required
2012 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test.
ACTION REQUIRED:
Acceptance testing of the new type 1 hood system and any alarm system devices that had to be relocated, disconnected during the rennovation or newly installed devices will require an acceptance test prior to the final occupancy inspection. contact the fire depaertment prior to schedule testing (816)969-1300.
|
|
Portable fire extinguishers for commercial cooking equipment.
Corrective Action Required
2012 IFC 904.11.5- Portable fire extinguishers for commercial cooking equipment. Portable fire extinguishers shall be provided within a 30-foot (9144 mm) travel distance of commercial-type cooking equipment. Cooking equipment involving vegetable or animal oils and fats shall be protected by a Class K rated portable extinguisher.
ACTION REQUIRED:
Provide a second K-class fire extinguisher for the second Type-1 hood system. To be mounted under or close to the manual pull station
|
|
Misc
Corrective Action Required
Type-1 Hood/suppression system
ACTION REQUIRED:
Provide specifications for the new Type-hood/suppression system.
|
|
Misc
Corrective Action Required
Type-1 hood/suppression systems
ACTION REQUIRED:
The suppression systems for the Type-1 hoods shall be monitored by the strip malls Fire Alarm Panel. Have the fire alarm system company make needed connections and programing. Testing required
|
|
|
Building Plan Review
|
Rejected
|
04/03/2018
|
03/26/2018
|
|
Joe Frogge
|
|
Health Dept Review
Corrective Action Required
For the Health Department review contact Deb Sees with the Jackson County Public Works Department, Environmental Services Division, at (816) 847-7070. Health Department approval is required prior to receiving any type of building permit from the City of Lee's Summit.
Action required: Comment is for informational purposes.
|
|
Health Dept Inspection
Corrective Action Required
For the Health Department inspection contact Deb Sees with the Jackson County Public Works Department, Environmental Health Division at (816) 847-7070. Health Department approval is required prior to receiving any type of Occupancy from the City of Lee's Summit.
Action required: Comment is for informational purposes.
|
|
Code analysis required
Corrective Action Required
A code analysis shall be provided which includes but is not limited to occupancy type, occupant load, construction type, actual area, height and floors, allowable area, height and floors, and the codes to which the project is designed.
Actions required:
- Modify drawings to reflect actual construction type which is 5B.
- Update code analysis to show occupant load.
|
|
Plan Submittal 2012 Codes
Corrective Action Required
All plans submitted for review on or after January 1, 2014 shall be designed to the requirements of the 2012 International Building Code, 2012 International Mechanical Code, 2012 International Plumbing Code, 2012 International Fuel Gas Code, 2012 International Fire Code, 2011 National Electric Code and the ANSI A117.1-2009 as amended and adopted by the City of Lee’s Summit.
Action required: Modify drawings to reflect actual ICC/ANSI year which is 2009.
|
|
Misc
Corrective Action Required
Not enough information to complete review.
Actions required:
- Label use of all spaces.
- Provide complete MEP designs as applicable.
- Provide complete design for new hood above oven.
|
|
Misc
Corrective Action Required
2012 IBC 1210.4 Toilet room location. Toilet rooms shall not open directly into a room used for the preparation of food for service to the public.
Action required: Modify design to demonstrate compliance.
|
|
Bldg - Accessibility - Point of sales and service counters 1109.12.3
Corrective Action Required
2012 IBC 1109.12.3 – Point of sale and service counters. Where counters are provided for sales or distribution of goods or services, at least one of each type provided shall be accessible. Where such counters are dispersed throughout the building or facility, accessible counters shall also be dispersed.
Action required: Specify compliant maximum height of countertop. (not relevant if not open to public - clarify)
|
|
Misc
Corrective Action Required
2012 IMC 507.2.2 Type II hoods. Type II hoods shall be installed above dishwashers and appliances that produce heat or moisture and do not produce grease or smoke as a result of the cooking process, except where the heat and moisture loads from such appliances are incorporated into the HVAC system design or into the design of a separate removal system. (see code section for more specific requirements)
Action required: Provide hood over new dishwasher or provide verification that exemptions are met.
|
|
|
Licensed Contractors
|
Rejected
|
04/03/2018
|
03/26/2018
|
|
Joe Frogge
|
|
LC - General Contractor
Corrective Action Required
Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances.
Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor.
|
|
LC - MEP Subs
Corrective Action Required
Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt)
No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section.
Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
|
|
|