Summary
PRCOM20180700
Building Permit - Commercial
Closed
CITY OF LEES SUMMIT
PARTIAL COMMERCIAL
FOUNDATION AND UNDERSLAB PERMIT FOR NEW APARTMENT WITH PARKING GARAGE BENEATH FULL PERMIT - PRCOM20172509
03/16/2018
04/13/2018
12/21/2018
Locations
Contacts
CITYSCAPE CONSTRUCTION VIEW HIGH LLC, Address:10 W CARMEL DR STE 200, Phone:(317) 574-1600 Ext:100  
CITY OF LEES SUMMIT, Address:220 SE GREEN ST  
LATIMER SOMMERS & ASSOCIATES PA, Address:3639 SW SUMMERFIELD DR STE A, Phone:(785) 233-3232  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 03/16/2018 03/16/2018
Joe Frogge
Fees
Paid Fees Amount Paid Owing Date Paid
Valuation Fee for Partial Commercial $501.48 $501.48 Paid 03/21/2018
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Underslab Plumbing Inspection - Commercial Partial 9/13/2018 9/13/2018 at 9:00 AM 09/13/2018
Misc
Corrective Action Required
09/13/2018
PARTIAL- MAIN TRUCK LINE ONLY
Footing Inspection - Commercial Partial 9/25/2018 9/25/2018 at 8:00 AM 09/25/2018
Misc
Corrective Action Required
09/25/2018
- lower west footing.
Foundation Inspection - Commercial Partial 10/2/2018 (11:00) 10/2/2018 at 12:00 PM 10/02/2018
Misc
Corrective Action Required
10/02/2018
PARTIAL- LOWER LEVEL WEST WALL.
Footing Inspection - Commercial Failed 10/22/2018 10/22/2018 at 11:30 AM 10/22/2018
Misc
Corrective Action Required
09/25/2018
- lower west footing.
Misc
Corrective Action Required
10/22/2018
BUILDING #4 PERIMETER FOOTING * REMOVE EXCESS WATER IN FOOTING * RAISE CRUSHED CHAIRS TO 3 " * ADD BLOCK OUTS TO SECTION OVER SEWER CONNECTION WHICH WILL NOT BE POURED
Footing Inspection - Commercial Failed 10/23/2018 (8:30) 10/23/2018 at 9:50 AM 10/23/2018
Misc
Corrective Action Required
10/22/2018
- lower west footing.
Misc
Corrective Action Required
10/22/2018
BUILDING #4 PERIMETER FOOTING * REMOVE EXCESS WATER IN FOOTING * RAISE CRUSHED CHAIRS TO 3 " * ADD BLOCK OUTS TO SECTION OVER SEWER CONNECTION WHICH WILL NOT BE POURED ***2nd inspeciton on east side of footing failed provide 3" clearance to all steel.
Footing Inspection - Commercial Passed 10/23/2018 10/23/2018 at 1:50 PM 10/23/2018
Misc
Corrective Action Required
10/23/2018
- lower west footing.
Misc
Resolved
10/23/2018
BUILDING #4 PERIMETER FOOTING * REMOVE EXCESS WATER IN FOOTING * RAISE CRUSHED CHAIRS TO 3 " * ADD BLOCK OUTS TO SECTION OVER SEWER CONNECTION WHICH WILL NOT BE POURED ***2nd inspeciton on east side of footing failed provide 3" clearance to all steel.
Informational
10/23/2018
*BUILDING #4 PERIMETER FOOTING OK TO POUR
Footing Inspection - Commercial Partial 12/14/2018 (9:00) 12/14/2018 12/14/2018
Misc
Corrective Action Required
12/14/2018
BUILDING #4 PERIMETER FOOTING - ;LOWER EAST Section; WEST LOWER FOUNDATIONS WALLS; UPPER WEST PERIMETER EXCEPT TIE IN ON EACH END, : UFFER SHOULD BE ON SOUTH SIDE UPPER END.
Underslab Plumbing Inspection - Commercial Failed 12/20/2018 12/20/2018 12/20/2018
Misc
Corrective Action Required
09/13/2018
PARTIAL- MAIN TRUCK LINE ONLY UPPER LEVEL- NORTH END INCOMPLTE NEED TO BED PIPE IN GRAVEL
Underslab Plumbing Inspection - Commercial Passed 12/21/2018 12/21/2018 12/21/2018
Misc
Resolved
12/21/2018
PARTIAL- MAIN TRUCK LINE ONLY UPPER LEVEL- NORTH END INCOMPLTE NEED TO BED PIPE IN GRAVEL
Footing Inspection - Commercial Passed 12/21/2018 12/21/2018
Misc
Resolved
12/21/2018
BUILDING #4 PERIMETER FOOTING - ;LOWER EAST Section; WEST LOWER FOUNDATIONS WALLS; UPPER WEST PERIMETER EXCEPT TIE IN ON EACH END, : UFFER SHOULD BE ON SOUTH SIDE UPPER END.
Foundation Inspection - Commercial Passed 12/21/2018
Misc
Resolved
12/21/2018
PARTIAL- LOWER LEVEL WEST WALL.
Documents & Images
Date Uploaded File Type Document Name
03/21/2018 Receipt Receipt for transaction: 2018-001046
04/13/2018 Letter Codes Building Permit
09/13/2018 Letter Inspection Summary
09/25/2018 Letter Inspection Summary
10/02/2018 Letter Inspection Summary
10/22/2018 Letter Inspection Summary
10/23/2018 Letter Inspection Summary
12/14/2018 Letter INSPECTION SUMMARY
12/20/2018 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home