Permit Application Status

PRCOM20180696


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20180696
Building Permit - Commercial
Closed
CITY OF LEES SUMMIT
PARTIAL COMMERCIAL
FOUNDATION AND UNDERSLAB PERMIT FOR NEW CLUBHOUSE WITH DOG GROOMING AND GYM FULL PERMIT - PRCOM20172500
03/16/2018
04/13/2018
03/26/2019
Locations
Contacts
CITYSCAPE CONSTRUCTION VIEW HIGH LLC, Address:10 W CARMEL DR STE 200, Phone:(317) 574-1600 Ext:100  
CITY OF LEES SUMMIT, Address:220 SE GREEN ST  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 03/16/2018 03/16/2018
Joe Frogge
Fees
Paid Fees Amount Paid Owing Date Paid
Valuation Fee for Partial Commercial $165.91 $165.91 Paid 03/21/2018
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Commercial Partial 6/12/2018 6/12/2018 06/12/2018
Misc
Corrective Action Required
06/12/2018
Partial Footing as Follows: Wet wall, south wall, south Retaining wall. Including Ufer Ground
Footing Inspection - Commercial Partial 6/13/2018 (9:15) 6/13/2018 06/13/2018
Misc
Corrective Action Required
06/12/2018
Partial Footing as Follows: Wet wall, south wall, south Retaining wall. North wall of Basement-pending
Footing Inspection - Commercial Partial 6/18/2018 6/18/2018 at 8:30 AM 06/18/2018
Misc
Corrective Action Required
06/13/2018
Partial Footing as Follows: Wet wall, south wall, south Retaining wall. North wall of Basement-pending ** east footing
Miscellaneous Inspection Partial 3/6/2019 06/19/2018
Misc
Corrective Action Required
06/19/2018
Initial inspection- partial approval- following areas-
Foundation Inspection - Commercial Partial 6/19/2018 (8:00) 6/19/2018 06/19/2018
Misc
Corrective Action Required
06/19/2018
Foundation wall 1-8
Footing Inspection - Commercial Partial 6/29/2018 6/29/2018 06/29/2018
Misc
Corrective Action Required
06/18/2018
Partial Footing as Follows: Wet wall, south wall, south Retaining wall. North wall of Basement-pending ** east footing north wall, and step footing
Foundation Inspection - Commercial Partial 6/22/2018 (8:00) 7/6/2018 07/06/2018
Misc
Corrective Action Required
06/19/2018
Foundation wall 1-8 WING WALL
Underslab Plumbing Inspection - Commercial Failed 8/2/2018 8/2/2018 at 7:30 AM 08/02/2018
Misc
Corrective Action Required
08/02/2018
INSTALL PLUMBING AS PER APPROVED PLANS. FLOOR CLEAN OUTS ETC. REVISE TO SHOW DIRECTION WHERE EXITING BUILDING.
Underslab Plumbing Inspection - Commercial Passed 8/3/2018 8/3/2018 at 8:30 AM 08/03/2018
Misc
Resolved
08/03/2018
INSTALL PLUMBING AS PER APPROVED PLANS. FLOOR CLEAN OUTS ETC. REVISE TO SHOW DIRECTION WHERE EXITING BUILDING.
Underslab Electrical Inspection - Commercial Passed 8/28/2018 8/28/2018 08/28/2018
Sewer Service Inspection Passed 10/4/2018 at 9:30 AM 10/04/2018
Sprinkler - Hydrostatic Test Passed 3/27/2019 03/27/2019
Documents & Images
Date Uploaded File Type Document Name
03/21/2018 Receipt Receipt for transaction: 2018-001046
04/13/2018 Letter Codes Building Permit
06/12/2018 Letter Inspection Summary
06/13/2018 Letter Inspection Summary
06/18/2018 Letter Inspection Summary
06/29/2018 Letter Inspection Summary
07/06/2018 Letter Inspection Summary
08/02/2018 Letter Inspection Summary
08/03/2018 Letter Inspection Summary
08/28/2018 Letter Inspection Summary
10/04/2018 Letter Inspection Summary
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide: