Permit Application Status

PRCOM20180366


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20180366
Building Permit - Commercial
Certificate of Occupancy
GALE COMMUNITIES INC
CHANGE OF TENANT
EXPANSION OF EXISTING TENANT INTO ADJACENT SPACE
02/20/2018
03/01/2018
08/22/2018
04/26/2018
Locations
Contacts
MID-AMERICA CONTRACTORS INC, Address:1400 IRON, Phone:(816) 221-4516  
KASA ELECTRIC LLC, Address:1206 NW VALLEY RIDGE DR, Phone:(816) 228-4886  
SCHARHAG ARCHITECTS, Address:310 ARMOR RD, #22, Phone:(816) 221-9297  
GALE COMMUNITIES INC, Address:400 SW LONGVIEW BLVD STE 105  
INNOVATIVE AIR INC, Address:8834 NALL AVE, Phone:(913) 291-4577  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 02/27/2018 02/28/2018
Joe Frogge
LC - MEP Subs
Resolved
02/28/2018

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company name of licensed Electrical Contractor. 2/28/18 - not addressed
Building Plan Review Approved 03/06/2018 02/28/2018
Joe Frogge
Bldg - Premises identification/address 501.2
Resolved
02/28/2018

2012 IBC 501.2 – Premises identification. New and existing buildings shall have approved numbers or letters. Each character shall not be less than 3 inches high with a minimum stroke width of 0.5 inch. They should be installed on a contrasting background and be plainly legible and visible from the street or road fronting the property. When required by the fire code official, address numbers shall be provided in additional approved locations to facilitate emergency response. Address numbers and letters shall be Arabic numbers or alphabetical letters. Where access is by means of a private road and the building cannot be viewed from the public way, a monument, pole or other approved sign or means shall be used to identify the structure. Address numbers shall be maintained. In multi-tenant commercial buildings where tenants have multiple entrances located on different sides of the building, each door shall be addressed. Address characters shall be capable of being illuminated by an internal or external lighting source. Action required: The correct address for this suite 400 SW Longview Blvd. (Not Road). Please update your files/records.
Misc
Resolved
02/28/2018

2012 IBC 1103.1 (Accessibility) Where required. Sites, buildings, structures, facilities, elements and spaces, temporary or permanent, shall be accessible to persons with physical disabilities. Action required: Provide verification that new space is accessible or that no services will be offered in upper space that is not offered in lower.
Bldg - Guards - Where required 1013.2
Resolved
02/28/2018

2012 IBC 1013.2 - Where required. Guards shall be located along open-sided walking surfaces, including mezzanines, equipment platforms, stairs, ramps and landings that are located more than 30 inches measured vertically to the floor or grade below at any point within 36 inches horizontally to the edge of the open side. Guards shall be adequate in strength and attachment in accordance with Section 1607.8. Guards are required at retaining walls over 30” above grade when walking surfaces are within ten (10) feet of the high side of the retaining wall. (As amended by the City of Lee’s Summit. See code section for possible exceptions.) Action required: If new stair exceeds 30" high, guards will be required. (dimension not provided and detail scales to 30") To be field verified.
Misc
Resolved
02/28/2018

2012 IBC 1606.2 Design dead load. For purposes of design, the actual weights of materials of construction and fixed service equipment shall be used. In the absence of definite information, values used shall be subject to the approval of the building official. Action required: Provide verification that wall being cut into is not load bearing. If load bearing provide size/method of headering off the new opening.
Fire Plan Review Approved with Conditions 03/06/2018 02/28/2018
Joe Dir
Construction documents - Fire protection systems
Corrective Action Required
02/27/2018

2012 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. ACTION REQUIRED:(information purposes) Fire sprinkler system may require modification due to wall and ceiling changes. Have the fire sprinkler system contractor provide shop drawings of any modification to be done to the fire sprinkler system.
Address numbers required
Corrective Action Required
02/27/2018

2012 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). ACTION REQUIRED:(verified at inspection) All doors leading into the suite from the corridor need to be addressed with the same suite designation.
Installation acceptance testing
Corrective Action Required
02/27/2018

2012 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. ACTION REQUIRED:(information purposes) Any fire alarm system devices that are disconnected, relocated or installed new will require an acceptance test prior to the final occupancy inspection. contact the fire department to schedule testing.(816)969-1300.
Building Plan Review Rejected 03/02/2018 02/23/2018
Joe Frogge
Bldg - Premises identification/address 501.2
Corrective Action Required
02/23/2018

2012 IBC 501.2 – Premises identification. New and existing buildings shall have approved numbers or letters. Each character shall not be less than 3 inches high with a minimum stroke width of 0.5 inch. They should be installed on a contrasting background and be plainly legible and visible from the street or road fronting the property. When required by the fire code official, address numbers shall be provided in additional approved locations to facilitate emergency response. Address numbers and letters shall be Arabic numbers or alphabetical letters. Where access is by means of a private road and the building cannot be viewed from the public way, a monument, pole or other approved sign or means shall be used to identify the structure. Address numbers shall be maintained. In multi-tenant commercial buildings where tenants have multiple entrances located on different sides of the building, each door shall be addressed. Address characters shall be capable of being illuminated by an internal or external lighting source. Action required: The correct address for this suite 400 SW Longview Blvd. (Not Road). Please update your files/records.
Misc
Corrective Action Required
02/23/2018

2012 IBC 1103.1 (Accessibility) Where required. Sites, buildings, structures, facilities, elements and spaces, temporary or permanent, shall be accessible to persons with physical disabilities. Action required: Provide verification that new space is accessible or that no services will be offered in upper space that is not offered in lower.
Bldg - Guards - Where required 1013.2
Corrective Action Required
02/23/2018

2012 IBC 1013.2 - Where required. Guards shall be located along open-sided walking surfaces, including mezzanines, equipment platforms, stairs, ramps and landings that are located more than 30 inches measured vertically to the floor or grade below at any point within 36 inches horizontally to the edge of the open side. Guards shall be adequate in strength and attachment in accordance with Section 1607.8. Guards are required at retaining walls over 30” above grade when walking surfaces are within ten (10) feet of the high side of the retaining wall. (As amended by the City of Lee’s Summit. See code section for possible exceptions.) Action required: If new stair exceeds 30" high, guards will be required. (dimension not provided and detail scales to 30") To be field verified.
Misc
Corrective Action Required
02/23/2018

2012 IBC 1606.2 Design dead load. For purposes of design, the actual weights of materials of construction and fixed service equipment shall be used. In the absence of definite information, values used shall be subject to the approval of the building official. Action required: Provide verification that wall being cut into is not load bearing. If load bearing provide size/method of headering off the new opening.
Licensed Contractors Rejected 02/20/2018 02/23/2018
Joe Frogge
LC - MEP Subs
Resolved
02/28/2018

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company name of licensed Electrical Contractor.
Fire Plan Review Approved with Conditions 03/02/2018 02/21/2018
Joe Dir
Construction documents - Fire protection systems
Corrective Action Required
02/21/2018

2012 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. ACTION REQUIRED:(information purposes) Fire sprinkler system may require modification due to wall and ceiling changes. Have the fire sprinkler system contractor provide shop drawings of any modification to be done to the fire sprinkler system.
Address numbers required
Corrective Action Required
02/21/2018

2012 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). ACTION REQUIRED:(verified at inspection) All doors leading into the suite from the corridor need to be addressed with the same suite designation.
Installation acceptance testing
Corrective Action Required
02/21/2018

2012 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. ACTION REQUIRED:(information purposes) Any fire alarm system devices that are disconnected, relocated or installed new will require an acceptance test prior to the final occupancy inspection. contact the fire department to schedule testing.(816)969-1300.
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for Change of Tenant $189.61 $189.61 Paid 03/01/2018
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Above Ceiling Inspection Passed 3/30/2018 3/30/2018 at 7:30 AM 03/30/2018
In-wall Inspection Passed 03/30/2018
Occupancy Inspection - Codes Commercial Failed 4/19/2018 4/19/2018 04/19/2018
Misc
Corrective Action Required
04/19/2018
pending Fire Dept- change address on both doors. ok for TCO or to occupy. will close out when fire is approved.
Alarm Test Passed 4/19/2018 04/19/2018
Occupancy Inspection - Fire Temporary C of O 4/19/2018 04/19/2018
Occupancy Inspection - Fire Passed 4/24/2018 04/24/2018
Occupancy Inspection - Codes Commercial Full C of O 04/26/2018
Misc
Resolved
04/26/2018
pending Fire Dept- change address on both doors. ok for TCO or to occupy. will close out when fire is approved.
Documents & Images
Date Uploaded File Type Document Name
02/21/2018 Letter Fire Building Plan Review
02/23/2018 Letter Codes P/R Corrections Document
02/28/2018 Letter Fire Building Plan Review
02/28/2018 Letter Codes Plan Review Conditions
03/01/2018 Receipt Receipt for transaction: 2018-000739
03/01/2018 Letter Codes Building Permit
03/30/2018 Letter Inspection Summary
04/19/2018 Letter Inspection Summary
04/27/2018 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home