Permit Application Status

PRCOM20173998


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20173998
Building Permit - Commercial
Final Completion
ALDERSGATE METHODIST CHURCH
PARTIAL COMMERCIAL
FOUNDATION AND UNDERSAB PERMIT FOR 3 STORY APARTMENT BUILDING COMPLETE PERMIT - PRCOM20170401
12/11/2017
12/22/2017
04/20/2020
Locations
Contacts
LUKE DRAILY CONSTRUCTION INC, Address:75 NW BUSINESS PARK LANE, Phone:(816) 459-8531  
ALDERSGATE METHODIST CHURCH, Address:350 SW M 150 HWY  
RELIABLE MECHANICAL SERVICES INC, Address:1025 W COUCHMAN DR, Phone:(816) 903-7674  
GRIFFIN RILEY PROPERTY GROUP, Address:21 SE 29TH TER, Phone:(816) 366-7900  
CITY OF LEE'S SUMMIT MISSOURI, Address:220 SE GREEN ST  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 12/11/2017 12/11/2017
Joe Frogge
Fees
Paid Fees Amount Paid Owing Date Paid
Valuation Fee for Partial Commercial $639.20 $639.20 Paid 12/20/2017
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Commercial Passed 5/11/2018 5/11/2018 at 1:30 PM 05/11/2018
Footing Inspection - Commercial Passed 5/14/2018 5/14/2018 at 11:11 AM 05/14/2018
Footing Inspection - Commercial Partial 5/15/2018 5/15/2018 at 3:30 PM 05/15/2018
Footing Inspection - Commercial Passed 5/16/2018 5/16/2018 at 2:15 PM 05/16/2018
Footing Inspection - Commercial Passed 5/17/2018 5/17/2018 at 2:30 PM 05/17/2018
Footing Inspection - Commercial Partial 5/30/2018 5/30/2018 at 3:00 PM 05/30/2018
Foundation Inspection - Commercial Partial 6/8/2018 6/8/2018 at 10:45 AM 06/08/2018
Misc
Corrective Action Required
06/08/2018
approved wall building 6
Foundation Inspection - Commercial Passed 6/14/2018 6/14/2018 at 8:00 AM 06/14/2018
Misc
Corrective Action Required
06/08/2018
approved wall building 6
Underslab Plumbing Inspection - Commercial Passed 7/10/2018 7/10/2018 at 10:15 AM 07/10/2018
Underground Plumbing Inspection - Commercial Passed 8/16/2018 8/16/2018 at 2:50 PM 08/16/2018
Misc
Corrective Action Required
08/16/2018
sewer connection ok
Footing Inspection - Commercial Passed 10/3/2018 (1:00) 10/3/2018 at 1:00 PM 10/03/2018
Footing Inspection - Commercial Passed 10/16/2018 10/16/2018 at 1:00 PM 10/16/2018
Misc
Corrective Action Required
10/16/2018
* bldg # 3 type C footings OK
Footing Inspection - Commercial Partial 5/29/2018 (2:30) 5/29/2018 at 2:30 PM 04/20/2020
Corrective Action Required
05/29/2018
EAST SIDE OF BUILDING SIX BOXED OUT AREA
Final Inspection - Commercial Passed 04/20/2020
Documents & Images
Date Uploaded File Type Document Name
12/20/2017 Receipt Receipt for transaction: 2017-007716
12/22/2017 Letter Codes Building Permit
05/11/2018 Letter Inspection Summary
05/14/2018 Letter Inspection Summary
05/15/2018 Letter Inspection Summary
05/16/2018 Letter Inspection Summary
05/17/2018 Letter Inspection Summary
05/29/2018 Letter Inspection Summary
05/30/2018 Letter Inspection Summary
06/08/2018 Letter Inspection Summary
06/14/2018 Letter Inspection Summary
07/10/2018 Letter Inspection Summary
08/16/2018 Letter Inspection Summary
10/16/2018 Letter Inspection Summary
04/20/2020 Letter INSPECTION SUMMARY
08/03/2020 Letter DS Building Permit
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home