Permit Application Status

PRCOM20173342


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20173342
Building Permit - Commercial
Final Completion
PRYOR CROSSINGS LLC
REPAIR REPLACE UPGRADE
TEMPORARY ELECTRICAL SERVICE FOR JOB TRAILER
10/05/2017
10/05/2017
10/16/2017
Locations
Contacts
PRYOR CROSSINGS LLC, Address:7387 W 162ND STE 200  
CAPITAL ELECTRIC LINE BUILDERS INC, Address:7050 ENSIGN DR, Phone:(816) 389-4000  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 10/05/2017 10/05/2017
Kim Brennan
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for Repair/Replace/Upgrade $30.00 $30.00 Paid 10/05/2017
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Electrical Service Inspection Not Ready 10/9/2017 10/9/2017 at 10:40 AM 10/09/2017
Misc
Corrective Action Required
10/09/2017
G.E.C. TERMINATION AT GROUND ROD NOT FOUND EXPOSED.
Electrical Service Inspection Passed 10/16/2017 10/16/2017 at 2:25 PM 10/16/2017
Misc
Resolved
10/16/2017
G.E.C. TERMINATION AT GROUND ROD NOT FOUND EXPOSED.
Final Electrical Inspection - Commercial Passed 10/16/2017 10/16/2017
Documents & Images
Date Uploaded File Type Document Name
10/05/2017 Receipt Receipt for transaction: 2017-006686
10/05/2017 Letter Codes Building Permit
10/05/2017 Scope of Work DOC100517-010
10/09/2017 Letter Inspection Summary
10/16/2017 Letter Inspection Summary
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home