Permit Application Status

PRCOM20173051


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20173051
Building Permit - Commercial
Certificate of Occupancy
MIDWEST DIVISION LSH LLC
NEW SHELL BUILDING
3 STORY SHELL BUILDING FOR FUTURE MEDICAL TENANTS
09/11/2017
05/22/2019
08/28/2019
07/16/2020
Locations
Contacts
TURNER CONSTRUCTION COMPANY, Address:1220 WASHINGTON STE 1000, Phone:(816) 283-0555  
STANGER INDUSTRIES, Address:4911 ELMWOOD AVE, Phone:(816) 861-2800  
BART'S ELECTRIC COMPANY INC, Address:7103 STEWART RD, Phone:(816) 421-0007  
STANGER INDUSTRIES, Address:4911 ELMWOOD AVE, Phone:(816) 861-2800  
HEREFORD DOOLEY ARCHITECTS, Address:1720 WEST END AVENUE, SUITE 130, Phone:(615) 244-7399  
TERRACON CONSULTANTS INC, Address:10841 S RIDGEVIEW ROAD, Phone:(913) 599-6886  
MIDWEST DIVISION LSH LLC, Address:PO BOX 80610  
Reviews
Review Type Outcome Est. Completion Date Completed
Fire Plan Review Approved with Conditions 03/20/2019 02/10/2020
Michael Weissenbach
Construction documents for fire alarm systems
Corrective Action Required
02/10/2020

2012 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. ACTION REQUIRED:(information purposes) Have the fire alarm system contractor provide shop drawings for approval of the fire alarm system to be installed.
Construction documents - Fire protection systems
Corrective Action Required
02/10/2020

2012 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. ACTION REQUIRED: (1) Provide information if the FDC will be on the building or a yard pedistal and within 100' of a fire hydrant. The FDC shall be a 4" Storz fitting with a 30 degree elbow. Have the fire sprinkler system contractor provide shop drawings for approval of the fire sprinkler system to be installed.
Installation acceptance testing
Corrective Action Required
02/10/2020

2012 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. ACTION REQUIRED:(information purposes) Field tests and acceptance testing of the fire sprinkler and fire alarm systems will be required prior to the final occupancy inspection. To schedule a test contact the fire department at (816)969-1300)
Stairway identification signs
Corrective Action Required
02/10/2020

Floor level signage ACTION REQUIRED:(verified at inspection) Provide floor level signage in the stairways at each floor level.
Duct smoke detectors
Corrective Action Required
02/10/2020

Duct detection ACTION REQUIRED: (verified at inspection) All AHU's producing over 2,000 CFM are required to have duct smoke detection installed and monitored by the buildings fire alarm system.
Misc
Corrective Action Required
02/10/2020

FDC /Fire Hydrants relocations SUGGESTION: Plan sheet C7.2 Utilizing the fire hydrant as shown on plan sheet C7.2 will block the roadway for further FD/PD access due to hose lines. SUGGESTION: Relocate the fire hydrant (U10) to where the Fire Department Connection (U9) is shown. Place the FDC (U9) on the building by the Sprinkler room. Relocation would open the roadway and save cost $ for the Hospital on the underground plumbing for the FDC.
Alarm Plan Review Released for Construction 02/05/2020
Michael Weissenbach
Installation acceptance testing
Corrective Action Required
02/05/2020

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule testing.
Sprinkler Plan Review Released for Construction 10/16/2019
Michael Weissenbach
Installation acceptance testing
Corrective Action Required
10/16/2019

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule a hydrostatic test and a flow test.
Misc
Corrective Action Required
01/14/2020

1. Post signage above FDC to pump at 175 2. If access allows, put FDC on building within 100 feet of a hydrant. 4 inch Storz connection with a 30 degree elbow.
Alarm Plan Review Released for Construction 08/22/2019
Michael Weissenbach
Misc
Corrective Action Required
08/22/2019

(Verified At Inspection) Provide weatherproof horn/strobe mounted by FDC
Duct smoke detectors
Corrective Action Required
08/22/2019

2018 IFC 907.3.1 Duct smoke detectors. Smoke detectors installed in ducts shall be listed for the air velocity, temperature and humidity present in the duct. Duct smoke detectors shall be connected to the building's fire alarm control unit when a fire alarm system is rquired by Section 907.2. Activation of a duct smoke detector shall initiate a visible and audible supervisory signal at a constantly attended location and shall perform the intended fire safety function in accordance with theis code and the International Mechanical Code. Duct smoke detectors shall not be used as a substitute for required open area detection. (Informational Purposes)
Final Development Plan Review Approved 05/21/2019
Joe Frogge
Licensed Contractors Approved 03/20/2019
Joe Frogge
LC - MEP Subs
Resolved
03/20/2019

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. 3/14/19 - acknowledged in letter
LC - MEP Subs
Resolved
03/20/2019

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. 3/14/19 - acknowledged in letter
Building Plan Review Approved with Conditions 03/20/2019 03/20/2019
Joe Frogge
Final Development Plan
Resolved
05/21/2019

The building permit for this project can not be issued until the Codes Administration Department has received the approved Final Development Plan from the Planning and Development Department. Action required: Comment is for informational purposes. 3/14/19 - acknowledged in letter
License Tax Application
Resolved
03/14/2019

A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a certificate of occupancy. Action required: Comment is for informational purposes.
Elevator Certificate of Inspection
Corrective Action Required
03/13/2019

Elevator Safety Act and Rules 701.361 - Each privately owned or operated installation and each installation owned or operated by the state of Missouri or any political subdivision of the state shall have a certificate of inspection and meet the safety code promulgated prusuant to sections 701.350 to 701.380. Action required: Comment is for informational purposes. 3/14/19 - acknowledged in letter
Elevator Equipment Permit
Corrective Action Required
03/13/2019

Prior to the installation or construction of any elevator equipment, an elevator equipment permit shall be obtained from the Missouri Department of Public Safety or its authorized representative. Action required: Comment is for informational purposes. 3/14/19 - acknowledged in letter
Elevator Equipment Inspection
Corrective Action Required
03/13/2019

Prior to the operation of any new elevator equipment or the issuance of the operating certificate, such elevator equipment shall be inspected by a licensed inspector. Testing must be performed in accordance with these rules and regulations. The testing must be witnessed by a licensed inspector. Contact the Lee's Summit Codes Administration. Action required: Comment is for informational purposes. 3/14/19 - acknowledged in letter
Misc
Resolved
03/14/2019

2012 IBC 1704.2 Special inspections. Where application is made for construction as described in this section, the owner or the registered design professional in responsible charge acting as the owner’s agent shall employ one or more approved agencies to perform inspections during construction on the types of work listed under Section 1705. These inspections are in addition to the inspections identified in Lee’s Summit Code of Ordinances Chapter 7. (see code section for exceptions) Action required: Provide statement of special inspections / letter of responsibility from company contracted to perform special inspections.
License Tax Application
Resolved
03/14/2019

A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit. Action required: Comment is for informational purposes.
Miscellaneous Correction
Resolved
03/20/2019

Inadequate information to complete review of fire ratings. Provide the following: - - Provide details and UL# for horizontal assembly at bottom of shaft. 3/20/19 - bottom of shaft is continuation of concrete floor - -
Miscellaneous Correction
Resolved
03/13/2019

2012 IPC 305.4 Freezing. Water, soil, and waste pipes shall not be installed outside of a building, in attics or crawl spaces, concealed in outside walls, or in any other place subjected to freezing temperatures unless adequate provision ins made to protect such pipes from freezing by insulation or heat or both. Exterior water supply system piping shall be installed not less than 6” below the frost line (42” below grade) and not less than 12 inches below grade. Action required: Modify note on sheet C2.0 to show correct minimum burial depth of water piping.
Miscellaneous Correction
Resolved
03/13/2019

Water meter is shown in a vault with a backflow preventer. Action required: Provide vault detail and remove reference to backflow device which will be installed inside building.
Miscellaneous Correction
Resolved
03/14/2019

2012 IBC 716.5 Fire door and shutter assemblies. 2012 IBC 716.5 Fire door and shutter assemblies. Approved fire door and fire shutter assemblies shall be constructed of any material or assembly of component materials that conforms to the test requirements of Section 716.5.1, 716.5.2 or 716.5.3 and the fire protection rating indicated in Table 716.5. Fire door frames with transom lights, sidelights or both shall be permitted in accordance with Section 716.5.6. Fire door assemblies and shutters shall be installed in accordance with the provisions of this section and the NFPA 80. Action required: Revise door schedule to show that doors into exit stairway enclosures will be 1 hour rated.
Miscellaneous Correction
Resolved
03/14/2019

2011 NEC Article 250.50 Grounding Electrode System. All Grounding electrodes as described in 250.52(A)(1) through (A)(7) that are present at each building or structure served shall be bonded together to form the grounding electrodes system. Where none of these grounding electrodes exist, one or more of the grounding electrodes specified in 250(A)(4) through (A)(8) shall be installed and used. (see code section for exception) Action required: Revise grounding drawings to show grounding to all required methods including concrete encased electrode (Ufer).
Miscellaneous Correction
Resolved
03/14/2019

110.26 (C)(3) Personnel Doors. Where equipment rated 1200 A or more that contains overcurrent devices, switching devices, or control devices is installed and there is a personnel door(s) intended for entrance to and egress from the working space less than 25 feet from the nearest edge of the working space, the door(s) shall open in the direction of egress and be equipped with panic bars, pressure plates or other devices that are normally latched but open under simple pressure. Action required: Provide panic device at 1st floor electric room door and swing door outwards.
Fire Plan Review Approved with Conditions 03/20/2019 03/15/2019
Joe Dir
Construction documents for fire alarm systems
Corrective Action Required
03/15/2019

2012 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. ACTION REQUIRED:(information purposes) Have the fire alarm system contractor provide shop drawings for approval of the fire alarm system to be installed.
Address numbers required
Resolved
03/15/2019

2012 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). ACTION REQUIRED:(verified at inspection) Numeric address shall be readable from the roadway (Blue Parkway) (1) Verify correct address of MOB building. Plans show address of (2100) which belongs to the Hospital building. The permit is issued for the address of (1980)
Construction documents - Fire protection systems
Corrective Action Required
03/15/2019

2012 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. ACTION REQUIRED: (1) Provide information if the FDC will be on the building or a yard pedistal and within 100' of a fire hydrant. The FDC shall be a 4" Storz fitting with a 30 degree elbow. Have the fire sprinkler system contractor provide shop drawings for approval of the fire sprinkler system to be installed.
Installation acceptance testing
Corrective Action Required
03/15/2019

2012 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. ACTION REQUIRED:(information purposes) Field tests and acceptance testing of the fire sprinkler and fire alarm systems will be required prior to the final occupancy inspection. To schedule a test contact the fire department at (816)969-1300)
Tenant identification
Resolved
03/15/2019

2012 IFC 408.11.2 - Tenant identification. Each occupied tenant space provided with a secondary exit to the exterior or exit corridor shall be provided with tenant identification by business name and/or address. Letters and numbers shall be posted on the corridor side of the door, be plainly legible and shall contrast with their background. ACTION REQUIRED: (verified at inspection) Each tenant space will be addressed and readable off of the corridors.
Knox box required
Resolved
03/15/2019

2012 IFC 506.1- Where required. Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type and shall contain keys to gain necessary access as required by the fire code official. ACTION REQUIRED:(verified at inspection) (1) Knox box shall be mounted on the exterior of the building by the sprinkler room access door. approx 5' off finish grade.
Portable fire extinguishers - general
Resolved
03/15/2019

2012 IFC 906.2- General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10. ACTION REQUIRED:(verified at inspection) Provide and mount fire extinguishers according to plans sheets G101,102,103. Additional fire extinguishers will be required for each tenant space as tenant spaces are finished and occupied.
Key boxes for non-standardized fire service elevator keys
Resolved
03/15/2019

Elevator keys boxes ACTION REQUIRED:(verified at inspection) Provide key boxes for the elevators banks. Key boxes can be obtained on line at knoxbox.com
Panic and fire exit hardware
Resolved
03/15/2019

Electrical room doors ACTION REQUIRED: Provide panic hardware for all electrial rooms with panels of 1200 amps, door shall swing in the direction of egress travel. 2012 IFC 1010.1.10 Panic and fire exit hardware. Doors serving a Group H occupancy and doors serving rooms or spaces with an occupant load of 50 or more in a Group A or E occupancy shall not be provided with a latch or lock unless it is a panic hardware or fire exit hardware. Electrical rooms with equipment rated 1,200 amperes or more and over 6 feet (1829 mm) wide that contain overcurrent devices, switching devices or control devices with exit or exit access doors shall be equipped with panic hardware or fire exit hardware. The doors shall swing in the direction of egress travel.
Door operations
Resolved
03/15/2019

2012 IFC 1010.1.9 Door operations. Except as specifically permitted by this section, egress doors shall be readily openable from the egress side without the use of a key or special knowledge or effort. ACTION REQUIRED:(information purposes) (1) No keyed locks on the egress side of an exit. (2) Controlled access egress doors, card reader doors or electromagnetically locked doors shall unlock in the event of a power outage or an activation of the fire alarm system and comply with 2012 IFC sections 1008.1.9.8, 1008.1.9.9 (3) Horizontal sliding egress doors shall comply with 2012 IFC section 1008.1.4.3
Stairway identification signs
Corrective Action Required
03/13/2019

Floor level signage ACTION REQUIRED:(verified at inspection) Provide floor level signage in the stairways at each floor level.
Duct smoke detectors
Corrective Action Required
03/13/2019

Duct detection ACTION REQUIRED: (verified at inspection) All AHU's producing over 2,000 CFM are required to have duct smoke detection installed and monitored by the buildings fire alarm system.
Misc
Corrective Action Required
03/15/2019

FDC /Fire Hydrants relocations SUGGESTION: Plan sheet C7.2 Utilizing the fire hydrant as shown on plan sheet C7.2 will block the roadway for further FD/PD access due to hose lines. SUGGESTION: Relocate the fire hydrant (U10) to where the Fire Department Connection (U9) is shown. Place the FDC (U9) on the building by the Sprinkler room. Relocation would open the roadway and save cost $ for the Hospital on the underground plumbing for the FDC.
Building Plan Review Rejected 03/11/2019 02/28/2019
Joe Frogge
Final Development Plan
Corrective Action Required
02/25/2019

The building permit for this project can not be issued until the Codes Administration Department has received the approved Final Development Plan from the Planning and Development Department. Action required: Comment is for informational purposes.
License Tax Application
Corrective Action Required
02/25/2019

A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a certificate of occupancy. Action required: Comment is for informational purposes.
Elevator Certificate of Inspection
Corrective Action Required
02/25/2019

Elevator Safety Act and Rules 701.361 - Each privately owned or operated installation and each installation owned or operated by the state of Missouri or any political subdivision of the state shall have a certificate of inspection and meet the safety code promulgated prusuant to sections 701.350 to 701.380. Action required: Comment is for informational purposes.
Elevator Equipment Permit
Corrective Action Required
02/25/2019

Prior to the installation or construction of any elevator equipment, an elevator equipment permit shall be obtained from the Missouri Department of Public Safety or its authorized representative. Action required: Comment is for informational purposes.
Elevator Equipment Inspection
Corrective Action Required
02/25/2019

Prior to the operation of any new elevator equipment or the issuance of the operating certificate, such elevator equipment shall be inspected by a licensed inspector. Testing must be performed in accordance with these rules and regulations. The testing must be witnessed by a licensed inspector. Contact the Lee's Summit Codes Administration. Action required: Comment is for informational purposes.
Misc
Corrective Action Required
02/25/2019

2012 IBC 1704.2 Special inspections. Where application is made for construction as described in this section, the owner or the registered design professional in responsible charge acting as the owner’s agent shall employ one or more approved agencies to perform inspections during construction on the types of work listed under Section 1705. These inspections are in addition to the inspections identified in Lee’s Summit Code of Ordinances Chapter 7. (see code section for exceptions) Action required: Provide statement of special inspections / letter of responsibility from company contracted to perform special inspections.
License Tax Application
Corrective Action Required
03/01/2019

A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit. Action required: Comment is for informational purposes.
Miscellaneous Correction
Corrective Action Required
03/01/2019

Inadequate information to complete review of fire ratings. Provide the following: - Clarify use of 2 hour walls on 3rd floor (re:G103) - Provide wall and UL details for shaft walls and horizontal assembly. (should be 1 hour rated) - Provide details for UL 465 assembly. - Provide wall and UL details for stair enclosure walls that are immediately adjacent to exterior walls.
Miscellaneous Correction
Corrective Action Required
03/01/2019

2012 IPC 305.4 Freezing. Water, soil, and waste pipes shall not be installed outside of a building, in attics or crawl spaces, concealed in outside walls, or in any other place subjected to freezing temperatures unless adequate provision ins made to protect such pipes from freezing by insulation or heat or both. Exterior water supply system piping shall be installed not less than 6” below the frost line (42” below grade) and not less than 12 inches below grade. Action required: Modify note on sheet C2.0 to show correct minimum burial depth of water piping.
Miscellaneous Correction
Corrective Action Required
03/01/2019

Water meter is shown in a vault with a backflow preventer. Action required: Provide vault detail and remove reference to backflow device which will be installed inside building.
Miscellaneous Correction
Corrective Action Required
03/01/2019

2012 IBC 716.5 Fire door and shutter assemblies. 2012 IBC 716.5 Fire door and shutter assemblies. Approved fire door and fire shutter assemblies shall be constructed of any material or assembly of component materials that conforms to the test requirements of Section 716.5.1, 716.5.2 or 716.5.3 and the fire protection rating indicated in Table 716.5. Fire door frames with transom lights, sidelights or both shall be permitted in accordance with Section 716.5.6. Fire door assemblies and shutters shall be installed in accordance with the provisions of this section and the NFPA 80. Action required: Revise door schedule to show that doors into exit stairway enclosures will be 1 hour rated.
Miscellaneous Correction
Corrective Action Required
03/01/2019

2011 NEC Article 250.50 Grounding Electrode System. All Grounding electrodes as described in 250.52(A)(1) through (A)(7) that are present at each building or structure served shall be bonded together to form the grounding electrodes system. Where none of these grounding electrodes exist, one or more of the grounding electrodes specified in 250(A)(4) through (A)(8) shall be installed and used. (see code section for exception) Action required: Revise grounding drawings to show grounding to all required methods including concrete encased electrode (Ufer).
Miscellaneous Correction
Corrective Action Required
03/01/2019

110.26 (C)(3) Personnel Doors. Where equipment rated 1200 A or more that contains overcurrent devices, switching devices, or control devices is installed and there is a personnel door(s) intended for entrance to and egress from the working space less than 25 feet from the nearest edge of the working space, the door(s) shall open in the direction of egress and be equipped with panic bars, pressure plates or other devices that are normally latched but open under simple pressure. Action required: Provide panic device at 1st floor electric room door and swing door outwards.
Licensed Contractors Rejected 02/25/2019 02/28/2019
Joe Frogge
LC - MEP Subs
Corrective Action Required
02/25/2019

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Fire Plan Review Rejected 03/11/2019 02/28/2019
Joe Dir
Construction documents for fire alarm systems
Corrective Action Required
02/25/2019

2012 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. ACTION REQUIRED:(information purposes) Have the fire alarm system contractor provide shop drawings for approval of the fire alarm system to be installed.
Address numbers required
Corrective Action Required
02/25/2019

2012 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). ACTION REQUIRED:(verified at inspection) Numeric address shall be readable from the roadway (Blue Parkway) (1) Verify correct address of MOB building. Plans show address of (2100) which belongs to the Hospital building. The permit is issued for the address of (1980)
Construction documents - Fire protection systems
Corrective Action Required
02/25/2019

2012 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. ACTION REQUIRED: (1) Provide information if the FDC will be on the building or a yard pedistal and within 100' of a fire hydrant. The FDC shall be a 4" Storz fitting with a 30 degree elbow. Have the fire sprinkler system contractor provide shop drawings for approval of the fire sprinkler system to be installed.
Installation acceptance testing
Corrective Action Required
02/25/2019

2012 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. ACTION REQUIRED:(information purposes) Field tests and acceptance testing of the fire sprinkler and fire alarm systems will be required prior to the final occupancy inspection. To schedule a test contact the fire department at (816)969-1300)
Tenant identification
Corrective Action Required
02/27/2019

2012 IFC 408.11.2 - Tenant identification. Each occupied tenant space provided with a secondary exit to the exterior or exit corridor shall be provided with tenant identification by business name and/or address. Letters and numbers shall be posted on the corridor side of the door, be plainly legible and shall contrast with their background. ACTION REQUIRED: (verified at inspection) Each tenant space will be addressed and readable off of the corridors.
Knox box required
Corrective Action Required
02/27/2019

2012 IFC 506.1- Where required. Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type and shall contain keys to gain necessary access as required by the fire code official. ACTION REQUIRED: Knox Box can be obtained on line at knoxbox.com ACTION REQUIRED:(verified at inspection) (1) Knox box shall be mounted on the exterior of the building by the sprinkler room access door. approx 5' off finish grade.
Portable fire extinguishers - general
Corrective Action Required
02/27/2019

2012 IFC 906.2- General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10. ACTION REQUIRED:(verified at inspection) Provide and mount fire extinguishers according to plans sheets G101,102,103. Additional fire extinguishers will be required for each tenant space as tenant spaces are finished and occupied.
Key boxes for non-standardized fire service elevator keys
Corrective Action Required
02/27/2019

Elevator keys boxes ACTION REQUIRED:Provide key boxes for the elevators banks. Key boxes can be obtained on line at knoxbox.com 2012 IFC 506.1.2 Key boxes for non-standardized fire service elevator keys. Key boxes provided for nonstandardized fire service elevator keys shall comply with Section 506.1 and all of the following: 1. The key box shall be compatible with an existing rapid entry key box system in use in the jurisdiction and approved by the fire code official. 2. The front cover shall be permanently labeled with the words “Fire Department Use Only—Elevator Keys.” 3. The key box shall be mounted at each elevator bank at the lobby nearest to the lowest level of fire department access. 4. The key box shall be mounted 5 feet 6 inches (1676 mm) above the finished floor to the right side of the elevator bank. 5. Contents of the key box are limited to fire service elevator keys. Additional elevator access tools, keys and information pertinent to emergency planning or elevator access shall be permitted when authorized by the fire code official. 6. In buildings with two or more elevator banks, a single key box shall be permitted to be used when such elevator banks are separated by not more than 30 feet (9144 mm). Additional key boxes shall be provided for each individual elevator or elevator bank separated by more than 30 feet (9144 mm).
Panic and fire exit hardware
Corrective Action Required
02/27/2019

Electrical room doors ACTION REQUIRED: Provide panic hardware for all electrial rooms with panels of 1200 amps, door shall swing in the direction of egress travel. 2012 IFC 1010.1.10 Panic and fire exit hardware. Doors serving a Group H occupancy and doors serving rooms or spaces with an occupant load of 50 or more in a Group A or E occupancy shall not be provided with a latch or lock unless it is a panic hardware or fire exit hardware. Electrical rooms with equipment rated 1,200 amperes or more and over 6 feet (1829 mm) wide that contain overcurrent devices, switching devices or control devices with exit or exit access doors shall be equipped with panic hardware or fire exit hardware. The doors shall swing in the direction of egress travel.
Door operations
Corrective Action Required
02/27/2019

2012 IFC 1010.1.9 Door operations. Except as specifically permitted by this section, egress doors shall be readily openable from the egress side without the use of a key or special knowledge or effort. ACTION REQUIRED: (1) No keyed locks on the egress side of an exit. (2) Controlled access egress doors, card reader doors or electromagnetically locked doors shall unlock in the event of a power outage or an activation of the fire alarm system and comply with 2012 IFC sections 1008.1.9.8, 1008.1.9.9 (3) Horizontal sliding egress doors shall comply with 2012 IFC section 1008.1.4.3
Stairway identification signs
Corrective Action Required
02/27/2019

Floor level signage ACTION REQUIRED: Provide floor level signage in the stairways. 2012 IFC (B) 1022.9 Stairway identification signs. A sign shall be provided at each floor landing in an interior exit stairway and ramp connecting more than three stories designating the floor level, the terminus of the top and bottom of the interior exit stairway and ramp and the identification of the stair or ramp. The signage shall also state the story of, and the direction to, the exit discharge and the availability of roof access from the interior exit stairway and ramp for the fire department. The sign shall be located 5 feet (1524mm) above the floor landing in a position that is readily visible when the doors are in the open an dclosed positions. In addition to the stairway identification sign, a floor-level sign in raised characters and Braille complying with the ICC A1 17.1 shall be located at each floor-level landing adjacent to the door leading from the interior exit stairway and ramp into the corridor to identify the floor level.
Duct smoke detectors
Corrective Action Required
02/27/2019

Duct detection ACTION REQUIRED: All AHU's producing over 2,000 CFM are required to have duct smoke detection intalled and monitored by the buildings fire alarm system. 2012 IFC 907.3.1 Duct smoke detectors. Smoke detectors installed in ducts shall be listed for the air velocity, temperature and humidity present in the duct. Duct smoke detectors shall be connected to the building's fire alarm control unit when a fire alarm system is rquired by Section 907.2. Activation of a duct smoke detector shall initiate a visible and audible supervisory signal at a constantly attended location and shall perform the intended fire safety function in accordance with this code and the International Mechanical Code. Duct smoke detectors shall not be used as a substitute for required open area detection.
Fire Plan Review Approved with Conditions 12/08/2017 12/05/2017
Joe Dir
Construction documents for fire alarm systems
Corrective Action Required
12/01/2017

2012 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. ACTION REQUIRED:(information purposes) Have the fire alarm system contractor provide shop drawings for approval of the fire alarm system to be installed.
Address numbers required
Corrective Action Required
12/01/2017

2012 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). ACTION REQUIRED:(verified at inspection) Address shall be readable from the roadway (Blue Parkway)
Construction documents - Fire protection systems
Corrective Action Required
12/01/2017

2012 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. ACTION REQUIRED:(information purposes) The FDC shall be a 4" Storz fitting with a 30 degree elbow not a 21/2" siemese. Riser drains shall be piped to the exterior not floor drains. Have the Fire Sprinkler System contractor provide shop drawings for approval of the fire sprinkler system to be installed.
Installation acceptance testing
Corrective Action Required
12/01/2017

2012 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. ACTION REQUIRED:(information purposes) Field tests and acceptance testing of the fire sprinkler and frie alarm systems will be required prior to the final occupancy inspection. To schedule a test contact the fire department at (816)969-1300)
Misc
Corrective Action Required
12/01/2017

Stairways ACTION REQUIRED:(verified at inspection) Each floor level shall be posted at the door of each stairway landing. [B] 1022.9 Stairway identification signs. A sign shall be provided at each floor landing in an interior exit stairway and ramp connecting more than three stories designating the floor level, the terminus of the top and bottom of the interior exit stairway and ramp and the identification of the stair or ramp. The signage shall also state the story of, and the direction to, the exit discharge and the availability of roof access from the interior exit stairway and ramp for the fire department. The sign shall be located 5 feet (1524 mm) above the floor landing in a position that is readily visible when the doors are in the open and closed positions. In addition to the stairway identification sign, a floor-level sign in raised characters and Braille complying with ICC A117.1 shall be located at each floor-level landing adjacent to the door leading from the interior exit stairway and ramp into the corridor to identify the floor level. [B] 1022.9.1 Signage requirements. Stairway identification signs shall comply with all of the following requirements: 1. The signs shall be a minimum size of 18 inches (457 mm) by 12 inches (305 mm). 2. The letters designating the identification of the interior exit stairway and ramp shall be a minimum of 11/2 inches (38 mm) in height. 3. The number designating the floor level shall be a minimum of 5 inches (127 mm) in height and located in the center of the sign. 4. All other lettering and numbers shall be a minimum of 1 inch (25 mm) in height. 5. Characters and their background shall have a nonglare finish. Characters shall contrast with their background, with either light characters on a dark background or dark characters on a light background. 6. When signs required by Section 1022.9 are installed in the interior exit stairways and ramps of buildings subject to Section 1024, the signs shall be made of the same materials as required by Section 1024.4.
Building Plan Review Rejected 12/08/2017 12/04/2017
Joe Frogge
Final Development Plan
Corrective Action Required
12/01/2017

The building permit for this project can not be issued until the Codes Administration Department has received the approved Final Development Plan from the Planning and Development Department. Action required: Comment is for informational purposes.
License Tax Application
Corrective Action Required
12/01/2017

A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a certificate of occupancy. Action required: Comment is for informational purposes.
Elevator Certificate of Inspection
Corrective Action Required
12/01/2017

Elevator Safety Act and Rules 701.361 - Each privately owned or operated installation and each installation owned or operated by the state of Missouri or any political subdivision of the state shall have a certificate of inspection and meet the safety code promulgated prusuant to sections 701.350 to 701.380. Action required: Comment is for informational purposes.
Elevator Equipment Permit
Corrective Action Required
12/01/2017

Prior to the installation or construction of any elevator equipment, an elevator equipment permit shall be obtained from the Missouri Department of Public Safety or its authorized representative. Action required: Comment is for informational purposes.
Elevator Equipment Inspection
Corrective Action Required
12/01/2017

Prior to the operation of any new elevator equipment or the issuance of the operating certificate, such elevator equipment shall be inspected by a licensed inspector. Testing must be performed in accordance with these rules and regulations. The testing must be witnessed by a licensed inspector. Contact the Lee's Summit Codes Administration. Action required: Comment is for informational purposes.
Misc
Corrective Action Required
12/01/2017

2012 IBC 1704.2 Special inspections. Where application is made for construction as described in this section, the owner or the registered design professional in responsible charge acting as the owner’s agent shall employ one or more approved agencies to perform inspections during construction on the types of work listed under Section 1705. These inspections are in addition to the inspections identified in Lee’s Summit Code of Ordinances Chapter 7. (see code section for exceptions) Action required: Provide statement of special inspections / letter of responsibility from company contracted to perform special inspections.
Misc
Resolved
12/04/2017

2012 IBC 703.2 Fire-resistance ratings. The fire-resistance rating of building elements, components or assemblies shall be determined in accordance with the test procedures set forth in ASTM E 119 or UL 263 or in accordance with Section 703.3. Where materials, systems or devices that have not been tested as part of a fire-resistance-rated assembly are incorporated into the building element, component or assembly, sufficient data shall be made available to the building official to show that the required fire-resistance rating is not reduced. Materials and methods of construction used to protect joints and penetrations in fire resistance-rated building elements, components or assemblies shall not reduce the required fire-resistance rating. Action required: a) Provide UL #'s and complete construction details for fire rated walls and horizontal assemblies. 11/7/17 - UL #'s and details provided, but I am unable to locate references to which detail applies to which assembly. (Floors and roof required to be rated per Table 601) b) Specify fire rating of door 001A 11/7/17 - This is my mistake. door in question was 101A. Please clarify. c) Specify fire rating or protection of windows in fire wall at connector. 11/7/17 - resolved d) Provide detail for recessed wall heaters that describes how to maintain rating of wall. 11/7/17 - resolved
Bldg - Types I and II construction allowable materials 602.2
Resolved
12/04/2017

2012 IBC 602.2 – Types I and II. Types I and II construction are those types of construction in which the building elements listed in Table 601 are of noncombustible materials, except as permitted in Section 603 and elsewhere in this code. Action required: Wood blocking is not allowed at parapets. Modify design. 11/7/17 - letter provided refers to spec sheets which we do not have copies of. 12/4/17 - spec sheets provided
Licensed Contractors Rejected 12/01/2017 12/04/2017
Joe Frogge
LC - MEP Subs
Corrective Action Required
12/01/2017

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Building Plan Review Rejected 11/10/2017 11/07/2017
Joe Frogge
Final Development Plan
Corrective Action Required
11/03/2017

The building permit for this project can not be issued until the Codes Administration Department has received the approved Final Development Plan from the Planning and Development Department. Action required: Comment is for informational purposes.
License Tax Application
Corrective Action Required
11/03/2017

A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a certificate of occupancy. Action required: Comment is for informational purposes.
Elevator Certificate of Inspection
Corrective Action Required
11/03/2017

Elevator Safety Act and Rules 701.361 - Each privately owned or operated installation and each installation owned or operated by the state of Missouri or any political subdivision of the state shall have a certificate of inspection and meet the safety code promulgated prusuant to sections 701.350 to 701.380. Action required: Comment is for informational purposes.
Elevator Equipment Permit
Corrective Action Required
11/03/2017

Prior to the installation or construction of any elevator equipment, an elevator equipment permit shall be obtained from the Missouri Department of Public Safety or its authorized representative. Action required: Comment is for informational purposes.
Elevator Equipment Inspection
Corrective Action Required
11/03/2017

Prior to the operation of any new elevator equipment or the issuance of the operating certificate, such elevator equipment shall be inspected by a licensed inspector. Testing must be performed in accordance with these rules and regulations. The testing must be witnessed by a licensed inspector. Contact the Lee's Summit Codes Administration. Action required: Comment is for informational purposes.
Misc
Corrective Action Required
11/03/2017

2012 IBC 1704.2 Special inspections. Where application is made for construction as described in this section, the owner or the registered design professional in responsible charge acting as the owner’s agent shall employ one or more approved agencies to perform inspections during construction on the types of work listed under Section 1705. These inspections are in addition to the inspections identified in Lee’s Summit Code of Ordinances Chapter 7. (see code section for exceptions) Action required: Provide statement of special inspections / letter of responsibility from company contracted to perform special inspections.
Misc
Corrective Action Required
11/03/2017

2012 IBC 703.2 Fire-resistance ratings. The fire-resistance rating of building elements, components or assemblies shall be determined in accordance with the test procedures set forth in ASTM E 119 or UL 263 or in accordance with Section 703.3. Where materials, systems or devices that have not been tested as part of a fire-resistance-rated assembly are incorporated into the building element, component or assembly, sufficient data shall be made available to the building official to show that the required fire-resistance rating is not reduced. Materials and methods of construction used to protect joints and penetrations in fire resistance-rated building elements, components or assemblies shall not reduce the required fire-resistance rating. Action required: a) Provide UL #'s and complete construction details for fire rated walls and horizontal assemblies. 11/7/17 - UL #'s and details provided, but I am unable to locate references to which detail applies to which assembly. (Floors and roof required to be rated per Table 601) b) Specify fire rating of door 001A 11/7/17 - This is my mistake. door in question was 101A. Please clarify. c) Specify fire rating or protection of windows in fire wall at connector. 11/7/17 - resolved d) Provide detail for recessed wall heaters that describes how to maintain rating of wall. 11/7/17 - resolved
Misc
Resolved
11/07/2017

2012 IBC 711.4 Continuity. Assemblies shall be continuous without openings, penetrations or joints except as permitted by this section and Sections 712.1, 714.4, 715, 1009.3 and 1022.1. Skylights and other penetrations through a fire-resistance-rated roof deck or slab are permitted to be unprotected, provided that the structural integrity of the fire-resistance-rated roof assembly is maintained. Unprotected skylights shall not be permitted in roof assemblies required to be fire-resistance-rated in accordance with Section 705.8.6. The supporting construction shall be protected to afford the required fire-resistance rating of the horizontal assembly supported. Action required: Specify protection of structural members supporting floors. 11/7/17 - to be spray applied
Misc
Resolved
11/07/2017

2012 IBC 706.1 General. Each portion of a building separated by one or more fire walls that comply with the provisions of this section shall be considered a separate building. The extent and location of such fire walls shall provide a complete separation. Where a fire wall also separates occupancies that are required to be separated by a fire barrier wall, the most restrictive requirements of each separation shall apply. Action required: Exterior wall at connection to MOB Connector to be designed as a "Fire Wall." Provide relevant UL # and construction details.
Misc
Resolved
11/07/2017

2012 IBC 1020.1 General. Exits shall comply with Sections 1020 through 1026 and the applicable requirements of Sections 1003 through 1013. An exit shall not be used for any purpose that interferes with its function as a means of egress. Once a given level of exit protection is achieved, such level of protection shall not be reduced until arrival at the exit discharge. Action required: Provide exit discharge directly to exterior at protected stairs.
Accessibility - Vertical clearance 307.4
Resolved
11/07/2017

ICC A117.1-2009 Section 307.4 Vertical Clearance. Vertical clearance shall be 80 inches minimum. Rails or other barriers shall be provided where the vertical clearance is less than 80 inches. The leading edge of such rails or barrier shall be located 27 inches maximum above the floor. Action required: Provide walls or rails or other method of protection below lower level stairs.
Bldg - Types I and II construction allowable materials 602.2
Corrective Action Required
11/03/2017

2012 IBC 602.2 – Types I and II. Types I and II construction are those types of construction in which the building elements listed in Table 601 are of noncombustible materials, except as permitted in Section 603 and elsewhere in this code. Action required: Wood blocking is not allowed at parapets. Modify design. 11/7/17 - letter provided refers to spec sheets which we do not have copies of.
Misc
Resolved
11/07/2017

2012 IBC 1006.3 – Emergency power for illumination. The power supply for means of egress illumination shall normally be provided by the premises’ electrical supply. In the event of power supply illuminate all of the following areas: 1. Aisles and unenclosed egress stairways in rooms and spaces that required two or more means of egress. 2. Corridors, interior exit stairways and ramps and exit passageways in buildings required to have two or more exits. 3. Exterior egress components at other than their levels of exit discharge until exit discharge is accomplished for buildings required to have two or more exits. 4. Interior exit discharge elements, as permitted in Section 1027.1, in buildings required to have two or more exits. 5. Exterior landings as required by Section 1008.1.6 for exit discharge doorways in buildings required to have two or more exits. The emergency power system shall provide power for duration of not less than 90 minutes and shall consist of storage batteries, unit equipment or an on-site generator. The installation of the emergency power system shall be in accordance with Section 2702. Action required: Provide emergency lighting at exterior side of egress doors.
Bldg - Floor elevation 1008.1.5
Resolved
11/07/2017

2012 IBC 1008.1.5 – Floor elevation. There shall be a floor or landing on each side of a door. Such floor or landing shall be at the same elevation on each side of the door. Landings shall be level except for exterior landings, which are permitted to have a slope not to exceed 0.25 unit vertical in 12 units horizontal (2-percent slope). See code section for possible exceptions. Action required: Modify design to show landings at all exterior doors.
Misc
Resolved
11/07/2017

2012 IMC 607.5 Where required. Fire dampers, smoke dampers and combination fire/smoke dampers shall be provided at the locations prescribed in Sections 607.5.1 through 607.5.7. Where an assembly is required to have both fire dampers and smoke dampers, combination fire/smoke dampers or a fire damper and smoke damper shall be required. 2012 IMC 607.5.1. Fire walls. Ducts and air transfer openings permitted in fire walls in accordance with Section 706.11 of the International Building Code shall be protected with listed fire dampers installed in accordance with their listing. 2012 IMC 607.5.1.1 Horizontal Exits. A listed smoke damper designed to resist the passage of smoke shall be provided at each point that a duct or air transfer opening penetrates a fire wall that serves as a horizontal exit. Action required: Provide fire and smoke dampers at duct penetrations through fire wall at connector.
Misc
Resolved
11/07/2017

2012 IMC 306.2 Appliances in rooms. Rooms containing appliances shall be provided with a door and an unobstructed passageway measuring not less than 36 inches (914 mm) wide and 80 inches (2032 mm) high. (see code for exceptions) Action required: Provide minimum 36" clearance around Fluid Cooler CT-1.
Licensed Contractors Rejected 11/03/2017 11/07/2017
Joe Frogge
LC - MEP Subs
Corrective Action Required
11/03/2017

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Fire Plan Review Approved with Conditions 11/10/2017 11/07/2017
Joe Dir
Construction documents for fire alarm systems
Corrective Action Required
11/03/2017

2012 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. ACTION REQUIRED:(information purposes) Have the fire alarm system contractor provide shop drawings for approval of the fire alarm system to be installed.
Address numbers required
Corrective Action Required
11/03/2017

2012 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). ACTION REQUIRED:(verified at inspection) Address shall be readable from the roadway (Blue Parkway)
Knox box required
Resolved
11/07/2017

2012 IFC 506.1- Where required. Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type and shall contain keys to gain necessary access as required by the fire code official. ACTION REQUIRED:(information purposes) Knox boxes can be obtained online at knoxbox.com Provide a knox box for building accesss. Knox box shall be mounted on the exterior of the building by the sprinkler room accress door. Provide a knox box to be mounted on the interior by the elevator bank. 506.1.2 Key boxes for nonstandardized fire service elevator keys. Key boxes provided for nonstandardized fire service elevator keys shall comply with Section 506.1 and all of the following: 1. The key box shall be compatible with an existing rapid entry key box system in use in the jurisdiction and approved by the fire code official. 2. The front cover shall be permanently labeled with the words “Fire Department Use Only—Elevator Keys.” 3. The key box shall be mounted at each elevator bank at the lobby nearest to the lowest level of fire department access. 4. The key box shall be mounted 5 feet 6 inches (1676 mm) above the finished floor to the right side of the elevator bank. 5. Contents of the key box are limited to fire service elevator keys. Additional elevator access tools, keys and information pertinent to emergency planning or elevator access shall be permitted when authorized by the fire code official. 6. In buildings with two or more elevator banks, a single key box shall be permitted to be used when such elevator banks are separated by not more than 30 feet (9144 mm). Additional key boxes shall be provided for each individual elevator or elevator bank separated by more than 30 feet (9144 mm).
Construction documents - Fire protection systems
Corrective Action Required
11/03/2017

2012 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. ACTION REQUIRED:(information purposes) The FDC shall be a 4" Storz fitting with a 30 degree elbow not a 21/2" siemese. Riser drains shall be piped to the exterior not floor drains. Have the Fire Sprinkler System contractor provide shop drawings for approval of the fire sprinkler system to be installed.
Installation acceptance testing
Corrective Action Required
11/03/2017

2012 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. ACTION REQUIRED:(information purposes) Field tests and acceptance testing of the fire sprinkler and frie alarm systems will be required prior to the final occupancy inspection. To schedule a test contact the fire department at (816)969-1300)
Portable fire extinguishers - general
Resolved
11/07/2017

2012 IFC 906.2 - General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10. ACTION REQUIRED:(information purposes) Provide and mount fire extinguishers according to the plans.
Misc
Corrective Action Required
11/03/2017

Stairways ACTION REQUIRED:(verified at inspection) Each floor level shall be posted at the door of each stairway landing.
Misc
Resolved
11/07/2017

Door operations ACTION REQUIRED:No keyd locks on the egress side of an exit. [B] 1008.1.9 Door operations. Except as specifically permitted by this section egress doors shall be readily openable from the egress side without the use of a key or special knowledge or effort.
Misc
Resolved
11/07/2017

Evacuation plans ACTION REQUIRED:(verified at inspection) Evcuation plans shall be p[osted in the corridors 404.3 Contents. Fire safety and evacuation plan contents shall be in accordance with Sections 404.3.1 and 404.3.2.
Misc
Resolved
11/07/2017

FDC access ACTION REQUIRED:(verified at inspection) Stripe off the parking space directly infront of the FDC pedistal for no Parking and clear access for fire operations. 503.3 Marking. Where required by the fire code official, approved signs or other approved notices or markings that include the words NO PARKING—FIRE LANE shall be provided for fire apparatus access roads to identify such roads or prohibit the obstruction thereof. The means by which fire lanes are designated shall be maintained in a clean and legible condition at all times and be replaced or repaired when necessary to provide adequate visibility.
Building Plan Review Rejected 09/25/2017 09/19/2017
Joe Frogge
Final Development Plan
Corrective Action Required
09/19/2017

The building permit for this project can not be issued until the Codes Administration Department has received the approved Final Development Plan from the Planning and Development Department. Action required: Comment is for informational purposes.
License Tax Application
Corrective Action Required
09/19/2017

A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a certificate of occupancy. Action required: Comment is for informational purposes.
Elevator Certificate of Inspection
Corrective Action Required
09/19/2017

Elevator Safety Act and Rules 701.361 - Each privately owned or operated installation and each installation owned or operated by the state of Missouri or any political subdivision of the state shall have a certificate of inspection and meet the safety code promulgated prusuant to sections 701.350 to 701.380. Action required: Comment is for informational purposes.
Elevator Equipment Permit
Corrective Action Required
09/19/2017

Prior to the installation or construction of any elevator equipment, an elevator equipment permit shall be obtained from the Missouri Department of Public Safety or its authorized representative. Action required: Comment is for informational purposes.
Elevator Equipment Inspection
Corrective Action Required
09/19/2017

Prior to the operation of any new elevator equipment or the issuance of the operating certificate, such elevator equipment shall be inspected by a licensed inspector. Testing must be performed in accordance with these rules and regulations. The testing must be witnessed by a licensed inspector. Contact the Lee's Summit Codes Administration. Action required: Comment is for informational purposes.
Misc
Corrective Action Required
09/19/2017

2012 IBC 1704.2 Special inspections. Where application is made for construction as described in this section, the owner or the registered design professional in responsible charge acting as the owner’s agent shall employ one or more approved agencies to perform inspections during construction on the types of work listed under Section 1705. These inspections are in addition to the inspections identified in Lee’s Summit Code of Ordinances Chapter 7. (see code section for exceptions) Action required: Provide statement of special inspections / letter of responsibility from company contracted to perform special inspections.
Misc
Corrective Action Required
09/19/2017

2012 IBC 703.2 Fire-resistance ratings. The fire-resistance rating of building elements, components or assemblies shall be determined in accordance with the test procedures set forth in ASTM E 119 or UL 263 or in accordance with Section 703.3. Where materials, systems or devices that have not been tested as part of a fire-resistance-rated assembly are incorporated into the building element, component or assembly, sufficient data shall be made available to the building official to show that the required fire-resistance rating is not reduced. Materials and methods of construction used to protect joints and penetrations in fire resistance-rated building elements, components or assemblies shall not reduce the required fire-resistance rating. Action required: a) Provide UL #'s and complete construction details for fire rated walls and horizontal assemblies. (Floors and roof required to be rated per Table 601) b) Specify fire rating of door 001A c) Specify fire rating or protection of windows in fire wall at connector. d) Provide detail for recessed wall heaters that describes how to maintain rating of wall.
Misc
Corrective Action Required
09/19/2017

2012 IBC 711.4 Continuity. Assemblies shall be continuous without openings, penetrations or joints except as permitted by this section and Sections 712.1, 714.4, 715, 1009.3 and 1022.1. Skylights and other penetrations through a fire-resistance-rated roof deck or slab are permitted to be unprotected, provided that the structural integrity of the fire-resistance-rated roof assembly is maintained. Unprotected skylights shall not be permitted in roof assemblies required to be fire-resistance-rated in accordance with Section 705.8.6. The supporting construction shall be protected to afford the required fire-resistance rating of the horizontal assembly supported. Action required: Specify protection of structural members supporting floors.
Misc
Corrective Action Required
09/19/2017

2012 IBC 706.1 General. Each portion of a building separated by one or more fire walls that comply with the provisions of this section shall be considered a separate building. The extent and location of such fire walls shall provide a complete separation. Where a fire wall also separates occupancies that are required to be separated by a fire barrier wall, the most restrictive requirements of each separation shall apply. Action required: Exterior wall at connection to MOB Connector to be designed as a "Fire Wall." Provide relevant UL # and construction details.
Misc
Corrective Action Required
09/19/2017

2012 IBC 1020.1 General. Exits shall comply with Sections 1020 through 1026 and the applicable requirements of Sections 1003 through 1013. An exit shall not be used for any purpose that interferes with its function as a means of egress. Once a given level of exit protection is achieved, such level of protection shall not be reduced until arrival at the exit discharge. Action required: Provide exit discharge directly to exterior at protected stairs.
Accessibility - Vertical clearance 307.4
Corrective Action Required
09/19/2017

ICC A117.1-2009 Section 307.4 Vertical Clearance. Vertical clearance shall be 80 inches minimum. Rails or other barriers shall be provided where the vertical clearance is less than 80 inches. The leading edge of such rails or barrier shall be located 27 inches maximum above the floor. Action required: Provide walls or rails or other method of protection below lower level stairs.
Bldg - Types I and II construction allowable materials 602.2
Corrective Action Required
09/19/2017

2012 IBC 602.2 – Types I and II. Types I and II construction are those types of construction in which the building elements listed in Table 601 are of noncombustible materials, except as permitted in Section 603 and elsewhere in this code. Action required: Wood blocking is not allowed at parapets. Modify design.
Misc
Corrective Action Required
09/19/2017

2012 IBC 1006.3 – Emergency power for illumination. The power supply for means of egress illumination shall normally be provided by the premises’ electrical supply. In the event of power supply illuminate all of the following areas: 1. Aisles and unenclosed egress stairways in rooms and spaces that required two or more means of egress. 2. Corridors, interior exit stairways and ramps and exit passageways in buildings required to have two or more exits. 3. Exterior egress components at other than their levels of exit discharge until exit discharge is accomplished for buildings required to have two or more exits. 4. Interior exit discharge elements, as permitted in Section 1027.1, in buildings required to have two or more exits. 5. Exterior landings as required by Section 1008.1.6 for exit discharge doorways in buildings required to have two or more exits. The emergency power system shall provide power for duration of not less than 90 minutes and shall consist of storage batteries, unit equipment or an on-site generator. The installation of the emergency power system shall be in accordance with Section 2702. Action required: Provide emergency lighting at exterior side of egress doors.
Bldg - Floor elevation 1008.1.5
Corrective Action Required
09/19/2017

2012 IBC 1008.1.5 – Floor elevation. There shall be a floor or landing on each side of a door. Such floor or landing shall be at the same elevation on each side of the door. Landings shall be level except for exterior landings, which are permitted to have a slope not to exceed 0.25 unit vertical in 12 units horizontal (2-percent slope). See code section for possible exceptions. Action required: Modify design to show landings at all exterior doors.
Misc
Corrective Action Required
09/20/2017

2012 IMC 607.5 Where required. Fire dampers, smoke dampers and combination fire/smoke dampers shall be provided at the locations prescribed in Sections 607.5.1 through 607.5.7. Where an assembly is required to have both fire dampers and smoke dampers, combination fire/smoke dampers or a fire damper and smoke damper shall be required. 2012 IMC 607.5.1. Fire walls. Ducts and air transfer openings permitted in fire walls in accordance with Section 706.11 of the International Building Code shall be protected with listed fire dampers installed in accordance with their listing. 2012 IMC 607.5.1.1 Horizontal Exits. A listed smoke damper designed to resist the passage of smoke shall be provided at each point that a duct or air transfer opening penetrates a fire wall that serves as a horizontal exit. Action required: Provide fire and smoke dampers at duct penetrations through fire wall at connector.
Misc
Corrective Action Required
09/20/2017

2012 IMC 306.2 Appliances in rooms. Rooms containing appliances shall be provided with a door and an unobstructed passageway measuring not less than 36 inches (914 mm) wide and 80 inches (2032 mm) high. (see code for exceptions) Action required: Provide minimum 36" clearance around Fluid Cooler CT-1.
Licensed Contractors Rejected 09/11/2017 09/19/2017
Joe Frogge
LC - MEP Subs
Corrective Action Required
09/19/2017

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Fire Plan Review Approved with Conditions 09/25/2017 09/19/2017
Joe Dir
09/19/2017

Construction documents for fire alarm systems
Corrective Action Required
09/19/2017

2012 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. ACTION REQUIRED:(information purposes) Have the fire alarm system contractor provide shop drawings for approval of the fire alarm system to be installed.
Address numbers required
Corrective Action Required
09/19/2017

2012 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). ACTION REQUIRED:(verified at inspection) Address shall be readable from the roadway (Blue Parkway)
Knox box required
Corrective Action Required
09/19/2017

2012 IFC 506.1- Where required. Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type and shall contain keys to gain necessary access as required by the fire code official. ACTION REQUIRED:(information purposes) Knox boxes can be obtained online at knoxbox.com Provide a knox box for building accesss. Knox box shall be mounted on the exterior of the building by the sprinkler room accress door. Provide a knox box to be mounted on the interior by the elevator bank. 506.1.2 Key boxes for nonstandardized fire service elevator keys. Key boxes provided for nonstandardized fire service elevator keys shall comply with Section 506.1 and all of the following: 1. The key box shall be compatible with an existing rapid entry key box system in use in the jurisdiction and approved by the fire code official. 2. The front cover shall be permanently labeled with the words “Fire Department Use Only—Elevator Keys.” 3. The key box shall be mounted at each elevator bank at the lobby nearest to the lowest level of fire department access. 4. The key box shall be mounted 5 feet 6 inches (1676 mm) above the finished floor to the right side of the elevator bank. 5. Contents of the key box are limited to fire service elevator keys. Additional elevator access tools, keys and information pertinent to emergency planning or elevator access shall be permitted when authorized by the fire code official. 6. In buildings with two or more elevator banks, a single key box shall be permitted to be used when such elevator banks are separated by not more than 30 feet (9144 mm). Additional key boxes shall be provided for each individual elevator or elevator bank separated by more than 30 feet (9144 mm).
Construction documents - Fire protection systems
Corrective Action Required
09/19/2017

2012 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. ACTION REQUIRED:(information purposes) The FDC shall be a 4" Storz fitting with a 30 degree elbow not a 21/2" siemese. Riser drains shall be piped to the exterior not floor drains. Have the Fire Sprinkler System contractor provide shop drawings for approval of the fire sprinkler system to be installed.
Installation acceptance testing
Corrective Action Required
09/19/2017

2012 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. ACTION REQUIRED:(information purposes) Field tests and acceptance testing of the fire sprinkler and frie alarm systems will be required prior to the final occupancy inspection. To schedule a test contact the fire department at (816)969-1300)
Portable fire extinguishers - general
Corrective Action Required
09/19/2017

2012 IFC 906.2 - General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10. ACTION REQUIRED:(information purposes) Provide and mount fire extinguishers according to the plans.
Misc
Corrective Action Required
09/19/2017

Stairways ACTION REQUIRED: Each floor level shall be posted at the door of each stairway landing.
Misc
Corrective Action Required
09/19/2017

Door operations ACTION REQUIRED:No keyed locks on the egress side of an exit. [B] 1008.1.9 Door operations. Except as specifically permitted by this section egress doors shall be readily openable from the egress side without the use of a key or special knowledge or effort.
Misc
Corrective Action Required
09/19/2017

Evacuation plans ACTION REQUIRED:(information purposes) Evcuation plans shall be posted in the corridors 404.3 Contents. Fire safety and evacuation plan contents shall be in accordance with Sections 404.3.1 and 404.3.2.
Misc
Corrective Action Required
09/19/2017

FDC access ACTION REQUIRED:Stripe off the parking space directly infront of the FDC pedistal for no Parking and clear access for fire operations. 503.3 Marking. Where required by the fire code official, approved signs or other approved notices or markings that include the words NO PARKING—FIRE LANE shall be provided for fire apparatus access roads to identify such roads or prohibit the obstruction thereof. The means by which fire lanes are designated shall be maintained in a clean and legible condition at all times and be replaced or repaired when necessary to provide adequate visibility.
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for New Shell Building $27,200.00 $27,200.00 Paid 05/07/2019
8331507-Sewer Connection Fee $1,260.00 $1,260.00 Paid 05/16/2019
8331401-Water Tap Fee $71,317.00 $71,317.00 Paid 05/16/2019
8350015-Water Meter Fee $2,882.00 $2,882.00 Paid 05/16/2019
9110073-Right of Way Permit Fee $75.00 $75.00 Paid 05/16/2019
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Underground Plumbing Inspection - Commercial Partial 7/29/2019 7/29/2019 07/29/2019
Misc
Corrective Action Required
07/29/2019
Grease Pit- Set and Graveled in place. No piping or vent from pit at this time.
Underground Plumbing Inspection - Commercial Partial 7/31/2019 7/31/2019 at 2:15 PM 07/31/2019
Misc
Partial Correction
07/31/2019
ACID BASIN & Grease Pit Set and Graveled in place. No piping or vent from pit at this time.
Piers/Caissons Inspection - Commercial Partial 8/19/2019 (9:00) 8/19/2019 at 9:20 AM 08/19/2019
Informational
08/19/2019
-PIERS ARE CURRENTLY BEING DRILLED. STEEL CAGES ARE READY TO BE INSTALLED. TERRACON EBGINEER IS CURRENTLY ON SITE FOR INSPECTION
Footing Inspection - Commercial Partial 9/3/2019 at 1:05 PM 09/03/2019
Misc
Partial Correction
09/03/2019
EXTERIOR WALL GB1-OK BELOW: -LINE 1-A TO E; LINE A&E-1 TO 2
Footing Inspection - Commercial Partial 9/4/2019 (3:30) 9/4/2019 at 3:10 PM 09/04/2019
Misc
Partial Correction
09/03/2019
EXTERIOR WALL GB1-OK BELOW: -LINE 1-A TO E; LINE A&E-1 TO 2; A/1.1 TO A/4.1;
Footing Inspection - Commercial Partial 9/5/2019 (11:30) 9/5/2019 at 11:30 AM 09/05/2019
Misc
Partial Correction
09/04/2019
-EXTERIOR WALL GB1-OK BELOW: -LINE 1-A TO E; LINE A-1 TO 4; LINE E-1 TO 4
Footing Inspection - Commercial Partial 9/6/2019 9/6/2019 at 1:40 PM 09/06/2019
Misc
Partial Correction
09/05/2019
-EXTERIOR WALL GB1-OK BELOW: -LINE 1-A TO E; LINE A-1 TO 4; LINE E-1 TO 6, CANOPY GB CLOCKWISE FROM E/5.1 TO E/6
Footing Inspection - Commercial Partial 9/9/2019 (11:30) 9/9/2019 at 12:45 PM 09/09/2019
Misc
Partial Correction
09/06/2019
-EXTERIOR WALL GB1-OK BELOW: -LINE 1-A TO E; LINE A-1 TO 4; LINE E-1 TO 6, CANOPY GB CLOCKWISE FROM E/5.1 TO E/6 -ELEVATOR PIT PAD
Foundation Inspection - Commercial Partial 9/10/2019 at 3:05 PM 09/10/2019
Misc
Corrective Action Required
09/10/2019
FOUNDATION WALL OK: -ELEVATOR PIT WALL
Footing Inspection - Commercial Partial 9/11/2019 (8:00) 9/11/2019 at 2:40 PM 09/11/2019
Misc
Partial Correction
09/09/2019
-EXTERIOR WALL GB1-OK BELOW: -LINE 1-A TO E; LINE A-1 TO 4; LINE E-1 TO 6, CANOPY GB CLOCKWISE FROM E/5.1 TO E/6; LINE E-7 TO 8 WITH STEP FOOTING AT 7; LINE 8-E TO HALF WAY BETWEEN B&C -ELEVATOR PIT PAD
Footing Inspection - Commercial Partial 9/12/2019 9/12/2019 at 1:20 PM 09/12/2019
Misc
Partial Correction
09/11/2019
-EXTERIOR WALL GB1-OK BELOW: -LINE 1-A TO E; LINE A-1 TO 4; LINE E-1 TO 6, CANOPY GB CLOCKWISE FROM E/5.1 TO E/6; LINE E-7 TO 8 WITH STEP FOOTING AT 7; LINE 8-E TO ALMOST A; LINE A-FROM 7 TO ALMOST 8. CORNER A/8 NOT DONE -ELEVATOR PIT PAD
Footing Inspection - Commercial Partial 9/13/2019 (2:00) 9/13/2019 at 2:30 PM 09/13/2019
Misc
Partial Correction
09/12/2019
-EXTERIOR WALL GB1-OK BELOW: -LINE 1-A TO E; LINE A-1 TO 8; LINE E-1 TO 8, LINE 8-A TO E; CANOPY GB CLOCKWISE FROM E/5.1 TO E/6; -ELEVATOR PIT PAD
Foundation Inspection - Commercial Partial 9/16/2019 at 2:35 PM 09/16/2019
Misc
Corrective Action Required
09/10/2019
FOUNDATION WALL OK: -ELEVATOR PIT WALL; F. WALL FROM A/7 CCW TO E/7
Underslab Plumbing Inspection - Commercial Partial 10/10/2019 at 12:55 PM 10/10/2019
Misc
Partial Correction
10/10/2019
-STORM DRAIN UNDER BUILDING-OK
Underground Electrical Inspection - Commercial Partial 10/11/2019 at 3:30 PM 10/11/2019
Misc
Partial Correction
10/11/2019
PARKING LOT LIGHT POLE PIERS OK: 6 LP PIERS IN SE PARKING LOT
Suspended Slab Inspection Partial 10/14/2019 10/14/2019
Misc
Partial Correction
10/14/2019
CONCRETE SLAB INSPECTION: -2ND FL FLOOR FROM NORTH TO COLUMN LINE 4.5
Underground Electrical Inspection - Commercial Partial 10/14/2019 10/14/2019
Misc
Partial Correction
10/11/2019
PARKING LOT LIGHT POLE PIERS OK: 6 LP PIERS AT SE PARKING LOT; 3 LP PIERS AT SW PARKING LOT
Underslab Plumbing Inspection - Commercial Partial 10/14/2019 at 2:35 PM 10/14/2019
Misc
Partial Correction
10/10/2019
-STORM DRAIN UNDER BUILDING-OK -SANITARY BUILDING DRAIN, EXCEPT BATHROOM-OK
Suspended Slab Inspection Partial 10/18/2019 at 8:20 AM 10/18/2019
Misc
Partial Correction
10/14/2019
CONCRETE SLAB INSPECTION: -2ND AND 3RD FLOOR FROM NORTH TO COLUMN LINE 4.5
Underground Electrical Inspection - Commercial Partial 10/18/2019 at 11:20 AM 10/18/2019
Misc
Partial Correction
10/14/2019
-PARKING LOT LIGHT POLE PIERS OK: 6 LP PIERS AT SE PARKING LOT; 3 LP PIERS AT SW PARKING LOT -TRENCH FOR TRANSFORMER SECONDARY-OK
Suspended Slab Inspection Partial 10/22/2019 at 2:00 PM 10/22/2019
Misc
Partial Correction
10/18/2019
CONCRETE SLAB INSPECTION: -2ND; 3RD FLOOR FROM NORTH TO COLUMN LINE 4.5
Underslab Plumbing Inspection - Commercial Partial 10/23/2019 10/23/2019 at 12:35 PM 10/23/2019
Misc
Partial Correction
10/14/2019
-STORM DRAIN UNDER BUILDING-OK -UNDERSLAB SANITARY DRAIN-OK
Suspended Slab Inspection Partial 10/25/2019 (8:00) 10/25/2019 at 8:00 AM 10/25/2019
Misc
Partial Correction
10/22/2019
CONCRETE SLAB INSPECTION: -2ND&3RD FLOOR
Foundation Inspection - Commercial Partial 10/25/2019 (8:00) 10/25/2019 10/25/2019
Misc
Corrective Action Required
09/16/2019
FOUNDATION WALL OK: -ELEVATOR PIT WALL; F. WALL FROM A/7 CCW TO E/7 -OUTER FOUNDATION BAND
Electrical Service Inspection Passed 12/5/2019 12/5/2019 12/05/2019
Informational
12/05/2019
TEMPORARY ELECTRICAL SERVICE OK FOR RELEASE
Rated Assembly Inspection Partial 12/16/2019 12/16/2019 at 1:25 PM 12/16/2019
Misc
Partial Correction
12/16/2019
-ELEVATOR SHAFT WALL: 3RD FL N&W WALL OK
Rated Assembly Inspection Failed 12/20/2019 at 10:40 AM 12/20/2019
Misc
Partial Correction
12/16/2019
-ELEVATOR SHAFT WALL: 3RD FL N&W WALL 1" GLASS BOARD-OK -MECHANICAL SHAFT WALL: 3RD FL W WALL 1" GLASS BOARD-OK 2ND FL N,E,&W WALL AND 3RD FL EAST WALL 1" GLASS BOARD NOT SCREWED PER WALL DESIGN
Rated Assembly Inspection Partial 12/23/2019 at 8:20 AM 12/23/2019
Misc
Partial Correction
12/20/2019
-ELEVATOR SHAFT WALL-OK: 3RD FL N&W&E WALL AND 2ND FL N,W,&E WALL 1" GLASS BOARD -MECHANICAL SHAFT WALL-OK: 3RD FL W WALL 1" GLASS BOARD-OK
Rated Assembly Inspection Failed 12/30/2019 12/30/2019 12/30/2019
Misc
Partial Correction
12/23/2019
-ELEVATOR SHAFT WALL-OK: 3RD FL N&W&E WALL AND 2ND FL N,W,&E WALL 1" GLASS BOARD -MECHANICAL SHAFT WALL-OK: 3RD FL W WALL 1" GLASS BOARD-OK **FIRECAULK WASHED OFF BY RAIN IN SOME AREA.
Rated Assembly Inspection Partial 1/2/2020 1/2/2020 01/02/2020
Misc
Partial Correction
12/30/2019
-ELEVATOR SHAFT WALL-OK: 3RD FL N&W&E WALL AND 2ND FL N,W,&E WALL 1" GLASS BOARD -MECHANICAL SHAFT WALL-OK: 3RD FL W WALL 1" GLASS BOARD-OK -NORTH WALL MECHANICAL SIDE OK TO COVER ONLY. 1” GLASS.
Underground Electrical Inspection - Commercial Partial 1/14/2020 1/14/2020 at 12:45 PM 01/14/2020
Misc
Partial Correction
10/18/2019
-PARKING LOT LIGHT POLE PIERS OK: 6 LP PIERS AT SE PARKING LOT; 3 LP PIERS AT SW PARKING LOT; 5 LP PIERS AT RETAINING BASIN -TRENCH FOR TRANSFORMER SECONDARY-OK
Rated Assembly Inspection Partial 1/23/2020 1/23/2020 01/23/2020
Misc
Partial Correction
01/02/2020
-ELEVATOR SHAFT WALL-OK: 3RD FL N&W&E WALL AND 2ND FL N,W,&E WALL 1" GLASS BOARD -MECHANICAL SHAFT WALL-OK: 3RD FL W WALL 1" GLASS BOARD-OK -NORTH WALL MECHANICAL SIDE OK TO COVER ONLY. 1” GLASS. : WEST & EAST MECHANICAL SHAFT HARD LID 1ST LAYER 1” GLASS BOARD OK :
Rated Assembly Inspection Partial 1/30/2020 1/30/2020 at 1:15 PM 01/30/2020
Misc
Partial Correction
01/23/2020
-ELEVATOR SHAFT WALL: 3RD FL N&W&E WALL AND 2ND FL N,W,&E WALL 1" GLASS BOARD -MECHANICAL SHAFT WALL: 3RD FL W WALL 1" GLASS BOARD-OK -NORTH WALL MECHANICAL SIDE OK TO COVER ONLY. 1” GLASS. : WEST & EAST -MECHANICAL SHAFT HARD LID AT 2ND FL: 1ST LAYER 1” GLASS BOARD OK
Misc
Corrective Action Required
01/30/2020
*CLOSE OPENING OF THE MECHANICAL SHAFT AT 2ND FL FLOOR LID AT STEEL COLUMN
Rough Plumbing Inspection - Commercial Partial 2/3/2020 02/03/2020
Misc
Partial Correction
02/03/2020
ROOF DRAINS AND IN-WALL ROUGH PLUMBING-OK
In-wall Inspection Partial 2/3/2020 at 10:35 AM 02/03/2020
Misc
Partial Correction
02/03/2020
1ST FL CORRIDOR-OK TO ROCK ONE SIDE
In-wall Inspection Failed 2/7/2020 2/7/2020 at 2:20 PM 02/07/2020
Misc
Corrective Action Required
02/07/2020
1ST FL CORRIDOR-OK TO ROCK ONE SIDE 1ST AND 2ND FL IN-WALL: -PROTECT ALL PLUMBING AT 1ST FL BOTTOM TRACK WITH BOCA PLATES -FIX CUT STUD IN 1ST FL WOMEN'S RESTROOM -FB 2ND FLOOR PENETRATIONS -INSTALL BLOCKINGS FOR WRAP BARS
Underslab Plumbing Inspection - Commercial Passed 12/5/2019 02/07/2020
Misc
Resolved
02/07/2020
-STORM DRAIN UNDER BUILDING-OK -UNDERSLAB SANITARY DRAIN-OK
Rated Assembly Inspection Partial 2/10/2020 02/10/2020
Misc
Partial Correction
01/30/2020
ELEVATOR SHAFT: 1ST FL: north wall ok for 5/8” gb at restroom only; other walls need screws at max 12” oc and fire-caulking 2ND FL: elevator/mechanical shaft wall ok; east&west wall ok for 5/8” gb 3RD FL: elevator/mechanical shaft wall ok; east&west wall ok for 5/8” gb ELEVATOR MECHANICAL SHAFT: 2ND FL: 1-hr lid ok; 3RD FL: MID-BUILDING MECHANICAL SHAFT: 2ND FL: 1-hr lid ok 3RD FL:
In-wall Inspection Partial 2/10/2020 at 2:35 PM 02/10/2020
Misc
Partial Correction
02/10/2020
1ST FL CORRIDOR-OK TO ROCK CORRIDOR SIDE 1ST AND 2ND FL IN-WALL-OK TO ROCK
In-wall Inspection Partial 2/12/2020 2/12/2020 02/12/2020
Misc
Partial Correction
02/10/2020
1ST FL: CORRIDORS OK TO ROCK COR. SIDE; ALL SHELL RMS OK 2ND FL: ALL SHELL RMS OK 3RD FL: CORRIDORS OK TO ROCK COR. SIDE
Rated Assembly Inspection Partial 2/18/2020 2/18/2020 02/18/2020
Misc
Partial Correction
02/10/2020
ELEVATOR SHAFT: 1ST FL: north wall ok for 5/8” gb at restroom only; other walls need screws at max 12” oc and fire-caulking 2ND FL: elevator/mechanical shaft wall ok; east&west wall ok for 5/8” gb 3RD FL: elevator/mechanical shaft wall ok; east&west wall ok for 5/8” gb ELEVATOR MECHANICAL SHAFT: 2ND FL: 1-hr lid ok; 3RD FL: MID-BUILDING MECHANICAL SHAFT: 2ND FL: 1-hr lid ok 3RD FL:
Footing Inspection - Commercial Partial 2/19/2020 2/19/2020 02/19/2020
Misc
Partial Correction
09/13/2019
-EXTERIOR WALL GB1-OK BELOW: -LINE 1-A TO E; LINE A-1 TO 8; LINE E-1 TO 8, LINE 8-A TO E; CANOPY GB CLOCKWISE FROM E/5.1 TO E/6; -ELEVATOR PIT PAD& 4 north lightpole piers
Rated Assembly Inspection Partial 2/20/2020 2/20/2020 02/20/2020
ELEVATOR 1
Partial Correction
02/18/2020
ELEVATOR SHAFT: 1ST FL: north wall ok for 5/8” gb at restroom only; other walls need screws at max 12” oc and fire-caulking 2ND FL: elevator/mechanical shaft wall ok; east&west wall ok for 5/8” gb, north wall 3RD FL: elevator/mechanical shaft wall ok; east&west wall ok for 5/8” gb,north wall ELEVATOR MECHANICAL SHAFT: 2ND FL: 1-hr lid ok;exterior walls, 3RD FL:exterior walls, MID-BUILDING MECHANICAL SHAFT: 2ND FL: 1-hr lid ok,exterior walls, 3RD FL:exterior walls,
STAIR TOWER 1
Corrective Action Required
02/20/2020
The following areas: 1st Floor- 2nd-floor- 3rd-floor-
STAIR TOWER 2
Corrective Action Required
02/20/2020
The following areas: 1st Floor- 2nd-floor- 3rd-floor-
Rated Assembly Inspection Partial 3/18/2020 3/18/2020 03/18/2020
ELEVATOR 1
Partial Correction
02/20/2020
ELEVATOR SHAFT: 1ST FL: Need to patch the wall above the restroom all the way to the steel beam. Screw pattern OK 2ND FL: elevator/mechanical shaft wall ok; east&west wall ok for 5/8” gb, north wall 3RD FL: elevator/mechanical shaft wall ok; east&west wall ok for 5/8” gb,north wall ELEVATOR MECHANICAL SHAFT: 2ND FL: 1-hr lid ok;exterior walls, 3RD FL:exterior walls, MID-BUILDING MECHANICAL SHAFT: 2ND FL: 1-hr lid ok,exterior walls, 3RD FL:exterior walls,
STAIR TOWER 1
Corrective Action Required
02/20/2020
The following areas: 1st Floor-OK to rock wall inside stair enclosure; outer side gb screw pattern OK 2nd-floor-OK to rock wall inside stair enclosure; outer side gb screw pattern OK 3rd-floor-Caulk the top edge of east wall inside stair enclosure; outer side gb screw pattern not extended to top edge (wall with door). Outer side screw pattern OK for other walls ***"STAIR TOWER 1" IS THE STAIR ENCLOSURE NEAR THE SE END OF BUILDING
STAIR TOWER 2
Corrective Action Required
02/20/2020
The following areas: 1st Floor-OK to rock wall inside stair enclosure; outer side gb screw pattern OK 2nd-floor-OK to rock wall inside stair enclosure; outer side gb screw pattern OK 3rd-floor-Caulk the top edge of north wall inside stair enclosure; outer side gb screw pattern OK ***"STAIR TOWER 1" IS THE STAIR ENCLOSURE AT THE NORTH END OF BUILDING
Electrical Service Inspection Partial 3/18/2020 3/18/2020 at 1:00 PM 03/18/2020
Misc
Partial Correction
03/18/2020
**SERVICE METER OK FOR RELEASE. -GROUND SERVICE TO WATER AND GROUNDING ROD TRIAD
Above Ceiling Inspection Partial 4/1/2020 4/1/2020 at 10:30 AM 04/01/2020
Misc
Partial Correction
04/01/2020
ABOVE-CEILING OK TO COVER: -EAST EXTERIOR CANOPY
Rough Plumbing Inspection - Commercial Partial 4/2/2020 04/02/2020
Misc
Partial Correction
02/03/2020
Roof drain and 1st fl waste&vent pressure test-OK 2nd fl not ready
Rated Assembly Inspection Partial 4/2/2020 4/2/2020 at 10:30 AM 04/02/2020
ELEVATOR 1
Partial Correction
03/18/2020
ELEVATOR SHAFT: 1ST FL: 1" shaft liner ok; elev/shaft wall ok; check outer side screw pattern for all walls *Need to patch the wall above the restroom all the way to the steel beam. 2ND FL: 1" shaft liner ok; elev/shaft wall ok; check outer side screw pattern for all walls 3RD FL: 1" shaft liner ok; elev/shaft wall ok; check outer side screw pattern for all walls ELEVATOR MECHANICAL SHAFT: 2ND FL: 1-hr lid ok; 1" shaft liner ok; outer layer ok 3RD FL: 1" shaft liner ok; outer layer ok MID-BUILDING MECHANICAL SHAFT: 2ND FL: 1-hr lid ok, outer layer ok 3RD FL: 1-hr lid ok, outer layer ok
STAIR TOWER 1
Partial Correction
04/02/2020
The following areas: 1st Floor-outer side OK; inner side not ready 2nd-floor-outer side OK; inner side OK 3rd-floor-complete top out of inner side of exterior wall; outer side OK ***"STAIR TOWER 1 IS THE STAIR ENCLOSURE NEAR THE SE END OF BUILDING
STAIR TOWER 2
Partial Correction
04/02/2020
The following areas: 1st Floor-outer side OK; inner side not ready 2nd-floor-outer side OK; inner side OK 3rd-floor-outer side OK; complete top out of inner side of exterior wall ***"STAIR TOWER 2 IS THE STAIR ENCLOSURE AT THE NORTH END OF BUILDING
Rated Assembly Inspection Partial 4/3/2020 4/3/2020 at 3:25 PM 04/03/2020
ELEVATOR 1
Partial Correction
04/02/2020
ELEVATOR SHAFT: 1ST FL: 1" shaft liner ok; elev/shaft wall ok; outer layer ok except below **Need to patch the wall above the restroom all the way to the steel beam. 2ND FL: 1" shaft liner ok; elev/shaft wall ok; outer layer ok 3RD FL: 1" shaft liner ok; elev/shaft wall ok; outer layer ok except below **close gap of outer layer at west/front intersection ELEVATOR MECHANICAL SHAFT: 2ND FL: 1-hr lid ok; 1" shaft liner ok; outer layer ok 3RD FL: 1" shaft liner ok; outer layer ok MID-BUILDING MECHANICAL SHAFT: 2ND FL: 1-hr lid ok, outer layer ok 3RD FL: 1-hr lid ok, outer layer ok
STAIR TOWER 1
Partial Correction
04/02/2020
The following areas: 1st Floor-outer side OK; inner side ok 2nd-floor-outer side OK; inner side ok **cover exposed steel w/ firerock 3rd floor-outer side OK; inner side ok ***"STAIR TOWER 1 IS THE STAIR ENCLOSURE NEAR THE SE END OF BUILDING
STAIR TOWER 2
Partial Correction
04/02/2020
The following areas: 1st Floor-outer side OK; inner side ok 2nd-floor-outer side OK; inner side ok **cover exposed steel w/ firerock 3rd floor-outer side OK; inner side ok ***"STAIR TOWER 2 IS THE STAIR ENCLOSURE AT THE NORTH END OF BUILDING
Piers/Caissons Inspection - Commercial Passed 4/8/2020 04/08/2020
Underground Electrical Inspection - Commercial Partial 2/19/2020 4/8/2020 at 2:45 PM 04/08/2020
Misc
Partial Correction
01/14/2020
-PARKING LOT LIGHT POLE PIERS OK: 6 LP PIERS AT SE PARKING LOT; 6 LP PIERS AT SW PARKING LOT; 7 LP PIERS AT RETAINING BASIN -TRENCH FOR TRANSFORMER SECONDARY-OK
Above Ceiling Inspection Partial 4/2/2020 4/13/2020 at 10:20 AM 04/13/2020
Misc
Partial Correction
04/01/2020
ABOVE-CEILING OK TO COVER: -EAST EXTERIOR CANOPY -2ND AND 3RD FLOORS **NEED TO VERIFY FIRE-CAULKING OF TOP OF STAIR WALL OUTSIDE DOOR AT BOTH 2ND AND 3RD FLOOR
Piers/Caissons Inspection - Commercial Failed 4/15/2020 4/15/2020 at 3:10 PM 04/15/2020
Misc
Corrective Action Required
04/15/2020
COVERED WALKWAY PIERS: MIN 36" DOWN TO FROST DEPTH AND TO BEARING SOIL, INSTALL 12 #5 VERTICAL REBARS
Piers/Caissons Inspection - Commercial Partial 4/16/2020 4/16/2020 at 10:55 AM 04/16/2020
Misc
Partial Correction
04/16/2020
COVERED WALKWAY PIERS: 7 PIERS OK TO POUR
Piers/Caissons Inspection - Commercial Partial 4/17/2020 4/17/2020 04/17/2020
Misc
Partial Correction
04/16/2020
COVERED WALKWAY PIERS: 14 PIERS OK
Above Ceiling Inspection Partial 4/17/2020 4/17/2020 04/17/2020
Misc
Partial Correction
04/13/2020
ABOVE-CEILING OK TO COVER: -EAST EXTERIOR CANOPY -1ST, 2ND, AND 3RD FLOORS
Sprinkler - Hydrostatic Test Passed 4/28/2020 04/28/2020
Sprinkler - Flow Test Passed 5/6/2020 05/13/2020
Alarm Test Passed 5/13/2020 05/13/2020
Occupancy Inspection - Planning Failed 05/14/2020
Corrective Action Required
05/14/2020
The surface course for the parking lot shall be completed and the parking lot striped per the approved site plan.
Above Ceiling Inspection Passed 05/15/2020
Misc
Resolved
05/15/2020
ABOVE-CEILING OK TO COVER: -EAST EXTERIOR CANOPY -1ST, 2ND, AND 3RD FLOORS
Piers/Caissons Inspection - Commercial Passed 05/15/2020
Misc
Resolved
05/15/2020
COVERED WALKWAY PIERS: 14 PIERS OK
Underground Electrical Inspection - Commercial Passed 05/15/2020
Misc
Resolved
05/15/2020
-PARKING LOT LIGHT POLE PIERS OK: 6 LP PIERS AT SE PARKING LOT; 6 LP PIERS AT SW PARKING LOT; 7 LP PIERS AT RETAINING BASIN -TRENCH FOR TRANSFORMER SECONDARY-OK
Rough Plumbing Inspection - Commercial Passed 05/15/2020
Misc
Resolved
05/15/2020
Roof drain and 1st fl waste&vent pressure test-OK
Underslab Electrical Inspection - Commercial Passed 05/15/2020
Underground Plumbing Inspection - Commercial Passed 10/18/2019 05/15/2020
Misc
Resolved
05/15/2020
ACID BASIN & Grease Pit Set and Graveled in place. No piping or vent from pit at this time.
Suspended Slab Inspection Passed 05/15/2020
Misc
Resolved
05/15/2020
CONCRETE SLAB INSPECTION: -2ND&3RD FLOOR
Rated Assembly Inspection Passed 05/15/2020
ELEVATOR 1
Resolved
05/15/2020
ELEVATOR SHAFT: 1ST FL: 1" shaft liner ok; elev/shaft wall ok; outer layer ok except below **Need to patch the wall above the restroom all the way to the steel beam. 2ND FL: 1" shaft liner ok; elev/shaft wall ok; outer layer ok 3RD FL: 1" shaft liner ok; elev/shaft wall ok; outer layer ok except below **close gap of outer layer at west/front intersection ELEVATOR MECHANICAL SHAFT: 2ND FL: 1-hr lid ok; 1" shaft liner ok; outer layer ok 3RD FL: 1" shaft liner ok; outer layer ok MID-BUILDING MECHANICAL SHAFT: 2ND FL: 1-hr lid ok, outer layer ok 3RD FL: 1-hr lid ok, outer layer ok
STAIR TOWER 1
Resolved
05/15/2020
The following areas: 1st Floor-outer side OK; inner side ok 2nd-floor-outer side OK; inner side ok **cover exposed steel w/ firerock 3rd floor-outer side OK; inner side ok ***"STAIR TOWER 1 IS THE STAIR ENCLOSURE NEAR THE SE END OF BUILDING
STAIR TOWER 2
Resolved
05/15/2020
The following areas: 1st Floor-outer side OK; inner side ok 2nd-floor-outer side OK; inner side ok **cover exposed steel w/ firerock 3rd floor-outer side OK; inner side ok ***"STAIR TOWER 2 IS THE STAIR ENCLOSURE AT THE NORTH END OF BUILDING
In-wall Inspection Passed 05/15/2020
Misc
Resolved
05/15/2020
1ST FL: CORRIDORS OK TO ROCK COR. SIDE; ALL SHELL RMS OK 2ND FL: ALL SHELL RMS OK 3RD FL: CORRIDORS OK TO ROCK COR. SIDE
Foundation Inspection - Commercial Passed 05/15/2020
Misc
Resolved
05/15/2020
FOUNDATION WALL OK: -ELEVATOR PIT WALL; F. WALL FROM A/7 CCW TO E/7 -OUTER FOUNDATION BAND
Footing Inspection - Commercial Passed 05/15/2020
Misc
Resolved
05/15/2020
-EXTERIOR WALL GB1-OK BELOW: -LINE 1-A TO E; LINE A-1 TO 8; LINE E-1 TO 8, LINE 8-A TO E; CANOPY GB CLOCKWISE FROM E/5.1 TO E/6; -ELEVATOR PIT PAD& 4 north lightpole piers
Electrical Service Inspection Passed 05/15/2020
Misc
Resolved
05/15/2020
**SERVICE METER OK FOR RELEASE. -GROUND SERVICE TO WATER AND GROUNDING ROD TRIAD
Occupancy Inspection - Codes Commercial Failed 5/15/2020 5/15/2020 at 1:00 PM 05/15/2020
Misc
Corrective Action Required
05/15/2020
-Approval required from: Fire, Water, Field Service, and Planning -Submit Special Inspection approval to city -Complete all exterior -Install 3/0 cu bonding jumper around the valve to bond the building water supply. -Install anti-backflow device at hose bib -Remove paint at grounding connection to water -Firecaulk penetrations of the fire sprinkler rm -Secure water heater LFNC within 12” of switch in 1st floor corridor mop sink rm -In stair enclosures, return bottom of handrail to guardrail and extend top handrail horizontally min 12” -Protect sprinkler heads under stair -Provide gfci protection for receptacle within six ft of mop sink of 2nd floor -No access to rooftop, electrical service room, and other areas -Provide 1 hour fire rating for elevator enclosure outer wall -Ground all light pole bases. Expose all grounding connections to rods
Occupancy Inspection - Fire Temporary C of O 5/15/2020 05/15/2020
Occupancy Inspection - Codes Commercial Temporary C of O 5/27/2020 5/27/2020 at 12:50 PM 05/27/2020
Misc
Corrective Action Required
05/15/2020
-Approval required from: Fire, Water, Field Service, and Planning -Submit Special Inspection approval to city -Complete exterior walkway canopy -Outlets for the drinking water coolers must have gfci protection TCO REMOVED BECAUSE OF THE DETENTION POND ISSUES.
Occupancy Inspection - Water Utilities Passed 5/27/2020 05/27/2020
Occupancy Inspection - Planning Temporary C of O 5/27/2020 05/27/2020
Corrective Action Required
05/27/2020
Accessible parking signs (type R7-8 in the MUTCD) shall be mounted at the head of each accessible parking space. The signs shall be mounted a minimum 5' above finished grade, measured to the bottom of the sign. The signs shall be installed prior to issuance of final C of O.
Occupancy Inspection - Codes Commercial Failed 05/28/2020
Misc
Corrective Action Required
05/27/2020
-Approval required from: Fire, Water, Field Service, and Planning -Submit Special Inspection approval to city -Complete exterior walkway canopy -Outlets for the drinking water coolers must have gfci protection
Occupancy Inspection - Engineering Failed 5/27/2020 06/05/2020
Occupancy Inspection - Engineering Temporary C of O 6/10/2020 06/10/2020
Misc
Corrective Action Required
06/10/2020
1. Get engineers approval for detention basin repair. 2. Need to make corrections on detention basin after receiving approval.
Occupancy Inspection - Engineering Failed 6/5/2020 06/10/2020
Misc
Informational
06/05/2020
Waiting on approval of denension basin and the as-builds before final can be given.
Occupancy Inspection - Codes Commercial Temporary C of O 6/11/2020 06/11/2020
Misc
Corrective Action Required
05/28/2020
-Approval required from: Fire, Water, Field Service, and Planning -Submit Special Inspection approval to city -Complete exterior walkway canopy
Occupancy Inspection - Fire Passed 6/23/2020 06/23/2020
Occupancy Inspection - Engineering Passed 6/24/2020 07/15/2020
Misc
Corrective Action Required
06/10/2020
1. Get engineers approval for detention basin repair. 2. Need to make corrections on detention basin after receiving approval.
Occupancy Inspection - Planning Passed 07/16/2020
Occupancy Inspection - Codes Commercial Full C of O 07/16/2020
Misc
Resolved
07/16/2020
-Approval required from: Fire, Water, Field Service, and Planning
Documents & Images
Date Uploaded File Type Document Name
09/19/2017 Letter Fire Building Plan Review
09/20/2017 Letter Codes P/R Corrections Document
11/07/2017 Letter Fire Building Plan Review
11/07/2017 Letter Codes P/R Corrections Document
12/05/2017 Letter Fire Building Plan Review
02/28/2019 Letter Fire Building Plan Review
03/01/2019 Letter DS P/R Corrections Document
03/15/2019 Letter Fire Building Plan Review
05/07/2019 Receipt Receipt for transaction: 2019-001810
05/16/2019 Receipt Receipt for transaction: 2019-002382
05/21/2019 Letter Codes Plan Review Conditions
05/22/2019 Letter Codes Building Permit
07/29/2019 Letter INSPECTION SUMMARY
07/31/2019 Letter INSPECTION SUMMARY
08/19/2019 Letter INSPECTION SUMMARY
08/27/2019 Letter Fire (Alarm) Plan Review Notice
09/03/2019 Letter INSPECTION SUMMARY
09/04/2019 Letter INSPECTION SUMMARY
09/05/2019 Letter INSPECTION SUMMARY
09/06/2019 Letter INSPECTION SUMMARY
09/09/2019 Letter INSPECTION SUMMARY
09/10/2019 Letter INSPECTION SUMMARY
09/11/2019 Letter INSPECTION SUMMARY
09/12/2019 Letter INSPECTION SUMMARY
09/13/2019 Letter INSPECTION SUMMARY
09/16/2019 Letter INSPECTION SUMMARY
10/10/2019 Letter INSPECTION SUMMARY
10/11/2019 Letter INSPECTION SUMMARY
10/14/2019 Letter INSPECTION SUMMARY
10/14/2019 Letter INSPECTION SUMMARY
10/14/2019 Letter INSPECTION SUMMARY
10/16/2019 Letter Fire (Sprinkler) Plan Review
10/18/2019 Letter INSPECTION SUMMARY
10/18/2019 Letter INSPECTION SUMMARY
10/22/2019 Letter INSPECTION SUMMARY
10/23/2019 Letter INSPECTION SUMMARY
10/25/2019 Letter INSPECTION SUMMARY
10/25/2019 Letter INSPECTION SUMMARY
12/05/2019 Letter INSPECTION SUMMARY
12/16/2019 Letter INSPECTION SUMMARY
12/20/2019 Letter INSPECTION SUMMARY
12/23/2019 Letter INSPECTION SUMMARY
12/30/2019 Letter INSPECTION SUMMARY
01/02/2020 Letter INSPECTION SUMMARY
01/14/2020 Letter INSPECTION SUMMARY
01/14/2020 Letter Fire (Sprinkler) Plan Review
01/23/2020 Letter INSPECTION SUMMARY
01/30/2020 Letter INSPECTION SUMMARY
02/03/2020 Letter INSPECTION SUMMARY
02/03/2020 Letter INSPECTION SUMMARY
02/05/2020 Letter Fire (Alarm) Plan Review Notice
02/07/2020 Letter INSPECTION SUMMARY
02/07/2020 Letter INSPECTION SUMMARY
02/10/2020 Letter Fire Building Plan Review
02/10/2020 Letter INSPECTION SUMMARY
02/10/2020 Letter INSPECTION SUMMARY
02/12/2020 Letter INSPECTION SUMMARY
02/18/2020 Letter INSPECTION SUMMARY
02/19/2020 Letter INSPECTION SUMMARY
02/19/2020 Letter INSPECTION SUMMARY
02/20/2020 Letter INSPECTION SUMMARY
03/18/2020 Letter INSPECTION SUMMARY
03/18/2020 Letter INSPECTION SUMMARY
04/01/2020 Letter INSPECTION SUMMARY
04/02/2020 Letter INSPECTION SUMMARY
04/03/2020 Letter INSPECTION SUMMARY
04/08/2020 Letter INSPECTION SUMMARY
04/13/2020 Letter INSPECTION SUMMARY
04/15/2020 Letter INSPECTION SUMMARY
04/16/2020 Letter INSPECTION SUMMARY
04/17/2020 Letter INSPECTION SUMMARY
05/15/2020 Letter INSPECTION SUMMARY
05/15/2020 Letter INSPECTION SUMMARY
05/15/2020 Letter INSPECTION SUMMARY
05/15/2020 Letter INSPECTION SUMMARY
05/15/2020 Letter INSPECTION SUMMARY
05/15/2020 Letter INSPECTION SUMMARY
05/15/2020 Letter INSPECTION SUMMARY
05/15/2020 Letter INSPECTION SUMMARY
05/15/2020 Letter INSPECTION SUMMARY
05/15/2020 Letter INSPECTION SUMMARY
06/05/2020 Letter DE-Daily Inspection Summary
06/10/2020 Letter DE-Daily Inspection Summary
06/11/2020 Letter Codes Temporary Certificate of Occupancy
07/16/2020 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home