Review Type |
Outcome |
Est. Completion Date |
Completed |
Sprinkler Plan Review
|
Released for Construction
|
|
11/22/2017
|
|
Joe Dir
|
|
Misc
Corrective Action Required
Installation
ACTION REQUIRED:
Install the tenant finish renovation of the system according to plans.
|
|
|
Alarm Plan Review
|
Released for Construction
|
|
10/27/2017
|
|
Joe Dir
|
|
Installation acceptance testing
Corrective Action Required
2012 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test.
ACTION REQUIRED:
An Acceptance test of the notification and activation devices will be required prior to the final occupancy inspection. Contact the fire department to schedule testing. (816)969-1300.
|
|
|
Licensed Contractors
|
Approved
|
09/19/2017
|
10/11/2017
|
|
Development Center
|
|
LC - General Contractor
Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances.
Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor.
9/22/17 - acknowledged in letter
|
|
LC - MEP Subs
Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt)
No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section.
Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
9/22/17 - acknowledged in letter
|
|
|
Building Plan Review
|
Approved with Conditions
|
09/26/2017
|
09/22/2017
|
|
Joe Frogge
|
|
License Tax Application
Corrective Action Required
A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit.
Action required: Comment is for informational purposes.
9/22/17 - acknowledged in letter
|
|
Misc
Missouri Board for Architects, Professional Engineers, Professional Land Surveyors and Professional Landscape Architects – Board Rules, Division 2030 – Chapter 3, 20 CSR 2030-3.060 Licensees Seal Documents must bear design professionals original seal with signature and date. (relevant portion paraphrased – reference original document for additional information)
Action required: Provide at least one copy of plan set with original seals/signatures or provide letters from design professionals attesting to the fact that these copies represent their digital seal.
|
|
Plan Submittal 2012 Codes
All plans submitted for review on or after January 1, 2014 shall be designed to the requirements of the 2012 International Building Code, 2012 International Mechanical Code, 2012 International Plumbing Code, 2012 International Fuel Gas Code, 2012 International Fire Code, 2011 National Electric Code and the ANSI A117.1-2009 as amended and adopted by the City of Lee’s Summit.
Action required: Update code analysis to reflect correct year of ANSI A117.1. (2009)
|
|
Bldg - Design occupant load 1004.1
2012 IBC 1004.1 Design occupant load. In determining means of egress requirements, the number of occupants for whom means of egress facilities shall be provided shall be determined in accordance with this section.
Action required: Update code analysis with corrected occupant load which needs to be calculated per use not occupancy type. i.e. use 1 person per 15sf where loose tables and chairs are used.
|
|
Screening - Rooftop equipment
Unified Development Ordinance Article 7, Section 7.180.E
Roof mounted equipment – All roof-mounted equipment shall be screened entirely from view by using parapet walls at the same height as the mechanical units. For additions to existing buildings that do not meet this standard, individual screens will be permitted, with the design subject to approval by the Director.
Action required: Make needed corrections to drawings that provide details as to how mechanical equipment will be screened per referenced UDO section.
9/22/17 - acknowledged in letter - per architect, existing parapets provide adequate screening
|
|
Misc
2012 IBC 1606.2 Design dead load. For purposes of design, the actual weights of materials of construction and fixed service equipment shall be used. In the absence of definite information, values used shall be subject to the approval of the building official.
Action required: Provide verification that existing roof structure will support additional load imposed by new roof mounted equipment.
9/22/17 - acknowledged in letter - per architect, the roof was originally designed for these loads
|
|
Accessibility - Swinging doors - maneuvering clearance 404.2.3.2
ICC A117.1-2009 Section 404.2.3.2 Swinging Doors. Swinging doors shall have maneuvering clearances complying with Table 404.2.3.2.
Action required: Modify design to provide minimum 18" clearance at latch side of restroom doors. New configuration is not to violate encroachment rules at exit path.
|
|
Bldg - Types I and II construction allowable materials 602.2
2012 IBC 602.2 – Types I and II. Types I and II construction are those types of construction in which the building elements listed in Table 601 are of noncombustible materials, except as permitted in Section 603 and elsewhere in this code.
Action required: Modify drawings to show compliant materials at platform. (ref: 410.3 for possible exceptions.)
9/22/17 - to be sprayed with intumescent coating
|
|
Bldg - Toilet room wall finish 1210.2.2
2012 IBC 1210.2.2 – Walls and partitions. Walls and partitions with 2 feet of service sinks, urinals and water closets shall have a smooth, hard, nonabsorbent surface, to a height of not less than 4 feet above the floor, and except for structural elements, the materials used in such walls shall be of a type that is not adversely affected by moisture. (See code section for possible exceptions.)
Action required: Modify documents to show compliant finish materials at restrooms and mop sink.
|
|
Plumb - Backflow general 608.1
2012 IPC 608.3 Devices, appurtenances, appliances and apparatus. Devices, appurtenances, appliances and apparatus intended to serve some special function, such as sterilization, distillation, processing, cooling, or storage of ice or foods, and that connect to the water supply system, shall be provided with protection against backflow and contamination of the water supply system. Water pumps, filters, softeners, tanks and other appliances and devices that handle or treat potable water shall be protected against contamination.
Action required: Provide backflow device in water line serving ice maker.
|
|
Misc
2012 IPC 502.1 General. Water heaters shall be installed in accordance with the manufacturer’s installation instructions. Oil-fired water heaters shall conform to the requirements of this code and the International Mechanical Code. Electric water heaters shall conform to the requirements of this code and provisions of NFPA 70. Gas-fired water heaters shall conform to the requirements of the International Fuel Gas Code.
Action required: Provide expansion tank at water heater or provide verification that water heater installed will not require expansion tanks in the manufacturer's written instructions.
|
|
|
Fire Plan Review
|
Approved with Conditions
|
09/26/2017
|
09/21/2017
|
|
Joe Dir
|
|
Construction documents for fire alarm systems
2012 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions.
ACTION REQUIRED:(information purposes)
Have the fire alarm system contractor provide shop drawings for approval of any modifications to be done to the fire alarm system.
|
|
Address numbers required
Corrective Action Required
2012 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm).
ACTION REQUIRED: (verified at inspection)
Post the suite designation on the exterior of all doors leading into the suite. Address shall be readable from the roadway.
|
|
Construction documents - Fire protection systems
2012 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation.
ACTION REQUIRED:(information purposes)
Have the fire sprinkler contractor provide shop drawings for approval of any modifications to be done to the fire sprinkler system.
|
|
Installation acceptance testing
2012 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test.
ACTION REQUIRED: (information purposes)
Acceptance testing will be required for the duct detection and any modifications done to the fire alarm system prior to the final occupancy inspection. To schedule testing contact the fire department at 816-969-1300.
|
|
Portable fire extinguishers - general
Corrective Action Required
2012 IFC 906.2 - General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10.
ACTION REQUIRED:(verified at inspection)
Provide a minimum of one 2A-10BC fire extinguisher. extinguisher(s) to be mounted on a normal path of travel close to an exit.
|
|
Misc
Corrective Action Required
Door operation
ACTION REQUIRED:(verified at inspection) No keyed locks on the egress side of an exit
[B] 1008.1.9 Door operations.
Except as specifically permitted by this section egress doors shall be readily openable from the egress side without the use of a key or special knowledge or effort.
|
|
Misc
Corrective Action Required
Duct detection
ACTION REQUIRED: (verified at testing)
Duct detection shall be connected to the main fire alarm panel.
|
|
|
Building Plan Review
|
Rejected
|
09/19/2017
|
09/11/2017
|
|
Joe Frogge
|
|
License Tax Application
Corrective Action Required
A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit.
Action required: Comment is for informational purposes.
|
|
Misc
Corrective Action Required
Missouri Board for Architects, Professional Engineers, Professional Land Surveyors and Professional Landscape Architects – Board Rules, Division 2030 – Chapter 3, 20 CSR 2030-3.060 Licensees Seal Documents must bear design professionals original seal with signature and date. (relevant portion paraphrased – reference original document for additional information)
Action required: Provide at least one copy of plan set with original seals/signatures or provide letters from design professionals attesting to the fact that these copies represent their digital seal.
|
|
Plan Submittal 2012 Codes
Corrective Action Required
All plans submitted for review on or after January 1, 2014 shall be designed to the requirements of the 2012 International Building Code, 2012 International Mechanical Code, 2012 International Plumbing Code, 2012 International Fuel Gas Code, 2012 International Fire Code, 2011 National Electric Code and the ANSI A117.1-2009 as amended and adopted by the City of Lee’s Summit.
Action required: Update code analysis to reflect correct year of ANSI A117.1. (2009)
|
|
Bldg - Design occupant load 1004.1
Corrective Action Required
2012 IBC 1004.1 Design occupant load. In determining means of egress requirements, the number of occupants for whom means of egress facilities shall be provided shall be determined in accordance with this section.
Action required: Update code analysis with corrected occupant load which needs to be calculated per use not occupancy type. i.e. use 1 person per 15sf where loose tables and chairs are used.
|
|
Screening - Rooftop equipment
Corrective Action Required
Unified Development Ordinance Article 7, Section 7.180.E
Roof mounted equipment – All roof-mounted equipment shall be screened entirely from view by using parapet walls at the same height as the mechanical units. For additions to existing buildings that do not meet this standard, individual screens will be permitted, with the design subject to approval by the Director.
Action required: Make needed corrections to drawings that provide details as to how mechanical equipment will be screened per referenced UDO section.
|
|
Misc
Corrective Action Required
2012 IBC 1606.2 Design dead load. For purposes of design, the actual weights of materials of construction and fixed service equipment shall be used. In the absence of definite information, values used shall be subject to the approval of the building official.
Action required: Provide verification that existing roof structure will support additional load imposed by new roof mounted equipment.
|
|
Accessibility - Swinging doors - maneuvering clearance 404.2.3.2
Corrective Action Required
ICC A117.1-2009 Section 404.2.3.2 Swinging Doors. Swinging doors shall have maneuvering clearances complying with Table 404.2.3.2.
Action required: Modify design to provide minimum 18" clearance at latch side of restroom doors. New configuration is not to violate encroachment rules at exit path.
|
|
Bldg - Types I and II construction allowable materials 602.2
Corrective Action Required
2012 IBC 602.2 – Types I and II. Types I and II construction are those types of construction in which the building elements listed in Table 601 are of noncombustible materials, except as permitted in Section 603 and elsewhere in this code.
Action required: Modify drawings to show compliant materials at platform. (ref: 410.3 for possible exceptions.)
|
|
Bldg - Toilet room wall finish 1210.2.2
Corrective Action Required
2012 IBC 1210.2.2 – Walls and partitions. Walls and partitions with 2 feet of service sinks, urinals and water closets shall have a smooth, hard, nonabsorbent surface, to a height of not less than 4 feet above the floor, and except for structural elements, the materials used in such walls shall be of a type that is not adversely affected by moisture. (See code section for possible exceptions.)
Action required: Modify documents to show compliant finish materials at restrooms and mop sink.
|
|
Plumb - Backflow general 608.1
Corrective Action Required
2012 IPC 608.3 Devices, appurtenances, appliances and apparatus. Devices, appurtenances, appliances and apparatus intended to serve some special function, such as sterilization, distillation, processing, cooling, or storage of ice or foods, and that connect to the water supply system, shall be provided with protection against backflow and contamination of the water supply system. Water pumps, filters, softeners, tanks and other appliances and devices that handle or treat potable water shall be protected against contamination.
Action required: Provide backflow device in water line serving ice maker.
|
|
Misc
Corrective Action Required
2012 IPC 502.1 General. Water heaters shall be installed in accordance with the manufacturer’s installation instructions. Oil-fired water heaters shall conform to the requirements of this code and the International Mechanical Code. Electric water heaters shall conform to the requirements of this code and provisions of NFPA 70. Gas-fired water heaters shall conform to the requirements of the International Fuel Gas Code.
Action required: Provide expansion tank at water heater or provide verification that water heater installed will not require expansion tanks in the manufacturer's written instructions.
|
|
|
Licensed Contractors
|
Rejected
|
09/07/2017
|
09/11/2017
|
|
Joe Frogge
|
|
LC - General Contractor
Corrective Action Required
Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances.
Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor.
|
|
LC - MEP Subs
Corrective Action Required
Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt)
No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section.
Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
|
|
|
Fire Plan Review
|
Approved with Conditions
|
09/19/2017
|
09/08/2017
|
|
Joe Dir
|
|
|
|
Construction documents for fire alarm systems
Corrective Action Required
2012 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions.
ACTION REQUIRED:(information purposes)
Have the fire alarm system contractor provide shop drawings for approval of any modifications to be done to the fire alarm system.
|
|
Address numbers required
Corrective Action Required
2012 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm).
ACTION REQUIRED: (verified at inspection)
Post the suite designation on the exterior of all doors leading into the suite. Address shall be readable from the roadway.
|
|
Construction documents - Fire protection systems
Corrective Action Required
2012 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation.
ACTION REQUIRED:(information purposes)
Have the fire sprinkler contractor provide shop drawings for approval of any modifications to be done to the fire sprinkler system.
|
|
Installation acceptance testing
Corrective Action Required
2012 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test.
ACTION REQUIRED: (information purposes)
Acceptance testing will be required for the duct detection and any modifications done to the fire alarm system prior to the final occupancy inspection. To schedule testing contact the fire department at 816-969-1300.
|
|
Portable fire extinguishers - general
Corrective Action Required
2012 IFC 906.2 - General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10.
ACTION REQUIRED:(verified at inspection)
Provide a minimum of one 2A-10BC fire extinguisher. extinguisher(s) to be mounted on a normal path of travel close to an exit.
|
|
Misc
Corrective Action Required
Door operation
ACTION REQUIRED: No keyed locks on the egress side of an exit
[B] 1008.1.9 Door operations.
Except as specifically permitted by this section egress doors shall be readily openable from the egress side without the use of a key or special knowledge or effort.
|
|
Misc
Corrective Action Required
Duct detction
ACTION REQUIRED: Duct detection is required
[M] 907.2.13.1.2 Duct smoke detection.
Duct smoke detectors complying with Section 907.3.1 shall be located as follows:
1. In the main return air and exhaust air plenum of each air-conditioning system having a capacity greater than 2,000 cubic feet per minute (cfm) (0.94 m3/s). Such detectors shall be located in a serviceable area downstream of the last duct inlet.
2. At each connection to a vertical duct or riser serving two or more stories from a return air duct or plenum of an air-conditioning system. In Group R-1 and R-2 occupancies, a smoke detector is allowed to be used in each return air riser carrying not more than 5,000 cfm (2.4 m3/s) and serving not more than 10 air-inlet openings.
907.3.1 Duct smoke detectors.
Smoke detectors installed in ducts shall be listed for the air velocity, temperature and humidity present in the duct. Duct smoke detectors shall be connected to the building’s fire alarm control unit when a fire alarm system is required by Section 907.2. Activation of a duct smoke detector shall initiate a visible and audible supervisory signal at a constantly attended location and shall perform the intended fire safety function in accordance with this code and the International Mechanical Code. Duct smoke detectors shall not be used as a substitute for required open area detection.
|
|
|