Permit Application Status

PRCOM20172546


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20172546
Building Permit - Commercial
Final Completion
PARROT PROPERTIES INC
NEW OTHER (COMMERCIAL)
SITE LIGHTING
07/24/2017
05/15/2018
04/15/2021
Locations
Contacts
CITYSCAPE CONSTRUCTION VIEW HIGH LLC, Address:10 W CARMEL DR STE 200, Phone:(317) 574-1600 Ext:100  
STANDARD ELECTRIC COMPANY INC, Address:2006 E PRAIRIE CIRCLE, Phone:(913) 782-5409  
SGN+A ARCHITECTS, Address:315 W PONCE DE LEON AVE #755, Phone:(404) 373-7370  
PARROT PROPERTIES INC, Address:11303 VIEW HIGH DR  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 07/25/2018 05/15/2018
Development Center
Final Development Plan Review Approved 08/07/2018 02/16/2018
Joe Frogge
Fees
Paid Fees Amount Paid Owing Date Paid
Valuation Fee for New Other $338.10 $338.10 Paid 03/29/2018
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Underground Electrical Inspection - Commercial Passed 11/20/2020 11/20/2020
Final Electrical Inspection - Commercial Failed 11/20/2020 11/20/2020
Misc
Corrective Action Required
11/20/2020
Ensure the equipment grounding conductor of the lighting circuit is mechanically fastened to all metallic light poles throughout the site
Underslab Electrical Inspection - Commercial Passed 11/20/2020
Final Electrical Inspection - Commercial Passed 4/15/2021 4/15/2021 04/15/2021
Misc
Resolved
04/15/2021
Ensure the equipment grounding conductor of the lighting circuit is mechanically fastened to all metallic light poles throughout the site
Final Inspection - Commercial Passed 04/15/2021
Documents & Images
Date Uploaded File Type Document Name
10/16/2017 Meridian Site Map
03/29/2018 Receipt Receipt for transaction: 2018-001156
05/15/2018 Letter Codes Building Permit
11/20/2020 Letter INSPECTION SUMMARY
11/20/2020 Letter INSPECTION SUMMARY
11/20/2020 Letter INSPECTION SUMMARY
04/15/2021 Letter INSPECTION SUMMARY
04/15/2021 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home