Summary
PRCOM20172521
Building Permit - Commercial
Certificate of Occupancy
PARROT PROPERTIES INC
NEW MULTI-FAMILY
NEW 2 STORY APARTMENT BUILDING WITH PARKING GARAGE BENEATH FOUNDATION PERMIT - PRCOM20181905
07/24/2017
12/06/2019
01/25/2021
Locations
Contacts
CITYSCAPE CONSTRUCTION VIEW HIGH LLC, Address:10 W CARMEL DR STE 200, Phone:(317) 574-1600 Ext:100  
STANDARD HEATING & COOLING TOO LLC, Address:2006 E PRAIRIE CIRCLE , Phone:(913) 782-5409  
STANDARD ELECTRIC TOO LLC, Address:2006 E PRAIRIE CIRCLE, Phone:(913) 782-5409  
GARRISON PLUMBING, Address:15430 S MAHAFFIE ST STE 102, Phone:(913) 768-1311  
SGN+A ARCHITECTS, Address:315 W PONCE DE LEON AVE #755, Phone:(404) 373-7370  
LATIMER SOMMERS & ASSOCIATES PA, Address:3639 SW SUMMERFIELD DR STE A, Phone:(785) 233-3232  
PARROT PROPERTIES INC, Address:11303 VIEW HIGH DR  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 07/25/2018 06/19/2018
Joe Frogge
Final Development Plan Review Approved 08/07/2018 02/16/2018
Joe Frogge
Building Plan Review Approved 08/07/2018 02/16/2018
Joe Frogge
Special Inspections Review Approved 08/24/2017
Joe Frogge
Fees
Paid Fees Amount Paid Owing Date Paid
Valuation Fee for New Multi-Family $7,995.39 $7,995.39 Paid 12/06/2019
8331507-Sewer Connection Fee $3,000.00 $3,000.00 Paid 12/06/2019
Outstanding Fees Amount Paid Owing Date Paid
Not Ready Inspection Fee $50.00 $0.00 $50.00 Not Paid


$50.00    Add Fees to My Cart
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Commercial Partial 1/30/2020 (8:00) 1/30/2020 01/30/2020
Misc
Informational
01/30/2020
Bldg #10 exterior footing
Footing Inspection - Commercial Not Ready 2/6/2020 (2:00) 2/6/2020 02/06/2020
Misc
Corrective Action Required
02/06/2020
Bldg # 10
Footing Inspection - Commercial Passed 2/7/2020 2/7/2020 02/07/2020
Misc
Informational
02/06/2020
Bldg #10 exterior footing 2/7/20 grade beam ok to pour
Miscellaneous Inspection Partial 2/20/2020 02/20/2020
Misc
Informational
02/20/2020
Bldg #10 walls at garage
All Rough Inspection - Commercial Failed 5/18/2020 5/18/2020 05/18/2020
LOWER LEVEL
Corrective Action Required
05/18/2020
SOUTH END - PROVIDE ANCHOR BOLTS THROUGHOUT - - CHECK FLASHING UNDER MISSING WINDOWS -
FIRST FLOOR
Corrective Action Required
05/18/2020
SOUTH END - - PROVIDE ANCHOR BOLTS THROUGHOUT - - CHECK FLASHING MISSING WINDOWS -
SECOND FLOOR
Corrective Action Required
05/18/2020
SOUTH END - 307 provide roof boots, support SEC cables - - 305 h 2.5s deck, roof boots - - CHECK FLASHING UNDER MISSING WINDOWS -
All Rough Inspection - Commercial Partial 5/22/2020 5/22/2020 05/22/2020
LOWER LEVEL
Corrective Action Required
05/18/2020
SOUTH END & NORTH END - OK TO INSULATE
FIRST FLOOR
Corrective Action Required
05/18/2020
SOUTH END - OK TO INSULATE NORTH END - OK TO INSULATE - CHECK FLASHING MISSING WINDOWS -
SECOND FLOOR
Corrective Action Required
05/18/2020
SOUTH END - OK TO INSULATE - 308 provide roof boots, - - 306 COMPLETE DWV AT TUB - NORTH END - OK TO INSULATE - CHECK FLASHING UNDER MISSING WINDOWS -
Rated Assembly Inspection Partial 5/29/2020 5/29/2020 05/29/2020
LOWER LEVEL
Corrective Action Required
05/29/2020
RC CHANNEL COMPLETE
FIRST FLOOR
Corrective Action Required
05/29/2020
RC CHANNEL COMPLETE
SECOND FLOOR
Corrective Action Required
05/29/2020
RC COMPLETE
Electrical Service Inspection Passed 6/2/2020 6/2/2020 06/02/2020
Misc
Informational
06/02/2020
- 16 UNITS 1 HOUSE METER -
All Rough Inspection - Commercial Partial 6/2/2020 6/2/2020 06/02/2020
LOWER LEVEL
Corrective Action Required
05/22/2020
SOUTH END & NORTH END - OK TO INSULATE
FIRST FLOOR
Corrective Action Required
05/22/2020
SOUTH END - OK TO INSULATE NORTH END - OK TO INSULATE - CHECK FLASHING MISSING WINDOWS -
SECOND FLOOR
Corrective Action Required
05/22/2020
SOUTH END - OK TO INSULATE NORTH END - OK TO INSULATE - CHECK FLASHING UNDER MISSING WINDOWS -
Sprinkler - Hydrostatic Test Passed 6/3/2020 06/03/2020
All Rough Inspection - Commercial Passed 6/16/2020 06/16/2020
LOWER LEVEL
Resolved
06/16/2020
SOUTH END & NORTH END - OK TO INSULATE
FIRST FLOOR
Resolved
06/16/2020
SOUTH END - OK TO INSULATE NORTH END - OK TO INSULALTE
SECOND FLOOR
Resolved
06/16/2020
SOUTH END - OK TO INSULATE NORTH END - OK TO INSULATE
Rated Assembly Inspection Partial 7/1/2020 7/1/2020 07/01/2020
LOWER LEVEL
Corrective Action Required
07/01/2020
- SOUTH END OK TO TAPE - - NORTH END FRESH GYPCRETE NO ACCCESS -
FIRST FLOOR
Corrective Action Required
07/01/2020
- SOUTH END OK TO TAPE - - NORTH END OK TO TAPE GARAGES - - FRESH GYPCRETE NO ACCESS TO UNITS -
SECOND FLOOR
Corrective Action Required
07/01/2020
- SOUTH END OK TO TAPE - - NORTH END FRESH GYPCRETE NO ACCESS -
Rated Assembly Inspection Passed 7/2/2020 7/2/2020 07/02/2020
LOWER LEVEL
Corrective Action Required
07/01/2020
RC CHANNEL COMPLETE NORTH & SOUTH ENDS OK TO TAPE
FIRST FLOOR
Corrective Action Required
07/01/2020
RC CHANNEL COMPLETE NORTH & SOUTH ENDS OK TO TAPE
SECOND FLOOR
Corrective Action Required
07/01/2020
RC COMPLETE NORTH & SOUTH ENDS OK TO TAPE
Piers/Caissons Inspection - Commercial Passed 9/1/2020 09/01/2020
Misc
Informational
09/01/2020
- LIGHT POLE BASE AT DETACH GARAGE & MEDIAN BLDGS 9 & 10 -
Underground Electrical Inspection - Commercial Passed 9/1/2020 09/01/2020
Misc
Informational
09/01/2020
- underground elec for light poles bldg 9 & 10 -
Alarm Test Passed 10/2/2020 10/02/2020
Sprinkler - Flow Test Passed 10/2/2020 10/02/2020
Occupancy Inspection - Water Utilities Passed 10/5/2020 10/05/2020
Sewer Service Inspection Passed 10/6/2020 10/06/2020
Water Service Inspection Passed 10/6/2020 10/06/2020
Sewer Service Inspection Passed 10/6/2020 10/06/2020
Occupancy Inspection - Engineering Passed 10/6/2020 10/06/2020
Occupancy Inspection - Codes Commercial Failed 10/6/2020 10/6/2020 10/06/2020
Misc
Corrective Action Required
10/06/2020
-Provide tamper resistant Schrader valves at all condensing units -complete electrical installation for hallway condensing unit -Complete exterior building façade/siding -Label main electrical disconnect as such -Safety glazing stairwell -address gap between wall and concrete slab G 10-7 -broken outboard glazing panel unit 206 -tighten all loose guard rails and handrails -complete rear door installation north building
Occupancy Inspection - Fire Failed 10/6/2020 10/6/2020 10/06/2020
Occupancy Inspection - Codes Commercial Temporary C of O 10/19/2020 10/19/2020 10/19/2020
Misc
Corrective Action Required
10/06/2020
-Provide tamper resistant Schrader valves at all condensing units -complete electrical installation for hallway condensing unit -Complete exterior building façade/siding
Occupancy Inspection - Fire Passed 10/19/2020 10/19/2020 10/19/2020
Occupancy Inspection - Planning Passed 10/6/2020 11/05/2020
Occupancy Inspection - Codes Commercial Temporary C of O 1/13/2021 1/13/2021 01/13/2021
Misc
Corrective Action Required
10/19/2020
-complete electrical installation for hallway condensing unit 10 day TCO extension
Occupancy Inspection - Codes Commercial Full C of O 1/25/2021 1/25/2021 01/25/2021
Misc
Resolved
01/25/2021
-complete electrical installation for hallway condensing unit 10 day TCO extension
Documents & Images
Date Uploaded File Type Document Name
10/16/2017 Meridian Site Map
12/06/2019 Letter DS Building Permit
01/30/2020 Letter INSPECTION SUMMARY
02/06/2020 Letter INSPECTION SUMMARY
02/07/2020 Letter INSPECTION SUMMARY
02/20/2020 Letter INSPECTION SUMMARY
05/18/2020 Letter INSPECTION SUMMARY
05/22/2020 Letter INSPECTION SUMMARY
05/29/2020 Letter INSPECTION SUMMARY
06/02/2020 Letter INSPECTION SUMMARY
06/16/2020 Letter INSPECTION SUMMARY
07/01/2020 Letter INSPECTION SUMMARY
07/02/2020 Letter INSPECTION SUMMARY
09/01/2020 Letter INSPECTION SUMMARY
09/01/2020 Letter INSPECTION SUMMARY
10/06/2020 Letter INSPECTION SUMMARY
10/19/2020 Letter Codes Temporary Certificate of Occupancy
01/25/2021 Letter Codes Final Certificate of Occupancy
01/25/2021 Letter Field Certificate of Occupancy
01/25/2021 Letter Codes Temporary Certificate of Occupancy
01/25/2021 Letter INSPECTION SUMMARY
06/01/2022 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home