Summary
PRCOM20172519
Building Permit - Commercial
Certificate of Occupancy
PARROT PROPERTIES INC
NEW MULTI-FAMILY
NEW 2 STORY APARTMENT BUILDING WITH PARKING GARAGE BENEATH FOUNDATION PERMIT - PRCOM20181904
07/24/2017
12/06/2019
01/25/2021
Locations
Contacts
CITYSCAPE CONSTRUCTION VIEW HIGH LLC, Address:10 W CARMEL DR STE 200, Phone:(317) 574-1600 Ext:100  
STANDARD HEATING & COOLING TOO LLC, Address:2006 E PRAIRIE CIRCLE , Phone:(913) 782-5409  
STANDARD ELECTRIC TOO LLC, Address:2006 E PRAIRIE CIRCLE, Phone:(913) 782-5409  
GARRISON PLUMBING, Address:15430 S MAHAFFIE ST STE 102, Phone:(913) 768-1311  
SGN+A ARCHITECTS, Address:315 W PONCE DE LEON AVE #755, Phone:(404) 373-7370  
LATIMER SOMMERS & ASSOCIATES PA, Address:3639 SW SUMMERFIELD DR STE A, Phone:(785) 233-3232  
PARROT PROPERTIES INC, Address:11303 VIEW HIGH DR  
Reviews
Review Type Outcome Est. Completion Date Completed
Sprinkler Plan Review Released for Construction 10/23/2020
Michael Weissenbach
Alarm Plan Review Released for Construction 10/23/2020
Michael Weissenbach
Licensed Contractors Approved 07/25/2018 06/19/2018
Joe Frogge
Final Development Plan Review Approved 08/07/2018 02/16/2018
Joe Frogge
Building Plan Review Approved 08/07/2018 02/16/2018
Joe Frogge
Special Inspections Review Approved 08/24/2017
Joe Frogge
Fees
Paid Fees Amount Paid Owing Date Paid
Valuation Fee for New Multi-Family $7,979.94 $7,979.94 Paid 12/06/2019
8331507-Sewer Connection Fee $3,000.00 $3,000.00 Paid 12/06/2019
Not Ready Inspection Fee $50.00 $50.00 Paid 12/01/2020
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Sewer Service Inspection Passed 12/9/2019 (1:00) 12/9/2019 12/09/2019
Misc
Informational
12/09/2019
Building service was connected to sanitary lateral with a hard back Frenco. RP 12-9-19
Footing Inspection - Commercial Partial 1/30/2020 (10:00) 1/30/2020 01/30/2020
Misc
Informational
01/30/2020
Bldg #9 exterior footing, Ufer installed
Footing Inspection - Commercial Not Ready 2/6/2020 (2:00) 2/6/2020 02/06/2020
Misc
Corrective Action Required
02/06/2020
Bldg # 9
Footing Inspection - Commercial Passed 2/7/2020 2/7/2020 02/07/2020
Misc
Corrective Action Required
02/06/2020
Bldg # 9 grade beam ok to pour
Footing Inspection - Commercial Partial 3/12/2020 (1:00) 3/12/2020 03/12/2020
Misc
Informational
03/12/2020
Foundation wall at grade beams
All Rough Inspection - Commercial Failed 5/29/2020 5/29/2020 05/29/2020
LOWER LEVEL
Corrective Action Required
05/29/2020
SOUTH END BLDG # 9 - - 105 FIRE BLOCK DEAD SPACE - - 107 FIRE BLOCK DEAD SPACE, BOCA PLATES DWV AT FLOOR CLOSET IN SHOWER BED ROOM - - NORTH END NOT READY -
FIRST FLOOR
Corrective Action Required
05/29/2020
SOUTH END BLDG # 9 - - G8 FIRE BLOCK DOUBLE WALL EVERY 10' - - 205 FIRE BLOCK DEAD SPACE, FIRE BLOCK DOUBLE WALL AT GARAGE EVERY 10' - - 207 FIRE BLOCK DEAD SPACE - - NORTH END NOT READY -
SECOND FLOOR
Corrective Action Required
05/29/2020
SOUTH END BLDG # 9 - - 305 FIRE BLOCK DEAD SPACE - - 306 ROOF BOOTS - - 307 ROOF BOOTS - - 308 ROOF BOOTS, FIRE BLOCK DOUBLE WALL EVRY 10', - - CORRIDOR FIRE BLOCK CHASE - - NORTH END NOT READY -
All Rough Inspection - Commercial Partial 6/2/2020 6/2/2020 06/02/2020
LOWER LEVEL
Corrective Action Required
05/29/2020
SOUTH END - - 105 FIRE CAULK DEAD SPACE @ FIRE COLLAR - - 107 FIRE CAULK DEAD SPACE @ FIRE COLLAR -
FIRST FLOOR
Resolved
06/11/2020
SECOND FLOOR
Corrective Action Required
05/29/2020
SOUTH END - - 307 FIRE CAULK DEAD SPACE - NORTH END - - 301 FIRE CAULK DEAD SPACE,
Rated Assembly Inspection Partial 6/11/2020 6/11/2020 06/11/2020
LOWER LEVEL
Corrective Action Required
06/11/2020
RC APPROVED
FIRST FLOOR
Corrective Action Required
06/11/2020
RC APPROVED
SECOND FLOOR
Corrective Action Required
06/11/2020
RC APPROVED
All Rough Inspection - Commercial Passed 6/12/2020 6/12/2020 06/12/2020
LOWER LEVEL
Resolved
06/12/2020
FIRST FLOOR
Resolved
06/12/2020
SECOND FLOOR
Resolved
06/12/2020
Sprinkler - Hydrostatic Test Passed 6/18/2020 06/18/2020
Rated Assembly Inspection Failed 7/7/2020 7/7/2020 07/07/2020
FIRST FLOOR
Corrective Action Required
07/07/2020
BLDG # 9 - - OK TO TAPE -
SECOND FLOOR
Corrective Action Required
07/07/2020
BLDG # 9 - NORTH END - - REPLACE TYPE X ON CEILING WITH TYPE C - CORRIDOR 2ND FLOOR - SOUTH END - UNIT 207 REPLACE TYPE X ON CEILING WITH TYPE C BEDROOM -
THIRD FLOOR
Corrective Action Required
07/07/2020
BLDG # 9 - - NORTH END & SOUTH END - - OK TO TAPE -
Rated Assembly Inspection Passed 7/8/2020 07/08/2020
FIRST FLOOR
Informational
07/08/2020
BLDG # 9 - - OK TO TAPE -
SECOND FLOOR
Resolved
07/08/2020
BLDG # 9 - NORTH END -SOUTH END - OK TO TAPE
THIRD FLOOR
Informational
07/08/2020
BLDG # 9 - - NORTH END & SOUTH END - - OK TO TAPE -
Electrical Service Inspection Passed 7/29/2020 7/29/2020 07/29/2020
Misc
Informational
07/29/2020
- 16 UNITS 1 HOUSE METER
Alarm Test Passed 10/20/2020 10/20/2020
Sprinkler - Flow Test Passed 10/20/2020 10/20/2020
Occupancy Inspection - Fire Failed 10/23/2020 10/23/2020 10/23/2020
Occupancy Inspection - Codes Commercial Failed 10/23/2020 10/23/2020 10/23/2020
Misc
Corrective Action Required
10/23/2020
-must pass fire inspection before TCO will be issued -complete exterior facade -remove trash & construction debris -Tamper resistant Schrader valves at all condensing units -provide all condensing units -provide guard rails at retaining wall
Occupancy Inspection - Planning Passed 10/26/2020 10/26/2020
Occupancy Inspection - Fire Passed 10/26/2020 10/26/2020
Water Service Inspection Passed 10/27/2020 10/27/2020
Sewer Service Inspection Passed 10/27/2020 10/27/2020
Occupancy Inspection - Engineering Passed 10/27/2020 10/27/2020
Occupancy Inspection - Codes Commercial Temporary C of O 10/27/2020 10/27/2020
Misc
Corrective Action Required
10/23/2020
-complete exterior facade -Tamper resistant Schrader valves at all condensing units -provide all condensing units
Occupancy Inspection - Water Utilities Passed 1/4/2021 01/04/2021
Occupancy Inspection - Codes Commercial Temporary C of O 1/13/2021 1/13/2021 01/13/2021
Misc
Corrective Action Required
10/27/2020
-Tamper resistant Schrader valves at all condensing units 10 day TCO extension
Occupancy Inspection - Codes Commercial Full C of O 1/25/2021 1/25/2021 01/25/2021
Misc
Resolved
01/25/2021
-Tamper resistant Schrader valves at all condensing units 10 day TCO extension
Documents & Images
Date Uploaded File Type Document Name
10/16/2017 Meridian Site Map
12/06/2019 Letter DS Building Permit
12/09/2019 07913F05-FCCC-45B1-8C3B-7C5891ECB57A
12/09/2019 Letter INSPECTION SUMMARY
01/30/2020 Letter INSPECTION SUMMARY
02/06/2020 Letter INSPECTION SUMMARY
02/07/2020 Letter INSPECTION SUMMARY
03/12/2020 Letter INSPECTION SUMMARY
05/29/2020 Letter INSPECTION SUMMARY
06/02/2020 Letter INSPECTION SUMMARY
06/11/2020 Letter INSPECTION SUMMARY
07/07/2020 Letter INSPECTION SUMMARY
07/08/2020 Letter INSPECTION SUMMARY
07/29/2020 Letter INSPECTION SUMMARY
10/23/2020 Letter INSPECTION SUMMARY
10/27/2020 Letter Codes Temporary Certificate of Occupancy
12/01/2020 Receipt Receipt for transaction:2020-007800
01/13/2021 Letter Codes Temporary Certificate of Occupancy
01/13/2021 Letter INSPECTION SUMMARY
01/25/2021 Letter Codes Final Certificate of Occupancy
01/25/2021 Letter Field Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home