Permit Application Status

PRCOM20172511


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20172511
Building Permit - Commercial
Certificate of Occupancy
PARROT PROPERTIES INC
NEW MULTI-FAMILY
BUILDING #5 NEW APARTMENT WITH PARKING GARAGE BENEATH FOUNDATION PERMIT - PRCOM20180701
07/24/2017
01/07/2019
03/19/2020
Locations
Contacts
CITYSCAPE CONSTRUCTION VIEW HIGH LLC, Address:10 W CARMEL DR STE 200, Phone:(317) 574-1600 Ext:100  
STANDARD HEATING & COOLING TOO LLC, Address:2006 E PRAIRIE CIRCLE , Phone:(913) 782-5409  
STANDARD ELECTRIC TOO LLC, Address:2006 E PRAIRIE CIRCLE, Phone:(913) 782-5409  
GARRISON PLUMBING, Address:15430 S MAHAFFIE ST STE 102, Phone:(913) 768-1311  
SGN+A ARCHITECTS, Address:315 W PONCE DE LEON AVE #755, Phone:(404) 373-7370  
LATIMER SOMMERS & ASSOCIATES PA, Address:3639 SW SUMMERFIELD DR STE A, Phone:(785) 233-3232  
PARROT PROPERTIES INC, Address:11303 VIEW HIGH DR  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 07/25/2018 11/08/2018
Dawn Bell
Final Development Plan Review Approved 08/07/2018 02/16/2018
Joe Frogge
Building Plan Review Approved 08/07/2018 02/16/2018
Joe Frogge
Special Inspections Review Approved 08/24/2017
Joe Frogge
Fees
Paid Fees Amount Paid Owing Date Paid
Valuation Fee for New Multi-Family $6,468.68 $6,468.68 Paid 01/07/2019
8331507-Sewer Connection Fee $3,000.00 $3,000.00 Paid 01/07/2019
Not Ready Inspection Fee $50.00 $50.00 Paid 12/06/2019
Not Ready Inspection Fee $50.00 $50.00 Paid 12/06/2019
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Underslab Plumbing Inspection - Commercial Passed 4/2/2019 4/2/2019 04/02/2019
All Rough Inspection - Commercial Failed 6/18/2019 6/18/2019 06/18/2019
LOWER LEVEL
Corrective Action Required
06/18/2019
Laudry drain pipe distance to drain. replace studs at laundry where removed corridor wall. Plumbing protection plates throughout. north exit - support , install joist hangers and hurrican ties as requried on truss , check bearing at end soffit. joist hager all landing joist throughout.
FIRST FLOOR
Corrective Action Required
06/18/2019
Plumbing protection plates throughout
SECOND FLOOR
Corrective Action Required
06/18/2019
Plumbing protection plates throughout. shear wall nailing NW section 2nd room from the north.
All Rough Inspection - Commercial Passed 6/25/2019 6/25/2019 06/25/2019
LOWER LEVEL
Resolved
06/25/2019
Laudry drain pipe distance to drain. replace studs at laundry where removed corridor wall. Plumbing protection plates throughout. north exit - support , install joist hangers and hurrican ties as requried on truss , check bearing at end soffit. joist hager all landing joist throughout.
FIRST FLOOR
Resolved
06/25/2019
Plumbing protection plates throughout
SECOND FLOOR
Resolved
06/25/2019
Plumbing protection plates throughout. shear wall nailing NW section 2nd room from the north.
Rated Assembly Inspection Partial 6/21/2019 6/21/2019 07/01/2019
LOWER LEVEL
Corrective Action Required
06/18/2019
RC: UNITS: PRE-ROCK: ok
FIRST FLOOR
Corrective Action Required
06/18/2019
RC: UNITS: PRE-ROCK: ok
SECOND FLOOR
Corrective Action Required
06/18/2019
RC: UNITS: PREROCK: ok
Rated Assembly Inspection Partial 7/2/2019 7/2/2019 07/02/2019
LOWER LEVEL
Corrective Action Required
07/01/2019
RC: UNITS: PRE-ROCK: ok tubs
FIRST FLOOR
Corrective Action Required
07/01/2019
RC: UNITS: PRE-ROCK: ok tubs
SECOND FLOOR
Corrective Action Required
07/01/2019
RC: UNITS: PREROCK: ok tubs
Rated Assembly Inspection Not Ready 7/3/2019 7/3/2019 07/03/2019
SECOND FLOOR
Corrective Action Required
07/02/2019
RC: UNITS: PREROCK: ok tubs
FIRST FLOOR
Corrective Action Required
07/02/2019
RC: UNITS: PRE-ROCK: ok tubs
LOWER LEVEL
Corrective Action Required
07/02/2019
RC: UNITS: PRE-ROCK: ok tubs
Misc
Corrective Action Required
07/03/2019
fire collars on 4"dwv in 4 units all levels incomplete for the #3rd time. fees due for the 3rd and 4th inspections.
Rated Assembly Inspection Partial 7/9/2019 7/9/2019 07/09/2019
SECOND FLOOR
Corrective Action Required
07/03/2019
RC: UNITS: ok PREROCK: ok tubs
FIRST FLOOR
Corrective Action Required
07/03/2019
RC: UNITS: PRE-ROCK: ok tubs
LOWER LEVEL
Corrective Action Required
07/03/2019
RC: UNITS: PRE-ROCK: ok tubs
Misc
Corrective Action Required
07/03/2019
fire collars on 4"dwv in 4 units all levels incomplete for the #3rd time. fees due for the 3rd and 4th inspections.
Rated Assembly Inspection Partial 7/16/2019 7/16/2019 07/16/2019
SECOND FLOOR
Corrective Action Required
07/09/2019
RC:ok UNITS: ok PREROCK: ok tubs
FIRST FLOOR
Corrective Action Required
07/09/2019
RC:ok UNITS:ok PRE-ROCK: ok tubs
LOWER LEVEL
Corrective Action Required
07/09/2019
RC:ok UNITS:ok PRE-ROCK: ok tubs
Misc
Resolved
07/16/2019
MC
Electrical Service Inspection Partial 7/23/2019 7/23/2019 07/23/2019
Misc
Corrective Action Required
07/23/2019
Partial- service is grounded , but need to see the Ufer ground complete and connected.
Rated Assembly Inspection Failed 7/30/2019 7/30/2019 07/30/2019
SECOND FLOOR
Corrective Action Required
07/16/2019
RC:ok UNITS: ok PREROCK: ok tubs
FIRST FLOOR
Corrective Action Required
07/16/2019
RC:ok UNITS:ok PRE-ROCK: ok tubs
LOWER LEVEL
Corrective Action Required
07/16/2019
RC:ok UNITS:ok--- PRE-ROCK: ok tubs stair towers not ready
Sprinkler - Hydrostatic Test Passed 8/16/2019 08/16/2019
Electrical Service Inspection Passed 10/30/2019 10/30/2019 10/30/2019
Alarm Test Passed 2/21/2020 02/21/2020
Sprinkler - Flow Test Passed 2/21/2020 02/21/2020
Miscellaneous Inspection Failed 3/16/2020 03/16/2020
Misc
Resolved
03/19/2020
- provide tamper proof caps A/C condensers, provide fire extinguishers per plan, 301 provide self closing door, fire caulk penetrations at water heater, 302 anti tip device stove, self closing door, fire caulk penetrations at water heater, 303 fire caulk penetrations at water heater, anti tip device stove, self closing door 304 fire caulk penetrations water heater, self closing door, 305 fire caulk penetrations at water heater, self closing door 306 self closing door, fire caulk penetrations at water heater 307 self closing door, fire caulk water heater penetrations 308 GFCI bathroom open neutral, self closing door, fire caulk penetrations at water heater 207 self closing door, fire caulk penetrations at water heater, 208 self closing door, fire caulk water heater penetrations, 206 anti tip device stove, self closing door, fire caulk. penetrations at water heater, 205 self closing door, fire caulk penetrations at water heater, anti tip device stove, 204 self closing door, seal, Fire caulk penetrations at water heater, 203 self closing door, fire caulk penetrations at water heater, 202 self closing door, fire caulk penetrations at water heater, 201 fire caulk penetrations at water heater
Occupancy Inspection - Fire Passed 3/18/2020 3/18/2020 03/18/2020
Occupancy Inspection - Planning Temporary C of O 3/18/2020 03/18/2020
Corrective Action Required
03/18/2020
Sod and landscaping shall be installed.
Occupancy Inspection - Engineering Passed 3/18/2020 03/18/2020
Rated Assembly Inspection Passed 03/19/2020
SECOND FLOOR
Corrective Action Required
07/30/2019
RC:ok UNITS: ok PREROCK: ok tubs
FIRST FLOOR
Corrective Action Required
07/30/2019
RC:ok UNITS:ok PRE-ROCK: ok tubs
LOWER LEVEL
Corrective Action Required
07/30/2019
RC:ok UNITS:ok--- PRE-ROCK: ok tubs stair towers not ready
In-wall Inspection Passed 03/19/2020
Miscellaneous Inspection Passed 03/19/2020
Rough Electrical Inspection - Commercial Passed 03/19/2020
Rough Mechanical Inspection - Commercial Passed 03/19/2020
Rough Plumbing Inspection - Commercial Passed 03/19/2020
Final Mechanical Inspection Passed 03/19/2020
Occupancy Inspection - Codes Commercial Full C of O 3/18/2020 3/18/2020 03/19/2020
Documents & Images
Date Uploaded File Type Document Name
10/16/2017 Meridian Site Map
01/07/2019 Letter Codes Building Permit
01/07/2019 Receipt Receipt for transaction: 2019-000072
06/18/2019 Letter INSPECTION SUMMARY
06/21/2019 Letter INSPECTION SUMMARY
06/25/2019 Letter INSPECTION SUMMARY
07/02/2019 Letter INSPECTION SUMMARY
07/03/2019 Letter INSPECTION SUMMARY
07/09/2019 Letter INSPECTION SUMMARY
07/16/2019 Letter INSPECTION SUMMARY
07/23/2019 Letter INSPECTION SUMMARY
07/30/2019 Letter INSPECTION SUMMARY
10/30/2019 Letter INSPECTION SUMMARY
03/16/2020 Letter INSPECTION SUMMARY
03/19/2020 Letter Field Certificate of Occupancy
04/29/2022 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home