Inspection |
Outcome |
Requested |
Scheduled |
Date Inspected |
Sewer Service Inspection
|
Passed
|
1/14/2019
|
1/14/2019
|
01/14/2019
|
Sprinkler - Hydrostatic Test
|
Passed
|
|
4/24/2019
|
04/24/2019
|
All Rough Inspection - Commercial
|
Partial
|
5/8/2019
|
5/8/2019
|
05/08/2019
|
|
FIRST FLOOR
|
|
SECOND FLOOR
Corrective Action Required
|
|
LOWER LEVEL
Corrective Action Required
|
Rated Assembly Inspection
|
Partial
|
5/8/2019
|
5/8/2019
|
05/16/2019
|
|
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
|
|
LOWER LEVEL
Corrective Action Required
|
|
FIRST FLOOR
Corrective Action Required
|
|
SECOND FLOOR
Corrective Action Required
|
Rated Assembly Inspection
|
Partial
|
|
5/16/2019
|
05/16/2019
|
|
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
|
|
LOWER LEVEL
Corrective Action Required
|
|
FIRST FLOOR
Corrective Action Required
|
|
SECOND FLOOR
Corrective Action Required
|
Rated Assembly Inspection
|
Partial
|
5/17/2019
|
5/17/2019
|
05/17/2019
|
|
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
|
|
LOWER LEVEL
Corrective Action Required
|
|
FIRST FLOOR
Corrective Action Required
|
|
SECOND FLOOR
Corrective Action Required
|
Rated Assembly Inspection
|
Partial
|
5/20/2019
|
5/20/2019 at 11:00 AM
|
05/20/2019
|
|
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
|
|
LOWER LEVEL
Corrective Action Required
|
|
FIRST FLOOR
Corrective Action Required
|
|
SECOND FLOOR
Corrective Action Required
|
Rated Assembly Inspection
|
Partial
|
5/22/2019
|
5/22/2019 at 10:00 AM
|
05/22/2019
|
|
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
|
|
LOWER LEVEL
Corrective Action Required
|
|
FIRST FLOOR
Corrective Action Required
|
Rated Assembly Inspection
|
Partial
|
5/24/2019
|
5/24/2019 at 9:45 AM
|
05/24/2019
|
|
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
|
|
LOWER LEVEL
Corrective Action Required
|
|
FIRST FLOOR
Corrective Action Required
|
Rated Assembly Inspection
|
Failed
|
5/28/2019
|
5/28/2019
|
05/28/2019
|
|
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
|
|
LOWER LEVEL
Corrective Action Required
|
|
FIRST FLOOR
Corrective Action Required
|
|
Misc
Corrective Action Required
|
Rated Assembly Inspection
|
Partial
|
5/30/2019
|
5/30/2019
|
05/30/2019
|
|
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
|
|
LOWER LEVEL
Corrective Action Required
|
|
FIRST FLOOR
Corrective Action Required
|
|
Misc
Corrective Action Required
|
Rated Assembly Inspection
|
Partial
|
6/4/2019
|
6/4/2019
|
06/04/2019
|
|
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
|
|
LOWER LEVEL
Corrective Action Required
|
|
FIRST FLOOR
Corrective Action Required
|
|
Misc
Corrective Action Required
|
|
SECOND FLOOR
Corrective Action Required
|
Rated Assembly Inspection
|
Partial
|
6/12/2019
|
6/12/2019
|
06/12/2019
|
|
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
|
|
LOWER LEVEL
Corrective Action Required
|
|
FIRST FLOOR
Corrective Action Required
|
|
Misc
Corrective Action Required
|
|
SECOND FLOOR
Corrective Action Required
|
Rated Assembly Inspection
|
Partial
|
6/19/2019
|
6/19/2019
|
06/19/2019
|
|
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
|
|
LOWER LEVEL
Corrective Action Required
|
|
FIRST FLOOR
Corrective Action Required
|
|
Misc
Corrective Action Required
|
|
SECOND FLOOR
Corrective Action Required
|
Electrical Service Inspection
|
Passed
|
7/8/2019
|
7/8/2019
|
07/08/2019
|
Above Ceiling Inspection
|
Passed
|
7/11/2019
|
7/11/2019
|
07/11/2019
|
Alarm Test
|
Passed
|
|
|
10/23/2019
|
Sprinkler - Flow Test
|
Passed
|
|
|
10/23/2019
|
Occupancy Inspection - Planning
|
Temporary C of O
|
|
|
11/01/2019
|
|
Corrective Action Required
|
|
Corrective Action Required
|
Occupancy Inspection - Fire
|
Passed
|
|
11/1/2019
|
11/01/2019
|
Occupancy Inspection - Codes Commercial
|
Failed
|
11/1/2019
|
11/1/2019 at 9:30 AM
|
11/01/2019
|
Occupancy Inspection - Codes Commercial
|
Failed
|
|
11/1/2019 at 3:10 PM
|
11/01/2019
|
|
Misc
Corrective Action Required
|
|
Misc
Corrective Action Required
|
|
Misc
Corrective Action Required
|
|
Misc
Corrective Action Required
|
|
Misc
Corrective Action Required
|
Occupancy Inspection - Codes Commercial
|
Full C of O
|
11/8/2019
|
11/8/2019
|
11/08/2019
|
|
Misc
|