Permit Application Status

PRCOM20172502


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20172502
Building Permit - Commercial
Final Completion
CITY OF LEES SUMMIT
NEW OTHER (COMMERCIAL)
NEW POOL SERVING APARTMENT COMPLEX
07/24/2017
01/02/2019
01/31/2018
06/25/2020
Locations
Contacts
CITYSCAPE CONSTRUCTION VIEW HIGH LLC, Address:10 W CARMEL DR STE 200, Phone:(317) 574-1600 Ext:100  
STANDARD ELECTRIC TOO LLC, Address:2006 E PRAIRIE CIRCLE, Phone:(913) 782-5409  
SGN+A ARCHITECTS, Address:315 W PONCE DE LEON AVE #755, Phone:(404) 373-7370  
GARRISON PLUMBING, Address:15430 S MAHAFFIE ST STE 102, Phone:(913) 768-1311  
CITY OF LEES SUMMIT, Address:220 SE GREEN ST  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 08/22/2017 11/08/2018
Dawn Bell
LC - General Contractor
Resolved
11/08/2018

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor. 8/24/17 - acknowledged
LC - MEP Subs
Resolved
11/08/2018

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. 8/24/17 - acknowledged
Building Plan Review Approved 08/29/2017 02/16/2018
Joe Frogge
Final Development Plan
Resolved
02/16/2018

The building permit for this project can not be issued until the Codes Administration Department has received the approved Final Development Plan from the Planning and Development Department. Action required: Comment is for informational purposes. 8/24/17 - acknowledged
Project cost
Resolved
02/16/2018

The project cost, which is used to establish the permit fee, has not been provided. Action required: Comment is for informational purposes. We will need a breakdown per structure. 8/24/17 - acknowledged
Misc
Resolved
08/24/2017

City of Lee's Summit Code of Ordinances Section 7-1010. - Steps or ladders. Two (2) or more means of egress in the form of steps or ladders shall be provided for all swimming pools. At least one such means of egress shall be located on a side of the pool at both the deep end and shallow end of the pool. Treads of steps and ladders shall be constructed of nonslip material and at least three (3) inches wide for their full length. Steps and ladders shall have a handrail on both sides. Exception: Pools accessory to one- and two-family dwellings. (Ord. No. 7369, § 1, 10-3-2013) Action required: Provide additional egress on opposite side of pool from stairs.
Final Development Plan Review Approved 08/07/2018 02/16/2018
Joe Frogge
Fire Plan Review Approved with Conditions 08/29/2017 08/23/2017
Joe Dir
Misc
Corrective Action Required
08/22/2017

All FD comments are to be found in plan review for apartment #1.
Fire Plan Review Approved with Conditions 08/07/2017 08/04/2017
Joe Frogge
Misc
Corrective Action Required
08/04/2017

All FD comments are to be found in plan review for apartment #1.
Building Plan Review Rejected 08/07/2017 08/04/2017
Joe Frogge
Final Development Plan
Corrective Action Required
08/04/2017

The building permit for this project can not be issued until the Codes Administration Department has received the approved Final Development Plan from the Planning and Development Department. Action required: Comment is for informational purposes.
Project cost
Corrective Action Required
08/04/2017

The project cost, which is used to establish the permit fee, has not been provided. Action required: Comment is for informational purposes. We will need a breakdown per structure.
Misc
Corrective Action Required
08/04/2017

City of Lee's Summit Code of Ordinances Section 7-1010. - Steps or ladders. Two (2) or more means of egress in the form of steps or ladders shall be provided for all swimming pools. At least one such means of egress shall be located on a side of the pool at both the deep end and shallow end of the pool. Treads of steps and ladders shall be constructed of nonslip material and at least three (3) inches wide for their full length. Steps and ladders shall have a handrail on both sides. Exception: Pools accessory to one- and two-family dwellings. (Ord. No. 7369, § 1, 10-3-2013) Action required: Provide additional egress on opposite side of pool from stairs.
Licensed Contractors Rejected 07/25/2017 08/04/2017
Joe Frogge
LC - General Contractor
Corrective Action Required
08/04/2017

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor.
LC - MEP Subs
Corrective Action Required
08/04/2017

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Fees
Paid Fees Amount Paid Owing Date Paid
Valuation Fee for New Other $1,465.10 $1,465.10 Paid 11/21/2018
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Pool Steel/Bonding - Commercial Partial 7/17/2019 7/17/2019 07/17/2019
Misc
Corrective Action Required
07/17/2019
Pool base, ladders, and lights
Gas Piping Inspection - Commercial Partial 11/25/2019 at 1:20 PM 11/25/2019
Misc
Partial Correction
11/25/2019
VISUAL INSPECTION AND PRESSURE TEST OK ON 20 LF OF GAS LINE TRENCHED FROM FIRE PIT LOCATION TO GRILL LOCATION.
Pool Steel/Bonding - Commercial Failed 12/11/2019 12/11/2019 at 3:40 PM 12/11/2019
Misc
Corrective Action Required
07/17/2019
Pool base, ladders, and lights **PARTIAL AREA BETWEEN STAIR: -INSTALL A LISTED BONDING CLAMP THAT MAKE A TIGHT CONNECTION TO REINFORCING STEEL -PERIMETER BONDING REQUIRES MIN 4 BONDING JUMPERS EQUALLY SPACED AROUND THE POOL
Pool Steel/Bonding - Commercial Partial 12/12/2019 at 2:10 PM 12/12/2019
Misc
Corrective Action Required
12/11/2019
Pool base, ladders, and lights **AREA ADJACENT TO THE ROUND POOL BETWEEN STAIRS** BONDED COMPONENTS: LADDER, HANDICAP POLE, PERIMETER SURFACE REINFORCEMENT STEEL, BONDING CONNECTION TO POOL SHELL REBAR
Pool Steel/Bonding - Commercial Failed 12/16/2019 12/16/2019 12/16/2019
Misc
Corrective Action Required
12/12/2019
MARK HARDING 12/16/2019 1:07 PM inspection failed need to see entire bonding section, covered with Blankets and snow only able to see portions of the mat and bonding. recall when ready-will treat like a 2HR due to weather if pouring week of 12/16. **AREA ADJACENT TO THE ROUND POOL BETWEEN STAIRS** BONDED COMPONENTS: LADDER, HANDICAP POLE, PERIMETER SURFACE REINFORCEMENT STEEL, BONDING CONNECTION TO POOL SHELL REBAR
Pool Steel/Bonding - Commercial Passed 12/18/2019 12/18/2019
Misc
Resolved
12/18/2019
MARK HARDING 12/16/2019 1:07 PM inspection failed need to see entire bonding section, covered with Blankets and snow only able to see portions of the mat and bonding. recall when ready-will treat like a 2HR due to weather if pouring week of 12/16. **AREA ADJACENT TO THE ROUND POOL BETWEEN STAIRS** BONDED COMPONENTS: LADDER, HANDICAP POLE, PERIMETER SURFACE REINFORCEMENT STEEL, BONDING CONNECTION TO POOL SHELL REBAR
Gas Piping Inspection - Commercial Partial 5/22/2020 05/22/2020
Misc
Resolved
06/09/2020
VISUAL INSPECTION AND PRESSURE TEST OK ON 20 LF OF GAS LINE TRENCHED FROM FIRE PIT LOCATION TO GRILL LOCATION.
Misc
Resolved
06/09/2020
270' gas line from meter to firepit tracer wire in place provide guage & pressure for gas test - OK TO COVER BEFRORE RAIN -PRESSURE STEADY AT 15 PSI -
Gas Piping Inspection - Commercial Passed 6/9/2020 6/9/2020 06/09/2020
Misc
Resolved
06/09/2020
VISUAL INSPECTION AND PRESSURE TEST OK ON 20 LF OF GAS LINE TRENCHED FROM FIRE PIT LOCATION TO GRILL LOCATION.
Misc
Resolved
06/09/2020
270' gas line from meter to firepit tracer wire in place provide guage & pressure for gas test - OK TO COVER BEFRORE RAIN -
Gas Service Inspection - Commercial Passed 6/9/2020 06/09/2020
Occupancy Inspection - Fire Failed 6/22/2020 06/22/2020
Final Inspection - Commercial Failed 6/22/2020 6/22/2020 06/22/2020
Misc
Corrective Action Required
06/24/2020
- PROVIDE NO FEWER THAN ONE 125 V 15 OR 20 AMP RECEPTACLE NOT LESS THAN 6' AND NOT MORE THAN 20' FROM INSIDE WALL OF POOL ( NEC 680.22 ) - - THE VERTICAL CLEARANCE BETWEEN GRADE AND THE BOTTOM OF THE BARRIER SHALL NOT EXCEED 2" FOR GRADE SURFACES THAT ARE NOT SOLID ( ISPSC 305.2.1.2) - - OPENINGS IN THE BARRIER SHALL NOT ALLOW PASSAGE OF A 4-INCH-DIAMETER SPHERE ( ISPSC 305.2.2 - - PROVIDE SIGNAGE ON CHEMICAL ROOM -
Occupancy Inspection - Fire Passed 6/24/2020 06/24/2020
Final Inspection - Commercial Passed 6/24/2020 06/24/2020
Misc
Resolved
06/24/2020
- PROVIDE NO FEWER THAN ONE 125 V 15 OR 20 AMP RECEPTACLE NOT LESS THAN 6' AND NOT MORE THAN 20' FROM INSIDE WALL OF POOL ( NEC 680.22 ) - - THE VERTICAL CLEARANCE BETWEEN GRADE AND THE BOTTOM OF THE BARRIER SHALL NOT EXCEED 2" FOR GRADE SURFACES THAT ARE NOT SOLID ( ISPSC 305.2.1.2) - - OPENINGS IN THE BARRIER SHALL NOT ALLOW PASSAGE OF A 4-INCH-DIAMETER SPHERE ( ISPSC 305.2.2 - - PROVIDE SIGNAGE ON CHEMICAL ROOM -
Documents & Images
Date Uploaded File Type Document Name
08/04/2017 Letter Codes P/R Corrections Document
10/16/2017 Meridian Site Map
11/21/2018 Receipt Receipt for transaction: 2018-007329
01/02/2019 Letter Codes Building Permit
07/17/2019 Letter INSPECTION SUMMARY
12/11/2019 Letter INSPECTION SUMMARY
12/12/2019 Letter INSPECTION SUMMARY
12/16/2019 Letter INSPECTION SUMMARY
12/18/2019 Letter INSPECTION SUMMARY
06/09/2020 Letter INSPECTION SUMMARY
06/09/2020 Letter INSPECTION SUMMARY
06/22/2020 Letter INSPECTION SUMMARY
06/24/2020 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide: