Summary
PRCOM20171833
Building Permit - Commercial
Certificate of Occupancy
LANGSFORD DEVELOPMENT INC
CHANGE OF TENANT
EXPAND EXISTING DENTIST OFFICE
06/05/2017
06/26/2017
12/09/2017
10/11/2017
Locations
Contacts
MID-WEST INTERIORS INC, Address:711 NE PILGRIM WAY, Phone:(816) 353-3100  
CHIEF HEATING & COOLING INC, Address:920 NW TECHNOLOGY DR, Phone:(816) 246-4646  
THREE DIAMOND ELECTRIC LLC, Address:27606 E PINK HILL RD, Phone:(816) 228-5470  
SCHOELLER PLUMBING INC, Address:PO BOX 1268, Phone:(816) 628-3848  
LANGSFORD DEVELOPMENT INC, Address:616 SW 3RD ST  
CHARLES R HOWARD ARTCHITECT LLC, Address:8718 HIAWATHA RD, Phone:(816) 361-6051  
Reviews
Review Type Outcome Est. Completion Date Completed
Building Plan Review Approved with Conditions 06/15/2017 06/20/2017
Joe Frogge
License Tax Application
Corrective Action Required
06/12/2017

A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit. Action required: Comment is for informational purposes. 6/20/17 - acknowledged in letter.
Misc
Corrective Action Required
06/12/2017

2012 IBC 1103.1 (Accessibility) Where required. Sites, buildings, structures, facilities, elements and spaces, temporary or permanent, shall be accessible to persons with physical disabilities. Action required: Hardware at pocket door must be accessible when in the closed position. 6/20/17 - acknowledged in letter. Field verify.
Misc
Corrective Action Required
06/12/2017

2012 IBC 1006.3 – Emergency power for illumination. The power supply for means of egress illumination shall normally be provided by the premises’ electrical supply. In the event of power supply illuminate all of the following areas: 1. Aisles and unenclosed egress stairways in rooms and spaces that required two or more means of egress. 2. Corridors, interior exit stairways and ramps and exit passageways in buildings required to have two or more exits. 3. Exterior egress components at other than their levels of exit discharge until exit discharge is accomplished for buildings required to have two or more exits. 4. Interior exit discharge elements, as permitted in Section 1027.1, in buildings required to have two or more exits. 5. Exterior landings as required by Section 1008.1.6 for exit discharge doorways in buildings required to have two or more exits. The emergency power system shall provide power for duration of not less than 90 minutes and shall consist of storage batteries, unit equipment or an on-site generator. The installation of the emergency power system shall be in accordance with Section 2702. Action required: Provide emergency lighting at exterior side of exit doors. 6/20/17 - acknowledged in letter. Field verify.
Mech - Dryer exhaust - Manufacturer's instructions 504.6.4.2
Corrective Action Required
06/12/2017

2012 IMC 504.6.4.2 – Manufacturer’s instructions. The maximum length of the exhaust duct shall be determined by the dryer manufacturer’s installation instructions. The code official shall be provided with a copy of the installation instructions for the make and model of the dryer. Where the exhaust duct is to be concealed, the installation instructions shall be provided to the code official prior to the concealment inspection. In the absence of fitting equivalent length calculations from the clothes dryer manufacturer, Table 504.6.1 shall be used. Action required: Specify material, routing, and termination of dryer duct. 6/20/17 - acknowledged in letter. Field verify.
Misc
Resolved
06/15/2017

2011 NEC 210.8 (B) Other Than Dwelling Units. All 125-volt, single-phase, 15- and 20-ampere receptacles installed in the locations specified in 210.8(B)(1) through (8) shall have ground-fault circuit-interrupter protection for personnel. (1) Bathrooms (2) Kitchens (3) Rooftops (4) Outdoors (5) Sinks - where receptacles are installed within 6 feet of the outside edge of the sink. (6) Indoor wet locations (7) Locker rooms with associated showering facilities (8) Garages, service bays, and similar areas where electrical diagnostic equipment, electrical hand tools, or portable lighting equipment are to be used. (refer to code for exceptions) Action required: Modify drawings to show that all receptacles within 6' of a sink will by GFCI protected.
Misc
Corrective Action Required
06/12/2017

2011 NEC 517.13 Grounding of Receptacles and Fixed Electrical Equipment in Patient Care Areas. Wiring in patient care areas shall comply with 517.13(A) and (B). (A) Wiring methods. All branch circuits serving patient care areas shall be provided with an effective ground-fault current path by installation in a metal raceway system, or a cable having a metallic armor or sheath assembly. The metal raceway system, or metallic cable armor, or sheath assembly shall itself qualify as an equipment grounding conductor in accordance with 250.118. (B) Insulated Equipment Grounding Conductor. (1) General. The following shall be directly connected to an insulated copper equipment grounding conductor that is installed with the branch circuit conductors in the wiring methods as provided in 517.13(A). 1. The grounding terminals of all receptacles. 2. Metal Boxes and enclosures containing receptacles. 3. All non-current-carrying conductive surfaces of fixed electrical equipment likely to become energized that are subject to personal contact, operating at over 100 volts. (refer code for exceptions) (2) Sizing. Equipment grounding conductors and equipment bonding jumpers shall be sized in accordance with 250.122. Action required: Modify drawings to show that all circuits in patient care areas will have redundant ground system. 6/20/17 - acknowledged in letter. Field verify.
Fire Plan Review Approved with Conditions 06/15/2017 06/06/2017
Joe Dir
Address numbers required
Corrective Action Required
06/06/2017

2012 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). ACTION REQUIRED:(verified at inspection) Post the suite designation on the exterior of all doors leading into the space. Address shall be readable from the roadway.
Portable fire extinguishers - general
Corrective Action Required
06/06/2017

2012 IFC 906.2 - General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10. ACTION REQUIRED: (verified at inspection) Providetwo 2A-10BC fire extinguishers. One to be mounted toward the rear of the space and one mounted toward the front of the space.
Misc
Corrective Action Required
06/06/2017

Exit/emergency lighting ACTION REQUIRED: Do away with the exit/emergency light fixture loacted in the storage/workroom.
Misc
Corrective Action Required
06/06/2017

Door operations ACTION REQUIRED:No keyed locks on the egress side of an exit. (verified at inspection) [B] 1008.1.9 Door operations. Except as specifically permitted by this section egress doors shall be readily openable from the egress side without the use of a key or special knowledge or effort.
Licensed Contractors Approved 06/15/2017 06/05/2017
Development Center
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for Change of Tenant $408.50 $408.50 Paid 06/26/2017
8331507-Sewer Connection Fee $120.00 $120.00 Paid 06/26/2017
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Underslab Plumbing Inspection - Commercial Passed 6/30/2017 6/30/2017 06/30/2017
Underslab Plumbing Inspection - Commercial Passed 7/6/2017 7/6/2017 07/06/2017
Underslab Electrical Inspection - Commercial Passed 7/11/2017 07/11/2017
In-wall Inspection Not Ready 7/24/2017 7/24/2017 07/24/2017
Misc
Partial Correction
07/24/2017
NO ISSUES FOUND ON IN-WALL PLUMBING IN PLACE TO DATE. CALL FOR COMPREHENSIVE IN-WALL INSPECTION WHEN ALL TRADES ARE COMPLETE AND READY.
Above Ceiling Inspection Not Ready 7/24/2017 7/24/2017 07/24/2017
In-wall Inspection Partial 8/1/2017 8/1/2017 08/01/2017
Misc
Partial Correction
07/24/2017
OK TO HANG DRYWALL EXCEPT AT EXISTING NW ROOM, AT NEW STERILIZATION WEST WALL AND NEW OP. 1 WEST WALL
In-wall Inspection Partial 8/7/2017 8/7/2017 08/07/2017
Misc
Partial Correction
08/01/2017
OK TO HANG DRYWALL EXCEPT AT EXISTING CONSULT ROOM AT NW. REMINDER -- NO CEILING TILE IS TO BE PLACED PRIOR TO ABOVE-CEILING INSPECTION AND APPROVAL EXCEPT THOSE FEW WHICH MAY BE NECESSARY FOR INSTALLATION OF ELECTRICAL OR OTHER DEVICES.
Above Ceiling Inspection Partial 9/5/2017 9/5/2017 at 10:15 AM 09/05/2017
Misc
Partial Correction
09/05/2017
OK TO COVER WHEN READY ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS THROUGHOUT EXCEPT WHERE MODIFICATIONS TO BE MADE AT CONSULT ROOM LATER.
Occupancy Inspection - Fire Temporary C of O 10/6/2017 10/06/2017
Above Ceiling Inspection Passed 10/06/2017
Misc
Resolved
10/06/2017
OK TO COVER WHEN READY ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS THROUGHOUT EXCEPT WHERE MODIFICATIONS TO BE MADE AT CONSULT ROOM LATER.
In-wall Inspection Passed 10/06/2017
Misc
Resolved
10/06/2017
OK TO HANG DRYWALL EXCEPT AT EXISTING CONSULT ROOM AT NW. REMINDER -- NO CEILING TILE IS TO BE PLACED PRIOR TO ABOVE-CEILING INSPECTION AND APPROVAL EXCEPT THOSE FEW WHICH MAY BE NECESSARY FOR INSTALLATION OF ELECTRICAL OR OTHER DEVICES.
Occupancy Inspection - Codes Commercial Temporary C of O 10/6/2017 10/6/2017 at 10:10 AM 10/06/2017
Misc
Corrective Action Required
10/06/2017
-FIRE DEPT APPROVA REQUIRED -POST NO SMOKING SIGNAGE AT FRONT ENTRY DOOR -COMPLETE DRYWALL FOR CONSULT RM -RECEPTACLE WITHIN SIX FT OF SINK IN BREAK RM MUST BE GFCI-PROTECTED -POST RESTROOM SIGNAGE NOTE: RESTROOM IS EXISTING AND NOT IN COMPLIANCE WITH ACCESSIBILITY REQUIREMENT
Occupancy Inspection - Fire Passed 10/6/2017 10/06/2017
Occupancy Inspection - Codes Commercial Full C of O 10/11/2017 at 10:05 AM 10/11/2017
Misc
Resolved
10/11/2017
-FIRE DEPT APPROVA REQUIRED -POST NO SMOKING SIGNAGE AT FRONT ENTRY DOOR -COMPLETE DRYWALL FOR CONSULT RM -RECEPTACLE WITHIN SIX FT OF SINK IN BREAK RM MUST BE GFCI-PROTECTED -POST RESTROOM SIGNAGE NOTE: RESTROOM IS EXISTING AND NOT IN COMPLIANCE WITH ACCESSIBILITY REQUIREMENT
Occupancy Inspection - Water Utilities Passed 10/16/2017
Documents & Images
Date Uploaded File Type Document Name
06/06/2017 Letter Fire Building Plan Review
06/12/2017 Letter Codes P/R Corrections Document
06/20/2017 Letter Codes Plan Review Conditions
06/26/2017 Receipt Receipt for transaction: 2017-004269
06/26/2017 Letter Codes Building Permit
06/30/2017 Letter Inspection Summary
07/06/2017 Letter Inspection Summary
07/11/2017 Letter Inspection Summary
07/24/2017 Letter Inspection Summary
08/01/2017 Letter Inspection Summary
08/07/2017 Letter Inspection Summary
09/05/2017 Letter Inspection Summary
10/06/2017 Letter Codes Temporary Certificate of Occupancy
10/11/2017 Letter Field Certificate of Occupancy
10/13/2017 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home