Permit Application Status

PRCOM20171689


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20171689
Building Permit - Commercial
Final Completion
SAINT LUKES EAST HOSPITAL
ADDITION COMMERCIAL
BUILDING ADDITION FOR SURGERY DEPARTMENT INCLUDING INTERIOR ALTERATIONS TO ADJACENT SPACES foundation permit: PRCOM20170703
05/25/2017
06/20/2017
12/03/2017
06/13/2018
Locations
Contacts
JE DUNN CONSTRUCTION CO, Address:120 S CENTRAL AVE STE 350, Phone:(816) 474-8600  
P1 CONSTRUCTION LLC, Address:13605 W 96TH TERR, Phone:(913) 529-5000  
R F FISHER ELECTRIC COMPANY LLC, Address:5299 DTC BLVD STE 600, Phone:(913) 384-1500  
P1 CONSTRUCTION LLC, Address:13605 W 96TH TERR, Phone:(913) 529-5000  
ACI BOLAND, Address:1421 EAST 104TH ST; SUITE 100, Phone:(816) 763-9600  
STRUCTURAL ENGINEERING ASSOCITES INC, Address:1000 WALNUT STE 1570, Phone:(816) 421-1042  
SAINT LUKES EAST HOSPITAL, Address:901 E 104TH ST MAILSTOP 900N  
Reviews
Review Type Outcome Est. Completion Date Completed
Fire Plan Review Approved with Conditions 06/21/2017 09/15/2017
Joe Dir
Address numbers required
Corrective Action Required
09/15/2017

2012 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). ACTION REQUIRED: (verified at inspection) Address all OR areas and specific rooms off of the corridors with room designation signage.
Installation acceptance testing
Corrective Action Required
09/15/2017

2012 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. ACTION REQUIRED:(information purposes) Field tests and acceptance testing shall be required prior to the final occupancy inspection for the following: (1) fire Sprinkler system modifications (2) fire alarm system modifications (3) (provide test documentation) for the med gas piping and gas alarms certifications (4) Generator power test for all circuits on the generator circuits.
Misc
Corrective Action Required
09/15/2017

Bio Hazards areas; ACTION REQUIRED:(verified at inspection) All rooms containing soiled/contaminated clothing, equipment, operation implements shall be labeled with a WARNING BIO-HAZARD label on the door leading into the area.
Misc
Corrective Action Required
09/15/2017

Group I-2 occupancy Electronically controlled doors operations: ACTION REQUIRED:(verified at inspection) Special locking arrangements in Group I-2 occupancies shall comply with the following conditions IFC 2012 1008.1.9.6 - 1008.1.9.10 where applicable.
Alarm Plan Review Released for Construction 09/05/2017
Joe Dir
Installation acceptance testing
Corrective Action Required
09/05/2017

2012 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. ACTION REQUIRED:(information purposes) Acceptance testing of all reloacted and new installed activation and notification devices will be required prior to the final occupancy inspection. To schedule testing contacrt the fire department at 816-969-1300.
Misc
Corrective Action Required
09/05/2017

Sequence of operation table Sheet FA-002 ACTION REQUIRED:Check sequence of operation table. All activation devices that actuate all audible and visual signals shall also release magnetically held doors and unlock security doors. Make the needed revision for manual pull stations, heat detectors, smoke detectors.
Misc
Corrective Action Required
09/05/2017

High Rise buildings ACTION REQUIRED: (verified at testing) All activation and notification devices shall be programed to actuate according to high rise building specifications.
Fire Plan Review Approved with Conditions 06/21/2017 08/18/2017
Joe Dir
Construction documents for fire alarm systems
Resolved
08/18/2017

2012 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control function. ACTION REQUIRED:(information purposes) Have the fire alarm system contractor provide shop drawings for the modification to be done to the fire alarm system.
Address numbers required
Corrective Action Required
08/18/2017

2012 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). ACTION REQUIRED: (verified at inspection) Address all OR areas and specific rooms off of the corridors with room designation signage.
Construction documents - Fire protection systems
Resolved
08/18/2017

2012 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. ACTION REQUIRED:(information purposes) Have the fire sprinkler system contractor provide shop drawings of the modifications to be done to the fire sprinkler system.
Installation acceptance testing
Corrective Action Required
08/18/2017

2012 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. ACTION REQUIRED:(information purposes) Field tests and acceptance testing shall be required prior to the final occupancy inspection for the following: (1) fire Sprinkler system modifications (2) fire alarm system modifications (3) (provide test documentation) for the med gas piping and gas alarms certifications (4) Generator power test for all circuits on the generator circuits.
Misc
Corrective Action Required
08/18/2017

Bio Hazards areas; ACTION REQUIRED:(verified at inspection) All rooms containing soiled/contaminated clothing, equipment, operation implements shall be labeled with a WARNING BIO-HAZARD label on the door leading into the area.
Misc
Corrective Action Required
08/18/2017

Group I-2 occupancy Electronically controlled doors operations: ACTION REQUIRED:(verified at inspection) Special locking arrangements in Group I-2 occupancies shall comply with the following conditions IFC 2012 1008.1.9.6 - 1008.1.9.10 where applicable.
Sprinkler Plan Review Released for Construction 08/03/2017
Joe Dir
08/03/2017

Installation acceptance testing
Corrective Action Required
08/03/2017

2012 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. ACTION REQUIRED: Hyrodstatic pressure test required for the sprinkler system addition. to schedule the testing contact the fire dpeartment at 816-969-1300
IFGC - Inspection, testing and maintenance - alarm and extinguishing systems 901.6
Corrective Action Required
08/03/2017

2012 IFC 901.6- Inspection, testing and maintenance. Fire detection, alarm and extinguishing systems shall be maintained in an operative condition at all times, and shall be replaced or repaired where defective. Not required fire protection systems and equipment shall be inspected, tested and maintained or removed. ACTION REQUIRED: (verified at inspection) The existing fire sprinkler system shall be current with all required maintenance and servicing. A current service tag shall be posted on the riser.
Licensed Contractors Approved 06/14/2017 06/19/2017
Joe Frogge
Building Plan Review Approved with Conditions 06/21/2017 06/19/2017
Joe Frogge
License Tax Application
Corrective Action Required
06/14/2017

A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit. Action required: Comment is for informational purposes. 6/19/17 - acknowledged in letter
Misc
Resolved
06/19/2017

2012 IBC 703.2 Fire-resistance ratings. The fire-resistance rating of building elements, components or assemblies shall be determined in accordance with the test procedures set forth in ASTM E 119 or UL 263 or in accordance with Section 703.3. Where materials, systems or devices that have not been tested as part of a fire-resistance-rated assembly are incorporated into the building element, component or assembly, sufficient data shall be made available to the building official to show that the required fire-resistance rating is not reduced. Materials and methods of construction used to protect joints and penetrations in fire resistance-rated building elements, components or assemblies shall not reduce the required fire-resistance rating. Actions required: - Provide verification that existing doors at new smoke barrier are appropriately rated. - Provide complete UL details for all UL assemblies listed in wall types.
Bldg - Types I and II construction allowable materials 602.2
Resolved
06/19/2017

2012 IBC 602.2 – Types I and II. Types I and II construction are those types of construction in which the building elements listed in Table 601 are of noncombustible materials, except as permitted in Section 603 and elsewhere in this code. Action required: Modify roof and parapet assembly details. Wood blocking not allowed.
Bldg - Toilet room wall finish 1210.2.2
Resolved
06/19/2017

2012 IBC 1210.2.2 – Walls and partitions. Walls and partitions with 2 feet of service sinks, urinals and water closets shall have a smooth, hard, nonabsorbent surface, to a height of not less than 4 feet above the floor, and except for structural elements, the materials used in such walls shall be of a type that is not adversely affected by moisture. (See code section for possible exceptions.) Action required: Modify drawings to demonstrate compliance. If paint is used in restrooms it must be epoxy based.
Mech - Outdoor air required 403.2
Resolved
06/19/2017

2012 IMC 403.2 Outdoor air required. The minimum outdoor airflow rate shall be determined in accordance with Section 403.3. Ventilation supply systems shall be designed to deliver the required rate of outdoor airflow to the breathing zone within each occupiable space. Action required: Revise drawings to show outside air calculations as well as method of delivery.
Misc
Resolved
06/19/2017

2011 NEC 210.63 Heating, Air-Conditioning, and Refrigeration Equipment Outlet. A 125-volt, single-phase, 15- or 20-ampere-rated receptacle outlet shall be installed at an accessible location for the servicing of heating, air-conditioning, and refrigeration equipment. The receptacle shall be located on the same level and within 25 feet of the heating, air-conditioning, and refrigeration equipment. The receptacle outlet shall not be connected to the load side of the equipment disconnecting means. Action required: Provide receptacles within 25' of new exhaust fans.
Fire Plan Review Approved with Conditions 06/21/2017 06/16/2017
Joe Dir
Construction documents for fire alarm systems
Corrective Action Required
06/14/2017

2012 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control function. ACTION REQUIRED:(information purposes) Have the fire alarm system contractor provide shop drawings for the modification to be done to the fire alarm system.
Address numbers required
Corrective Action Required
06/14/2017

2012 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). ACTION REQUIRED: (verified at inspection) Address all OR areas and specific rooms off of the corridors with room designation signage.
Construction documents - Fire protection systems
Corrective Action Required
06/14/2017

2012 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. ACTION REQUIRED:(information purposes) Have the fire sprinkler system contractor provide shop drawings of the modifications to be done to the fire sprinkler system.
Installation acceptance testing
Corrective Action Required
06/14/2017

2012 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. ACTION REQUIRED:(information purposes) Field tests and acceptance testing shall be required prior to the final occupancy inspection for the following: (1) fire Sprinkler system modifications (2) fire alarm system modifications (3) (provide test documentation) for the med gas piping and gas alarms certifications (4) Generator power test for all circuits on the generator circuits.
Misc
Corrective Action Required
06/14/2017

Bio Hazards areas; ACTION REQUIRED:(verified at inspection) All rooms containing soiled/contaminated clothing, equipment, operation implements shall be labeled with a WARNING BIO-HAZARD label on the door leading into the area.
Misc
Corrective Action Required
06/14/2017

Group I-2 occupancy Electronically controlled doors operations: ACTION REQUIRED:(verified at inspection) Special locking arrangements in Group I-2 occupancies shall comply with the following conditions IFC 2012 1008.1.9.6 - 1008.1.9.10 where applicable.
Final Development Plan Review Approved 06/09/2017 06/08/2017
Joe Frogge
Special Inspections Review Approved 06/08/2017
Development Center
Fire Plan Review Approved with Conditions 06/09/2017 06/01/2017
Joe Dir
Construction documents for fire alarm systems
Corrective Action Required
06/01/2017

2012 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control function. ACTION REQUIRED:(information purposes) Have the fire alarm system contractor provide shop drawings for the modification to be done to the fire alarm system.
Address numbers required
Corrective Action Required
06/01/2017

2012 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). ACTION REQUIRED:(verified at inspection) Address all OR areas and specific rooms off of the corridors with room designation signage.
Construction documents - Fire protection systems
Corrective Action Required
06/01/2017

2012 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. ACTION REQUIRED:(information purposes) Have the fire sprinkler system contractor provide shop drawings of the modifications to be done to the fire sprinkler system.
Installation acceptance testing
Corrective Action Required
06/01/2017

2012 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. ACTION REQUIRED:(information purposes) Field tests and acceptance testing shall be required prior to the final occupancy inspection for the following: (1) fire Sprinkler system modifications (2) fire alarm system modifications (3) (provide test documentation) for the med gas piping and gas alarms certifications (4) Generator power test for all circuits on the generator circuits.
Misc
Corrective Action Required
06/01/2017

Bio Hazards areas; ACTION REQUIRED:(verified at inspection) All rooms containing soiled/contaminated clothing, equipment, operation implements shall be labeled with a WARNING BIO-HAZARD label on the door leading into the area.
Misc
Corrective Action Required
06/01/2017

Group I-2 occupancy Electronically controlled doors operations: ACTION REQUIRED:(verified at inspection) Special locking arrangements in Group I-2 occupancies shall comply with the following conditions IFC 2012 1008.1.9.6 - 1008.1.9.10 where applicable.
Building Plan Review Rejected 06/09/2017 05/30/2017
Joe Frogge
Final Development Plan
Resolved
06/08/2017

The building permit for this project can not be issued until the Codes Administration Department has received the approved Final Development Plan from the Planning and Development Department. Action required: Comment is for informational purposes.
License Tax Application
Corrective Action Required
05/30/2017

A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit. Action required: Comment is for informational purposes.
Misc
Resolved
06/14/2017

2012 IBC 1704.2 Special inspections. Where application is made for construction as described in this section, the owner or the registered design professional in responsible charge acting as the owner’s agent shall employ one or more approved agencies to perform inspections during construction on the types of work listed under Section 1705. These inspections are in addition to the inspections identified in Lee’s Summit Code of Ordinances Chapter 7. (see code section for exceptions) Action required: Provide statement of special inspections / letter of responsibility from company contracted to perform special inspections.
Misc
Corrective Action Required
05/30/2017

2012 IBC 703.2 Fire-resistance ratings. The fire-resistance rating of building elements, components or assemblies shall be determined in accordance with the test procedures set forth in ASTM E 119 or UL 263 or in accordance with Section 703.3. Where materials, systems or devices that have not been tested as part of a fire-resistance-rated assembly are incorporated into the building element, component or assembly, sufficient data shall be made available to the building official to show that the required fire-resistance rating is not reduced. Materials and methods of construction used to protect joints and penetrations in fire resistance-rated building elements, components or assemblies shall not reduce the required fire-resistance rating. Actions required: - Provide verification that existing doors at new smoke barrier are appropriately rated. - Provide complete UL details for all UL assemblies listed in wall types.
Bldg - Types I and II construction allowable materials 602.2
Corrective Action Required
05/30/2017

2012 IBC 602.2 – Types I and II. Types I and II construction are those types of construction in which the building elements listed in Table 601 are of noncombustible materials, except as permitted in Section 603 and elsewhere in this code. Action required: Modify roof and parapet assembly details. Wood blocking not allowed.
Bldg - Toilet room wall finish 1210.2.2
Corrective Action Required
05/30/2017

2012 IBC 1210.2.2 – Walls and partitions. Walls and partitions with 2 feet of service sinks, urinals and water closets shall have a smooth, hard, nonabsorbent surface, to a height of not less than 4 feet above the floor, and except for structural elements, the materials used in such walls shall be of a type that is not adversely affected by moisture. (See code section for possible exceptions.) Action required: Modify drawings to demonstrate compliance. If paint is used in restrooms it must be epoxy based.
Mech - Outdoor air required 403.2
Corrective Action Required
05/30/2017

2012 IMC 403.2 Outdoor air required. The minimum outdoor airflow rate shall be determined in accordance with Section 403.3. Ventilation supply systems shall be designed to deliver the required rate of outdoor airflow to the breathing zone within each occupiable space. Action required: Revise drawings to show outside air calculations as well as method of delivery.
Misc
Corrective Action Required
05/30/2017

2011 NEC 210.63 Heating, Air-Conditioning, and Refrigeration Equipment Outlet. A 125-volt, single-phase, 15- or 20-ampere-rated receptacle outlet shall be installed at an accessible location for the servicing of heating, air-conditioning, and refrigeration equipment. The receptacle shall be located on the same level and within 25 feet of the heating, air-conditioning, and refrigeration equipment. The receptacle outlet shall not be connected to the load side of the equipment disconnecting means. Action required: Provide receptacles within 25' of new exhaust fans.
Licensed Contractors Approved 05/25/2017 05/25/2017
Joe Frogge
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for Addition to Commercial $14,537.69 $14,537.69 Paid 06/20/2017
7232302-Saint Lukes Road and Bridge Escrow $3,258.88 $3,258.88 Paid 06/14/2017
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Rough Framing Inspection - Commercial Not Ready 8/2/2017 8/2/2017 08/02/2017
Misc
Corrective Action Required
08/02/2017
PARAPET WALL COVERED ROOF FACE AND TOP PRIOR TO INSPECTION. LOWER WALL LATERAL BRACING NOT PER DRAWING.
Rough Framing Inspection - Commercial Partial 8/11/2017 8/11/2017 08/11/2017
Misc
Partial Correction
08/11/2017
OK TO COVER WHEN READY PARAPET WALL COMPLETE. LOWER WALL OK FROM NORTH END SOUTH TO (15.5);
Rough Framing Inspection - Commercial Partial 8/22/2017 8/22/2017 at 1:50 PM 08/22/2017
Misc
Partial Correction
08/11/2017
OK TO COVER WHEN READY PARAPET WALL COMPLETE. LOWER WALL OK FROM NORTH END SOUTH TO (15.5); REMAINDER OF LOWER WEST WALL;
Rough Framing Inspection - Commercial Partial 8/25/2017 8/25/2017 at 9:40 AM 08/25/2017
Misc
Partial Correction
08/22/2017
OK TO COVER WHEN READY PARAPET WALL COMPLETE. LOWER WALL FROM NORTH END SOUTH TO (15.5); REMAINDER OF LOWER WEST WALL; SOUTH EXTERIOR LOWER WALL COMPLETE
Rough Framing Inspection - Commercial Partial 9/14/2017 9/14/2017 at 10:15 AM 09/14/2017
Misc
Partial Correction
08/25/2017
OK TO COVER WHEN READY PARAPET WALL COMPLETE. LOWER WALL FROM NORTH END SOUTH TO (15.5); REMAINDER OF LOWER WEST WALL; SOUTH EXTERIOR LOWER WALL COMPLETE. STUB WALLS AT (12.9) / (13.1);
In-wall Inspection Partial 9/21/2017 9/21/2017 at 2:45 AM 09/21/2017
Misc
Partial Correction
09/25/2017
IN-WALL INSPECTION COMPLETE AT: -SOUTHWEST CORNER OF BUILDING, BOUNDED BY ROWS F THROUGH J, AND 17.3 THROUGH 16
Rated Assembly Inspection Partial 9/25/2017 9/25/2017 at 11:25 AM 09/25/2017
Misc
Partial Correction
09/25/2017
OK TO TAPE, MUD AND FIRE-STOP 5/8" TYPE X GWB AT FIRE-RATED WALLS AT: TOP-OUT ONLY AT: 1A212 W WALL AT DOOR #212.3; 218 N, W, S WALLS: 258 W WALL; 260 W WALL; 261 W WALL; 262.1 N, W WALLS; 262.2 W WALL;
In-wall Inspection Partial 9/28/2017 9/29/2017 at 3:00 PM 09/29/2017
Misc
Corrective Action Required
09/21/2017
IN-WALL INSPECTION COMPLETE AT: -ROWS F THROUGH J, AND 17.3 THROUGH 16 STORAGE RM 1A226 AND RESTROOM 1A232-OK TO ROCK STORAGE RM 1A250-NEED TO HEADER ACROSS CUT STUDS
In-wall Inspection Partial 10/3/2017 10/03/2017
Misc
Corrective Action Required
09/29/2017
IN-WALL INSPECTION COMPLETE AT: -ROWS F THROUGH J, AND 17.3 THROUGH 16 IN-WALL OK TO ROCK: STORAGE RM 1A226; RESTROOM 1A232; STORAGE RM 1A250; RESTROOM 1A217; CLEAN RM 1A218; EXTERIOR WALL AT 1A263&1A268
Rated Assembly Inspection Partial 10/3/2017 10/3/2017 at 1:25 PM 10/03/2017
Misc
Partial Correction
09/25/2017
OK TO TAPE, MUD AND FIRE-STOP 5/8" TYPE X GWB AT FIRE-RATED WALLS AT: OUTSIDE 1A250 AND 1A226 FROM CORNER TO DOOR TOP-OUT ONLY AT: 1A212 W WALL AT DOOR #212.3; 218 N, W, S WALLS: 258 W WALL; 260 W WALL; 261 W WALL; 262.1 N, W WALLS; 262.2 W WALL;
Above Ceiling Inspection Partial 10/9/2017 at 9:15 AM 10/09/2017
Misc
Partial Correction
10/09/2017
OK TO COVER WHEN READY GWB CEILING / SOFFIT / BULKHEAD FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: SOFFITS AT NURSE STATIONS 208&222: FRAMING & SPRINKLER PIPING ONLY AT THREE WEST SOFFITS;
Rated Assembly Inspection Partial 10/9/2017 10/9/2017 at 8:50 AM 10/09/2017
Misc
Partial Correction
10/03/2017
OK TO TAPE, MUD AND FIRE-STOP 5/8" TYPE X GWB AT: FIRE-RATED WALLS AT: OUTSIDE 1A250 AND 1A226 FROM CORNER TO DOOR TOP-OUT ONLY AT: 1A212 W WALL AT DOOR #212.3; 218 N, W, S WALLS: 258 W WALL; 260 W WALL; 261 W WALL; 262.1 N, W WALLS; 262.2 W WALL; 1A232 S&E TO 10' AFF; 1A250 S/E/N TO 10' AFF; 226 COMPLETE; ON F' FROM (15.6) TO (16.4) CORRIDOR FACE ONLY;
In-wall Inspection Partial 10/11/2017 10/11/2017 at 1:15 PM 10/11/2017
Misc
Partial Correction
10/11/2017
OK TO COVER WHEN READY LIGHT-GAUGE STEEL WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING SPACES/LOCATIONS: ROWS F THROUGH J, AND 17.3 THROUGH 16; STORAGE RM 1A226; RESTROOM 1A232; STORAGE RM 1A250; RESTROOM 1A217; CLEAN RM 1A218; EXTERIOR WALL AT 1A263 & 1A268; [261; 262.1; 262.2; 267;
Rated Assembly Inspection Partial 10/18/2017 at 8:35 AM 10/18/2017
Misc
Partial Correction
10/09/2017
OK TO TAPE, MUD AND FIRE-STOP 5/8" TYPE X GWB AT: FIRE-RATED WALLS AT: OUTSIDE 1A250 AND 1A226 FROM CORNER TO DOOR TOP-OUT ONLY AT: 1A212 W WALL AT DOOR #212.3; 218 N, W, S WALLS: 258 W WALL; 260 W WALL; 261 W WALL; 262.1 N, W WALLS; 262.2 W WALL; 1A232 S&E TO 10' AFF; 1A250 S/E/N TO 10' AFF; 226 COMPLETE; ON F' FROM (15.6) TO (16.4) CORRIDOR FACE ONLY; [TOP-OUT COMPLETE @ 250; 255 N AT BACKSIDE OF 262.1; 257; 261; 262.1; 263;
In-wall Inspection Partial 10/18/2017 10/18/2017 at 8:10 AM 10/18/2017
Misc
Partial Correction
10/11/2017
OK TO COVER WHEN READY LIGHT-GAUGE STEEL WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING SPACES/LOCATIONS: ROWS F THROUGH J, AND 17.3 THROUGH 16; STORAGE RM 1A226; RESTROOM 1A232; STORAGE RM 1A250; RESTROOM 1A217; CLEAN RM 1A218; EXTERIOR WALL AT 1A263 & 1A268; [261; 262.1; 262.2; 267; [218 COMPLETE; 263 COMPLETE; 210 COMPLETE; 258; 260;
Sprinkler - Hydrostatic Test Passed 10/19/2017 10/19/2017
Rated Assembly Inspection Partial 10/20/2017 10/20/2017 at 1:40 AM 10/20/2017
Misc
Partial Correction
10/18/2017
OK TO TAPE, MUD AND FIRE-STOP 5/8" TYPE X GWB AT: FIRE-RATED WALLS AT: OUTSIDE 1A250 AND 1A226 FROM CORNER TO DOOR TOP-OUT ONLY AT: 1A212 W WALL AT DOOR #212.3; 218 N, W, S WALLS: 258 W WALL; 260 W WALL; 261 W WALL; 262.1 N, W WALLS; 262.2 W WALL; 1A232 S&E TO 10' AFF; 1A250 S/E/N TO 10' AFF; 226 COMPLETE; ON F' FROM (15.6) TO (16.4) CORRIDOR FACE ONLY; [TOP-OUT COMPLETE @ 250; 255 N AT BACKSIDE OF 262.1; 257; 261; 262.1; 263; 267 West, East, & North walls; 260 East wall; & 258 East wall
Rated Assembly Inspection Partial 10/25/2017 10/25/2017 at 9:30 AM 10/25/2017
Misc
Partial Correction
10/20/2017
OK TO TAPE, MUD AND FIRE-STOP 5/8" TYPE X GWB AT: FIRE-RATED WALLS AT: OUTSIDE 1A250 AND 1A226 FROM CORNER TO DOOR TOP-OUT ONLY AT: 1A212 W WALL AT DOOR #212.3; 218 N, W, S WALLS: 258 W WALL; 260 W WALL; 261 W WALL; 262.1 N, W WALLS; 262.2 W WALL; 1A232 S&E TO 10' AFF; 1A250 S/E/N TO 10' AFF; 226 COMPLETE; ON F' FROM (15.6) TO (16.4) CORRIDOR FACE ONLY; TOP-OUT COMPLETE @ 250; 255 N AT BACKSIDE OF 262.1; 257; 261; 262.1; 263; 267 West, East, & North walls; 260 East wall; & 258 East wall [218 B/F; 212 N,W,S B/F; 268 E WALL
In-wall Inspection Partial 10/25/2017 at 9:55 AM 10/25/2017
Misc
Partial Correction
10/18/2017
OK TO COVER WHEN READY LIGHT-GAUGE STEEL WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING SPACES/LOCATIONS: ROWS F THROUGH J, AND 17.3 THROUGH 16; STORAGE RM 1A226; RESTROOM 1A232; STORAGE RM 1A250; RESTROOM 1A217; CLEAN RM 1A218; EXTERIOR WALL AT 1A263 & 1A268; [261; 262.1; 262.2; 267; 218 COMPLETE; 263 COMPLETE; 210 COMPLETE; 258; 260; [CORR 259;
Rated Assembly Inspection Partial 10/30/2017 10/30/2017 at 11:10 AM 10/30/2017
Misc
Partial Correction
10/25/2017
OK TO TAPE, MUD AND FIRE-STOP 5/8" TYPE X GWB AT: FIRE-RATED WALLS AT: OUTSIDE 1A250 AND 1A226 FROM CORNER TO DOOR TOP-OUT ONLY AT: 1A212 W WALL AT DOOR #212.3; 218 N, W, S WALLS: 258 W WALL; 260 W WALL; 261 W WALL; 262.1 N, W WALLS; 262.2 W WALL; 1A232 S&E TO 10' AFF; 1A250 S/E/N TO 10' AFF; 226 COMPLETE; ON F' FROM (15.6) TO (16.4) CORRIDOR FACE ONLY; TOP-OUT COMPLETE @ 250; 255 N AT BACKSIDE OF 262.1; 257; 261; 262.1; 263; 267 West, East, & North walls; 260 East wall; & 258 East wall 218 B/F; 212 N,W,S B/F; 268 E WALL; [259 W WALL;
In-wall Inspection Partial 10/30/2017 10/30/2017 at 11:30 AM 10/30/2017
Misc
Partial Correction
10/25/2017
OK TO COVER WHEN READY LIGHT-GAUGE STEEL WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING SPACES/LOCATIONS: ROWS F THROUGH J, AND 17.3 THROUGH 16; STORAGE RM 1A226; RESTROOM 1A232; STORAGE RM 1A250; RESTROOM 1A217; CLEAN RM 1A218; EXTERIOR WALL AT 1A263 & 1A268; [261; 262.1; 262.2; 267; 218 COMPLETE; 263 COMPLETE; 210 COMPLETE; 258; 260; CORR 259; [209 S WALL; 213-215 E WALL; 266 N WALL;
Rated Assembly Inspection Partial 10/31/2017 10/31/2017 at 12:20 PM 10/31/2017
Misc
Partial Correction
10/30/2017
OK TO TAPE, MUD AND FIRE-STOP 5/8" TYPE X GWB AT: FIRE-RATED WALLS AT: OUTSIDE 1A250 AND 1A226 FROM CORNER TO DOOR TOP-OUT ONLY AT: 1A212 W WALL AT DOOR #212.3; 218 N, W, S WALLS: 258 W WALL; 260 W WALL; 261 W WALL; 262.1 N, W WALLS; 262.2 W WALL; 1A232 S&E TO 10' AFF; 1A250 S/E/N TO 10' AFF; 226 COMPLETE; ON F' FROM (15.6) TO (16.4) CORRIDOR FACE ONLY; TOP-OUT COMPLETE @ 250; 255 N AT BACKSIDE OF 262.1; 257; 261; 262.1; 263; 267 West, East, & North walls; 260 East wall; & 258 East wall 218 B/F; 212 N,W,S B/F; 268 E WALL; 259 W WALL; 255 S WALL FROM (E') TO (J);
Above Ceiling Inspection Not Ready 11/2/2017 11/2/2017 at 9:50 AM 11/02/2017
Misc
Partial Correction
10/09/2017
OK TO COVER WHEN READY GWB CEILING / SOFFIT / BULKHEAD FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: SOFFITS AT NURSE STATIONS 208&222: FRAMING & SPRINKLER PIPING ONLY AT THREE WEST SOFFITS;
Above Ceiling Inspection Partial 11/3/2017 11/3/2017 at 2:00 PM 11/03/2017
Misc
Partial Correction
11/02/2017
OK TO COVER WHEN READY GWB CEILING / SOFFIT / BULKHEAD FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: SOFFITS AT NURSE STATIONS 208&222: FRAMING & SPRINKLER PIPING ONLY AT THREE WEST SOFFITS; OR 258; OR 260;
Underslab Plumbing Inspection - Commercial Partial 11/3/2017 11/3/2017 at 2:15 PM 11/03/2017
Misc
Partial Correction
11/03/2017
OK TO COVER WHEN READY UNDER-SLAB PVC SANITARY DRAIN, WASTE, & VENT PIPING AT: 256 SUBSTERILE; NOTE IPC 312 / IRC P2503.5.1 REQUIREMENT FOR PRESSURE-TESTING PIPING SYSTEM.
In-wall Inspection Partial 11/7/2017 11/7/2017 at 8:25 AM 11/07/2017
Misc
Partial Correction
10/30/2017
OK TO COVER WHEN READY LIGHT-GAUGE STEEL WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING SPACES/LOCATIONS: ROWS F THROUGH J, AND 17.3 THROUGH 16; STORAGE RM 1A226; RESTROOM 1A232; STORAGE RM 1A250; RESTROOM 1A217; CLEAN RM 1A218; EXTERIOR WALL AT 1A263 & 1A268; [261; 262.1; 262.2; 267; 218 COMPLETE; 263 COMPLETE; 210 COMPLETE; 258; 260; CORR 259; [209 S WALL; 213-215 E WALL; 266 N WALL; 266 W WALL B/F;
Rated Assembly Inspection Partial 11/7/2017 11/7/2017 at 8:40 AM 11/07/2017
Misc
Partial Correction
10/31/2017
OK TO TAPE, MUD AND FIRE-STOP 5/8" TYPE X GWB AT: FIRE-RATED WALLS AT: OUTSIDE 1A250 AND 1A226 FROM CORNER TO DOOR TOP-OUT ONLY AT: 1A212 W WALL AT DOOR #212.3; 218 N, W, S WALLS: 258 W WALL; 260 W WALL; 261 W WALL; 262.1 N, W WALLS; 262.2 W WALL; 1A232 S&E TO 10' AFF; 1A250 S/E/N TO 10' AFF; 226 COMPLETE; ON F' FROM (15.6) TO (16.4) CORRIDOR FACE ONLY; TOP-OUT COMPLETE @ 250; 255 N AT BACKSIDE OF 262.1; 257; 261; 262.1; 263; 267 West, East, & North walls; 260 East wall; & 258 East wall 218 B/F; 212 N,W,S B/F; 268 E WALL; 259 W WALL; 255 S WALL FROM (E') TO (J); 266 W & N;
Rated Assembly Inspection Partial 11/13/2017 at 8:30 AM 11/13/2017
Misc
Partial Correction
11/07/2017
OK TO TAPE, MUD AND FIRE-STOP 5/8" TYPE X GWB AT: FIRE-RATED WALLS AT: OUTSIDE 1A250 AND 1A226 FROM CORNER TO DOOR TOP-OUT ONLY AT: 1A212 W WALL AT DOOR #212.3; 218 N, W, S WALLS: 258 W WALL; 260 W WALL; 261 W WALL; 262.1 N, W WALLS; 262.2 W WALL; 1A232 S&E TO 10' AFF; 1A250 S/E/N TO 10' AFF; 226 COMPLETE; ON F' FROM (15.6) TO (16.4) CORRIDOR FACE ONLY; TOP-OUT COMPLETE @ 250; 255 N AT BACKSIDE OF 262.1; 257; 261; 262.1; 263; 267 West, East, & North walls; 260 East wall; & 258 East wall 218 B/F; 212 N,W,S B/F; 268 E WALL; 259 W WALL; 255 S WALL FROM (E') TO (J); 266 W & N; 265 W WALL;
In-wall Inspection Partial 11/14/2017 11/14/2017 at 3:00 PM 11/14/2017
Misc
Partial Correction
11/07/2017
OK TO COVER WHEN READY LIGHT-GAUGE STEEL WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING SPACES/LOCATIONS: ROWS F THROUGH J, AND 17.3 THROUGH 16; STORAGE RM 1A226; RESTROOM 1A232; STORAGE RM 1A250; RESTROOM 1A217; CLEAN RM 1A218; EXTERIOR WALL AT 1A263 & 1A268; [261; 262.1; 262.2; 267; 218 COMPLETE; 263 COMPLETE; 210 COMPLETE; 258; 260; CORR 259; [209 S WALL; 213-215 E WALL; 266 N WALL; 266 W WALL B/F; [256 N WALL B/F;
Above Ceiling Inspection Partial 11/21/2017 11/21/2017 at 2:45 PM 11/21/2017
Misc
Partial Correction
11/03/2017
OK TO COVER WHEN READY GWB CEILING / SOFFIT / BULKHEAD FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: SOFFITS AT NURSE STATIONS 208&222: FRAMING & SPRINKLER PIPING ONLY AT THREE WEST SOFFITS; OR 258; OR 260;
Misc
Partial Correction
11/21/2017
OK TO COVER WHEN READY ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS @: 1A216; 219-239;
Above Ceiling Inspection Partial 12/27/2017 12/27/2017 at 8:25 AM 12/27/2017
Misc
Partial Correction
11/21/2017
OK TO COVER WHEN READY GWB CEILING / SOFFIT / BULKHEAD FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: SOFFITS AT NURSE STATIONS 208&222: FRAMING & SPRINKLER PIPING ONLY AT THREE WEST SOFFITS; OR 258; OR 260;
Misc
Partial Correction
11/21/2017
OK TO COVER WHEN READY ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS @: 1A216; 219-239; [250; 257; 261; 262.1; 263; 267; 268;
Above Ceiling Inspection Partial 1/9/2018 1/9/2018 at 8:30 AM 01/09/2018
Misc
Partial Correction
12/27/2017
OK TO COVER WHEN READY GWB CEILING / SOFFIT / BULKHEAD FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: SOFFITS AT NURSE STATIONS 208&222: FRAMING & SPRINKLER PIPING ONLY AT THREE WEST SOFFITS; OR 258; OR 260;
Misc
Partial Correction
12/27/2017
OK TO COVER WHEN READY ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS @: 1A216; 219-239; 250; 257; 261; 262.1; 263; 267; 268; [266;
Above Ceiling Inspection Partial 1/11/2018 1/11/2018 at 2:05 PM 01/11/2018
Misc
Partial Correction
01/09/2018
OK TO COVER WHEN READY GWB CEILING / SOFFIT / BULKHEAD FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: SOFFITS AT NURSE STATIONS 208&222: FRAMING & SPRINKLER PIPING ONLY AT THREE WEST SOFFITS; OR 258; OR 260;
Misc
Partial Correction
01/09/2018
OK TO COVER WHEN READY ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS @: 1A216; 219-239; 250; 257; 261; 262.1; 263; 267; 268; 266; PHASE INTERFACE AREAS: [1A256 SUBSTERILE CORRIDOR N 1/2; INTERSECTION AREA OF CORR 251 & 257; NURSE STATION AREA S OF RECOVERY;
Miscellaneous Inspection Partial 1/22/2018 at 7:00 AM 01/22/2018
Alarm Test Partial 1/22/2018 01/22/2018
Occupancy Inspection - Fire Temporary C of O 1/22/2018 01/22/2018
Occupancy Inspection - Codes Commercial Partial 1/23/2018 1/23/2018 01/23/2018
Misc
Corrective Action Required
01/23/2018
LABEL BREAKER POSTIONS AT PANEL A1-32 LC SEC 2
Misc
Partial Correction
01/23/2018
PHASE 1 BUILDING ADDITION OK FOR USE & OCCUPANCY
Final Inspection - Commercial Partial 1/23/2018 at 10:30 AM 01/23/2018
Occupancy Inspection - Planning Failed 01/23/2018
Corrective Action Required
01/23/2018
Parking lot striping shall be completed per the approved plan.
Corrective Action Required
01/23/2018
Wallpack lighting shall be installed per the approved architectural drawings.
Occupancy Inspection - Water Utilities Passed 01/24/2018
Underslab Plumbing Inspection - Commercial Partial 2/15/2018 2/15/2018 at 11:20 AM 02/15/2018
Misc
Partial Correction
11/03/2017
OK TO COVER WHEN READY UNDER-SLAB PVC SANITARY DRAIN, WASTE, & VENT PIPING AT: 256 SUBSTERILE; [PRE-OP AREA THREE LOCATIONS; NOTE IPC 312 / IRC P2503.5.1 REQUIREMENT FOR PRESSURE-TESTING PIPING SYSTEM.
Underslab Electrical Inspection - Commercial Partial 2/15/2018 2/15/2018 at 11:50 AM 02/15/2018
Misc
Partial Correction
02/15/2018
NO ISSUES FOUND ON UNDER-SLAB ELECTRICAL CONDUIT MATERIAL & WORKMANSHIP AT: [PRE-OP AREA ONE LOCATION;
Underslab Plumbing Inspection - Commercial Partial 3/1/2018 at 8:20 AM 03/01/2018
Misc
Partial Correction
02/15/2018
OK TO COVER WHEN READY UNDER-SLAB PVC SANITARY DRAIN, WASTE, & VENT PIPING AT: 256 SUBSTERILE; PRE-OP AREA THREE LOCATIONS; [1a264 FOR THREE STERLIZERS AND CART WASHER; NOTE IPC 312 / IRC P2503.5.1 REQUIREMENT FOR PRESSURE-TESTING PIPING SYSTEM.
In-wall Inspection Partial 3/1/2018 at 8:50 AM 03/01/2018
Misc
Partial Correction
11/14/2017
OK TO COVER WHEN READY LIGHT-GAUGE STEEL WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING SPACES/LOCATIONS: ROWS F THROUGH J, AND 17.3 THROUGH 16; STORAGE RM 1A226; RESTROOM 1A232; STORAGE RM 1A250; RESTROOM 1A217; CLEAN RM 1A218; EXTERIOR WALL AT 1A263 & 1A268; 261; 262.1; 262.2; 267; 218 COMPLETE; 263 COMPLETE; 210 COMPLETE; 258; 260; CORR 259; 209 S WALL; 213-215 E WALL; 266 N WALL; 266 W WALL B/F; 256 N WALL B/F; [1A044 E; 1A200-203; 206-207; 256 S;
Underslab Plumbing Inspection - Commercial Partial 3/2/2018 at 9:25 AM 03/02/2018
Misc
Partial Correction
03/01/2018
OK TO COVER WHEN READY UNDER-SLAB PVC SANITARY DRAIN, WASTE, & VENT PIPING AT: 256 SUBSTERILE; PRE-OP AREA THREE LOCATIONS; 1A264 FOR THREE STERLIZERS AND CART WASHER; [1A044 FOR SINK; NOTE IPC 312 / IRC P2503.5.1 REQUIREMENT FOR PRESSURE-TESTING PIPING SYSTEM.
In-wall Inspection Partial 3/9/2018 3/9/2018 at 10:05 AM 03/09/2018
Misc
Partial Correction
03/01/2018
OK TO COVER WHEN READY LIGHT-GAUGE STEEL WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING SPACES/LOCATIONS: ROWS F THROUGH J, AND 17.3 THROUGH 16; STORAGE RM 1A226; RESTROOM 1A232; STORAGE RM 1A250; RESTROOM 1A217; CLEAN RM 1A218; EXTERIOR WALL AT 1A263 & 1A268; 261; 262.1; 262.2; 267; 218 COMPLETE; 263 COMPLETE; 210 COMPLETE; 258; 260; CORR 259; 209 S WALL; 213-215 E WALL; 266 N WALL; 266 W WALL B/F; 256 N WALL B/F; 1A044 E; 1A200-203; 206-207; 256 S; [S WALL AT 1A255 FROM D' TO E' BOTH FACES;
Above Ceiling Inspection Partial 3/9/2018 at 10:35 AM 03/09/2018
Misc
Partial Correction
01/11/2018
OK TO COVER WHEN READY GWB CEILING / SOFFIT / BULKHEAD FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: SOFFITS AT NURSE STATIONS 208&222: FRAMING & SPRINKLER PIPING ONLY AT THREE WEST SOFFITS; OR 258; OR 260; [SOFFIT AT NURSE STN #2 @ 1A208;
Misc
Partial Correction
01/11/2018
OK TO COVER WHEN READY ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS @: 1A216; 219-239; 250; 257; 261; 262.1; 263; 267; 268; 266; PHASE INTERFACE AREAS: [1A256 SUBSTERILE CORRIDOR N 1/2; INTERSECTION AREA OF CORR 251 & 257; NURSE STATION AREA S OF RECOVERY;
In-wall Inspection Partial 3/14/2018 3/14/2018 at 8:10 AM 03/14/2018
Misc
Partial Correction
03/09/2018
OK TO COVER WHEN READY LIGHT-GAUGE STEEL WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING SPACES/LOCATIONS: ROWS F THROUGH J, AND 17.3 THROUGH 16; STORAGE RM 1A226; RESTROOM 1A232; STORAGE RM 1A250; RESTROOM 1A217; CLEAN RM 1A218; EXTERIOR WALL AT 1A263 & 1A268; 261; 262.1; 262.2; 267; 218 COMPLETE; 263 COMPLETE; 210 COMPLETE; 258; 260; CORR 259; 209 S WALL; 213-215 E WALL; 266 N WALL; 266 W WALL B/F; 256 N WALL B/F; 1A044 E; 1A200-203; 206-207; 256 S; S WALL AT 1A255 FROM D' TO E' BOTH FACES; [A264 S WALL, W WALL, HEADERS/BULKHEADS AT CART WASHER;
In-wall Inspection Partial 3/23/2018 3/23/2018 at 7:15 AM 03/23/2018
Misc
Partial Correction
03/14/2018
OK TO COVER WHEN READY LIGHT-GAUGE STEEL WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING SPACES/LOCATIONS: ROWS F THROUGH J, AND 17.3 THROUGH 16; STORAGE RM 1A226; RESTROOM 1A232; STORAGE RM 1A250; RESTROOM 1A217; CLEAN RM 1A218; EXTERIOR WALL AT 1A263 & 1A268; 261; 262.1; 262.2; 267; 218 COMPLETE; 263 COMPLETE; 210 COMPLETE; 258; 260; CORR 259; 209 S WALL; 213-215 E WALL; 266 N WALL; 266 W WALL B/F; 256 N WALL B/F; 1A044 E; 1A200-203; 206-207; 256 S; S WALL AT 1A255 FROM D' TO E' BOTH FACES; A264 S WALL, W WALL, HEADERS/BULKHEADS AT CART WASHER; [1A044 N WALL, S WALL + WALL @ CENTER; 042 S WALL; CART WASH S WALL;
Above Ceiling Inspection Partial 4/4/2018 4/4/2018 at 8:35 AM 04/04/2018
Misc
Partial Correction
03/09/2018
OK TO COVER WHEN READY GWB CEILING / SOFFIT / BULKHEAD FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: SOFFITS AT NURSE STATIONS 208&222: FRAMING & SPRINKLER PIPING ONLY AT THREE WEST SOFFITS; OR 258; OR 260; [SOFFIT AT NURSE STN #2 @ 1A208;
Misc
Partial Correction
03/09/2018
OK TO COVER WHEN READY ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS @: 1A216; 219-239; 250; 257; 261; 262.1; 263; 267; 268; 266; [200 - 209; AREA TO BE GRIDDED AND COVERED 4/7 OK TO COMPLETE WITHOUT FULL INSPECTION; PHASE INTERFACE AREAS: 1A256 SUBSTERILE CORRIDOR N 1/2; INTERSECTION AREA OF CORR 251 & 257; NURSE STATION AREA S OF RECOVERY;
Rated Assembly Inspection Partial 4/4/2018 at 9:20 AM 04/04/2018
Misc
Partial Correction
11/13/2017
OK TO TAPE, MUD AND FIRE-STOP 5/8" TYPE X GWB AT: FIRE-RATED WALLS AT: OUTSIDE 1A250 AND 1A226 FROM CORNER TO DOOR TOP-OUT ONLY AT: 1A212 W WALL AT DOOR #212.3; 218 N, W, S WALLS: 258 W WALL; 260 W WALL; 261 W WALL; 262.1 N, W WALLS; 262.2 W WALL; 1A232 S&E TO 10' AFF; 1A250 S/E/N TO 10' AFF; 226 COMPLETE; ON F' FROM (15.6) TO (16.4) CORRIDOR FACE ONLY; TOP-OUT COMPLETE @ 250; 255 N AT BACKSIDE OF 262.1; 257; 261; 262.1; 263; 267 West, East, & North walls; 260 East wall; & 258 East wall 218 B/F; 212 N,W,S B/F; 268 E WALL; 259 W WALL; 255 S WALL FROM (E') TO (J); 266 W & N; 265 W WALL; [265 W/NW + @ DOOR OPNG 266.1; 043 NE B/F;
In-wall Inspection Partial 4/6/2018 at 1:35 PM 04/06/2018
Misc
Partial Correction
03/23/2018
OK TO COVER WHEN READY LIGHT-GAUGE STEEL WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING SPACES/LOCATIONS: ROWS F THROUGH J, AND 17.3 THROUGH 16; STORAGE RM 1A226; RESTROOM 1A232; STORAGE RM 1A250; RESTROOM 1A217; CLEAN RM 1A218; EXTERIOR WALL AT 1A263 & 1A268; 261; 262.1; 262.2; 267; 218 COMPLETE; 263 COMPLETE; 210 COMPLETE; 258; 260; CORR 259; 209 S WALL; 213-215 E WALL; 266 N WALL; 266 W WALL B/F; 256 N WALL B/F; 1A044 E; 1A200-203; 206-207; 256 S; S WALL AT 1A255 FROM D' TO E' BOTH FACES; A264 S WALL, W WALL, HEADERS/BULKHEADS AT CART WASHER; 1A044 N WALL, S WALL + WALL @ CENTER; 042 S WALL; CART WASH S WALL; [NEW/ MODIFIED WALLS @ 1A091 N & W; MODIFIED WALL @ DOOR OPNG 1A044.2;
Above Ceiling Inspection Partial 4/6/2018 at 1:50 PM 04/06/2018
Misc
Partial Correction
04/04/2018
OK TO COVER WHEN READY GWB CEILING / SOFFIT / BULKHEAD FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: SOFFITS AT NURSE STATIONS 208&222: FRAMING & SPRINKLER PIPING ONLY AT THREE WEST SOFFITS; OR 258; OR 260; SOFFIT AT NURSE STN #2 @ 1A208;
Misc
Partial Correction
04/04/2018
OK TO COVER WHEN READY ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS @: 1A216; 219-239; 250; 257; 261; 262.1; 263; 267; 268; 266; 200 - 209; [UPCOMING 4/7 WEEKEND WORK AT CORRIDORS 1A256 AND 1A255 E TO DOOR 1A254 OK TO COMPLETE AND COVER; PHASE INTERFACE AREAS: 1A256 SUBSTERILE CORRIDOR N 1/2; INTERSECTION AREA OF CORR 251 & 257; NURSE STATION AREA S OF RECOVERY;
In-wall Inspection Partial 4/16/2018 4/16/2018 at 10:55 AM 04/16/2018
Misc
Partial Correction
04/06/2018
OK TO COVER WHEN READY LIGHT-GAUGE STEEL WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING SPACES/LOCATIONS: ROWS F THROUGH J, AND 17.3 THROUGH 16; STORAGE RM 1A226; RESTROOM 1A232; STORAGE RM 1A250; RESTROOM 1A217; CLEAN RM 1A218; EXTERIOR WALL AT 1A263 & 1A268; 261; 262.1; 262.2; 267; 218 COMPLETE; 263 COMPLETE; 210 COMPLETE; 258; 260; CORR 259; 209 S WALL; 213-215 E WALL; 266 N WALL; 266 W WALL B/F; 256 N WALL B/F; 1A044 E; 1A200-203; 206-207; 256 S; S WALL AT 1A255 FROM D' TO E' BOTH FACES; A264 S WALL, W WALL, HEADERS/BULKHEADS AT CART WASHER; 1A044 N WALL, S WALL + WALL @ CENTER; 042 S WALL; CART WASH S WALL; NEW/ MODIFIED WALLS @ 1A091 N & W; MODIFIED WALL @ DOOR OPNG 1A044.2; [WALL SECTIONS WITH DOOR OPENINGS AT 1A044 NE AND INTERSECTING WALL @ DOOR OPNG 1A055;
Above Ceiling Inspection Partial 4/23/2018 4/23/2018 at 3:05 PM 04/23/2018
Misc
Partial Correction
04/06/2018
OK TO COVER WHEN READY GWB CEILING / SOFFIT / BULKHEAD FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: SOFFITS AT NURSE STATIONS 208&222: FRAMING & SPRINKLER PIPING ONLY AT THREE WEST SOFFITS; OR 258; OR 260; SOFFIT AT NURSE STN #2 @ 1A208;
Misc
Partial Correction
04/06/2018
OK TO COVER WHEN READY ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS @: 1A216; 219-239; 250; 257; 261; 262.1; 263; 267; 268; 266; 200 - 209; [UPCOMING 4/7 WEEKEND WORK AT CORRIDORS 1A256 AND 1A255 E TO DOOR 1A254 OK TO COMPLETE AND COVER; PHASE INTERFACE AREAS: 1A256 SUBSTERILE CORRIDOR N 1/2; INTERSECTION AREA OF CORR 251 & 257; NURSE STATION AREA S OF RECOVERY; *APR-23: -INSPECTED RM GI STORAGE 1A091 1-HR FIRE-RATED CEILING FRAMING. BACK BOARD INSTALLED AND PENETRATIONS FIRECAULKED. ABOVE-CEILING NOT READY BUT WILL BE CHECKED LATER THROUGH ACCESS OPENINGS (CLOSE OFF OPENINGS IN WALL, CLOSE ALL J-BOXES, REMOVE TEMPORARY ELECTRICAL)
Above Ceiling Inspection Partial 4/23/2018 4/25/2018 at 8:10 AM 04/25/2018
Misc
Partial Correction
04/06/2018
OK TO COVER WHEN READY GWB CEILING / SOFFIT / BULKHEAD FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: SOFFITS AT NURSE STATIONS 208&222: FRAMING & SPRINKLER PIPING ONLY AT THREE WEST SOFFITS; OR 258; OR 260; SOFFIT AT NURSE STN #2 @ 1A208;
Misc
Partial Correction
04/06/2018
OK TO COVER WHEN READY ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS @: 1A216; 219-239; 250; 257; 261; 262.1; 263; 267; 268; 266; 200 - 209; [UPCOMING 4/7 WEEKEND WORK AT CORRIDORS 1A256 AND 1A255 E TO DOOR 1A254 OK TO COMPLETE AND COVER; PHASE INTERFACE AREAS: 1A256 SUBSTERILE CORRIDOR N 1/2; INTERSECTION AREA OF CORR 251 & 257; NURSE STATION AREA S OF RECOVERY; -RM GI STORAGE 1A091 1-HR FIRE-RATED CEILING-OK . ABOVE-CEILING NOT COMPLETED BUT WILL BE CHECKED LATER THROUGH ACCESS OPENINGS -COMPR. RM 1A042, STER STORAGE RM 1A043, DECONTAM RM 1A044, W/P RM 1A264, STERILE RM 1A265
Above Ceiling Inspection Partial 4/26/2018 4/26/2018 at 1:35 PM 04/26/2018
Misc
Partial Correction
04/25/2018
OK TO COVER WHEN READY GWB CEILING / SOFFIT / BULKHEAD FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: SOFFITS AT NURSE STATIONS 208&222: FRAMING & SPRINKLER PIPING ONLY AT THREE WEST SOFFITS; OR 258; OR 260; SOFFIT AT NURSE STN #2 @ 1A208;
Misc
Partial Correction
04/25/2018
OK TO COVER WHEN READY ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS @: 1A216; 219-239; 250; 257; 261; 262.1; 263; 267; 268; 266; 200 - 209; [UPCOMING 4/7 WEEKEND WORK AT CORRIDORS 1A256 AND 1A255 E TO DOOR 1A254 OK TO COMPLETE AND COVER; PHASE INTERFACE AREAS: 1A256 SUBSTERILE CORRIDOR N 1/2; INTERSECTION AREA OF CORR 251 & 257; NURSE STATION AREA S OF RECOVERY; -RM GI STORAGE 1A091 1-HR FIRE-RATED CEILING-OK . ABOVE-CEILING NOT COMPLETED BUT WILL BE CHECKED LATER THROUGH ACCESS OPENINGS -COMPR. RM 1A042, STER STORAGE RM 1A043, DECONTAM RM 1A044, W/P RM 1A264, STERILE RM 1A265 -ABOUT 20 FT OF CORRIDOR 1A255 OK; HOWEVER, LEAVE THE TILES ABOVE DOOR 1A255 OPEN. THE RATED WALL MUST BE CLOSED OFF AT CORNER WITH ALL PENETRATIONS PROTECTED
Rated Assembly Inspection Partial 5/2/2018 at 8:10 AM 05/02/2018
Misc
Partial Correction
04/04/2018
OK TO TAPE, MUD AND FIRE-STOP 5/8" TYPE X GWB AT: FIRE-RATED WALLS AT: OUTSIDE 1A250 AND 1A226 FROM CORNER TO DOOR TOP-OUT ONLY AT: 1A212 W WALL AT DOOR #212.3; 218 N, W, S WALLS: 258 W WALL; 260 W WALL; 261 W WALL; 262.1 N, W WALLS; 262.2 W WALL; 1A232 S&E TO 10' AFF; 1A250 S/E/N TO 10' AFF; 226 COMPLETE; ON F' FROM (15.6) TO (16.4) CORRIDOR FACE ONLY; TOP-OUT COMPLETE @ 250; 255 N AT BACKSIDE OF 262.1; 257; 261; 262.1; 263; 267 West, East, & North walls; 260 East wall; & 258 East wall 218 B/F; 212 N,W,S B/F; 268 E WALL; 259 W WALL; 255 S WALL FROM (E') TO (J); 266 W & N; 265 W WALL; 265 W/NW + @ DOOR OPNG 266.1; 043 NE B/F; [ABOVE DOOR OPENING 1A225;
Alarm Test Passed 5/8/2018 05/08/2018
Miscellaneous Inspection Partial 5/9/2018 at 8:55 AM 05/09/2018
Occupancy Inspection - Engineering Passed 5/10/2018 05/10/2018
Final Inspection - Commercial Partial 5/10/2018 5/10/2018 at 8:45 AM 05/10/2018
Misc
Resolved
05/10/2018
LABEL BREAKER POSTIONS AT PANEL A1-32 LC SEC 2
Misc
Partial Correction
01/23/2018
PHASE 1 BUILDING ADDITION OK FOR USE & OCCUPANCY. PHASE 2 AREAS PRE-OP AND SPD (STERILIZATION, PROCESSING, DECONTAMINATION) OK TO SET OP FOR BUSINESS. NO PATIENTS OR PUBLIC UNTIL REINSPECTION APPROVED AFTER ALL WORK IS COMPLETED AND TEMPORARY PROVISIONS ARE REMOVED.
Occupancy Inspection - Fire Temporary C of O 5/10/2018 05/10/2018
Occupancy Inspection - Planning Temporary C of O 5/10/2018 05/10/2018
Miscellaneous Correction
Corrective Action Required
05/10/2018
Replace dead tree adjacent to the parking lot entrance.
Occupancy Inspection - Planning Temporary C of O 05/10/2018
Corrective Action Required
05/10/2018
The dead tree in the landscaping area shall be removed and replaced.
Above Ceiling Inspection Passed 4/26/2018 05/18/2018
Misc
Resolved
05/18/2018
OK TO COVER WHEN READY GWB CEILING / SOFFIT / BULKHEAD FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: SOFFITS AT NURSE STATIONS 208&222: FRAMING & SPRINKLER PIPING ONLY AT THREE WEST SOFFITS; OR 258; OR 260; SOFFIT AT NURSE STN #2 @ 1A208;
Misc
Resolved
05/18/2018
OK TO COVER WHEN READY ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS @: 1A216; 219-239; 250; 257; 261; 262.1; 263; 267; 268; 266; 200 - 209; [UPCOMING 4/7 WEEKEND WORK AT CORRIDORS 1A256 AND 1A255 E TO DOOR 1A254 OK TO COMPLETE AND COVER; PHASE INTERFACE AREAS: 1A256 SUBSTERILE CORRIDOR N 1/2; INTERSECTION AREA OF CORR 251 & 257; NURSE STATION AREA S OF RECOVERY; -RM GI STORAGE 1A091 1-HR FIRE-RATED CEILING-OK . ABOVE-CEILING NOT COMPLETED BUT WILL BE CHECKED LATER THROUGH ACCESS OPENINGS -COMPR. RM 1A042, STER STORAGE RM 1A043, DECONTAM RM 1A044, W/P RM 1A264, STERILE RM 1A265 -ABOUT 20 FT OF CORRIDOR 1A255 OK; HOWEVER, LEAVE THE TILES ABOVE DOOR 1A255 OPEN. THE RATED WALL MUST BE CLOSED OFF AT CORNER WITH ALL PENETRATIONS PROTECTED
In-wall Inspection Passed 5/2/2018 4/16/2018 05/18/2018
Misc
Resolved
05/18/2018
OK TO COVER WHEN READY LIGHT-GAUGE STEEL WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING SPACES/LOCATIONS: ROWS F THROUGH J, AND 17.3 THROUGH 16; STORAGE RM 1A226; RESTROOM 1A232; STORAGE RM 1A250; RESTROOM 1A217; CLEAN RM 1A218; EXTERIOR WALL AT 1A263 & 1A268; 261; 262.1; 262.2; 267; 218 COMPLETE; 263 COMPLETE; 210 COMPLETE; 258; 260; CORR 259; 209 S WALL; 213-215 E WALL; 266 N WALL; 266 W WALL B/F; 256 N WALL B/F; 1A044 E; 1A200-203; 206-207; 256 S; S WALL AT 1A255 FROM D' TO E' BOTH FACES; A264 S WALL, W WALL, HEADERS/BULKHEADS AT CART WASHER; 1A044 N WALL, S WALL + WALL @ CENTER; 042 S WALL; CART WASH S WALL; NEW/ MODIFIED WALLS @ 1A091 N & W; MODIFIED WALL @ DOOR OPNG 1A044.2; [WALL SECTIONS WITH DOOR OPENINGS AT 1A044 NE AND INTERSECTING WALL @ DOOR OPNG 1A055;
Miscellaneous Inspection Passed 05/18/2018
Rated Assembly Inspection Passed 5/2/2018 05/18/2018
Misc
Resolved
05/18/2018
OK TO TAPE, MUD AND FIRE-STOP 5/8" TYPE X GWB AT: FIRE-RATED WALLS AT: OUTSIDE 1A250 AND 1A226 FROM CORNER TO DOOR TOP-OUT ONLY AT: 1A212 W WALL AT DOOR #212.3; 218 N, W, S WALLS: 258 W WALL; 260 W WALL; 261 W WALL; 262.1 N, W WALLS; 262.2 W WALL; 1A232 S&E TO 10' AFF; 1A250 S/E/N TO 10' AFF; 226 COMPLETE; ON F' FROM (15.6) TO (16.4) CORRIDOR FACE ONLY; TOP-OUT COMPLETE @ 250; 255 N AT BACKSIDE OF 262.1; 257; 261; 262.1; 263; 267 West, East, & North walls; 260 East wall; & 258 East wall 218 B/F; 212 N,W,S B/F; 268 E WALL; 259 W WALL; 255 S WALL FROM (E') TO (J); 266 W & N; 265 W WALL; 265 W/NW + @ DOOR OPNG 266.1; 043 NE B/F; [ABOVE DOOR OPENING 1A225;
Rough Framing Inspection - Commercial Passed 3/9/2018 9/14/2017 05/18/2018
Misc
Resolved
05/18/2018
OK TO COVER WHEN READY PARAPET WALL COMPLETE. LOWER WALL FROM NORTH END SOUTH TO (15.5); REMAINDER OF LOWER WEST WALL; SOUTH EXTERIOR LOWER WALL COMPLETE. ROOFTOP STUB WALLS AT (12.9) / (13.1);
Underslab Plumbing Inspection - Commercial Passed 3/2/2018 05/18/2018
Misc
Resolved
05/18/2018
OK TO COVER WHEN READY UNDER-SLAB PVC SANITARY DRAIN, WASTE, & VENT PIPING AT: 256 SUBSTERILE; PRE-OP AREA THREE LOCATIONS; 1A264 FOR THREE STERLIZERS AND CART WASHER; [1A044 FOR SINK; NOTE IPC 312 / IRC P2503.5.1 REQUIREMENT FOR PRESSURE-TESTING PIPING SYSTEM.
Final Inspection - Commercial Partial 5/18/2018 5/18/2018 at 8:45 AM 05/18/2018
Misc
Partial Correction
05/10/2018
PHASE 1 BUILDING ADDITION OK FOR USE & OCCUPANCY. PHASE 2 AREAS PRE-OP AND SPD (STERILIZATION, PROCESSING, DECONTAMINATION) OK TO SET OP FOR BUSINESS. NO PATIENTS OR PUBLIC UNTIL REINSPECTION APPROVED AFTER ALL WORK IS COMPLETED AND TEMPORARY PROVISIONS ARE REMOVED.
Final Inspection - Commercial Partial 5/25/2018 5/25/2018 at 8:55 AM 05/25/2018
Misc
Resolved
05/25/2018
PHASE 1 BUILDING ADDITION OK FOR USE & OCCUPANCY. PHASE 2 AREAS PRE-OP AND SPD (STERILIZATION, PROCESSING, DECONTAMINATION) OK TO SET OP FOR BUSINESS. NO PATIENTS OR PUBLIC UNTIL REINSPECTION APPROVED AFTER ALL WORK IS COMPLETED AND TEMPORARY PROVISIONS ARE REMOVED.
Misc
Corrective Action Required
05/25/2018
NO REMAINING ISSUES ON BUILDING ASPECTS OF NEW ADDITION AND RENOVATED SPACES. ALL OK FOR USE & OCCUPANCY. FINISH SITEWORK HAS YET TO BE APPROVED BY LS PLANNING. CONTACT HECTOR SOTO (816-969-1238) WHEN HE RETURNS TO WORK 5/31/18 TO RESOLVE ANY REMAINING ISSUES.
Occupancy Inspection - Fire Passed 5/25/2018 05/25/2018
Final Inspection - Commercial Partial 6/6/2018 at 9:45 AM 06/06/2018
Misc
Corrective Action Required
05/25/2018
NO REMAINING ISSUES ON BUILDING ASPECTS OF NEW ADDITION AND RENOVATED SPACES. ALL OK FOR USE & OCCUPANCY. FINISH SITEWORK HAS YET TO BE APPROVED BY LS PLANNING. CONTACT HECTOR SOTO (816-969-1238) WHEN HE RETURNS TO WORK 5/31/18 TO RESOLVE ANY REMAINING ISSUES.
Final Inspection - Commercial Partial 6/8/2018 at 3:30 PM 06/08/2018
Misc
Corrective Action Required
06/06/2018
NO REMAINING ISSUES ON BUILDING ASPECTS OF NEW ADDITION AND RENOVATED SPACES. ALL OK FOR USE & OCCUPANCY. FINISH SITEWORK HAS YET TO BE APPROVED BY LS PLANNING. CONTACT HECTOR SOTO (816-969-1238) WHEN HE RETURNS TO WORK 5/31/18 TO RESOLVE ANY REMAINING ISSUES.
Occupancy Inspection - Planning Passed 6/6/2018 06/11/2018
Final Inspection - Commercial Passed 6/12/2018 at 8:15 AM 06/12/2018
Misc
Resolved
06/12/2018
NO REMAINING ISSUES ON BUILDING ASPECTS OF NEW ADDITION AND RENOVATED SPACES. ALL OK FOR USE & OCCUPANCY. FINISH SITEWORK HAS YET TO BE APPROVED BY LS PLANNING. CONTACT HECTOR SOTO (816-969-1238) WHEN HE RETURNS TO WORK 5/31/18 TO RESOLVE ANY REMAINING ISSUES.
Documents & Images
Date Uploaded File Type Document Name
06/01/2017 Letter Fire Building Plan Review
06/06/2017 Letter Codes P/R Corrections Document
06/14/2017 Receipt Receipt for transaction: 2017-003810
06/14/2017 St Lukes East - Lees Summit Hospital OR Addition 2 Shell and Finish SI Ltr
06/14/2017 fire stopping spec insp
06/16/2017 Letter Fire Building Plan Review
06/19/2017 St Lukes OR Addition 2 SI Rept 01
06/19/2017 Letter Codes Plan Review Conditions
06/20/2017 Receipt Receipt for transaction: 2017-004018
06/20/2017 Letter Codes Building Permit
07/06/2017 St Lukes OR Addition 2 SI Rept 02
07/10/2017 St Lukes OR Addition 2 SI Rept 03
07/24/2017 St Lukes OR Addition 2 SI Rept 04
07/26/2017 Letter Fire Building Plan Review
08/02/2017 Letter Inspection Summary
08/02/2017 Letter Inspection Summary
08/03/2017 Letter Fire (Sprinkler) Plan Review
08/11/2017 Letter Inspection Summary
08/18/2017 St Lukes OR Addition 2 SI Rept 05
08/18/2017 Letter Fire Building Plan Review
08/22/2017 Letter Inspection Summary
08/25/2017 Letter Inspection Summary
09/01/2017 St Lukes OR Addition 2 SI Rept 06
09/05/2017 Letter Fire (Alarm) Plan Review Notice
09/05/2017 Letter Fire (Alarm) Plan Review Notice
09/13/2017 St Lukes OR Addition 2 SI Rept 07
09/14/2017 Letter Inspection Summary
09/15/2017 Letter Fire Building Plan Review
09/21/2017 Letter Inspection Summary
09/25/2017 Letter Inspection Summary
09/29/2017 Letter Inspection Summary
10/03/2017 Letter Inspection Summary
10/09/2017 Letter Inspection Summary
10/11/2017 Letter Inspection Summary
10/18/2017 Letter Inspection Summary
10/20/2017 Letter Inspection Summary
10/25/2017 Letter Inspection Summary
10/30/2017 Letter Inspection Summary
10/31/2017 Letter Inspection Summary
11/03/2017 Letter Inspection Summary
11/07/2017 Letter Inspection Summary
11/13/2017 Letter Inspection Summary
11/14/2017 Letter Inspection Summary
11/21/2017 Letter Inspection Summary
12/27/2017 Letter Inspection Summary
01/09/2018 Letter Inspection Summary
01/11/2018 Letter Inspection Summary
01/23/2018 Letter Inspection Summary
02/15/2018 Letter Inspection Summary
03/01/2018 Letter Inspection Summary
03/02/2018 Letter Inspection Summary
03/09/2018 Letter Inspection Summary
03/14/2018 Letter Inspection Summary
03/23/2018 Letter Inspection Summary
04/04/2018 Letter Inspection Summary
04/06/2018 Letter Inspection Summary
04/16/2018 Letter Inspection Summary
04/23/2018 Letter Inspection Summary
04/25/2018 Letter Inspection Summary
04/26/2018 Letter Inspection Summary
05/02/2018 Letter Inspection Summary
05/10/2018 Letter Inspection Summary
05/25/2018 Letter Inspection Summary
05/25/2018 Letter Planning Inspection Summary
06/12/2018 Letter Inspection Summary
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home