Permit Application Status

PRCOM20170703


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20170703
Building Permit - Commercial
Final Completion
SAINT LUKES EAST HOSPITAL
PARTIAL COMMERCIAL
FOOTINGS AND FOUNDATIONS FOR ADDITION TO OR - INCLUDES A RETAINING WALL AND SEWER RELOCATION UNDERSLAB PLUMBING ADDED 6/8/17 - THERE WILL ALSO BE SOME UNDERSLAB ELECTRICAL WHICH IS TO BE INSTALLED PER SLE STANDARD SPEC I.E. UNDOCUMENTED ON DRAWINGS full building permit: PRCOM20171689
03/16/2017
04/27/2017
10/15/2017
01/02/2018
Locations
Contacts
SAINT LUKES EAST HOSPITAL, Address:901 E 104TH ST MAILSTOP 900N  
JE DUNN CONSTRUCTION CO, Address:120 S CENTRAL AVE STE 350, Phone:(816) 474-8600  
ACI BOLAND, Address:1421 EAST 104TH ST; SUITE 100, Phone:(816) 763-9600  
J A LILLIG EXCAVATING INC, Address:1615 E 173RD ST, Phone:(816) 331-2280  
STRUCTURAL ENGINEERING ASSOCITES INC, Address:1000 WALNUT STE 1570, Phone:(816) 421-1042  
Intertek-PSI, Address:2828 S. 44th Street, Phone:(913) 310-1600  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 04/26/2017 04/26/2017
Joe Frogge
Building Plan Review Approved with Conditions 05/03/2017 04/26/2017
Joe Frogge
Building Plan Review Approved with Conditions 04/21/2017 04/18/2017
Joe Frogge
Final Development Plan
Resolved
04/26/2017

The building permit for this project can not be issued until the Codes Administration Department has received the approved Final Development Plan from the Planning and Development Department. Action required: Comment is for informational purposes.
Code analysis required
Resolved
04/18/2017

A code analysis shall be provided which includes but is not limited to occupancy type, occupant load, construction type, actual area, height and floors, allowable area, height and floors, and the codes to which the project is designed. Action required: Provide detailed code analysis in order for us to evaluate maximum area/height, fire separations, etc.
Licensed Contractors Approved 04/14/2017 04/18/2017
Joe Frogge
LC - MEP Subs
Resolved
04/18/2017

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company name of licensed Plumbing Contractor. - -Lillig is contractor - they do not have a master plumber's license but will only be doing the storm drain
Building Plan Review Rejected 03/16/2017
Joe Frogge
Final Development Plan
Corrective Action Required
03/16/2017

The building permit for this project can not be issued until the Codes Administration Department has received the approved Final Development Plan from the Planning and Development Department. Action required: Comment is for informational purposes.
Code analysis required
Corrective Action Required
03/16/2017

A code analysis shall be provided which includes but is not limited to occupancy type, occupant load, construction type, actual area, height and floors, allowable area, height and floors, and the codes to which the project is designed. Action required: Provide detailed code analysis in order for us to evaluate maximum area/height, fire separations, etc.
Misc
Resolved
03/21/2017

2012 IBC 1704.2 Special inspections. Where application is made for construction as described in this section, the owner or the registered design professional in responsible charge acting as the owner’s agent shall employ one or more approved agencies to perform inspections during construction on the types of work listed under Section 1705. These inspections are in addition to the inspections identified in Lee’s Summit Code of Ordinances Chapter 7. (see code section for exceptions) Action required: Provide statement of special inspections / letter of responsibility from company contracted to perform special inspections. Provided - Mike Weisenborn 03/21/2017 9:58 AM
Licensed Contractors Rejected 03/16/2017 03/16/2017
Joe Frogge
LC - MEP Subs
Corrective Action Required
03/16/2017

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company name of licensed Plumbing Contractor.
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for Partial Commercial $1,438.20 $1,438.20 Paid 04/21/2017
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Piers/Caissons Inspection - Commercial Partial 5/15/2017 5/15/2017 05/15/2017
Misc
Partial Correction
05/15/2017
HOLES DRILLED, CAGES SET, CONCRETE POURED WITH 3RD PARTY INSPECTION PRESENT: THREE PIERS;
Piers/Caissons Inspection - Commercial Partial 5/16/2017 (11:15) 5/16/2017 05/16/2017
Misc
Partial Correction
05/15/2017
HOLES DRILLED, CAGES SET, CONCRETE POURED WITH 3RD PARTY INSPECTION PRESENT: PIERS AT G/13; J/13; J/14; [F'.4/18.25; H/17.8; H/18.2; J/17;
Piers/Caissons Inspection - Commercial Partial 5/17/2017 (1:00) 5/17/2017 05/17/2017
Misc
Partial Correction
05/16/2017
HOLES DRILLED, CAGES SET, CONCRETE POURED WITH 3RD PARTY INSPECTION PRESENT: PIERS AT G/13; J/13; J/14; [F'.4/18.25; H/17.8; H/18.2; J/17; G.C. FAILED TO ARRANGE FOR INSPECTION IN ADVANCE OF POURS. POUR UNDER WAY ON JB ARRIVAL.
Piers/Caissons Inspection - Commercial Partial 5/18/2017 05/18/2017
Misc
Partial Correction
05/17/2017
HOLES DRILLED, CAGES SET, CONCRETE POURED WITH 3RD PARTY INSPECTION PRESENT: PIERS AT G/13; J/13; J/14; [F'.4/18.25; H/17.8; H/18.2; J/17; G.C. FAILED TO ARRANGE FOR INSPECTION IN ADVANCE OF POURS. POUR UNDER WAY ON JB ARRIVAL.
Piers/Caissons Inspection - Commercial Partial 5/18/2017 05/18/2017
Misc
Partial Correction
05/18/2017
HOLES DRILLED, CAGES SET, CONCRETE POURED WITH 3RD PARTY INSPECTION PRESENT: PIERS AT G/13; J/13; J/14; [F'.4/18.25; H/17.8; H/18.2; J/17; G.C. FAILED TO ARRANGE FOR INSPECTION IN ADVANCE OF POURS. POUR UNDER WAY ON JB ARRIVAL. EXCAVATION, REINFORCEMENT AND POURING OF PIERS TO BE COMPLETED THIS DATE UNDER INSPECTION BY 3RD PARTY INSPECTION.
Footing Inspection - Commercial Not Ready 5/23/2017 5/23/2017 05/23/2017
Footing Inspection - Commercial Partial 5/24/2017 (8:00) 5/24/2017 05/24/2017
Misc
Partial Correction
05/24/2017
OK TO POUR WHEN READY SECTIONS OF CONCRETE TIE BEAM, GRADE BEAM + INTEGRAL PIER CAPS AS FOLLOWS: ON (J) FROM (13.5) TO (14.7); ON (14) FROM (J) TO (I);
Footing Inspection - Commercial Partial 5/24/2017 5/24/2017 05/24/2017
Misc
Partial Correction
05/24/2017
OK TO POUR WHEN READY SECTIONS OF CONCRETE TIE BEAM, GRADE BEAM + INTEGRAL PIER CAPS AS FOLLOWS: ON (J) FROM (13.5) TO (14.7); ON (14) FROM (J) TO (I); FROM (E'.2) TO (F'.8); FROM (G.2) TO (I); ON (17) FROM (E'.2) TO (G.8); FROM (H.2) TO (H.4);
Footing Inspection - Commercial Partial 5/25/2017 05/25/2017
Misc
Partial Correction
05/24/2017
OK TO POUR WHEN READY SECTIONS OF CONCRETE TIE BEAM, GRADE BEAM + INTEGRAL PIER CAPS AS FOLLOWS: ON (J) FROM (13.5) TO (14.7); ON (14) FROM (J) TO (I); FROM (E'.2) TO (F'.8); FROM (G.2) TO (I); ON (17) FROM (E'.2) TO (G.8); FROM (H.2) TO (H.4); ON (15) FROM (E'.2) TO (G.8); FROM (H.2) TO (H.4);
Footing Inspection - Commercial Partial 5/25/2017 5/25/2017 05/25/2017
Misc
Partial Correction
05/25/2017
OK TO POUR WHEN READY SECTIONS OF CONCRETE TIE BEAM, GRADE BEAM + INTEGRAL PIER CAPS AS FOLLOWS: ON (J) FROM (13.5) TO (14.7); ON (G) FROM (13) TO (16); ON (14) FROM (J) TO (I); FROM (E'.2) TO (F'.8); FROM (G.2) TO (I); ON (17) FROM (E'.2) TO (G.8); FROM (H.2) TO (H.4); ON (15) FROM (E'.2) TO (G.8); FROM (H.2) TO (H.4);
Footing Inspection - Commercial Partial 5/26/2017 05/26/2017
Misc
Partial Correction
05/25/2017
OK TO POUR WHEN READY SECTIONS OF CONCRETE TIE BEAM, GRADE BEAM + INTEGRAL PIER CAPS AS FOLLOWS: ON (J) FROM (13.5) TO (14.7); ON (G) FROM (13) TO (16); ON (14) FROM (J) TO (I); FROM (E'.2) TO (F'.8); FROM (G.2) TO (I); ON (17) FROM (E'.2) TO (G.8); FROM (H.2) TO (H.4); ON (15) FROM (E'.2) TO (G.8); FROM (H.2) TO (H.4); ON (16) FROM (E'.2) TO (H.5); H/17 TO G/16; /17 TO H/16;
Footing Inspection - Commercial Partial 6/2/2017 (2:30) 6/2/2017 06/02/2017
Misc
Partial Correction
05/26/2017
OK TO POUR WHEN READY SECTIONS OF CONCRETE TIE BEAM, GRADE BEAM + INTEGRAL PIER CAPS AS FOLLOWS: ON (J) FROM (13.5) TO (14.7); FROM (14.7) TO (17.5); ON (G) FROM (13) TO (16); ON (14) FROM (J) TO (I); FROM (E'.2) TO (F'.8); FROM (G.2) TO (I); ON (17) FROM (E'.2) TO (G.8); FROM (H.2) TO (H.4); ON (15) FROM (E'.2) TO (G.8); FROM (H.2) TO (H.4); ON (16) FROM (E'.2) TO (H.5); H/16.7 TO G/16; /17 TO H/16; H/16.7 TO H/18.2; 18.2/E' TO 18./I TO 17.8/I TO 17.8/I.7; 17.8/H TO 17.8/I;
Footing Inspection - Commercial Partial 6/5/2017 6/5/2017 06/05/2017
Misc
Resolved
06/05/2017
OK TO POUR WHEN READY SECTIONS OF CONCRETE TIE BEAM, GRADE BEAM + INTEGRAL PIER CAPS AS FOLLOWS: ON (J) FROM (13.5) TO (14.7); FROM (14.7) TO (17.5); ON (G) FROM (13) TO (16); ON (14) FROM (J) TO (I); FROM (E'.2) TO (F'.8); FROM (G.2) TO (I); ON (17) FROM (E'.2) TO (G.8); FROM (H.2) TO (H.4); ON (15) FROM (E'.2) TO (G.8); FROM (H.2) TO (H.4); ON (16) FROM (E'.2) TO (H.5); H/16.7 TO G/16; /17 TO H/16; H/16.7 TO H/18.2; 18.2/E' TO 18./I TO 17.8/I TO 17.8/I.7; 17.8/H TO 17.8/I;
Misc
Partial Correction
06/05/2017
RETAINING WALL AT SOUTH NOT PRESENTLY READY FOR INSPECTION
Concrete Walls and Columns Inspection Partial 6/6/2017 06/06/2017
Misc
Partial Correction
06/06/2017
OK TO POUR WHEN READY C.I.P. CONCRETE COLUMNS @ FOLLOWING LOCATIONS: G/16; H/16; H/17; J/17.8;
Concrete Walls and Columns Inspection Partial 6/7/2017 6/7/2017 06/07/2017
Misc
Partial Correction
06/06/2017
OK TO POUR WHEN READY C.I.P. CONCRETE COLUMNS @ FOLLOWING LOCATIONS: G/16; H/16; H/17; J/17.8; J/15; J/16; J/17; H/18.2;
Underslab Plumbing Inspection - Commercial Not Ready 6/8/2017 6/8/2017 06/08/2017
Misc
Corrective Action Required
06/08/2017
LSCO SEC 7-142; IBC 106: PERMIT DRAWINGS ON SITE DO NOT CONTAIN REQUIRED DRAWING SHEET. NO INSPECTIONS WITHOUT CITY-STAMPED PERMIT PRINTS
Underslab Plumbing Inspection - Commercial Partial 6/9/2017 6/9/2017 06/09/2017
Misc
Partial Correction
06/09/2017
OK TO COVER WHEN READY UNDER-SLAB PVC SANITARY DRAIN, WASTE, & VENT PIPING AT: SPACES 1A212, 216, 217, 221, 227 + MAIN DRAIN LINE FROM THEM TO BLDG DRAIN; NOTE IPC 312 / IRC P2503.5.1 REQUIREMENT FOR PRESSURE-TESTING PIPING SYSTEM.
Misc
Partial Correction
06/09/2017
OK TO COVER WHEN READY SECTIONS ON ROOF DRAIN STORM PIPING AT:
Underslab Plumbing Inspection - Commercial Partial 6/9/2017 06/09/2017
Misc
Partial Correction
06/09/2017
OK TO COVER WHEN READY UNDER-SLAB PVC SANITARY DRAIN, WASTE, & VENT PIPING AT: SPACES 1A212, 216, 217, 221, 227 + MAIN DRAIN LINE FROM THEM TO BLDG DRAIN; NOTE IPC 312 / IRC P2503.5.1 REQUIREMENT FOR PRESSURE-TESTING PIPING SYSTEM.
Misc
Partial Correction
06/09/2017
OK TO COVER WHEN READY SECTIONS ON ROOF DRAIN STORM PIPING: ON (H.6) FROM (15.6) TO CONNECTION AT MAIN STORM DRAIN LINE AT (17.5);
Foundation Inspection - Commercial Partial 6/13/2017 (9:00) 6/13/2017 06/13/2017
Misc
Partial Correction
06/13/2017
OK TO POUR WHEN READY KNEE WALL AT BLDG PERIMETER: FROM E'/18.2 TO I/18.2 TO I/17.8 TO J/17.8 TO J/16;
Underslab Plumbing Inspection - Commercial Partial 6/14/2017 06/14/2017
Misc
Partial Correction
06/09/2017
OK TO COVER WHEN READY UNDER-SLAB PVC SANITARY DRAIN, WASTE, & VENT PIPING AT: SPACES 1A212, 216, 217, 221, 227 + MAIN DRAIN LINE FROM THEM TO BLDG DRAIN; DWV PIPING NORTH OF (14) NOTE IPC 312 / IRC P2503.5.1 REQUIREMENT FOR PRESSURE-TESTING PIPING SYSTEM.
Misc
Partial Correction
06/09/2017
OK TO COVER WHEN READY SECTIONS ON ROOF DRAIN STORM PIPING: ON (H.6) FROM (15.6) TO CONNECTION AT MAIN STORM DRAIN LINE AT (17.5);
Footing Inspection - Commercial Partial 6/14/2017 06/14/2017
Misc
Partial Correction
06/14/2017
RETAINING WALL FOOTINF PER SECTIONS (2), (3) AND (4) ON SHEET S1.0 OK TO POUR WHEN READY AND APPROVED BY 3RD PARTY INSPECTOR
Misc
Partial Correction
06/14/2017
OK TO POUR WHEN READY SECTIONS OF CONCRETE TIE BEAM, GRADE BEAM + INTEGRAL PIER CAPS AS FOLLOWS: ON (J) FROM (13.5) TO (14.7); FROM (14.7) TO (17.5); ON (G) FROM (13) TO (16); ON (14) FROM (J) TO (I); FROM (E'.2) TO (F'.8); FROM (G.2) TO (I); ON (17) FROM (E'.2) TO (G.8); FROM (H.2) TO (H.4); ON (15) FROM (E'.2) TO (G.8); FROM (H.2) TO (H.4); ON (16) FROM (E'.2) TO (H.5); H/16.7 TO G/16; /17 TO H/16; H/16.7 TO H/18.2; 18.2/E' TO 18./I TO 17.8/I TO 17.8/I.7;
Footing Inspection - Commercial Partial 6/14/2017 06/14/2017
Misc
Partial Correction
06/14/2017
RETAINING WALL AT SOUTH NOT PRESENTLY READY FOR INSPECTION
Underslab Electrical Inspection - Commercial Partial 6/15/2017 06/15/2017
Misc
Partial Correction
06/15/2017
NO ISSUES FOUND ON UNDER-SLAB ELECTRICAL CONDUIT MATERIAL & WORKMANSHIP AT: 1A209/1A217; 1A221/222;
Underslab Plumbing Inspection - Commercial Partial 6/15/2017 6/15/2017 06/15/2017
Misc
Partial Correction
06/14/2017
OK TO COVER WHEN READY UNDER-SLAB PVC SANITARY DRAIN, WASTE, & VENT PIPING AT: SPACES 1A212, 216, 217, 221, 227 + MAIN DRAIN LINE FROM THEM TO BLDG DRAIN; DWV PIPING NORTH OF (14) NOTE IPC 312 / IRC P2503.5.1 REQUIREMENT FOR PRESSURE-TESTING PIPING SYSTEM.
Misc
Partial Correction
06/14/2017
OK TO COVER WHEN READY SECTIONS ON ROOF DRAIN STORM PIPING: ON (H.6) FROM (15.6) TO CONNECTION AT MAIN STORM DRAIN LINE AT (17.5); COMPLETE NORTH OF (14);
Retaining Wall Inspection Passed 6/21/2017 06/21/2017
Suspended Slab Inspection Partial 7/6/2017 07/06/2017
Misc
Partial Correction
07/06/2017
OK TO POUR WHEN READY PORTIONS OF 2ND FLOOR PAN SLAB AS APPROVED BY SPECIAL INSPECTOR: ALL NORTH OF (15.6);
Concrete Walls and Columns Inspection Partial 6/8/2017 07/13/2017
Misc
Partial Correction
06/08/2017
OK TO POUR WHEN READY C.I.P. CONCRETE COLUMNS @ FOLLOWING LOCATIONS: G/16; H/16; H/17; J/17.8; J/15; J/16; J/17; H/18.2; H/17.8; I/18.2; J/18.2; J/12.9; G/12.9; G/14;
Retaining Wall Inspection Passed 7/13/2017 07/13/2017
Footing Inspection - Commercial Partial 7/18/2017 (1:00) 7/18/2017 07/18/2017
Misc
Partial Correction
07/18/2017
RETAINING WALL FOOTINF PER SECTIONS (2), (3) AND (4) ON SHEET S1.0 OK TO POUR WHEN READY AND APPROVED BY 3RD PARTY INSPECTOR
Misc
Partial Correction
07/18/2017
OK TO POUR WHEN READY SECTIONS OF CONCRETE TIE BEAM, GRADE BEAM + INTEGRAL PIER CAPS AS FOLLOWS: "PANT-LEG" TIE BEAM TRIANGLE BETWEEN (12.1) AND (13) ON (J) FROM (13.5) TO (14.7); FROM (14.7) TO (17.5); ON (G) FROM (13) TO (16); ON (14) FROM (J) TO (I); FROM (E'.2) TO (F'.8); FROM (G.2) TO (I); ON (17) FROM (E'.2) TO (G.8); FROM (H.2) TO (H.4); ON (15) FROM (E'.2) TO (G.8); FROM (H.2) TO (H.4); ON (16) FROM (E'.2) TO (H.5); H/16.7 TO G/16; /17 TO H/16; H/16.7 TO H/18.2; 18.2/E' TO 18./I TO 17.8/I TO 17.8/I.7;
Footing Inspection - Commercial Partial 7/19/2017 7/19/2017 07/19/2017
Misc
Partial Correction
07/18/2017
RETAINING WALL FOOTINF PER SECTIONS (2), (3) AND (4) ON SHEET S1.0 OK TO POUR WHEN READY AND APPROVED BY 3RD PARTY INSPECTOR
Misc
Partial Correction
07/18/2017
OK TO POUR WHEN READY SECTIONS OF CONCRETE TIE BEAM, GRADE BEAM + INTEGRAL PIER CAPS AS FOLLOWS: "PANT-LEG" TIE BEAM TRIANGLE BETWEEN (12.1) AND (13) ON (J) FROM (13.5) TO (14.7); FROM (14.7) TO (17.5); [FROM (12) TO (13.7) ON (G) FROM (13) TO (16); [FROM (12.8) TO (13.3) [ON (13) FROM (E') TO (J) ON (14) FROM (J) TO (I); FROM (E'.2) TO (F'.8); FROM (G.2) TO (I); ON (17) FROM (E'.2) TO (G.8); FROM (H.2) TO (H.4); ON (15) FROM (E'.2) TO (G.8); FROM (H.2) TO (H.4); ON (16) FROM (E'.2) TO (H.5); H/16.7 TO G/16; /17 TO H/16; H/16.7 TO H/18.2; 18.2/E' TO 18./I TO 17.8/I TO 17.8/I.7;
Concrete Walls and Columns Inspection Partial 7/20/2017 (8:00) 7/20/2017 07/20/2017
Misc
Partial Correction
06/08/2017
OK TO POUR WHEN READY C.I.P. CONCRETE COLUMNS @ FOLLOWING LOCATIONS: G/16; H/16; H/17; J/17.8; J/15; J/16; J/17; H/18.2; H/17.8; I/18.2; J/18.2; J/12.9; G/12.9; G/14; [G/13.1; J/12.1; J/13.1;
Concrete Walls and Columns Inspection Partial 7/21/2017 7/21/2017 07/21/2017
Misc
Partial Correction
07/20/2017
OK TO POUR WHEN READY C.I.P. CONCRETE COLUMNS @ FOLLOWING LOCATIONS: G/16; H/16; H/17; J/17.8; J/15; J/16; J/17; H/18.2; H/17.8; I/18.2; J/18.2; J/12.9; G/12.9; G/14; G/13.1; J/12.1; J/13; [G/12.9; J/12.9; H.3/12.1;
Underslab Plumbing Inspection - Commercial Passed 7/25/2017 07/25/2017
Misc
Resolved
07/25/2017
OK TO COVER WHEN READY UNDER-SLAB PVC SANITARY DRAIN, WASTE, & VENT PIPING AT: SPACES 1A212, 216, 217, 221, 227 + MAIN DRAIN LINE FROM THEM TO BLDG DRAIN; DWV PIPING NORTH OF (14) NOTE IPC 312 / IRC P2503.5.1 REQUIREMENT FOR PRESSURE-TESTING PIPING SYSTEM.
Misc
Resolved
07/25/2017
OK TO COVER WHEN READY SECTIONS ON ROOF DRAIN STORM PIPING: ON (H.6) FROM (15.6) TO CONNECTION AT MAIN STORM DRAIN LINE AT (17.5); COMPLETE NORTH OF (14);
Rough Framing Inspection - Commercial Partial 8/7/2017 8/7/2017 08/07/2017
Misc
Partial Correction
08/07/2017
OK TO COVER WHEN READY EXTERIOR WALL LIGHT-GAUGE STEEL FRAMING AT: F'/17.3 TO I/17.3 TO I/17.2 TO J/17.2 TO J/16;
Suspended Slab Inspection Partial 8/7/2017 (3:30) 8/7/2017 08/07/2017
Misc
Partial Correction
07/06/2017
OK TO POUR WHEN READY PORTIONS OF 2ND FLOOR PAN SLAB AS APPROVED BY SPECIAL INSPECTOR: ALL NORTH OF (15.6); COMPLETE FROM (15.6) TO (12.1)
Concrete Walls and Columns Inspection Partial 8/9/2017 (8:00) 8/9/2017 08/09/2017
Misc
Partial Correction
07/21/2017
OK TO POUR WHEN READY C.I.P. CONCRETE COLUMNS @ FOLLOWING LOCATIONS: G/16; H/16; H/17; J/17.8; J/15; J/16; J/17; H/18.2; H/17.8; I/18.2; J/18.2; J/12.9; G/12.9; G/14; G/13.1; J/12.1; J/13.1; G/12.9; J/12.9; H.3/12.1; COLUMN STUBS ABOVE ROOF ELEVATION COMPLETE FROM (15.6) TO (12.1)
Concrete Walls and Columns Inspection Passed 8/9/2017 12/27/2017
Misc
Resolved
12/27/2017
OK TO POUR WHEN READY C.I.P. CONCRETE COLUMNS @ FOLLOWING LOCATIONS: G/16; H/16; H/17; J/17.8; J/15; J/16; J/17; H/18.2; H/17.8; I/18.2; J/18.2; J/12.9; G/12.9; G/14; G/13.1; J/12.1; J/13.1; G/12.9; J/12.9; H.3/12.1; COLUMN STUBS ABOVE ROOF ELEVATION COMPLETE FROM (15.6) TO (12.1)
Footing Inspection - Commercial Passed 7/19/2017 12/27/2017
Misc
Resolved
12/27/2017
RETAINING WALL FOOTINF PER SECTIONS (2), (3) AND (4) ON SHEET S1.0 OK TO POUR WHEN READY AND APPROVED BY 3RD PARTY INSPECTOR
Misc
Resolved
12/27/2017
OK TO POUR WHEN READY SECTIONS OF CONCRETE TIE BEAM, GRADE BEAM + INTEGRAL PIER CAPS AS FOLLOWS: "PANT-LEG" TIE BEAM TRIANGLE BETWEEN (12.1) AND (13) ON (J) FROM (13.5) TO (14.7); FROM (14.7) TO (17.5); [FROM (12) TO (13.7) ON (G) FROM (13) TO (16); [FROM (12.8) TO (13.3) [ON (13) FROM (E') TO (J) ON (14) FROM (J) TO (I); FROM (E'.2) TO (F'.8); FROM (G.2) TO (I); ON (17) FROM (E'.2) TO (G.8); FROM (H.2) TO (H.4); ON (15) FROM (E'.2) TO (G.8); FROM (H.2) TO (H.4); ON (16) FROM (E'.2) TO (H.5); H/16.7 TO G/16; /17 TO H/16; H/16.7 TO H/18.2; 18.2/E' TO 18./I TO 17.8/I TO 17.8/I.7;
Foundation Inspection - Commercial Passed 6/21/2017 (10:30) 6/13/2017 12/27/2017
Misc
Resolved
12/27/2017
OK TO POUR WHEN READY KNEE WALL AT BLDG PERIMETER: FROM E'/18.2 TO I/18.2 TO I/17.8 TO J/17.8 TO J/16;
Piers/Caissons Inspection - Commercial Passed 5/18/2017 12/27/2017
Misc
Resolved
12/27/2017
HOLES DRILLED, CAGES SET, CONCRETE POURED WITH 3RD PARTY INSPECTION PRESENT: PIERS AT G/13; J/13; J/14; [F'.4/18.25; H/17.8; H/18.2; J/17; G.C. FAILED TO ARRANGE FOR INSPECTION IN ADVANCE OF POURS. POUR UNDER WAY ON JB ARRIVAL. EXCAVATION, REINFORCEMENT AND POURING OF PIERS TO BE COMPLETED THIS DATE UNDER INSPECTION BY 3RD PARTY INSPECTION.
Rough Framing Inspection - Commercial Passed 8/7/2017 12/27/2017
Misc
Resolved
12/27/2017
OK TO COVER WHEN READY EXTERIOR WALL LIGHT-GAUGE STEEL FRAMING AT: F'/17.3 TO I/17.3 TO I/17.2 TO J/17.2 TO J/16;
Suspended Slab Inspection Passed 8/7/2017 12/27/2017
Misc
Resolved
12/27/2017
OK TO POUR WHEN READY PORTIONS OF 2ND FLOOR PAN SLAB AS APPROVED BY SPECIAL INSPECTOR: ALL NORTH OF (15.6); COMPLETE FROM (15.6) TO (12.1)
Underslab Electrical Inspection - Commercial Passed 6/15/2017 12/27/2017
Misc
Resolved
12/27/2017
NO ISSUES FOUND ON UNDER-SLAB ELECTRICAL CONDUIT MATERIAL & WORKMANSHIP AT: 1A209/1A217; 1A221/222;
Final Inspection - Commercial Passed 12/27/2017 at 8:10 AM 12/27/2017
Documents & Images
Date Uploaded File Type Document Name
03/16/2017 Letter Codes P/R Corrections Document
03/21/2017 Letter Special Inspections - Lees Summit Hospital OR Addition 2 Footings and Foundation
04/18/2017 Letter Codes P/R Corrections Document
04/21/2017 Receipt Receipt for transaction: 2017-001553
04/27/2017 Letter Codes Building Permit
04/27/2017 Letter Codes Building Permit
04/27/2017 Letter Codes Plan Review Conditions
04/27/2017 Letter Codes Plan Review Conditions
05/15/2017 Letter Inspection Summary
05/16/2017 Letter Inspection Summary
05/24/2017 Letter Inspection Summary
05/25/2017 Letter Inspection Summary
05/25/2017 Letter Inspection Summary
05/26/2017 Letter Inspection Summary
06/02/2017 Letter Inspection Summary
06/05/2017 Letter Inspection Summary
06/06/2017 Letter Inspection Summary
06/07/2017 Letter Inspection Summary
06/07/2017 Spec Insp
06/08/2017 Letter Inspection Summary
06/09/2017 Letter Inspection Summary
06/13/2017 Letter Inspection Summary
06/14/2017 Letter Inspection Summary
06/15/2017 Letter Inspection Summary
06/21/2017 Letter Inspection Summary
06/21/2017 Letter Inspection Summary
07/06/2017 Letter Inspection Summary
07/13/2017 Letter Inspection Summary
07/18/2017 Letter Inspection Summary
07/19/2017 Letter Inspection Summary
07/20/2017 Letter Inspection Summary
07/20/2017 Letter Inspection Summary
07/21/2017 Letter Inspection Summary
07/25/2017 Letter Inspection Summary
08/07/2017 Letter Inspection Summary
08/09/2017 Letter Inspection Summary
12/27/2017 Letter Inspection Summary
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home