M150 ECHELON LAND DEV LLC
NEW MULTI-FAMILY
NEW 3 STORY APARTMENT BUILDING FOUNDATION/UNDERSLAB PERMIT - PRCOM20181439
02/16/2017
09/25/2019
11/20/2020
Locations
Contacts
LUKE DRAILY CONSTRUCTION INC, Address:75 NW BUSINESS PARK LANE, Phone:(816) 459-8531  
RELIABLE MECHANICAL SERVICES INC, Address:1025 W COUCHMAN DR, Phone:(816) 903-7674  
ELECTRICAL ENTERPRISES INC, Address:PO BOX 127, Phone:(785) 242-7971  
RELIABLE MECHANICAL SERVICES INC, Address:1025 W COUCHMAN DR, Phone:(816) 903-7674  
NSPJ ARCHITECTS, Address:3515 W 75TH ST, SUITE 201, Phone:(913) 831-1415 Ext:278  
KANSAS CITY TESTING & ENGINEERING, Address:1308 ADAMS STREET, Phone:(913) 321-8100  
M150 ECHELON LAND DEV LLC, Address:120 SE 30TH ST  
GRIFFIN RILEY PROPERTY GROUP, Address:21 SE 29TH TER, Phone:(816) 366-7900  
CITY OF LEE'S SUMMIT MISSOURI, Address:220 SE GREEN ST  
Reviews
Review Type Outcome Est. Completion Date Completed
Fire Plan Review Approved 03/06/2017 04/12/2018
Joe Frogge
Building Plan Review Approved 06/14/2018 04/12/2018
Joe Frogge
Licensed Contractors Approved 06/14/2018 04/12/2018
Joe Frogge
Final Development Plan Review Approved 03/06/2017 02/05/2018
Joe Frogge
Special Inspections Review Approved 02/05/2018
Joe Frogge
Alarm Plan Review Released for Construction 05/24/2017
Joe Dir
Sprinkler Plan Review Released for Construction 05/24/2017
Joe Dir
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for Addition to Commercial $10,987.39 $10,987.39 Paid 12/20/2017
8331507-Sewer Connection Fee $3,000.00 $3,000.00 Paid 12/20/2017
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
All Rough Inspection - Commercial Partial 4/29/2020 4/29/2020 04/29/2020
THIRD FLOOR
Corrective Action Required
04/29/2020
OK TO INSULATE & ROCK
All Rough Inspection - Commercial Partial 5/5/2020 5/5/2020 05/05/2020
THIRD FLOOR
Corrective Action Required
04/29/2020
OK TO INSULATE & ROCK
SECOND FLOOR
Corrective Action Required
05/05/2020
OK TO INSULATE & ROCK
Sprinkler - Hydrostatic Test Passed 5/6/2020 05/06/2020
All Rough Inspection - Commercial Failed 5/11/2020 5/11/2020 05/11/2020
THIRD FLOOR
Corrective Action Required
05/05/2020
OK TO INSULATE & ROCK
SECOND FLOOR
Corrective Action Required
05/05/2020
OK TO INSULATE & ROCK
FIRST FLOOR
Corrective Action Required
05/11/2020
-107 complete plumbing strap & fire caulk top plate- - complete floor drain ceiling storage unit 2 doors from riser room - - complete plumbing ceiling corridor 2nd garage from south stair - - complete plumbing ceiling garage at north stair - - complete plumbing storage near generator - 102 complete plumbing & nail guard mech closet -
All Rough Inspection - Commercial Partial 5/12/2020 5/12/2020 05/12/2020
SECOND FLOOR
Resolved
05/12/2020
OK TO INSULATE & ROCK
THIRD FLOOR
Resolved
05/12/2020
OK TO INSULATE & ROCK
FIRST FLOOR
Resolved
05/12/2020
OK TO INSULATE & ROCK
LOWER LEVEL
Resolved
05/19/2020
Electrical Service Inspection Passed 5/14/2020 5/14/2020 05/14/2020
Misc
Informational
05/14/2020
36 units 1 house meter
Rated Assembly Inspection Partial 5/14/2020 5/14/2020 05/14/2020
THIRD FLOOR
Corrective Action Required
05/14/2020
- 3rd floor 1st layer type C ceilings - - 1 layer type X units & south corridor -
Rated Assembly Inspection Partial 05/14/2020
THIRD FLOOR
Corrective Action Required
05/14/2020
- 3rd floor 1st layer type C ceilings - - 1 layer type X units & south corridor -
STAIR TOWER 1
Corrective Action Required
05/14/2020
-1ST LAYER TYPE C CEILING 3RD FLOOR - - 1ST LAYER X WALLS 3RD FLOOR -
STAIR TOWER 2
Corrective Action Required
05/14/2020
- 1ST LAYER TYPE C CEILING 3RD FLOOR - - 1ST LAYER TYPE X WALL 3RD FLOOR -
STAIR TOWER 3
Corrective Action Required
05/14/2020
- 1ST LAYER TYPE C CEILING 3RD FLOOR - - 1ST LAYER TYPE X WALLS 3RD FLOOR -
STAIR TOWER 4
Corrective Action Required
05/14/2020
1ST LAYER TYPE C CEILING 3RD FLOOR - 1ST LAYER TYPE X WALLS 3RD FLOOR -
All Rough Inspection - Commercial Failed 5/18/2020 5/18/2020 05/18/2020
LOWER LEVEL
Corrective Action Required
05/12/2020
- FIRE BLOCK FURR OUT FOUNDATION WALL EVERY 10' - - 00 FIRE CAULK SEC CABLE TOP PLATE SECURE SEC CABLES - - 02 INSULATE TUB TRAP CEILING, FIRE CAULK DWV TOP PLATE, ADDRESS BORE @ BATH VANITY - - 10 SECURE SEC CABLES, PROVIDE STUD SHOE OVERSIZED BORE KITCHEN/BEDROON -
All Rough Inspection - Commercial Passed 5/19/2020 5/19/2020 05/19/2020
LOWER LEVEL
Resolved
05/19/2020
OK TO INSULATE & ROCK
Rated Assembly Inspection Partial 5/19/2020 5/19/2020 05/19/2020
THIRD FLOOR
Corrective Action Required
05/14/2020
- 3rd floor 1st layer type C ceilings - - 1 layer type X units & south corridor - 3RD FLOOR 2ND LAYER TYPE C CEILINGS
STAIR TOWER 1
Corrective Action Required
05/14/2020
-1ST LAYER TYPE C CEILING 3RD FLOOR - - 1ST LAYER X WALLS 3RD FLOOR -
STAIR TOWER 2
Corrective Action Required
05/14/2020
- 1ST LAYER TYPE C CEILING 3RD FLOOR - - 1ST LAYER TYPE X WALL 3RD FLOOR -
STAIR TOWER 3
Corrective Action Required
05/14/2020
- 1ST LAYER TYPE C CEILING 3RD FLOOR - - 1ST LAYER TYPE X WALLS 3RD FLOOR -
STAIR TOWER 4
Corrective Action Required
05/14/2020
1ST LAYER TYPE C CEILING 3RD FLOOR - 1ST LAYER TYPE X WALLS 3RD FLOOR -
Rated Assembly Inspection Failed 6/4/2020 6/4/2020 06/04/2020
THIRD FLOOR
Corrective Action Required
05/19/2020
- 3rd floor 1st layer type C ceilings - - 1 layer type X units & south corridor - 3RD FLOOR 2ND LAYER TYPE C CEILINGS
STAIR TOWER 1
Corrective Action Required
05/19/2020
-1ST LAYER TYPE C CEILING 3RD FLOOR - - 2nd layer type c ceiling - - 3RD LAYER TYPE C & RC CHANNEL
STAIR TOWER 2
Corrective Action Required
05/19/2020
- 1ST LAYER TYPE C CEILING 3RD FLOOR - - 2ND LAYER TYPE C - - 3RD LAYER TYPE C & RC CHANNEL -
STAIR TOWER 3
Corrective Action Required
05/19/2020
- 1ST LAYER TYPE C CEILING 3RD FLOOR - - 2nd layer type c - - 3RD LAYER TYPE C & RC CHANNEL -
STAIR TOWER 4
Corrective Action Required
05/19/2020
1ST LAYER TYPE C CEILING 3RD FLOOR - - 2nd layer type c - - 3RD LAYER TYPE C & RC CHANNEL -
LOWER LEVEL
Corrective Action Required
06/04/2020
- ALL UNITS OK -
FIRST FLOOR
Corrective Action Required
06/04/2020
- UNITS ONLY - - 1ST LAYER CORRIDOR AT STAIRWAYS - - 102 REPAIR CEILING AT ENTRY DOOR - - 106 REMOVE TYPE X CEILING LIVING ROOM IN CORNER - - 108 COMPLETE SCREW PATTERN TO CEILING - - 110 COMPLETE SCREW PATTERN TO CEILING -
SECOND FLOOR
Corrective Action Required
06/04/2020
- UNITS COMPLETE - - 1ST LAYER CORRIDOR AT STAIRWAYS -
Rated Assembly Inspection Passed 6/16/2020 6/16/2020 06/16/2020
THIRD FLOOR
Resolved
06/16/2020
- 3rd floor 1st layer type C ceilings - - 1 layer type X units & south corridor - 3RD FLOOR 2ND LAYER TYPE C CEILINGS
STAIR TOWER 1
Corrective Action Required
06/04/2020
-1ST LAYER TYPE C CEILING 3RD FLOOR - - 2nd layer type c ceiling - - 3RD LAYER TYPE C & RC CHANNEL - - 4TH LAYER TYPE C CEILING - Michael Harkins 06/23/2020 8:12 AM
STAIR TOWER 2
Corrective Action Required
06/04/2020
- 1ST LAYER TYPE C CEILING 3RD FLOOR - - 2ND LAYER TYPE C - - 3RD LAYER TYPE C & RC CHANNEL - - 4TH LAYER TYPE C CEILING - Michael Harkins 06/23/2020 8:12 AM
STAIR TOWER 3
Corrective Action Required
06/04/2020
- 1ST LAYER TYPE C CEILING 3RD FLOOR - - 2nd layer type c - - 3RD LAYER TYPE C & RC CHANNEL - - 4TH LAYER TYPE C CEILING - -2ND LAYER TYPE X WALLS - Michael Harkins 06/23/2020 8:13 AM
STAIR TOWER 4
Corrective Action Required
06/04/2020
1ST LAYER TYPE C CEILING 3RD FLOOR - - 2nd layer type c - - 3RD LAYER TYPE C & RC CHANNEL - - 4TH LAYER TYPE C CEILING - - 2ND LAYER TYPE X WALLS Michael Harkins 06/23/2020 8:12 AM
LOWER LEVEL
Resolved
06/16/2020
- ALL UNITS OK -
FIRST FLOOR
Resolved
06/16/2020
- UNITS ONLY - - 1ST LAYER CORRIDOR AT STAIRWAYS - - 2ND LAYER CORRIDOR ST STAIRWAYS
SECOND FLOOR
Resolved
06/16/2020
- UNITS COMPLETE - - 1ST LAYER CORRIDOR AT STAIRWAYS -
Rated Assembly Inspection Passed 6/23/2020 6/23/2020 06/23/2020
Sprinkler - Flow Test Passed 11/4/2020 11/04/2020
Alarm Test Passed 11/4/2020 11/04/2020
Miscellaneous Inspection Failed 11/6/2020 11/6/2020 11/06/2020
Misc
Corrective Action Required
11/06/2020
3580 Hollywood pre final inspection 311 seal ceiling mech closet, Deck rail 4" ? 310 sprinkler heads master bedroom & closet, Seal ceiling mech closet, 309 seal ceiling mech room, a 4" sphere shall not pass through deck railing, 308 seal ceiling mech closet, 4" deck railing ? 307 seal ceiling mech closet, 306 seal ceiling mech closet, 209 seal ceiling mech closet, 207 " " 206 " " 208 " " Above is Mike’s partial list ran out of time Below is John’s partial list PROPER AFCI PROTECTION FOR ALL UNITS CEILING/WALL JOINT IN MECH CLOSETS SEAL ALL EXTERIOR PENETRATIONS North stair shaft/East entry door-Fireblock Sheetrock penetrations at sprinkler equipment North Mechanical room- fireblock penetrations, repair Sheetrock at return air, Provide electrical panel schedule and blanks for open breaker spaces S20-Fireblock ceiling penetration S8-locked S6-locked IT Room-Fireblock ceiling penetrations ???1st floor corridor ceiling penetrations 104-fireblock ceiling penetrations in mechanical closet, weatherstrip exterior door, ADA unit? 102-Weatherstrip exterior door, Fireblock mechanical closet ceiling penetrations 100- Fireblock mechanical closet ceiling penetrations, Weatherstrip exterior door 201-Repair sheet rock and fire block ceiling penetrations in mechanical closet, Weatherstripping exterior door 200-Repair sheet rock and fire block ceiling penetrations in mechanical closet, Anti-tip device at stove, Weatherstrip exterior door 202-Weatherstrip exterior door, Fireblock ceiling penetrations in mechanical closet 203-Dwelling/Corredor door does not self latch, Repair sheet rock fire block ceiling penetrations mechanical closet 205- Repair sheet rock and fire block ceiling penetrations in mechanical closet 204-Fireblock penetrations in mechanical closet ceiling 305-Fireblock penetrations in mechanical closet ceiling 303-Fireblock penetrations in mechanical closet ceiling, missing sprinkler head in mechanical closet 302-Repair sheet rock in mechanical closet and fire block penetrations and ceiling, Missing sprinkler head in mechanical closet 301/302 still to do ? PROPER AFCI PROTECTION FOR ALL UNITS CEILING/WALL JOINT IN MECH CLOSETS SEAL ALL EXTERIOR PENETRATIONS North stair shaft/East entry door-Fireblock Sheetrock penetrations at sprinkler equipment North Mechanical room- fireblock penetrations, repair Sheetrock at return air, Provide electrical panel schedule and blanks for open breaker spaces S20-Fireblock ceiling penetration S8-locked S6-locked IT Room-Fireblock ceiling penetrations ???1st floor corridor ceiling penetrations 104-fireblock ceiling penetrations in mechanical closet, weatherstrip exterior door, ADA unit? 102-Weatherstrip exterior door, Fireblock mechanical closet ceiling penetrations 100- Fireblock mechanical closet ceiling penetrations, Weatherstrip exterior door 201-Repair sheet rock and fire block ceiling penetrations in mechanical closet, Weatherstripping exterior door 200-Repair sheet rock and fire block ceiling penetrations in mechanical closet, Anti-tip device at stove, Weatherstrip exterior door 202-Weatherstrip exterior door, Fireblock ceiling penetrations in mechanical closet 203-Dwelling/Corredor door does not self latch, Repair sheet rock fire block ceiling penetrations mechanical closet 205- Repair sheet rock and fire block ceiling penetrations in mechanical closet 204-Fireblock penetrations in mechanical closet ceiling 305-Fireblock penetrations in mechanical closet ceiling 303-Fireblock penetrations in mechanical closet ceiling, missing sprinkler head in mechanical closet 302-Repair sheet rock in mechanical closet and fire block penetrations and ceiling, Missing sprinkler head in mechanical closet 301/302 still to do
Occupancy Inspection - Engineering Passed 11/9/2020 11/09/2020
Occupancy Inspection - Planning Passed 11/9/2020 11/09/2020
Occupancy Inspection - Fire Failed 11/9/2020 11/9/2020 11/09/2020
Occupancy Inspection - Codes Commercial Failed 11/9/2020 11/9/2020 11/09/2020
Misc
Corrective Action Required
11/09/2020
G1- hole west wall, caulk around sprinkler pipe. Door lock not installed. G2- covered spkr head. Units-109,107 caulk HVAC South Mechanical room caulk all ceiling penetrations correctly. IT room penetrations. G10 hole ceiling at garage door wires. S20 esc ring loose caulk around hole. Mechanical & Electrical room north - missing blanks. Caulk ac line set. Secure MC to furnace. G13 SPRKL HEAD painted head. Painted head over door 1st floor Next to Stairs North tower. North stair shaft/East entry door-Fireblock Sheetrock penetrations at sprinkler equipment. North Mechanical room- fire block penetrations, repair Sheetrock at return air, Provide electrical panel schedule and blanks for open breaker spaces. S20-Fireblock ceiling penetration, junction box outside S20 & basement- ceiling of corridor, seal and install correct cover plate. IT Room-Fire block ceiling penetration. 1st floor corridor ceiling penetrations . 311 seal ceiling mech closet, Deck rail. 310 sprinkler heads master bedroom & closet, Seal ceiling mech closet, 309 seal ceiling mech room, a 4" sphere shall not pass through deck railing. 308 seal ceiling mech closet, 4" deck railing. 206,207,208,209, 306,307 seal ceiling mech closet. 211 seal ceiling mech closet 104-fireblock ceiling penetrations in mechanical closet. 102- seal ceiling mech closet. 100- seal ceiling mech closet 2nd floor Northeast stair tower, secure handrail to wall. 201-Repair sheet rock and seal ceiling mech closet 200 seal ceiling mech closet, Anti-tip device at stove. 202 seal ceiling mech closet. 203- Repair sheet rock fire block ceiling penetrations mechanical closet. 205- Repair sheet rock and fire block ceiling penetrations in mechanical closet 204-305- 303-Fireblock penetrations in mechanical closet ceiling, covered sprinkler head. 303 missing sprinkler head in mech closet 302-Repair sheet rock in mechanical closet and fire block penetrations and ceiling, covered sprinkler head in mech room. 301 seal mech room penetrations 300 seal mech room penetrations 304 seal mech room penetrations South Sprinkler room- install cover for heater, fire caulk and seal all penetrations. Basement safe room – terminate NM at ceiling, terminate NM at box for heater 06,08,02 – seal, repair penetrations at mech room ceiling 10 – seal mech room ceiling, guardrail 4” max 00 – seal mech room ceiling, guardrail 4” max at patio, missing esc ring at sprinkler 04 – ceiling light missing in hall and bathroom, seal mech room ceiling, G12, G11,G10,G9,G8,G7,G6,G4 – fire caulk at ceiling pentrations Fire Department list --- inspect at re-final by Codes. Exit sign not illuminating or battery backup (next to 206). Chevrons on exit sign 1st floor hall needs to be taken out(arrows to point to both exits). Fire extinguisher in 3rd floor hall needs to be annually certified . Emergency light lower level (stair2) not illuminating on battery backup.
Occupancy Inspection - Water Utilities Passed 11/10/2020 11/10/2020
Occupancy Inspection - Codes Commercial Full C of O 11/20/2020 11/20/2020 11/20/2020
Misc
Resolved
11/20/2020
G1- hole west wall, caulk around sprinkler pipe. Door lock not installed. G2- covered spkr head. Units-109,107 caulk HVAC South Mechanical room caulk all ceiling penetrations correctly. IT room penetrations. G10 hole ceiling at garage door wires. S20 esc ring loose caulk around hole. Mechanical & Electrical room north - missing blanks. Caulk ac line set. Secure MC to furnace. G13 SPRKL HEAD painted head. Painted head over door 1st floor Next to Stairs North tower. North stair shaft/East entry door-Fireblock Sheetrock penetrations at sprinkler equipment. North Mechanical room- fire block penetrations, repair Sheetrock at return air, Provide electrical panel schedule and blanks for open breaker spaces. S20-Fireblock ceiling penetration, junction box outside S20 & basement- ceiling of corridor, seal and install correct cover plate. IT Room-Fire block ceiling penetration. 1st floor corridor ceiling penetrations . 311 seal ceiling mech closet, Deck rail. 310 sprinkler heads master bedroom & closet, Seal ceiling mech closet, 309 seal ceiling mech room, a 4" sphere shall not pass through deck railing. 308 seal ceiling mech closet, 4" deck railing. 206,207,208,209, 306,307 seal ceiling mech closet. 211 seal ceiling mech closet 104-fireblock ceiling penetrations in mechanical closet. 102- seal ceiling mech closet. 100- seal ceiling mech closet 2nd floor Northeast stair tower, secure handrail to wall. 201-Repair sheet rock and seal ceiling mech closet 200 seal ceiling mech closet, Anti-tip device at stove. 202 seal ceiling mech closet. 203- Repair sheet rock fire block ceiling penetrations mechanical closet. 205- Repair sheet rock and fire block ceiling penetrations in mechanical closet 204-305- 303-Fireblock penetrations in mechanical closet ceiling, covered sprinkler head. 303 missing sprinkler head in mech closet 302-Repair sheet rock in mechanical closet and fire block penetrations and ceiling, covered sprinkler head in mech room. 301 seal mech room penetrations 300 seal mech room penetrations 304 seal mech room penetrations South Sprinkler room- install cover for heater, fire caulk and seal all penetrations. Basement safe room – terminate NM at ceiling, terminate NM at box for heater 06,08,02 – seal, repair penetrations at mech room ceiling 10 – seal mech room ceiling, guardrail 4” max 00 – seal mech room ceiling, guardrail 4” max at patio, missing esc ring at sprinkler 04 – ceiling light missing in hall and bathroom, seal mech room ceiling, G12, G11,G10,G9,G8,G7,G6,G4 – fire caulk at ceiling pentrations Fire Department list --- inspect at re-final by Codes. Exit sign not illuminating or battery backup (next to 206). Chevrons on exit sign 1st floor hall needs to be taken out(arrows to point to both exits). Fire extinguisher in 3rd floor hall needs to be annually certified . Emergency light lower level (stair2) not illuminating on battery backup.
Occupancy Inspection - Fire Passed 11/20/2020 11/20/2020 11/20/2020
Documents & Images
Date Uploaded File Type Document Name
05/22/2017 Permit Map
12/20/2017 Receipt Receipt for transaction: 2017-007716
09/25/2019 Letter DS Building Permit
04/29/2020 Letter INSPECTION SUMMARY
05/05/2020 Letter INSPECTION SUMMARY
05/11/2020 Letter INSPECTION SUMMARY
05/12/2020 Letter INSPECTION SUMMARY
05/14/2020 Letter INSPECTION SUMMARY
05/14/2020 Letter INSPECTION SUMMARY
05/14/2020 Letter INSPECTION SUMMARY
05/18/2020 Letter INSPECTION SUMMARY
05/19/2020 Letter INSPECTION SUMMARY
05/19/2020 Letter INSPECTION SUMMARY
06/04/2020 Letter INSPECTION SUMMARY
06/16/2020 Letter INSPECTION SUMMARY
06/23/2020 Letter INSPECTION SUMMARY
08/03/2020 Letter DS Building Permit
11/06/2020 Letter INSPECTION SUMMARY
11/09/2020 Letter INSPECTION SUMMARY
11/10/2020 Letter INSPECTION SUMMARY
11/10/2020 Letter Codes Plan Review Conditions
11/10/2020 Letter INSPECTION SUMMARY
11/10/2020 Letter INSPECTION SUMMARY
11/10/2020 Letter INSPECTION SUMMARY
11/10/2020 Letter INSPECTION SUMMARY
11/10/2020 Letter INSPECTION SUMMARY
11/10/2020 Letter INSPECTION SUMMARY
11/10/2020 Letter INSPECTION SUMMARY
11/10/2020 Letter INSPECTION SUMMARY
11/10/2020 Letter INSPECTION SUMMARY
11/10/2020 Letter INSPECTION SUMMARY
11/10/2020 Letter INSPECTION SUMMARY
11/10/2020 Letter INSPECTION SUMMARY
11/10/2020 Letter INSPECTION SUMMARY
11/10/2020 Letter INSPECTION SUMMARY
11/10/2020 Letter INSPECTION SUMMARY
11/10/2020 Letter INSPECTION SUMMARY
11/10/2020 Letter INSPECTION SUMMARY
11/10/2020 Letter INSPECTION SUMMARY
11/10/2020 Letter INSPECTION SUMMARY
11/10/2020 Letter INSPECTION SUMMARY
11/10/2020 Letter INSPECTION SUMMARY
11/10/2020 Letter INSPECTION SUMMARY
11/10/2020 Letter INSPECTION SUMMARY
11/18/2020 Letter INSPECTION SUMMARY
11/18/2020 Letter INSPECTION SUMMARY
11/18/2020 Letter INSPECTION SUMMARY
11/18/2020 Letter INSPECTION SUMMARY
11/18/2020 Letter INSPECTION SUMMARY
11/18/2020 Letter INSPECTION SUMMARY
11/18/2020 Letter INSPECTION SUMMARY
11/18/2020 Letter INSPECTION SUMMARY
11/18/2020 Letter INSPECTION SUMMARY
11/20/2020 Letter Codes Final Certificate of Occupancy
11/24/2020 Letter INSPECTION SUMMARY
11/24/2020 Letter INSPECTION SUMMARY
11/24/2020 Letter Fire Loss Reduction Form
11/24/2020 Letter Field Certificate of Occupancy
11/24/2020 Letter INSPECTION SUMMARY
11/25/2020 Letter INSPECTION SUMMARY
11/25/2020 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home