M150 ECHELON LAND DEV LLC
NEW MULTI-FAMILY
NEW 3 STORY APARTMENT BUILDING #6 FOUNDATION PERMIT - PRCOM20180521
02/16/2017
08/07/2018
10/29/2019
Locations
Contacts
LUKE DRAILY CONSTRUCTION INC, Address:75 NW BUSINESS PARK LANE, Phone:(816) 459-8531  
RELIABLE MECHANICAL SERVICES INC, Address:1025 W COUCHMAN DR, Phone:(816) 903-7674  
ELECTRICAL ENTERPRISES INC, Address:PO BOX 127, Phone:(785) 242-7971  
RELIABLE MECHANICAL SERVICES INC, Address:1025 W COUCHMAN DR, Phone:(816) 903-7674  
NSPJ ARCHITECTS, Address:3515 W 75TH ST, SUITE 201, Phone:(913) 831-1415 Ext:278  
KANSAS CITY TESTING & ENGINEERING, Address:1308 ADAMS STREET, Phone:(913) 321-8100  
M150 ECHELON LAND DEV LLC, Address:120 SE 30TH ST  
CITY OF LEE'S SUMMIT MISSOURI, Address:220 SE GREEN ST  
Reviews
Review Type Outcome Est. Completion Date Completed
Special Inspections Review Approved 04/12/2018
Joe Frogge
Fire Plan Review Approved 03/06/2017 04/12/2018
Joe Frogge
Building Plan Review Approved 06/14/2018 04/12/2018
Joe Frogge
Licensed Contractors Approved 06/14/2018 04/12/2018
Joe Frogge
Final Development Plan Review Approved 03/06/2017 02/05/2018
Joe Frogge
Alarm Plan Review Released for Construction 05/24/2017
Joe Dir
Sprinkler Plan Review Released for Construction 05/24/2017
Joe Dir
Fees
Paid Fees Amount Paid Owing Date Paid
Valuation Fee for New Multi-Family $18,489.96 $18,489.96 Paid 12/20/2017
8331507-Sewer Connection Fee $3,000.00 $3,000.00 Paid 12/20/2017
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Above Ceiling Inspection Passed 4/8/2019 at 12:45 PM 04/08/2019
All Rough Inspection - Commercial Partial 4/8/2019 at 1:16 PM 04/08/2019
THIRD FLOOR
Corrective Action Required
04/08/2019
STRAP TOP PLATES AT PLUMBING VENT BORE IN PLATE TWO FAR NORTH UNTITS. OKAY TO INSULATE 3RD FLOOR ONLY
All Rough Inspection - Commercial Failed 4/11/2019 4/11/2019 04/11/2019
THIRD FLOOR
Corrective Action Required
04/08/2019
STRAP TOP PLATES AT PLUMBING VENT BORE IN PLATE TWO FAR NORTH UNTITS. OKAY TO INSULATE 3RD FLOOR ONLY
SECOND FLOOR
Corrective Action Required
04/11/2019
-BEARING TOP PLATES DRILLED OVER 50% FOR PLUMBING NEED STRAPS. CHECK ALL -DRILLING HOLES IN DRAFT STOPS FOR FIBER, STILL WORKING, NOT SEALED -DOUBLE WALLS NEXT TO TUBS NORTH UNTITS NEED FIRESTOPPED
All Rough Inspection - Commercial Failed 4/16/2019 4/16/2019 at 12:50 PM 04/16/2019
THIRD FLOOR
Partial Correction
04/16/2019
NO VIOLATIONS-LIGHT WEIGHT CONCRETE AROUND TUBS APPROVE
SECOND FLOOR
Partial Correction
04/16/2019
NO VIOLATIONS-LIGHT WEIGHT CONCRETE AROUND TUBS APPROVE
FIRST FLOOR
Corrective Action Required
04/16/2019
1. South garage, south wall missing hold downs 2. Unit to the south of the southwest stair tower: missing strap top plate south wall, area next to the tub not firestopped, cut bottom chord of truss in the same area. 3. First floor draft stops not compliant. No compliant draft stops between garages/corridor. Multiple penetrations in unit draft stops. 4. North garage wall missing hold downs.
Electrical Service Inspection Passed 4/18/2019 4/18/2019 04/18/2019
Rated Assembly Inspection Partial 4/23/2019 4/24/2019 at 11:00 AM 04/24/2019
THIRD FLOOR
Partial Correction
04/23/2019
FIRST LAYER WALLS AND LID
SECOND FLOOR
Partial Correction
04/23/2019
UNITS ONLY: LID APPROVED
All Rough Inspection - Commercial Failed 4/24/2019 4/24/2019 04/24/2019
THIRD FLOOR
Partial Correction
04/16/2019
NO VIOLATIONS-LIGHT WEIGHT CONCRETE AROUND TUBS APPROVE
SECOND FLOOR
Partial Correction
04/16/2019
NO VIOLATIONS-LIGHT WEIGHT CONCRETE AROUND TUBS APPROVE
FIRST FLOOR
Corrective Action Required
04/16/2019
2. Unit to the south of the southwest stair tower: cut bottom chord of truss in the same area. Have engineer addreses a fix.
Rated Assembly Inspection Partial 4/26/2019 4/26/2019 04/26/2019
THIRD FLOOR
Partial Correction
04/24/2019
FIRST LAYER WALLS AND LID
SECOND FLOOR
Partial Correction
04/24/2019
UNITS ONLY: LID APPROVED
All Rough Inspection - Commercial Partial 4/29/2019 4/29/2019 at 1:00 PM 04/29/2019
THIRD FLOOR
Partial Correction
04/24/2019
NO VIOLATIONS-LIGHT WEIGHT CONCRETE AROUND TUBS APPROVE
SECOND FLOOR
Partial Correction
04/24/2019
NO VIOLATIONS-LIGHT WEIGHT CONCRETE AROUND TUBS APPROVE
FIRST FLOOR
Partial Correction
04/29/2019
no violations
Rated Assembly Inspection Partial 4/29/2019 4/29/2019 at 1:11 PM 04/29/2019
THIRD FLOOR
Partial Correction
04/26/2019
FIRST LAYER WALLS AND LID. SECOND LAYER LIDS THROUGHOUT APPROVED
SECOND FLOOR
Partial Correction
04/26/2019
UNITS ONLY: LID APPROVED
Misc
Partial Correction
04/29/2019
-STAIR TOWERS: LIDS, FIRST AND SECOND LAYERS APPROVED
Rated Assembly Inspection Partial 5/1/2019 5/1/2019 at 1:00 PM 05/01/2019
THIRD FLOOR
Partial Correction
04/29/2019
FIRST LAYER WALLS AND LID. SECOND LAYER LIDS THROUGHOUT APPROVED
SECOND FLOOR
Partial Correction
04/29/2019
ALL WALLS LIDS APPROVED
Misc
Partial Correction
04/29/2019
-STAIR TOWERS: LIDS, FIRST, SECOND AND THIRD LAYERS APPROVED
Rated Assembly Inspection Partial 5/6/2019 5/6/2019 at 1:00 PM 05/06/2019
THIRD FLOOR
Partial Correction
05/01/2019
FIRST LAYER WALLS AND LID. SECOND LAYER LIDS THROUGHOUT APPROVED
SECOND FLOOR
Partial Correction
05/01/2019
ALL WALLS LIDS APPROVED
Misc
Partial Correction
05/01/2019
-STAIR TOWERS: LIDS, FIRST, SECOND AND THIRD LAYERS APPROVED. HAT CHANNEL APPROVED ALL TOWERS
All Rough Inspection - Commercial Passed 5/6/2019 5/6/2019 at 1:05 PM 05/06/2019
THIRD FLOOR
Resolved
05/06/2019
NO VIOLATIONS-LIGHT WEIGHT CONCRETE AROUND TUBS APPROVE
SECOND FLOOR
Resolved
05/06/2019
NO VIOLATIONS-LIGHT WEIGHT CONCRETE AROUND TUBS APPROVE
FIRST FLOOR
Resolved
05/06/2019
no violations
Rated Assembly Inspection Partial 5/14/2019 5/14/2019 at 9:00 AM 05/14/2019
THIRD FLOOR
Partial Correction
05/06/2019
FIRST LAYER WALLS AND LID. SECOND LAYER LIDS THROUGHOUT APPROVED
SECOND FLOOR
Partial Correction
05/06/2019
ALL WALLS LIDS APPROVED
Misc
Partial Correction
05/06/2019
-STAIR TOWERS: ALL LAYERS LIDS APPROVED, FIRST LAYER WALLS APPROVED
FIRST FLOOR
Partial Correction
05/14/2019
FIRST LAYER WALLS AND LIDS APPROVED EVERYWHERE EXCEPT GARAGES
Rated Assembly Inspection Partial 5/24/2019 5/24/2019 05/24/2019
THIRD FLOOR
Partial Correction
05/14/2019
FIRST LAYER WALLS AND LID. SECOND LAYER LIDS THROUGHOUT APPROVED
SECOND FLOOR
Partial Correction
05/14/2019
ALL WALLS LIDS APPROVED
Misc
Partial Correction
05/14/2019
-STAIR TOWERS: ALL LAYERS LIDS APPROVED, walls approved south tower, North tower walls not complete WALKOUT LEVEL: Units walls and lid approved
FIRST FLOOR
Partial Correction
05/14/2019
FIRST LAYER WALLS AND LIDS APPROVED
Rated Assembly Inspection Partial 6/4/2019 6/4/2019 at 10:30 AM 06/04/2019
THIRD FLOOR
Partial Correction
05/24/2019
FIRST LAYER WALLS AND LID. SECOND LAYER LIDS THROUGHOUT APPROVED
SECOND FLOOR
Partial Correction
05/24/2019
ALL WALLS LIDS APPROVED
Misc
Partial Correction
05/24/2019
-STAIR TOWERS: , walls approved south tower,1ST LAYER North tower walls not complete WALKOUT LEVEL: Units walls and lid approved
FIRST FLOOR
Partial Correction
05/24/2019
FIRST LAYER WALLS AND LIDS APPROVED
Misc
Corrective Action Required
06/04/2019
stair towers 1st layer walls OK
Rated Assembly Inspection Partial 6/13/2019 6/13/2019 06/13/2019
THIRD FLOOR
Resolved
10/29/2019
FIRST LAYER WALLS AND LID. SECOND LAYER LIDS THROUGHOUT APPROVED
SECOND FLOOR
Resolved
10/29/2019
ALL WALLS LIDS APPROVED
Misc
Resolved
10/29/2019
-STAIR TOWERS: , walls approved south tower,1ST LAYER North tower walls not complete WALKOUT LEVEL: Units walls and lid approved
FIRST FLOOR
Resolved
10/29/2019
FIRST LAYER WALLS AND LIDS APPROVED
Misc
Resolved
10/29/2019
stair towers 1st layer walls OK 2nd layer west towers approved
Alarm Test Passed 10/24/2019 10/24/2019
Sprinkler - Flow Test Passed 10/24/2019 10/24/2019
Sprinkler - Hydrostatic Test Passed 4/1/2019 10/24/2019
Occupancy Inspection - Fire Failed 10/25/2019 10/25/2019
Occupancy Inspection - Codes Commercial Failed 10/25/2019 10/25/2019 10/25/2019
Misc
Corrective Action Required
10/25/2019
-207 spindle spacing bent at porch -205 rock wool in hole 3x6” cover with Sheetrock. -Storage unit 6 fire caulk around 2” pipe -Gfci units 306-07 stacks counter A1 units -Gfci needed in safe room in basement -E3902.6 kitchen counter - Unit 306 gfci needed in kitchen, east wall - Unit 307 gfci needed in kitchen, west wall Smoke detector covered up in bedroom -unit 08 fire caulk waterlines going through ceiling in mechanical room - unit 06 gfci needed on east wall in kitchen
Occupancy Inspection - Planning Passed 10/29/2019
Occupancy Inspection - Codes Commercial Full C of O 10/29/2019 10/29/2019 10/29/2019
Misc
Resolved
10/29/2019
-207 spindle spacing bent at porch -205 rock wool in hole 3x6” cover with Sheetrock. -Storage unit 6 fire caulk around 2” pipe -Gfci units 306-07 stacks counter A1 units -Gfci needed in safe room in basement -E3902.6 kitchen counter - Unit 306 gfci needed in kitchen, east wall - Unit 307 gfci needed in kitchen, west wall Smoke detector covered up in bedroom -unit 08 fire caulk waterlines going through ceiling in mechanical room - unit 06 gfci needed on east wall in kitchen
Occupancy Inspection - Fire Passed 10/30/2019 10/30/2019
Documents & Images
Date Uploaded File Type Document Name
05/22/2017 Permit Map
12/20/2017 Receipt Receipt for transaction: 2017-007716
08/07/2018 Letter Codes Building Permit
04/08/2019 Letter INSPECTION SUMMARY
04/08/2019 Letter INSPECTION SUMMARY
04/11/2019 Letter INSPECTION SUMMARY
04/16/2019 Letter INSPECTION SUMMARY
04/18/2019 Letter INSPECTION SUMMARY
04/23/2019 Letter INSPECTION SUMMARY
04/24/2019 Letter INSPECTION SUMMARY
04/24/2019 Letter INSPECTION SUMMARY
04/26/2019 Letter INSPECTION SUMMARY
04/29/2019 Letter INSPECTION SUMMARY
04/29/2019 Letter INSPECTION SUMMARY
05/01/2019 Letter INSPECTION SUMMARY
05/06/2019 Letter INSPECTION SUMMARY
05/06/2019 Letter INSPECTION SUMMARY
05/14/2019 Letter INSPECTION SUMMARY
05/24/2019 Letter INSPECTION SUMMARY
06/04/2019 Letter INSPECTION SUMMARY
06/13/2019 Letter INSPECTION SUMMARY
10/25/2019 Letter INSPECTION SUMMARY
10/29/2019 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home