Summary
PRCOM20170403
Building Permit - Commercial
Certificate of Occupancy
M150 ECHELON LAND DEV LLC
NEW MULTI-FAMILY
NEW 3 STORY APARTMENT BUILDING FOUNDATION PERMIT - PRCOM20173999 *NOT TO BE ISSUED UNTIL FIRE DEPARTMENT RELEASES PERMIT
02/16/2017
08/07/2018
09/06/2019
Locations
Contacts
LUKE DRAILY CONSTRUCTION INC, Address:75 NW BUSINESS PARK LANE, Phone:(816) 459-8531  
RELIABLE MECHANICAL SERVICES INC, Address:1025 W COUCHMAN DR, Phone:(816) 903-7674  
ELECTRICAL ENTERPRISES INC, Address:PO BOX 127, Phone:(785) 242-7971  
RELIABLE MECHANICAL SERVICES INC, Address:1025 W COUCHMAN DR, Phone:(816) 903-7674  
NSPJ ARCHITECTS, Address:3515 W 75TH ST, SUITE 201, Phone:(913) 831-1415 Ext:278  
KANSAS CITY TESTING & ENGINEERING, Address:1308 ADAMS STREET, Phone:(913) 321-8100  
M150 ECHELON LAND DEV LLC, Address:120 SE 30TH ST  
CITY OF LEE'S SUMMIT MISSOURI, Address:220 SE GREEN ST  
Reviews
Review Type Outcome Est. Completion Date Completed
Special Inspections Review Approved 04/12/2018
Joe Frogge
Fire Plan Review Approved 03/06/2017 04/12/2018
Joe Frogge
Building Plan Review Approved 06/14/2018 04/12/2018
Joe Frogge
Final Development Plan Review Approved 03/06/2017 02/05/2018
Joe Frogge
Licensed Contractors Approved 02/17/2017 02/05/2018
Joe Frogge
Alarm Plan Review Released for Construction 05/24/2017
Joe Dir
Sprinkler Plan Review Released for Construction 05/24/2017
Joe Dir
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for New Multi-Family $10,524.62 $10,524.62 Paid 12/20/2017
8331507-Sewer Connection Fee $3,000.00 $3,000.00 Paid 12/20/2017
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Above Ceiling Inspection Failed 1/29/2019 1/29/2019 at 12:30 PM 01/29/2019
Misc
Corrective Action Required
01/29/2019
3RD FLOOR ONLY, COMPLETE BATH FAN INSATLLATION. NAIL HEADERS. SEAL PENETRATIONS IN DRAFTSTOP SYSTEMS. STRAP BEARING TOP PLATES DRILLED OVER 50%
Above Ceiling Inspection Partial 2/1/2019 2/1/2019 02/01/2019
Misc
Corrective Action Required
01/29/2019
3rd floor: need to see bath fan dampers through rated assembly. Okay to begin rated lid
Sprinkler - Hydrostatic Test Passed 2/1/2019 02/01/2019
All Rough Inspection - Commercial Partial 2/5/2019 2/5/2019 at 12:00 PM 02/05/2019
Misc
Partial Correction
02/05/2019
2nd and 3rd floor approved to cover
All Rough Inspection - Commercial Failed 2/14/2019 2/14/2019 at 12:16 PM 02/14/2019
Misc
Partial Correction
02/05/2019
2nd and 3rd floor approved to cover
FIRST FLOOR
Corrective Action Required
02/14/2019
-UNIT NORTH OF NORTH STAIRS, FIREBLOCK AND FIRESTOP DEAD SPACES -FIRESTOP FEEDERS FAR NORTH GARAGE WALL -COMPLETE WIRING NORTH COMMON AREA
Rated Assembly Inspection Partial 2/15/2019 2/15/2019 at 1:00 PM 02/15/2019
THIRD FLOOR
Partial Correction
02/15/2019
FIRST LAYER LID 3RD FLOOR APPROVED
All Rough Inspection - Commercial Failed 2/20/2019 2/20/2019 at 12:20 PM 02/20/2019
Misc
Partial Correction
02/14/2019
2nd and 3rd floor approved to cover
FIRST FLOOR
Corrective Action Required
02/14/2019
-UNIT NORTH OF NORTH STAIRS, FIREBLOCK AND FIRESTOP DEAD SPACES
All Rough Inspection - Commercial Passed 2/22/2019 02/22/2019
Misc
Resolved
02/22/2019
2nd and 3rd floor approved to cover
FIRST FLOOR
Resolved
02/22/2019
-UNIT NORTH OF NORTH STAIRS, FIREBLOCK AND FIRESTOP DEAD SPACES
Rated Assembly Inspection Partial 3/13/2019 at 1:45 PM 03/13/2019
FIRST FLOOR
Partial Correction
03/13/2019
party walls and lid in units and garages approved
SECOND FLOOR
Partial Correction
03/13/2019
-lid and party walls and hallway approved
THIRD FLOOR
Partial Correction
03/13/2019
-1st and 2nd layer lid approved, party walls approved, hallway approved
Rated Assembly Inspection Partial 3/18/2019 3/18/2019 at 1:30 PM 03/18/2019
THIRD FLOOR
Partial Correction
03/13/2019
FIRST AND SECOND LAYER LID APPROVED, PARTY WALLS AND CORRIDOR APPROVED
SECOND FLOOR
Partial Correction
03/18/2019
PARTY WALLS AND LID APPROVED
FIRST FLOOR
Partial Correction
03/18/2019
PARTY WALLS AND LID APPROVED, CORRIDOR APPROVED
Misc
Partial Correction
03/18/2019
STAIR TOWERS: FIRST LAYER APPROVED
Rated Assembly Inspection Partial 3/20/2019 3/22/2019 03/22/2019
THIRD FLOOR
Partial Correction
03/18/2019
FIRST AND SECOND LAYER LID APPROVED, PARTY WALLS AND CORRIDOR APPROVED
SECOND FLOOR
Partial Correction
03/18/2019
PARTY WALLS AND LID APPROVED
FIRST FLOOR
Partial Correction
03/18/2019
PARTY WALLS AND LID APPROVED, CORRIDOR APPROVED
Misc
Partial Correction
03/18/2019
THIRD LAYER LID STAIR TOWER APPROVED. TOWER WALLS APPROVED.
Rated Assembly Inspection Partial 3/25/2019 3/25/2019 at 11:11 AM 03/25/2019
THIRD FLOOR
Partial Correction
03/22/2019
FIRST AND SECOND LAYER LID APPROVED, PARTY WALLS AND CORRIDOR APPROVED
SECOND FLOOR
Partial Correction
03/22/2019
PARTY WALLS AND LID APPROVED
FIRST FLOOR
Partial Correction
03/22/2019
PARTY WALLS AND LID APPROVED, CORRIDOR APPROVED
Misc
Partial Correction
03/22/2019
THIRD LAYER LID STAIR TOWER APPROVED. hat channel aproved TOWER WALLS APPROVED.
Rated Assembly Inspection Passed 3/26/2019 3/26/2019 at 1:20 PM 03/26/2019
THIRD FLOOR
Resolved
03/26/2019
FIRST AND SECOND LAYER LID APPROVED, PARTY WALLS AND CORRIDOR APPROVED
SECOND FLOOR
Resolved
03/26/2019
PARTY WALLS AND LID APPROVED
FIRST FLOOR
Resolved
03/26/2019
PARTY WALLS AND LID APPROVED, CORRIDOR APPROVED
Misc
Resolved
03/26/2019
THIRD LAYER LID STAIR TOWER APPROVED. hat channel aproved TOWER WALLS APPROVED.
Electrical Service Inspection Passed 4/3/2019 4/3/2019 at 1:45 PM 04/03/2019
Alarm Test Failed 6/25/2019 06/25/2019
Sprinkler - Flow Test Passed 6/25/2019 06/25/2019
Alarm Test Failed 7/8/2019 07/08/2019
Alarm Test Passed 7/15/2019 07/15/2019
Occupancy Inspection - Fire Failed 8/26/2019 08/26/2019
Occupancy Inspection - Codes Commercial Failed 8/26/2019 8/26/2019 08/26/2019
Misc
Corrective Action Required
08/26/2019
204-205 firecaulk furnace room 204 sprinkler ring hall Sprinkler ring hall 2 Stair tower 2 Tower 2 exit light and exterior light Room 300 -outlet in spare bathroom on right side needs to be gfci protected Room 105 -carbon monoxide detector needs to be in great room, it is installed in the bedroom Room 103 -clean out in bedroom needs cover Room 101 -bathroom GFCI not working Storage Room S9 -light hanging Storage room 19 -clean out needs cover South Mechanical room -secure WHIP within 12” of boxes, fire caulk around heat ducts, Room 107 Need clean out cover underneath sink in bathroom, cover over vent in bathroom, smoke and C/o detectors need to be swapped in bedroom and main room, vent fan not working in front bathroom Room 206 -smoke/co combo unit will need to be switched with smoke detector. Main room and bedroom Room 306 -vent fan not working in bathroom Room 307 -fire caulk needed at the ceiling in mechanical room, smoke detector covered in bedroom, vent fan not working in far bathroom
Occupancy Inspection - Codes Commercial Failed 8/28/2019 8/28/2019 08/28/2019
Misc
Corrective Action Required
08/26/2019
Erosion control needs installed ASAP on cheddington dr west of building 4-5. Room 103 -clean out in bedroom needs cover sheetrocked over . Storage Room Storage room 19 COVERED -clean out needs cover It room fire caulk South Mechanical room -, fire caulk around heat ducts.
Occupancy Inspection - Fire Passed 8/28/2019 8/28/2019 08/28/2019
Occupancy Inspection - Codes Commercial Failed 8/29/2019 8/29/2019 08/29/2019
Misc
Corrective Action Required
08/26/2019
Building Inspection items completed. Fire completed- pending Planning and Engineering
Occupancy Inspection - Planning Passed 09/04/2019
Occupancy Inspection - Codes Commercial Full C of O 09/06/2019
Documents & Images
Date Uploaded File Type Document Name
05/22/2017 Permit Map
12/20/2017 Receipt Receipt for transaction: 2017-007716
08/07/2018 Letter Codes Building Permit
01/29/2019 Letter INSPECTION SUMMARY
02/01/2019 Letter Codes Plan Review Conditions
02/01/2019 Letter INSPECTION SUMMARY
02/05/2019 Letter INSPECTION SUMMARY
02/14/2019 Letter INSPECTION SUMMARY
02/15/2019 Letter INSPECTION SUMMARY
02/20/2019 Letter INSPECTION SUMMARY
02/22/2019 Letter INSPECTION SUMMARY
03/13/2019 Letter INSPECTION SUMMARY
03/18/2019 Letter INSPECTION SUMMARY
03/21/2019 Letter INSPECTION SUMMARY
03/22/2019 Letter INSPECTION SUMMARY
03/25/2019 Letter INSPECTION SUMMARY
03/26/2019 Letter INSPECTION SUMMARY
04/03/2019 Letter INSPECTION SUMMARY
08/26/2019 Letter INSPECTION SUMMARY
08/28/2019 Letter INSPECTION SUMMARY
08/29/2019 Letter INSPECTION SUMMARY
09/06/2019 Letter Field Certificate of Occupancy
09/09/2019 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide: