Permit Application Status

PRCOM20170401


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20170401
Building Permit - Commercial
Certificate of Occupancy
M150 ECHELON LAND DEV LLC
NEW MULTI-FAMILY
NEW 3 STORY APARTMENT BUILDING FOUNDATION PERMIT - PRCOM20173998 *NOT TO BE ISSUED UNTIL FIRE DEPARTMENT RELEASES PERMIT
02/16/2017
08/07/2018
02/13/2020
Locations
Contacts
LUKE DRAILY CONSTRUCTION INC, Address:75 NW BUSINESS PARK LANE, Phone:(816) 459-8531  
RELIABLE MECHANICAL SERVICES INC, Address:1025 W COUCHMAN DR, Phone:(816) 903-7674  
ELECTRICAL ENTERPRISES INC, Address:PO BOX 127, Phone:(785) 242-7971  
RELIABLE MECHANICAL SERVICES INC, Address:1025 W COUCHMAN DR, Phone:(816) 903-7674  
NSPJ ARCHITECTS, Address:3515 W 75TH ST, SUITE 201, Phone:(913) 831-1415 Ext:278  
KANSAS CITY TESTING & ENGINEERING, Address:1308 ADAMS STREET, Phone:(913) 321-8100  
M150 ECHELON LAND DEV LLC, Address:120 SE 30TH ST  
CITY OF LEE'S SUMMIT MISSOURI, Address:220 SE GREEN ST  
Reviews
Review Type Outcome Est. Completion Date Completed
Fire Plan Review Approved 03/06/2017 04/12/2018
Joe Frogge
Building Plan Review Approved 05/17/2018 04/12/2018
Joe Frogge
Special Inspections Review Approved 04/12/2018
Joe Frogge
Licensed Contractors Approved 06/14/2018 04/12/2018
Joe Frogge
Final Development Plan Review Approved 03/06/2017 02/05/2018
Joe Frogge
Alarm Plan Review Released for Construction 05/24/2017
Joe Dir
Sprinkler Plan Review Released for Construction 05/24/2017
Joe Dir
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for New Multi-Family $12,571.56 $12,571.56 Paid 12/20/2017
8331507-Sewer Connection Fee $3,000.00 $3,000.00 Paid 12/20/2017
9110080-Not Ready Inspection Fee $50.00 $50.00 Paid 09/26/2019
9110080-Not Ready Inspection Fee $50.00 $50.00 Paid 09/26/2019
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Sprinkler - Hydrostatic Test Failed 4/4/2019 04/04/2019
Sprinkler - Hydrostatic Test Passed 5/13/2019 05/13/2019
All Rough Inspection - Commercial Failed 5/17/2019 5/17/2019 05/17/2019
THIRD FLOOR
Corrective Action Required
05/17/2019
1. Putty pads on back to boxes, Check all. 2. Overdrilled 2x6 studs for plumbing. 3. Firestop line sets stair towers. Strap plates same locations. 4. Unit 303, missing nipple in panel. 5. Unit 302 missing firestop south wall. 6. Firestop tub traps. 7. Electrical conductor protection. Check all.
THIRD FLOOR
Corrective Action Required
05/17/2019
Above Ceiling Inspection Passed 5/17/2019 5/17/2019 05/17/2019
All Rough Inspection - Commercial Partial 5/20/2019 5/20/2019 at 8:50 AM 05/20/2019
THIRD FLOOR
Partial Correction
05/20/2019
THIRD FLOOR APPROVED
All Rough Inspection - Commercial Failed 5/22/2019 5/22/2019 05/22/2019
THIRD FLOOR
Partial Correction
05/20/2019
THIRD FLOOR APPROVED
SECOND FLOOR
Corrective Action Required
05/22/2019
not ready for inspection
All Rough Inspection - Commercial Partial 5/29/2019 at 10:00 AM 05/29/2019
THIRD FLOOR
Partial Correction
05/22/2019
THIRD FLOOR APPROVED
SECOND FLOOR
Corrective Action Required
05/22/2019
-DOUBLE WALLS, PUTTY PADS ON BACK TO BACK BOXES -FIRESTOP LINE SET UNIT 207 BY TUB.
All Rough Inspection - Commercial Partial 5/30/2019 5/30/2019 at 9:10 AM 05/30/2019
THIRD FLOOR
Partial Correction
05/29/2019
THIRD FLOOR APPROVED
SECOND FLOOR
Partial Correction
05/30/2019
2ND FLOOR APPROVED TO COVER
Rated Assembly Inspection Partial 5/31/2019 5/31/2019 at 11:30 AM 05/31/2019
Misc
Partial Correction
05/31/2019
-STAIR TOWER LIDS: FIRST LAYER APPROVED
Rated Assembly Inspection Partial 6/4/2019 6/4/2019 at 11:00 AM 06/04/2019
Misc
Corrective Action Required
06/04/2019
STAIR TOWER LIDS 2ND LAYER APPROVED.
Rated Assembly Inspection Partial 6/4/2019 at 11:21 AM 06/04/2019
Misc
Corrective Action Required
06/04/2019
STAIR TOWER LIDS 2ND LAYER APPROVED.
Misc
Corrective Action Required
06/04/2019
3RD FL ALL WALLS AND CEILINGS EXCEPT 300 , AND 301. APPROVED
Rated Assembly Inspection Partial 6/5/2019 6/5/2019 06/05/2019
Misc
Corrective Action Required
06/04/2019
STAIR TOWER LIDS 3RD LAYER APPROVED.
Misc
Corrective Action Required
06/04/2019
3RD FL ALL WALLS AND CEILINGS EXCEPT
All Rough Inspection - Commercial Partial 6/6/2019 at 12:19 PM 06/06/2019
THIRD FLOOR
Partial Correction
05/30/2019
THIRD FLOOR APPROVED
SECOND FLOOR
Partial Correction
05/30/2019
2ND FLOOR APPROVED TO COVER
FIRST FLOOR
Corrective Action Required
06/06/2019
-PLUMBING PROTECTION DWV NEXT TO SPRINKLER ROOM -SUPPORT ALL DWV PIPE EVERY 4 FEET -STUD SHOE NEXT TO TUB AT UNIT 106
All Rough Inspection - Commercial Partial 6/12/2019 6/12/2019 06/11/2019
THIRD FLOOR
Partial Correction
06/06/2019
THIRD FLOOR APPROVED
SECOND FLOOR
Partial Correction
06/06/2019
2ND FLOOR APPROVED TO COVER
FIRST FLOOR
Corrective Action Required
06/06/2019
-PLUMBING PROTECTION DWV NEXT TO SPRINKLER ROOM
All Rough Inspection - Commercial Partial 6/12/2019 6/12/2019 06/12/2019
THIRD FLOOR
Partial Correction
06/11/2019
THIRD FLOOR APPROVED
SECOND FLOOR
Partial Correction
06/11/2019
2ND FLOOR APPROVED TO COVER
FIRST FLOOR
Partial Correction
06/12/2019
-APPROVED TO COVER
Rated Assembly Inspection Partial 6/12/2019 6/12/2019 06/12/2019
Misc
Corrective Action Required
06/05/2019
STAIR TOWER LIDS 3RD LAYER AND RC APPROVED
Misc
Corrective Action Required
06/05/2019
3RD FL ALL WALLS AND CEILINGS EXCEPT
All Rough Inspection - Commercial Failed 6/13/2019 6/13/2019 06/13/2019
THIRD FLOOR
Partial Correction
06/12/2019
THIRD FLOOR APPROVED
SECOND FLOOR
Partial Correction
06/12/2019
2ND FLOOR APPROVED TO COVER
FIRST FLOOR
Partial Correction
06/12/2019
-APPROVED TO COVER
Misc
Corrective Action Required
06/13/2019
2 loctions for draft stop, mid-point north south, west exterior wall. South end between unit and hallway
Rated Assembly Inspection Partial 6/14/2019 6/14/2019 06/14/2019
Misc
Corrective Action Required
06/12/2019
STAIR TOWER LIDS 3RD LAYER AND RC APPROVED
Misc
Corrective Action Required
06/12/2019
3RD FL ALL WALLS AND CEILINGS FIRST LAYER. SECOND LAYER LIDS APPROVED.
All Rough Inspection - Commercial Passed 6/17/2019 6/17/2019 at 12:30 PM 06/17/2019
THIRD FLOOR
Resolved
06/17/2019
THIRD FLOOR APPROVED
SECOND FLOOR
Resolved
06/17/2019
2ND FLOOR APPROVED TO COVER
FIRST FLOOR
Resolved
06/17/2019
-APPROVED TO COVER
Misc
Resolved
06/17/2019
2 loctions for draft stop, mid-point north south, west exterior wall. South end between unit and hallway
Rated Assembly Inspection Partial 6/18/2019 6/18/2019 at 12:00 PM 06/18/2019
Misc
Corrective Action Required
06/14/2019
STAIR TOWER LIDS approved
Misc
Corrective Action Required
06/14/2019
3RD FL ALL WALLS AND CEILINGS FIRST LAYER. SECOND LAYER LIDS APPROVED.
Rated Assembly Inspection Partial 6/26/2019 6/26/2019 06/26/2019
Misc
Corrective Action Required
06/18/2019
STAIR TOWER LIDS approved, FIRST LAYER WALLS ALL TOWERS APPROVED
Misc
Partial Correction
06/26/2019
3RD FL ALL WALLS AND CEILINGS FIRST LAYER. SECOND LAYER LIDS APPROVED.
SECOND FLOOR
Partial Correction
06/26/2019
FIRST FLOOR
Partial Correction
06/26/2019
FIRST FLOOR, ALL APPROVED EXCEPT COMMON AREA AND CLOSETS
Misc
Partial Correction
06/26/2019
WALKOUT FLOOR APPROVED
Rated Assembly Inspection Partial 7/10/2019 7/10/2019 07/10/2019
Misc
Corrective Action Required
06/26/2019
STAIR TOWER LIDS approved, FIRST LAYER WALLS ALL TOWERS APPROVED
Misc
Partial Correction
06/26/2019
3RD FL ALL WALLS AND CEILINGS FIRST LAYER. SECOND LAYER LIDS APPROVED.
SECOND FLOOR
Partial Correction
06/26/2019
FIRST FLOOR
Partial Correction
06/26/2019
FIRST FLOOR, ALL APPROVED EXCEPT COMMON AREA AND CLOSETS
Misc
Partial Correction
06/26/2019
WALKOUT FLOOR APPROVED
Rated Assembly Inspection Not Ready 7/18/2019 7/18/2019 07/18/2019
Misc
Corrective Action Required
07/10/2019
West side stair towers not complete, workers still installing Sheetrock, screw patterns were not complete and ready for inspection
Misc
Resolved
07/18/2019
SECOND FLOOR
Corrective Action Required
07/18/2019
West side stair towers not complete, workers still installing Sheetrock, screw patterns were not complete and ready for inspection
FIRST FLOOR
Corrective Action Required
07/18/2019
West side stair towers not complete, workers still installing Sheetrock, screw patterns were not complete and ready for inspection
Misc
Resolved
07/18/2019
Electrical Service Inspection Failed 8/7/2019 08/07/2019
Misc
Corrective Action Required
08/07/2019
Needs correct size grounding wire going to ufer ground rod
Alarm Test Passed 11/21/2019 11/21/2019
Sprinkler - Flow Test Passed 11/21/2019 11/21/2019
Occupancy Inspection - Planning Passed 12/10/2019
Occupancy Inspection - Fire Failed 12/10/2019 12/10/2019 12/10/2019
Occupancy Inspection - Codes Commercial Failed 12/10/2019 12/11/2019 12/11/2019
Misc
Corrective Action Required
12/11/2019
307- missing cover plates and spark rings, 1 upper. Lockout for water heater that is hardwired. Label panel. 305-Lockout on water heater . 304-panel labels incorrect - breakers and space 306- labeled incorrect . 308-ok 309-ok 209- missing uppers and backsplash cover plates . 208-ok 206-missing uppers no backsplash, outlets & cover plates not set. 204-,205, 207-same as 206. 104- 106-uppers same as 206,207. 108- lowers & uppers anti tip device on stove , kit counter outlets. Storage S10- ceiling light hanging from electrical with open box. >>Secure HVAC whip south mechanical room 1st floor. >>Center IT Room install metal sleeves to ceiling and secure on all low voltage and cables. >>1St- North electrical & mechanical room - no labeling of panel. >> Basement north end—ok >North Fire sprinkler room- outlet covers missing, install metal conduit on cables and low voltage , caulk all penetrations. South bsmt 06- anti tip stove outlets and 1 upper. Electrical panel not Labeled. 08-no kitchen uppers & lower counters, electrical or plumb , sink, etc. No inspection of Kitchen South meter bank- electrical hanging out of ground and in bushes. Terminate all site electrical in approved box. Main MDP's not Labeled 1of 2, and 2of 2. Install Lockouts on all hardwired appliances not within sight of panel. Install all ranges and anti-tip devices. Complete all unfinished counter, uppers, lowers, back splash, spark rings on outlets & covers.
Electrical Service Inspection Passed 8/9/2019 8/9/2019 12/12/2019
Misc
Informational
08/09/2019
Ok to release
Occupancy Inspection - Fire Passed 12/16/2019 12/16/2019
Occupancy Inspection - Codes Commercial Failed 12/16/2019 12/16/2019 12/16/2019
Misc
Corrective Action Required
12/11/2019
307- missing cover plates and spark rings, 1 upper. Lockout for water heater that is hardwired. Label panel. 305-Lockout on water heater . 209- missing uppers and backsplash cover plates . 206-missing uppers no backsplash, outlets & cover plates not set. 207-same as 206. 106-uppers same as 206,207. 108- lowers & uppers anti tip device on stove , kit counter outlets. Storage >>Center IT Room install metal sleeves to ceiling and secure on all low voltage and cables. >> Basement north end—ok 06- anti tip stove outlets and 1 upper. Electrical panel not Labeled. 08-no kitchen uppers & lower counters, electrical or plumb , sink, etc. No inspection of Kitchen Install Lockouts on all hardwired appliances not within sight of panel. Install all ranges and anti-tip devices. Complete all unfinished counter, uppers, lowers, back splash, spark rings on outlets & covers. Need to inspect roof top
Occupancy Inspection - Codes Commercial Failed 12/18/2019 12/18/2019 12/18/2019
Misc
Corrective Action Required
12/16/2019
209- missing uppers and backsplash cover plates . 206-missing uppers no backsplash, outlets & cover plates not set. 207-same as 206. 106-uppers same as 206,207. 108- lowers & uppers anti tip device on stove , kit counter outlets. Storage >>Center IT Room install metal sleeves to ceiling and secure on all low voltage and cables. >> Basement north end—ok 06- anti tip stove outlets and 1 upper. 08-no kitchen uppers & lower counters, electrical or plumb , sink, etc. No inspection of Kitchen Install all ranges and anti-tip devices. Complete all unfinished counter, uppers, lowers, back splash, spark rings on outlets & covers. All ac whips on roof top need to be secured
Rated Assembly Inspection Passed 01/02/2020
Misc
Resolved
01/02/2020
West side stair towers not complete, workers still installing Sheetrock, screw patterns were not complete and ready for inspection
SECOND FLOOR
Resolved
01/02/2020
West side stair towers not complete, workers still installing Sheetrock, screw patterns were not complete and ready for inspection
FIRST FLOOR
Resolved
01/02/2020
West side stair towers not complete, workers still installing Sheetrock, screw patterns were not complete and ready for inspection
Occupancy Inspection - Codes Commercial Temporary C of O 1/2/2020 1/3/2020 01/03/2020
Misc
Corrective Action Required
01/02/2020
As per Ryan Elam on 12/23 email to Jake Loveless we will issue a TCO on this building only with the following units incomplete. these units shall not be occupied until inspected and approved. this will be the only building out of the 8 this will be allowed. once all units are complete 1 final inspection can be scheduled. 209- missing uppers and backsplash cover plates . 206-missing uppers no backsplash, outlets & cover plates not set. >> 207-same as 206. > 108- lowers & uppers anti tip device on stove , kit counter outlets. >> 06- anti tip stove outlets and 1 upper. 08-no kitchen uppers & lower counters, electrical or plumb , sink, etc. No inspection of Kitchen Install all ranges and anti-tip devices. Complete all unfinished counter, uppers, lowers, back splash, spark rings on outlets & covers. Room 106 ok to occupy
Occupancy Inspection - Codes Commercial Full C of O 2/13/2020 2/13/2020 02/13/2020
Misc
Resolved
02/13/2020
As per Ryan Elam on 12/23 email to Jake Loveless we will issue a TCO on this building only with the following units incomplete. these units shall not be occupied until inspected and approved. this will be the only building out of the 8 this will be allowed. once all units are complete 1 final inspection can be scheduled.
Documents & Images
Date Uploaded File Type Document Name
05/22/2017 Permit Map
12/20/2017 Receipt Receipt for transaction: 2017-007716
08/07/2018 Letter Codes Building Permit
05/17/2019 Letter INSPECTION SUMMARY
05/17/2019 Letter INSPECTION SUMMARY
05/20/2019 Letter INSPECTION SUMMARY
05/22/2019 Letter INSPECTION SUMMARY
05/29/2019 Letter INSPECTION SUMMARY
05/30/2019 Letter INSPECTION SUMMARY
05/31/2019 Letter INSPECTION SUMMARY
06/04/2019 Letter INSPECTION SUMMARY
06/04/2019 Letter INSPECTION SUMMARY
06/05/2019 Letter INSPECTION SUMMARY
06/11/2019 Letter INSPECTION SUMMARY
06/12/2019 Letter INSPECTION SUMMARY
06/12/2019 Letter INSPECTION SUMMARY
06/13/2019 Letter INSPECTION SUMMARY
06/17/2019 Letter INSPECTION SUMMARY
06/18/2019 Letter INSPECTION SUMMARY
06/26/2019 Letter INSPECTION SUMMARY
07/10/2019 Letter INSPECTION SUMMARY
07/18/2019 Letter INSPECTION SUMMARY
08/07/2019 Letter INSPECTION SUMMARY
08/09/2019 Letter INSPECTION SUMMARY
09/26/2019 Receipt Receipt for transaction: 2019-006441
12/11/2019 Letter INSPECTION SUMMARY
12/16/2019 Letter INSPECTION SUMMARY
12/18/2019 Letter INSPECTION SUMMARY
12/19/2019 Letter INSPECTION SUMMARY
01/03/2020 Letter INSPECTION SUMMARY
01/03/2020 Letter Codes Temporary Certificate of Occupancy
02/13/2020 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home