Permit Application Status

PRCOM20170248


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20170248
Building Permit - Commercial
Withdrawn
TRD REAL ESTATE LLC
NEW COMMERCIAL
NEW BUILDING FOR OIL CHANGES AND MINOR REPAIRS Mike Weisenborn 03/29/2018 8:34 AM - Application was withdrawn by the applicant.
02/03/2017
08/09/2017
03/29/2018
Locations
Contacts
  
  
  
  
DAVIDSON ARCHITECTURE & ENGINEERING, Address:4301 INDIAN CREEK PKWY, Phone:(913) 451-9390  
TRD REAL ESTATE LLC, Address:607 NW BLUE PARKWAY  
Intertek-PSI, Address:2828 S. 44th Street, Phone:(913) 310-1600  
Reviews
Review Type Outcome Est. Completion Date Completed
Alarm Plan Review Released for Construction 05/24/2017
Joe Dir
Sprinkler Plan Review Released for Construction 05/24/2017
Joe Dir
Fire Plan Review Approved with Conditions 04/03/2017 03/29/2017
Joe Dir
Misc
Corrective Action Required
03/27/2017

ACTION REQUIRED: AFTER REVIEW OF THE INFORMATION ABOUT THE SIZE/QUANTITY OF THE NEW AND WASTE OIL TANKS AND ANTIFREEZE TANKS. A HAZARDOUS MATERIALS PERMIT WILL BE REQUIRED. A PERMIT CAN BE OBTAINED AT THE FIRE DEPARTMENT.
Material safety and data sheets
Corrective Action Required
03/27/2017

2012 IFC 407.2- Material Safety Data Sheets. Material Safety Data Sheets (MSDS) for all hazardous materials shall be readily available on the premises. PROVIDE THE SDS SHEETS FOR OILS,SOLVENTS, CLEANERS AND MISC FLUIDS THAT MAY BE UTILIZED OR STORED IN BULK. (VERIFIED AT INSPECTION)
Construction documents for fire alarm systems
Corrective Action Required
03/27/2017

2012 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. HAVE THE FIRE ALARM SYSTEM CONTRACTOR PROVIDE SHOP DRAWINGS OF THE FIRE ALARM SYSTEM TO BE INSTALLED. (INFORMATION PURPOSES)
Knox box required
Corrective Action Required
03/27/2017

2012 IFC 506.1- Where required. Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type and shall contain keys to gain necessary access as required by the fire code official. A KNOX BOX CAN BE OBTAINED ON LINE AT knoxbox.com. THE KNOX BOX IS TO BE MOUNTED ABOVE THE FDC APPROX. 5-6 FEET ABOVE FINISH GRADE. (VERIFIED AT INSPECTION)
Construction documents - Fire protection systems
Corrective Action Required
03/27/2017

2012 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. HAVE THE FIRE SPRINKLER SYSTEM CONTRACTOR PROVIDE SHOP DRAWINGS OF THE FIRE SPRINKLER SYSTEM TO BE INSTALLED. (INFORMATION PURPOSES)
Installation acceptance testing
Corrective Action Required
03/27/2017

2012 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. FIELD AND ACCEPTANCE TESTING OF THE FIRE ALARM AND FIRE SPRINKLER SYSTEMS WILL BE REQUIRED PRIOR TO THE FINAL OCCUPANCY INSPECTION. TO SCHEDULE A TEST CONTACT THE FIRE DEPARTMENT AT 816-969-1300.
Building Plan Review Approved with Conditions 04/03/2017 03/28/2017
Joe Frogge
License Tax Application
Corrective Action Required
03/27/2017

A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit. Action required: Comment for informational purposes. 3/28/17 - acknowledged in letter
Final Development Plan
Corrective Action Required
03/27/2017

The building permit for this project can not be issued until the Codes Administration Department has received the approved Final Development Plan from the Planning and Development Department. Action required: Comment for informational purposes.
Bldg - Toilet room wall finish 1210.2.2
Resolved
03/28/2017

2012 IBC 1210.2.2 – Walls and partitions. Walls and partitions with 2 feet of service sinks, urinals and water closets shall have a smooth, hard, nonabsorbent surface, to a height of not less than 4 feet above the floor, and except for structural elements, the materials used in such walls shall be of a type that is not adversely affected by moisture. (See code section for possible exceptions.) Action required: Specify compliant wall finish materials around mop sink and in restrooms 110 & 111. (If paint is used, it must be epoxy based)
Licensed Contractors Rejected 03/27/2017 03/28/2017
Joe Frogge
LC - General Contractor
Corrective Action Required
03/27/2017

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor. 3/28/17 - acknowledged in letter
LC - MEP Subs
Corrective Action Required
03/27/2017

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. 3/28/17 - acknowledged in letter
Fire Plan Review Approved with Conditions 02/17/2017 02/10/2017
Joe Dir
Misc
Corrective Action Required
02/10/2017

PROVIDE INFORMATION ABOUT THE SIZE/QUANTITY OF THE OIL STOREAGE TANKS. NEW AND WASTE OIL TANKS. A HAZARDOUS MATERIALS PERMIT MAY BE REQUIRED.
Material safety and data sheets
Corrective Action Required
02/10/2017

2012 IFC 407.2- Material Safety Data Sheets. Material Safety Data Sheets (MSDS) for all hazardous materials shall be readily available on the premises. PROVIDE THE SDS SHEETS FOR OILS,SOLVENTS, CLEANERS AND MISC FLUIDS THAT MAY BE UTILIZED OR STORED IN BULK. (VERIFIED AT INSPECTION)
Construction documents for fire alarm systems
Corrective Action Required
02/10/2017

2012 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. HAVE THE FIRE ALARM SYSTEM CONTRACTOR PROVIDE SHOP DRAWINGS OF THE FIRE ALARM SYSTEM TO BE INSTALLED. (INFORMATION PURPOSES)
Knox box required
Corrective Action Required
02/10/2017

2012 IFC 506.1- Where required. Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type and shall contain keys to gain necessary access as required by the fire code official. A KNOX BOX CAN BE OBTAINED ON LINE AT knoxbox.com. THE KNOX BOX IS TO BE MOUNTED ABOVE THE FDC APPROX. 5-6 FEET ABOVE FINISH GRADE. (VERIFIED AT INSPECTION)
Construction documents - Fire protection systems
Corrective Action Required
02/10/2017

2012 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. HAVE THE FIRE SPRINKLER SYSTEM CONTRACTOR PROVIDE SHOP DRAWINGS OF THE FIRE SPRINKLER SYSTEM TO BE INSTALLED. (INFORMATION PURPOSES)
Installation acceptance testing
Corrective Action Required
02/10/2017

2012 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. FIELD AND ACCEPTANCE TESTING OF THE FIRE ALARM AND FIRE SPRINKLER SYSTEMS WILL BE REQUIRED PRIOR TO THE FINAL OCCUPANCY INSPECTION. TO SCHEDULE A TEST CONTACT THE FIRE DEPARTMENT AT 816-969-1300.
Building Plan Review Rejected 02/17/2017 02/09/2017
Joe Frogge
License Tax Application
Corrective Action Required
02/09/2017

A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit. Action required: Comment for informational purposes.
Final Development Plan
Corrective Action Required
02/09/2017

The building permit for this project can not be issued until the Codes Administration Department has received the approved Final Development Plan from the Planning and Development Department. Action required: Comment for informational purposes.
Bldg - Toilet room wall finish 1210.2.2
Corrective Action Required
02/09/2017

2012 IBC 1210.2.2 – Walls and partitions. Walls and partitions with 2 feet of service sinks, urinals and water closets shall have a smooth, hard, nonabsorbent surface, to a height of not less than 4 feet above the floor, and except for structural elements, the materials used in such walls shall be of a type that is not adversely affected by moisture. (See code section for possible exceptions.) Action required: Specify compliant wall finish materials around mop sink and in restrooms 110 & 111. (If paint is used, it must be epoxy based)
Licensed Contractors Rejected 02/03/2017 02/09/2017
Joe Frogge
LC - General Contractor
Corrective Action Required
02/09/2017

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor.
LC - MEP Subs
Corrective Action Required
02/09/2017

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Inspections

There are no inspections for this permit application.

Documents & Images
Date Uploaded File Type Document Name
02/10/2017 Letter Fire Building Plan Review
02/10/2017 Letter Codes P/R Corrections Document
03/29/2017 Letter Fire Building Plan Review
03/29/2018 Email Withdrawn Email
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home