Permit Application Status

PRCOM20162803


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20162803
Building Permit - Commercial
Final Completion
JOHN KNOX VILLAGE
PARTIAL COMMERCIAL
COMMONS BUILDING - FOUNDATION AND UNDERSLAB ONLY
10/26/2016
11/01/2016
05/11/2017
Locations
Contacts
PARIC CORPORATION , Address:77 WESTORT PLAZA STE 250, Phone:(636) 561-9795  
LMG CONSTRUCTION, Address:3011 ROANOKE RD, Phone:(816) 474-0333  
JOHN KNOX VILLAGE, Address:400 NW MURRAY RD  
TORGESON ELECTRIC CO INC, Address:3545 SW 6TH AVE, Phone:(785) 233-2213 Ext:101  
Not shown for privacy reasons.
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 11/01/2016 11/01/2016
Development Center
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for Partial Commercial $509.01 $509.01 Paid 11/01/2016
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Commercial Partial 11/7/2016 (2:00) 11/7/2016 11/07/2016
Misc
Partial Correction
11/07/2016
OK TO POUR WHEN READY SECTIONS OF CONCRETE GRADE BEAM + INTEGRAL COLUMN FOOTINGS AS MARKED ON PERMIT PRINTS: POINTS (A) THRU (M);
Footing Inspection - Commercial Partial 11/11/2016 11/11/2016
Misc
Partial Correction
11/07/2016
OK TO POUR WHEN READY SECTIONS OF CONCRETE GRADE BEAM + INTEGRAL COLUMN FOOTINGS AS MARKED ON PERMIT PRINTS: POINTS (A) THRU (M); (M) C/W TO (N); (U) TO (V);
Rough Electrical Inspection - Commercial Passed 11/15/2016 11/15/2016
Footing Inspection - Commercial Partial 11/15/2016 11/15/2016
Misc
Partial Correction
11/11/2016
OK TO POUR WHEN READY SECTIONS OF CONCRETE GRADE BEAM + INTEGRAL COLUMN FOOTINGS AS MARKED ON PERMIT PRINTS: POINTS (A) THRU (M); (M) C/W TO (N); (U) TO (V); (U) TO (T) TO (S) TO (R) TO (Q); (A) TO (W);
Underground Electrical Inspection - Commercial Partial 11/16/2016 11/16/2016 11/16/2016
Misc
Partial Correction
11/16/2016
OK TO COVER WHEN READY BURIED CONDUIT FOR SITE ELECTRICAL SYSTEM AT FOLLOWING LOCATIONS NUMBERED ON SITE PLAN IN PERMIT PRINT SET: #1 TO #2;
Footing Inspection - Commercial Partial 11/16/2016 (1:30) 11/16/2016 11/16/2016
Misc
Partial Correction
11/15/2016
OK TO POUR WHEN READY SECTIONS OF CONCRETE GRADE BEAM + INTEGRAL COLUMN FOOTINGS AS MARKED ON PERMIT PRINTS: POINTS (A) THRU (M); (M) C/W TO (N); (U) TO (V); (U) TO (T) TO (S) TO (R) TO (Q); (A) TO (W); (O) C/W TO (Q); (V) TO (V');
Underground Electrical Inspection - Commercial Partial 11/18/2016 11/18/2016 11/18/2016
Misc
Partial Correction
11/16/2016
OK TO COVER WHEN READY BURIED CONDUIT FOR SITE ELECTRICAL SYSTEM AT FOLLOWING LOCATIONS NUMBERED ON SITE PLAN IN PERMIT PRINT SET: #1 TO #2; #3 SW 90' TO NEAR STORM INLET;
Footing Inspection - Commercial Partial 11/18/2016 (10:00) 11/18/2016 11/18/2016
Misc
Partial Correction
11/16/2016
OK TO POUR WHEN READY SECTIONS OF CONCRETE GRADE BEAM + INTEGRAL COLUMN FOOTINGS AS MARKED ON PERMIT PRINTS: POINTS (A) THRU (M); (M) C/W TO (N); (U) TO (V); (U) TO (T) TO (S) TO (R) TO (Q); (A) TO (W); (O) C/W TO (Q); (V) TO (V'); REMAINDER OF PERIMETER GRADE BEAM EXCEPT ONE AT SOUTH SIDE OF BLDG
Misc
Partial Correction
11/18/2016
INTERIOR ISOLATED FOOTINGS COMPLETE
Underslab Electrical Inspection - Commercial Partial 11/16/2016 12/14/2016 12/14/2016
Misc
Partial Correction
12/14/2016
NO ISSUES FOUND ON UNDER-SLAB ELECTRICAL CONDUIT MATERIAL & WORKMANSHIP AT: TWO 2" UNDER ELECT RM FROM PANEL-TO-PANEL; TWO 4" FROM ELECT RM TO PANEL "K"; ONE 2" PVC FROM ELECT RM TO PANEL "K1";
Underground Electrical Inspection - Commercial Partial 12/22/2016 12/22/2016 12/22/2016
Misc
Partial Correction
11/18/2016
OK TO COVER WHEN READY BURIED CONDUIT FOR SITE ELECTRICAL SYSTEM AT FOLLOWING LOCATIONS NUMBERED ON SITE PLAN IN PERMIT PRINT SET: #1 TO #2; FROM #3 SW 90' TO NEAR STORM INLET;
Misc
Partial Correction
12/22/2016
-SECONDARY CONDUITS SOUTH SIDE COMMONS, 5 4" AND 2 3" CONDUITS APPROVED TO COVER
Footing Inspection - Commercial Passed 11/18/2016 05/11/2017
Misc
Resolved
05/11/2017
OK TO POUR WHEN READY SECTIONS OF CONCRETE GRADE BEAM + INTEGRAL COLUMN FOOTINGS AS MARKED ON PERMIT PRINTS: POINTS (A) THRU (M); (M) C/W TO (N); (U) TO (V); (U) TO (T) TO (S) TO (R) TO (Q); (A) TO (W); (O) C/W TO (Q); (V) TO (V'); REMAINDER OF PERIMETER GRADE BEAM EXCEPT ONE AT SOUTH SIDE OF BLDG
Misc
Resolved
05/11/2017
INTERIOR ISOLATED FOOTINGS COMPLETE
Underground Electrical Inspection - Commercial Passed 12/22/2016 05/11/2017
Misc
Resolved
05/11/2017
OK TO COVER WHEN READY BURIED CONDUIT FOR SITE ELECTRICAL SYSTEM AT FOLLOWING LOCATIONS NUMBERED ON SITE PLAN IN PERMIT PRINT SET: #1 TO #2; FROM #3 SW 90' TO NEAR STORM INLET;
Misc
Resolved
05/11/2017
-SECONDARY CONDUITS SOUTH SIDE COMMONS, 5 4" AND 2 3" CONDUITS APPROVED TO COVER
Underslab Electrical Inspection - Commercial Passed 12/14/2016 05/11/2017
Misc
Resolved
05/11/2017
NO ISSUES FOUND ON UNDER-SLAB ELECTRICAL CONDUIT MATERIAL & WORKMANSHIP AT: TWO 2" UNDER ELECT RM FROM PANEL-TO-PANEL; TWO 4" FROM ELECT RM TO PANEL "K"; ONE 2" PVC FROM ELECT RM TO PANEL "K1";
Underslab Plumbing Inspection - Commercial Passed 12/14/2016 05/11/2017
Final Inspection - Commercial Passed 5/11/2017 05/11/2017
Documents & Images
Date Uploaded File Type Document Name
11/01/2016 Receipt Receipt for transaction: 2016-006664
11/01/2016 Letter Codes Building Permit
11/07/2016 Letter Inspection Summary
11/11/2016 Letter Inspection Summary
11/15/2016 Letter Inspection Summary
11/16/2016 Letter Inspection Summary
11/16/2016 Letter Inspection Summary
11/18/2016 Letter Inspection Summary
11/18/2016 Letter Inspection Summary
12/14/2016 Letter Inspection Summary
12/22/2016 Letter Inspection Summary
05/11/2017 Letter Inspection Summary
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home