PRCOM20162367
Building Permit - Commercial
Final Completion
PARTIAL COMMERCIAL
FOUNDATION AND UNDRSLAB ONLY PERMIT FOR NEW 4 STORY APARTMENT BUILDING REF: PRCOM20161771 FOR FULL BUILDING PERMIT
09/14/2016
10/10/2016
07/06/2017
Locations
Contacts
NEIGHBORS CONSTRUCTION COMPANY INC, Address:1708 E 123RD ST, Phone:(913) 422-5555  
BLUE RIVER PLUMBING INC, Address:9125 BARTON ST, Phone:(913) 701-6410  
LYNN ELECTRIC & COMMUNICATIONS INC, Address:725 N 2ND ST STE K, Phone:(785) 843-5709  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 09/14/2016 10/06/2016
Joe Frogge
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for Partial Commercial $1,055.48 $1,055.48 Paid 10/10/2016
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Commercial Partial 1/27/2017 (9:00) 1/27/2017 01/27/2017
Misc
Partial Correction
01/27/2017
AFTER UFER GROUND JUMPERS ARE IN PLACE OK TO POUR WHEN READY PERIMETER FOOTING AT N,E,S.
Footing Inspection - Commercial Partial 1/30/2017 (9:00) 1/30/2017 01/30/2017
Misc
Partial Correction
01/27/2017
AFTER UFER GROUND JUMPERS ARE IN PLACE OK TO POUR WHEN READY PERIMETER FOOTING AT N,E,S.
Misc
Partial Correction
01/30/2017
OK TO POUR WHEN READY ELEVATOR PIT SLAB
Foundation Inspection - Commercial Partial 1/31/2017 (3:00) 1/31/2017 01/31/2017
Misc
Partial Correction
01/30/2017
OK TO POUR WHEN READY ELEVATOR PIT WALLS
Underslab Plumbing Inspection - Commercial Partial 2/13/2017 2/13/2017 02/13/2017
Misc
Partial Correction
02/13/2017
OK TO COVER WHEN READY UNDER-SLAB PVC SANITARY DRAIN, WASTE, & VENT PIPING. NOTE IPC 312 / IRC P2503.5.1 REQUIREMENT FOR PRESSURE-TESTING PIPING SYSTEM.
Underslab Plumbing Inspection - Commercial Passed 2/14/2017 02/14/2017
Misc
Resolved
02/14/2017
OK TO COVER WHEN READY UNDER-SLAB PVC SANITARY DRAIN, WASTE, & VENT PIPING + RADON COLLECTION & UNDER-SLAB DRAINAGE. ROOF DRAIN PIPING SUBSTANTIALLY COVERED BUT APPREARS TO BE COMPLETE UNDER-SLAB. NOTE IPC 312 / IRC P2503.5.1 REQUIREMENT FOR PRESSURE-TESTING PIPING SYSTEM.
Foundation Inspection - Commercial Passed 1/31/2017 02/14/2017
Misc
Resolved
02/14/2017
OK TO POUR WHEN READY ELEVATOR PIT WALLS
Underslab Electrical Inspection - Commercial Partial 2/14/2017 02/14/2017
Misc
Partial Correction
02/14/2017
OK TO COVER WHEN READY DEEP LIFT PVC ELECTRICAL CONDUIT FROM EAST WALL ENTRY TO ELECTRICAL ROOM
Footing Inspection - Commercial Partial 2/23/2017 (1:00) 2/23/2017 02/23/2017
Misc
Partial Correction
02/22/2017
AFTER UFER GROUND JUMPERS ARE IN PLACE OK TO POUR WHEN READY PERIMETER FOOTING AT N,E,S.
Misc
Partial Correction
02/22/2017
OK TO POUR WHEN READY ELEVATOR PIT SLAB
Misc
Partial Correction
02/23/2017
OK TO POUR POST-TENSIONED FLOOR SLAB SYSTEM AS APPROVED BY SPECIAL INSPECTOR. ENSURE OPENINGS IN VAPOR BARRIER ARE SEALED.
Foundation Inspection - Commercial Not Ready 2/27/2017 02/27/2017
Misc
Partial Correction
02/27/2017
OK TO POUR WHEN READY FOUNDATION WALL AT S,W,N
Foundation Inspection - Commercial Partial 2/28/2017 02/28/2017
Misc
Partial Correction
02/27/2017
OK TO POUR WHEN READY FOUNDATION WALL AT S,W,N
Footing Inspection - Commercial Passed 3/6/2017 (8:15) 3/6/2017 03/06/2017
Misc
Partial Correction
02/23/2017
AFTER UFER GROUND JUMPERS ARE IN PLACE OK TO POUR WHEN READY PERIMETER FOOTING AT N,E,S.
Misc
Partial Correction
02/23/2017
OK TO POUR WHEN READY ELEVATOR PIT SLAB
Misc
Partial Correction
02/23/2017
OK TO POUR POST-TENSIONED FLOOR SLAB SYSTEM AS APPROVED BY SPECIAL INSPECTOR. ENSURE OPENINGS IN VAPOR BARRIER ARE SEALED.
Underground Electrical Inspection - Commercial Passed 3/16/2017 03/16/2017
Foundation Inspection - Commercial Partial 3/20/2017 03/20/2017
Misc
Partial Correction
02/28/2017
OK TO POUR WHEN READY FOUNDATION WALL AT S,W,N
Misc
Partial Correction
03/20/2017
OK TO POUR POST-TENSIONED FLOOR SLAB SYSTEM AT TWO DETACHED GARAGES AS APPROVED BY SPECIAL INSPECTOR.
Footing Inspection - Commercial Partial 3/21/2017 (8:45) 3/21/2017 03/21/2017
Misc
Partial Correction
03/21/2017
OK TO POUR WHEN READY FOOTING FOR RETAINING WALL AT SW AFTER BOTTOM MAT RE-BAR IS CLEAR >=3" FROM TRENCH BOTTOM
Concrete Walls and Columns Inspection Partial 3/23/2017 (8:00) 3/23/2017 03/23/2017
Misc
Partial Correction
03/23/2017
OK TO POUR WHEN READY C.I.P. CONCRETE WING WALLS AT: OUTSIDE SW & NW CORNERS OF BLDG;
Concrete Walls and Columns Inspection Partial 3/23/2017 03/23/2017
Misc
Partial Correction
03/23/2017
OK TO POUR WHEN READY C.I.P. CONCRETE WING WALLS AT: OUTSIDE SW CORNER OF BLDG;
Underground Electrical Inspection - Commercial Partial 4/25/2017 4/25/2017 04/25/2017
Misc
Partial Correction
04/25/2017
OK TO COVER WHEN READY BURIED PVC SECONDARY ELECTRICAL SERVICE CONDUIT: THREE 3" FROM XFRMR LOC SOUTH OF S END OF HIGH SIDE OF BLDG TO BLDG ENTRY;
Footing Inspection - Commercial Partial 5/5/2017 (1:00) 5/5/2017 05/05/2017
Misc
Resolved
05/05/2017
OK TO POUR WHEN READY FOOTING FOR RETAINING WALL AT SW AFTER BOTTOM MAT RE-BAR IS CLEAR >=3" FROM TRENCH BOTTOM
Misc
Partial Correction
05/05/2017
OK TO POUR WHEN READY TRENCH FOOTING AND INTEGRAL SQUARE FOOTINGS AT UPPER LEVEL BLDG FROM (A) TO (P);
Footing Inspection - Commercial Partial 5/6/2017 05/06/2017
Misc
Partial Correction
05/05/2017
OK TO POUR WHEN READY PER 3RD PARTY INSPECTOR TRENCH FOOTING AND INTEGRAL SQUARE FOOTINGS AT UPPER LEVEL BLDG COMPLETE. UFER GROUND JUMPERS IN PLACE ATE SOUTH & NORTH ENDS.
Underslab Plumbing Inspection - Commercial Passed 5/10/2017 5/10/2017 05/10/2017
Foundation Inspection - Commercial Partial 5/15/2017 05/15/2017
Misc
Partial Correction
03/20/2017
OK TO POUR WHEN READY FOUNDATION WALL AT S,W,N
Misc
Partial Correction
03/20/2017
OK TO POUR POST-TENSIONED FLOOR SLAB SYSTEM AT TWO DETACHED GARAGES AS APPROVED BY SPECIAL INSPECTOR.
Misc
Partial Correction
05/15/2017
OK TO POUR WHEN READY POST-TENSIONED FLOOR SLAB SYSTEM AT UPPER LEVEL WHEN APPROVED BY SPECIAL INSPECTOR
Underground Electrical Inspection - Commercial Partial 5/17/2017 5/17/2017 05/17/2017
Misc
Partial Correction
04/25/2017
OK TO COVER WHEN READY BURIED PVC SECONDARY ELECTRICAL SERVICE CONDUIT: THREE 3" FROM XFRMR LOC SOUTH OF S END OF HIGH SIDE OF BLDG TO BLDG ENTRY; THREE 3" FROM XFRMR LOC NW OF N END OF HIGH SIDE OF BLDG TO BLDG ENTRY @ N END;
Underground Electrical Inspection - Commercial Partial 5/25/2017 5/25/2017 05/25/2017
Misc
Partial Correction
05/17/2017
OK TO COVER WHEN READY BURIED PVC SECONDARY ELECTRICAL SERVICE CONDUIT: THREE 3" FROM XFRMR LOC SOUTH OF S END OF HIGH SIDE OF BLDG TO BLDG ENTRY; THREE 3" FROM XFRMR LOC NW OF N END OF HIGH SIDE OF BLDG TO BLDG ENTRY @ N END;
Misc
Partial Correction
05/25/2017
OK TO COVER WHEN READY CONNDUITS FROM UPPER LEVEL BUILDING W/NW TO Q-BOX LOCATION IN ISLAND THEN TO SPACE BETWEEN THE DETACHED GARAGE BUILDINGS -- ONE 3/4", ONE 1", ONE 1-1/4";
Foundation Inspection - Commercial Passed 5/30/2017 05/30/2017
Misc
Resolved
05/30/2017
OK TO POUR WHEN READY FOUNDATION WALL AT S,W,N
Misc
Resolved
05/30/2017
OK TO POUR POST-TENSIONED FLOOR SLAB SYSTEM AT TWO DETACHED GARAGES AS APPROVED BY SPECIAL INSPECTOR.
Misc
Resolved
05/30/2017
OK TO POUR WHEN READY POST-TENSIONED FLOOR SLAB SYSTEM AT UPPER LEVEL WHEN APPROVED BY SPECIAL INSPECTOR
Foundation Inspection - Commercial Passed 5/30/2017 05/30/2017
Concrete Walls and Columns Inspection Passed 5/22/2017 (1:00) 3/23/2017 06/27/2017
Misc
Resolved
06/27/2017
OK TO POUR WHEN READY C.I.P. CONCRETE WING WALLS AT: OUTSIDE SW CORNER OF BLDG;
Footing Inspection - Commercial Passed 5/31/2017 (8:00) 5/6/2017 06/27/2017
Misc
Resolved
06/27/2017
OK TO POUR WHEN READY PER 3RD PARTY INSPECTOR TRENCH FOOTING AND INTEGRAL SQUARE FOOTINGS AT UPPER LEVEL BLDG COMPLETE. UFER GROUND JUMPERS IN PLACE ATE SOUTH & NORTH ENDS.
Underground Electrical Inspection - Commercial Passed 5/25/2017 06/27/2017
Misc
Resolved
06/27/2017
OK TO COVER WHEN READY BURIED PVC SECONDARY ELECTRICAL SERVICE CONDUIT: THREE 3" FROM XFRMR LOC SOUTH OF S END OF HIGH SIDE OF BLDG TO BLDG ENTRY; THREE 3" FROM XFRMR LOC NW OF N END OF HIGH SIDE OF BLDG TO BLDG ENTRY @ N END;
Misc
Resolved
06/27/2017
OK TO COVER WHEN READY CONNDUITS FROM UPPER LEVEL BUILDING W/NW TO Q-BOX LOCATION IN ISLAND THEN TO SPACE BETWEEN THE DETACHED GARAGE BUILDINGS -- ONE 3/4", ONE 1", ONE 1-1/4";
Underslab Electrical Inspection - Commercial Passed 2/14/2017 06/27/2017
Misc
Resolved
02/27/2017
OK TO COVER WHEN READY DEEP LIFT PVC ELECTRICAL CONDUIT FROM EAST WALL ENTRY TO ELECTRICAL ROOM
Final Inspection - Commercial Passed 6/28/2017 06/28/2017
Electrical Service Inspection Passed 6/30/2017 06/30/2017
Final Inspection - Commercial Passed 7/3/2017 07/03/2017
Underground Electrical Inspection - Commercial Partial 4/26/2018 at 11:30 AM 04/26/2018
Misc
Partial Correction
04/26/2018
UE FROM BUILDING 7 GARAGE SERVICE EQUIPMENT TO: ISLAND, 3 LIGHT POLES ON WEST SIDE OF GARAGES, AND TO TRASH DUMPSTER
Documents & Images
Date Uploaded File Type Document Name
10/10/2016 Receipt Receipt for transaction: 2016-006306
10/10/2016 Letter Codes Building Permit
01/27/2017 Letter Inspection Summary
01/30/2017 Letter Inspection Summary
01/31/2017 Letter Inspection Summary
02/13/2017 Letter Inspection Summary
02/14/2017 Letter Inspection Summary
02/23/2017 Letter Inspection Summary
02/28/2017 Letter Inspection Summary
03/06/2017 Letter Inspection Summary
03/16/2017 Letter Inspection Summary
03/20/2017 Letter Inspection Summary
03/21/2017 Letter Inspection Summary
03/23/2017 Letter Inspection Summary
03/23/2017 Letter Inspection Summary
04/25/2017 Letter Inspection Summary
05/05/2017 Letter Inspection Summary
05/06/2017 Letter Inspection Summary
05/10/2017 Letter Inspection Summary
05/15/2017 Letter Inspection Summary
05/17/2017 Letter Inspection Summary
05/25/2017 Letter Inspection Summary
05/30/2017 Letter Inspection Summary
05/30/2017 Letter Inspection Summary
06/28/2017 Letter Inspection Summary
06/28/2017 Letter Inspection Summary
06/30/2017 Letter Inspection Summary
07/03/2017 Letter Inspection Summary
04/26/2018 Letter Inspection Summary
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home