Summary
PRCOM20162365
Building Permit - Commercial
Final Completion
PARTIAL COMMERCIAL
FOUNDATION AND UNDERSLAB ONLY PERMIT FOR NEW 4 STORY APARTMENT BUILDING REF: PRCOM20161767 FOR FULL BUILDING PERMIT
09/14/2016
10/10/2016
06/28/2017
Locations
Contacts
NEIGHBORS CONSTRUCTION COMPANY INC, Address:1708 E 123RD ST, Phone:(913) 422-5555  
BLUE RIVER PLUMBING INC, Address:9125 BARTON ST, Phone:(913) 701-6410  
LYNN ELECTRIC & COMMUNICATIONS INC, Address:725 N 2ND ST STE K, Phone:(785) 843-5709  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 09/14/2016 10/06/2016
Joe Frogge
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for Partial Commercial $1,055.48 $1,055.48 Paid 10/10/2016
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Commercial Passed 12/23/2016 12/28/2016
Footing Inspection - Commercial Partial 1/13/2017 01/13/2017
Misc
Partial Correction
01/13/2017
OK TO POUR WHEN READY ELEVATOR PIT SLAB
Foundation Inspection - Commercial Partial 1/19/2017 01/19/2017
Misc
Partial Correction
01/19/2017
ELEVATOR PIT WALLS: EAST WALL HANGS OVER EDGE OF SLAB; EDGE OF SLAB HAS BEEN DOWELED. CONDITION ALLOWED THIS INSTANCE ONLY AS EXCEPTION TO DRAWINGS.
Underslab Plumbing Inspection - Commercial Partial 2/22/2017 2/22/2017 02/22/2017
Misc
Partial Correction
02/22/2017
OK TO COVER WHEN READY UNDER-SLAB PVC SANITARY DRAIN, WASTE, & VENT PIPING. NOTE IPC 312 / IRC P2503.5.1 REQUIREMENT FOR PRESSURE-TESTING PIPING SYSTEM.
Underslab Electrical Inspection - Commercial Partial 2/22/2017 02/22/2017
Misc
Partial Correction
02/22/2017
OK TO COVER WHEN READY MAIN ELECTRICAL CONDUITS FROM BUILDING ENTRY UNDER WEST EXTERIOR WALL FOOTING TO ELECTRICAL ROOM
Underslab Plumbing Inspection - Commercial Partial 2/24/2017 2/24/2017 02/24/2017
Misc
Partial Correction
02/22/2017
OK TO COVER WHEN READY UNDER-SLAB PVC SANITARY DRAIN, WASTE, & VENT PIPING. NOTE IPC 312 / IRC P2503.5.1 REQUIREMENT FOR PRESSURE-TESTING PIPING SYSTEM.
Misc
Partial Correction
02/24/2017
OK TO COVER WHEN READY RADON COLLECTION PIPING SYSTEM FOUND INSTALLED SUBSTANTIALLY PER REVISION /1\ ON DRAWING SHEET 2.00. ROOF DRAIN PIPING IN PLACE TO BUILDING EXIT.
Underslab Electrical Inspection - Commercial Partial 2/24/2017 02/24/2017
Misc
Partial Correction
02/22/2017
OK TO COVER WHEN READY ELECTRICAL CONDUITS FROM BUILDING ENTRIES UNDER WEST AND EAST EXTERIOR WALL FOOTINGS TO ELECTRICAL ROOM.
Footing Inspection - Commercial Partial 2/27/2017 (10:30) 2/27/2017 02/27/2017
Misc
Partial Correction
01/13/2017
OK TO POUR WHEN READY ELEVATOR PIT SLAB
Misc
Partial Correction
02/27/2017
OK TO POUR WHEN READY GARAGE PERIMETER FOOTING.
Foundation Inspection - Commercial Partial 3/2/2017 03/02/2017
Misc
Partial Correction
01/19/2017
ELEVATOR PIT WALLS: EAST WALL HANGS OVER EDGE OF SLAB; EDGE OF SLAB HAS BEEN DOWELED. CONDITION ALLOWED THIS INSTANCE ONLY AS EXCEPTION TO DRAWINGS.
Misc
Partial Correction
03/02/2017
OK TO POUR POST-TENSIONED BUILDING FLOOR SLAB SYSTEM AS APPROVED BY SPECIAL INSPECTOR. ENSURE UFER GROUND LEADS REMAIN EXTENDED OUTSIDE POUR.
Misc
Partial Correction
03/02/2017
OK TO POUR POST-TENSIONED GARAGE FLOOR SLAB SYSTEM AS APPROVED BY SPECIAL INSPECTOR.
Foundation Inspection - Commercial Partial 3/20/2017 (8:00) 3/20/2017 03/20/2017
Misc
Partial Correction
03/02/2017
ELEVATOR PIT WALLS: EAST WALL HANGS OVER EDGE OF SLAB; EDGE OF SLAB HAS BEEN DOWELED. CONDITION ALLOWED THIS INSTANCE ONLY AS EXCEPTION TO DRAWINGS.
Misc
Partial Correction
03/02/2017
OK TO POUR POST-TENSIONED BUILDING FLOOR SLAB SYSTEM AS APPROVED BY SPECIAL INSPECTOR. ENSURE UFER GROUND LEADS REMAIN EXTENDED OUTSIDE POUR.
Misc
Partial Correction
03/02/2017
OK TO POUR POST-TENSIONED GARAGE FLOOR SLAB SYSTEM AS APPROVED BY SPECIAL INSPECTOR.
Misc
Partial Correction
03/20/2017
OK TO POUR WHEN READY STUB WALLS AT N & S ENDS
Underground Electrical Inspection - Commercial Partial 3/23/2017 3/23/2017 03/23/2017
Misc
Partial Correction
03/23/2017
OK TO COVER WHEN READY PVC CONDUIT TRENCHED BETWEEN APARTMENT BUILDING AND DETACHED GARAGES: ONE 1-1/4" FROM BUILDING TO BUILDING + ONE 3/4" FROM GARAGE TO MIDWAY BETWEEN BUILDINGS STUBBED UP FOR FUTURE EXTENSION FOR SITE LIGHTING
Underground Electrical Inspection - Commercial Partial 4/19/2017 4/19/2017 04/19/2017
Misc
Partial Correction
03/23/2017
OK TO COVER WHEN READY PVC CONDUIT TRENCHED BETWEEN APARTMENT BUILDING AND DETACHED GARAGES: ONE 1-1/4" FROM BUILDING TO BUILDING + ONE 3/4" FROM GARAGE TO MIDWAY BETWEEN BUILDINGS STUBBED UP FOR FUTURE EXTENSION FOR SITE LIGHTING
Misc
Partial Correction
04/19/2017
OK TO COVER WHEN READY THREE 3" PVC SECONDARY SERVICE CONDUITS FROM TRANSFORMER LOCATION AT SE CORNER OF BLDG #6 TO BLDG ENTRY AT N END OF BLDG #5
Footing Inspection - Commercial Passed 3/2/2017 (1:00) 2/27/2017 06/27/2017
Misc
Resolved
06/27/2017
OK TO POUR WHEN READY ELEVATOR PIT SLAB
Misc
Resolved
06/27/2017
OK TO POUR WHEN READY GARAGE PERIMETER FOOTING.
Foundation Inspection - Commercial Passed 3/20/2017 06/27/2017
Misc
Resolved
06/27/2017
ELEVATOR PIT WALLS: EAST WALL HANGS OVER EDGE OF SLAB; EDGE OF SLAB HAS BEEN DOWELED. CONDITION ALLOWED THIS INSTANCE ONLY AS EXCEPTION TO DRAWINGS.
Misc
Resolved
06/27/2017
OK TO POUR POST-TENSIONED BUILDING FLOOR SLAB SYSTEM AS APPROVED BY SPECIAL INSPECTOR. ENSURE UFER GROUND LEADS REMAIN EXTENDED OUTSIDE POUR.
Misc
Resolved
06/27/2017
OK TO POUR POST-TENSIONED GARAGE FLOOR SLAB SYSTEM AS APPROVED BY SPECIAL INSPECTOR.
Misc
Resolved
06/27/2017
OK TO POUR WHEN READY STUB WALLS AT N & S ENDS
Underground Electrical Inspection - Commercial Passed 4/19/2017 06/27/2017
Misc
Resolved
06/27/2017
OK TO COVER WHEN READY PVC CONDUIT TRENCHED BETWEEN APARTMENT BUILDING AND DETACHED GARAGES: ONE 1-1/4" FROM BUILDING TO BUILDING + ONE 3/4" FROM GARAGE TO MIDWAY BETWEEN BUILDINGS STUBBED UP FOR FUTURE EXTENSION FOR SITE LIGHTING
Misc
Resolved
06/27/2017
OK TO COVER WHEN READY THREE 3" PVC SECONDARY SERVICE CONDUITS FROM TRANSFORMER LOCATION AT SE CORNER OF BLDG #6 TO BLDG ENTRY AT N END OF BLDG #5
Underslab Electrical Inspection - Commercial Passed 2/24/2017 06/27/2017
Misc
Resolved
06/27/2017
OK TO COVER WHEN READY ELECTRICAL CONDUITS FROM BUILDING ENTRIES UNDER WEST AND EAST EXTERIOR WALL FOOTINGS TO ELECTRICAL ROOM.
Underslab Plumbing Inspection - Commercial Passed 2/24/2017 06/27/2017
Misc
Partial Correction
02/24/2017
OK TO COVER WHEN READY UNDER-SLAB PVC SANITARY DRAIN, WASTE, & VENT PIPING. NOTE IPC 312 / IRC P2503.5.1 REQUIREMENT FOR PRESSURE-TESTING PIPING SYSTEM.
Misc
Partial Correction
02/24/2017
OK TO COVER WHEN READY RADON COLLECTION PIPING SYSTEM FOUND INSTALLED SUBSTANTIALLY PER REVISION /1\ ON DRAWING SHEET 2.00. ROOF DRAIN PIPING IN PLACE TO BUILDING EXIT.
Final Inspection - Commercial Passed 6/28/2017 06/28/2017
Documents & Images
Date Uploaded File Type Document Name
10/10/2016 Receipt Receipt for transaction: 2016-006306
10/10/2016 Letter Codes Building Permit
12/28/2016 Letter Inspection Summary
01/13/2017 Letter Inspection Summary
01/19/2017 Letter Inspection Summary
02/22/2017 Letter Inspection Summary
02/24/2017 Letter Inspection Summary
02/27/2017 Letter Inspection Summary
03/02/2017 Letter Inspection Summary
03/20/2017 Letter Inspection Summary
03/23/2017 Letter Inspection Summary
04/19/2017 Letter Inspection Summary
04/19/2017 Letter Inspection Summary
06/28/2017 Letter Inspection Summary
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home