Summary
PRCOM20160805
Building Permit - Commercial
Final Completion
NEWBERRY INVESTMENTS LLC
PARTIAL COMMERCIAL
FOUNDATION AND UNDERSLAB FOR NEW BUILDING FOR THE MANUFACTURING OF METAL PARTS FULL PERMIT: PRCOM20160414
04/12/2016
04/13/2016
12/03/2019
Locations
Contacts
INTEGRAL CONSTRUCTION SERVICES, INC, Address:303 SW MARKET ST, Phone:(816) 246-5655  
BRINTON ELECTRIC COMPANY INC, Address:10100 E 65TH ST STE B, Phone:(816) 356-0922  
CL HOWERTON ENTERPRISES LLC, Address:224 NW AA HWY, Phone:(816) 237-6338  
RUNDQUIST & ASSOCIATES, ARCHITECTS PC, Address:6635 EDGEVALE ROAD, Phone:(816) 472-6006  
TERRACON CONSULTANTS INC, Address:10841 S RIDGEVIEW ROAD, Phone:(913) 599-6886  
NEWBERRY INVESTMENTS LLC, Address:103 SE MAGELLAN DR  
PHILLIPS REIS LLC, Address:1440 SE BROADWAY DR  
Reviews
Review Type Outcome Est. Completion Date Completed
Building Plan Review Approved 04/12/2016
Joe Frogge
Special Inspections Review Approved 04/12/2016
Joe Frogge
Licensed Contractors Approved 04/12/2016 04/12/2016
Joe Frogge
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for Partial Commercial $915.65 $915.65 Paid 04/13/2016
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Foundation Inspection - Commercial Partial 6/29/2016 (11:00) 6/29/2016 06/29/2016
Misc
Corrective Action Required
06/29/2016
A"-1-6 WEST WALL
Foundation Inspection - Commercial Partial 6/30/2016 06/30/2016
Misc
Corrective Action Required
06/29/2016
A"-1-6 WEST WALL north wall
Foundation Inspection - Commercial Partial 7/1/2016 07/01/2016
Misc
Corrective Action Required
06/30/2016
A"-1-6 WEST WALL north wall SOUTH AND EAST WALLS, WHERE LOADING DOCK WALL FOOTING WILL START
Footing Inspection - Commercial Passed 7/8/2016 (11:00) 7/8/2016 07/08/2016
Foundation Inspection - Commercial Passed 7/13/2016 7/13/2016 07/13/2016
Misc
Corrective Action Required
07/01/2016
A"-1-6 WEST WALL north wall SOUTH AND EAST WALLS, WHERE LOADING DOCK WALL FOOTING WILL START
Piers/Caissons Inspection - Commercial Partial 7/15/2016 7/15/2016 07/15/2016
Misc
Corrective Action Required
07/15/2016
PADS OK BELOW: -PADS AT D/3, D/4, D.6/3, D.6/4, E/3, E/4
Piers/Caissons Inspection - Commercial Passed 7/18/2016 (1:00) 7/18/2016 07/18/2016
Misc
Resolved
07/18/2016
PADS OK BELOW: -PADS AT D/3, D/4, D.6/3, D.6/4, E/3, E/4
Erosion Control Inspection Residential Partial 7/25/2016 07/25/2016
PW-Erosion and Sediment Control
Corrective Action Required
07/25/2016
Your project is in violation of the Erosion and Sediment control policy. Brice Lawson 07/25/2016 4:01 PM Add the construction entrance per the plans and remove any debris that has been tracked onto the roadway.
Underslab Plumbing Inspection - Commercial Partial 7/29/2016 07/29/2016
Misc
Partial Correction
07/29/2016
UNDERSLAB PLUMBING OK, EXCEPT THE TWO RESTROOMS **HAVE THE ENGINEER APPROVE THE BUSTING OUT OF THE CORNER OF THE PAD FOR THE PLUMBING
Underslab Electrical Inspection - Commercial Passed 8/3/2016 8/3/2016 08/03/2016
Underslab Plumbing Inspection - Commercial Passed 8/3/2016 8/3/2016 08/03/2016
Misc
Resolved
08/03/2016
UNDERSLAB PLUMBING OK, EXCEPT THE TWO RESTROOMS **HAVE THE ENGINEER APPROVE THE BUSTING OUT OF THE CORNER OF THE PAD FOR THE PLUMBING
Water Service Inspection Partial 8/9/2016 08/09/2016
PW-Misc
Informational
08/09/2016
Brice Lawson 08/09/2016 4:09 PM The one and a half inch copper water service line has been stubbed inside the footing and extends approx. 18' outside the building. The 6" ductile iron fire water line has been stubbed into the building and extends approx. 18' outside the building. There is a concrete ticket for this in documents and images. This work has been completed by CL Howerton Enterprises.
PW-Misc
Informational
08/10/2016
Brice Lawson 08/10/2016 4:08 PM CL Howerton Enterprises poured the thrust block for the fire line stub. The thrust block was already backfilled when I showed up to inspect it. I asked Clayton with CL Howerton to provide me with a concrete ticket for this thrust block. Brice Lawson 08/12/2016 7:49 AM A copy of the concrete ticket for this thrust block is saved in documents and images.
Erosion Control Inspection Residential Partial 8/1/2016 09/14/2016
PW-Erosion and Sediment Control
Corrective Action Required
07/25/2016
Your project is in violation of the Erosion and Sediment control policy. Brice Lawson 07/25/2016 4:01 PM Add the construction entrance per the plans and remove any debris that has been tracked onto the roadway.
PW-Misc
Informational
09/14/2016
Brice Lawson 09/14/2016 10:33 AM The ESC inspections will be logged on the infrastructure permit.
Underground Electrical Inspection - Commercial Partial 11/8/2016 11/8/2016 at 11:10 AM 11/08/2016
Misc
Partial Correction
11/08/2016
CONDUIT AT SW CORNER OF PARKING LOT.
Underground Electrical Inspection - Commercial Not Ready 11/8/2016 11/8/2016 at 12:55 PM 11/08/2016
Misc
Partial Correction
11/08/2016
CONDUIT AT SW CORNER OF PARKING LOT.
Underground Electrical Inspection - Commercial Passed 11/8/2016 11/8/2016 11/08/2016
Misc
Partial Correction
11/08/2016
CONDUIT AT SW CORNER OF PARKING LOT.
Documents & Images
Date Uploaded File Type Document Name
04/13/2016 Receipt Receipt for transaction: 2016-001125
04/13/2016 Letter Codes Building Permit
06/29/2016 Letter Inspection Summary
06/30/2016 Letter Inspection Summary
07/01/2016 Letter Inspection Summary
07/08/2016 Letter Inspection Summary
07/13/2016 Letter Inspection Summary
07/15/2016 Letter Inspection Summary
07/18/2016 Letter Inspection Summary
07/25/2016 Letter PW-Daily Inspection Summary
07/29/2016 Letter Inspection Summary
08/03/2016 Letter Inspection Summary
08/12/2016 Fire line thrust block
11/08/2016 Letter Inspection Summary
11/08/2016 Letter Inspection Summary
11/08/2016 Letter Inspection Summary
12/13/2017 Engineer Report/Study Terracon Report - HT Solutions
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home