Permit Application Status

PRCOM20160125


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20160125
Building Permit - Commercial
Final Completion
SAINT LUKES EAST HOSPITAL
CHANGE OF TENANT
INTERIOR ALTERATIONS TO SUITE 330 FOR OUTPATIENT CLINIC - INSTALL 2 HYPERBARIC CHAMBERS, FOUR EXAM ROOMS, DR/NURSE OFFICES
02/01/2016
04/27/2017
08/06/2016
07/24/2017
Locations
Contacts
MCCOWN GORDON CONSTRUCTION LLC, Address:850 MAIN ST, Phone:(816) 960-1111  
RAND CONSTRUCTION COMPANY, Address:1428 W 9TH ST, Phone:(816) 421-4143  
R F FISHER ELECTRIC COMPANY LLC, Address:5299 DTC BLVD STE 600, Phone:(913) 384-1500  
RAND CONSTRUCTION COMPANY, Address:1428 W 9TH ST, Phone:(816) 421-4143  
ACI-BOLAND, Address:1421 EAST 104TH STREET, SUITE 100, Phone:(816) 763-9600  
SAINT LUKES EAST HOSPITAL, Address:901 E 104TH ST MAILSTOP 900N  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 04/14/2017 04/26/2017
Joe Frogge
LC - General Contractor
Resolved
04/26/2017

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor. 7/18/17 - acknowledged in letter
LC - MEP Subs
Resolved
04/26/2017

MEP Subs: No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Excerpt from Sec. 7-130, Lees Summit Code of Ordinances. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. 7/18/17 - acknowledged in letter
Building Plan Review Approved 04/21/2017 04/18/2017
Joe Frogge
Accessibility - Swinging doors - maneuvering clearance 404.2.3.2
Resolved
04/18/2017

ICC A117.1-2009 Section 404.2.3.2 Swinging Doors. Swinging doors shall have maneuvering clearances complying with Table 404.2.3.2. Action required: Modify design at door into Toilet 3D202 to comply. Minimum 18" required at latch side of front approach.
Fire Plan Review Approved with Conditions 04/21/2017 04/18/2017
Joe Dir
Misc
Corrective Action Required
04/14/2017

ACTION RWEQUIRED; (ACKNOWLEDGED) ALL DELAYED EGRESS DOORS, ELECTRIC STIKES, CARD READERS, SHALL UNLOCK UPON ACTUATION OF THE FIRE SPRINKLER SYSTEM, FIRE ALARM SYSTEM, POWER LOSS TO THE LOCK, A SIGNAL FROM THE COMMAND CENTER. INFORMATION PURPOSES, VERIFIED AT TESTING.
Construction documents for fire alarm systems
Corrective Action Required
04/14/2017

ACTION REQUIRED: (ACKNOWLEDGED) 2012 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. PROVIDE AS BUILT PLANS FOR ANY ALTERATIONS TO THE ALARM SYSTEM. INFORMATION PURPOSES
Address numbers required
Corrective Action Required
04/14/2017

ACTION REQUIRED: (ACKNOWLEDGED) 2012 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). PROVIDE SUITE ADRESSING OFF THE CORRIDOR FOR ALL DOORS LEADING INTO THE SUITE. VERIFIED AT INSPECTION.
Construction documents - Fire protection systems
Corrective Action Required
04/14/2017

ACTION REQUIRED: (ACKNOWLEDGED) 2012 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. PROVIDE AS BUILT PLANS FOR ANY ALTERATIONS TO THE FIRE SPRINKLER SYSTEM. INFOMATION PURPOSES.
Installation acceptance testing
Corrective Action Required
04/14/2017

ACTION REQUIRED: (ACKNOWLEDGED) 2012 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. TESTING WILL BE REQUIRED FOR ANY ALTERATIONS DONE TO THE FIRE ALARM SYSTEM. TO SCHEDULE A TEST CONTACT THE FIRE DEPARTMENT @ 816-969-1300. INFORMATION PURPOSES.
Misc
Corrective Action Required
04/14/2017

ACTION REQUIRED: (ACKNOWLEDGED) ALL POWER OUTLETS, LIGHTS, SWITCHES POWERED BY THE GENERATOR NEED TO BE TESTED FOR CONNECTION TO THE GENERATOR PANEL PRIOR TO THE FINAL INSPECTION. DOCUMENTATION OF THE TEST PROVIDE TO THE FIRE DEPARTMENT AND CODES ADMINISTRATION. INFORMATION PURPOSES VERIFIED AT INSPECTION.
Alarm Plan Review Released for Construction 12/31/2016
Joe Dir
Installation acceptance testing
Corrective Action Required
06/06/2017

2012 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. ACTION REQUIRED:(Information purposes) Testing of the new installation will be required prior to the final occupancy inspection. To schedule the testing contact the fire dpartment at 816-969-1300.
Sprinkler Plan Review Released for Construction 12/31/2016
Joe Dir
IFGC - Inspection, testing and maintenance - alarm and extinguishing systems 901.6
Corrective Action Required
06/05/2017

2012 IFC 901.6- Inspection, testing and maintenance. Fire detection, alarm and extinguishing systems shall be maintained in an operative condition at all times, and shall be replaced or repaired where defective. Not required fire protection systems and equipment shall be inspected, tested and maintained or removed. ACTION REQUIRED: (verified at inspection) The existing sprinkler system riser shall be current with all required maintenance and certifications.
Building Plan Review Rejected 02/11/2016 02/08/2016
Joe Frogge
Accessibility - Swinging doors - maneuvering clearance 404.2.3.2
Corrective Action Required
02/08/2016

ICC A117.1-2009 Section 404.2.3.2 Swinging Doors. Swinging doors shall have maneuvering clearances complying with Table 404.2.3.2. Action required: Modify design at door into Toilet 3D202 to comply. Minimum 18" required at latch side of front approach.
Licensed Contractors Rejected 02/11/2016 02/08/2016
Joe Frogge
LC - General Contractor
Corrective Action Required
02/08/2016

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor.
LC - MEP Subs
Corrective Action Required
02/08/2016

MEP Subs: No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Excerpt from Sec. 7-130, Lees Summit Code of Ordinances. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Zoning Review Approved 02/11/2016 02/02/2016
Mike Weisenborn
Fire Plan Review Approved with Conditions 02/11/2016 02/02/2016
Joe Dir
Misc
Corrective Action Required
02/02/2016

ALL DELAYED EGRESS DOORS, ELECTRIC STIKES, CARD READERS, SHALL UNLOCK UPON ACTUATION OF THE FIRE SPRINKLER SYSTEM, FIRE ALARM SYSTEM, POWER LOSS TO THE LOCK, A SIGNAL FROM THE COMMAND CENTER. INFORMATION PURPOSES, VERIFIED AT TESTING.
Construction documents for fire alarm systems
Corrective Action Required
02/02/2016

2012 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. PROVIDE AS BUILT PLANS FOR ANY ALTERATIONS TO THE ALARM SYSTEM. INFORMATION PURPOSES
Address numbers required
Corrective Action Required
02/02/2016

2012 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). PROVIDE SUITE ADRESSING OFF THE CORRIDOR FOR ALL DOORS LEADING INTO THE SUITE. VERIFIED AT INSPECTION.
Construction documents - Fire protection systems
Corrective Action Required
02/02/2016

2012 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. PROVIDE AS BUILT PLANS FOR ANY ALTERATIONS TO THE FIRE SPRINKLER SYSTEM. INFOMATION PURPOSES.
Installation acceptance testing
Corrective Action Required
02/02/2016

2012 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. TESTING WILL BE REQUIRED FOR ANY ALTERATIONS DONE TO THE FIRE ALARM SYSTEM. TO SCHEDULE A TEST CONTACT THE FIRE DEPARTMENT @ 816-969-1300. INFORMATION PURPOSES.
Misc
Corrective Action Required
02/02/2016

ALL POWER OUTLETS, LIGHTS, SWITCHES POWERED BY THE GENERATOR NEED TO BE TESTED FOR CONNECTION TO THE GENERATOR PANEL PRIOR TO THE FINAL INSPECTION. DOCUMENTATION OF THE TEST PROVIDE TO THE FIRE DEPARTMENT AND CODES ADMINISTRATION. INFORMATION PURPOSES VERIFIED AT INSPECTION.
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for Change of Tenant $2,083.35 $2,083.35 Paid 04/27/2017
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
In-wall Inspection Partial 6/6/2017 6/6/2017 06/06/2017
Misc
Partial Correction
06/06/2017
OK TO COVER WHEN READY LIGHT-GAUGE STEEL WALL FRAMING + IN-WALL SYSTEMS THROUGHOUT EXCEPT AT 3D205 & 3D207;
In-wall Inspection Passed 6/8/2017 6/8/2017 06/08/2017
Misc
Resolved
06/08/2017
OK TO COVER WHEN READY LIGHT-GAUGE STEEL WALL FRAMING + IN-WALL SYSTEMS THROUGHOUT EXCEPT AT 3D205 & 3D207;
Above Ceiling Inspection Passed 6/29/2017 6/29/2017 06/29/2017
Alarm Test Passed 7/20/2017 07/20/2017
Occupancy Inspection - Fire Temporary C of O 7/20/2017 07/20/2017
Investigation Inspection Complete 6/2/2017 07/21/2017
Final Inspection - Commercial Passed 7/21/2017 7/21/2017 07/21/2017
Occupancy Inspection - Fire Passed 7/26/2017 07/26/2017
Documents & Images
Date Uploaded File Type Document Name
02/02/2016 Letter Fire Building Plan Review
02/08/2016 Letter Codes P/R Corrections Document
04/18/2017 Letter Fire Building Plan Review
04/26/2017 Letter Codes Plan Review Conditions
04/27/2017 Receipt Receipt for transaction: 2017-001616
04/27/2017 Letter Codes Building Permit
06/05/2017 Letter Fire (Sprinkler) Plan Review
06/06/2017 Letter Fire (Alarm) Plan Review Notice
06/06/2017 Letter Inspection Summary
06/08/2017 Letter Inspection Summary
06/08/2017 Letter Inspection Summary
06/29/2017 Letter Inspection Summary
07/21/2017 Letter Inspection Summary
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home