Permit Application Status

PRCOM20152838


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20152838
Building Permit - Commercial
Final Completion
SAINT LUKES EAST HOSPITAL
ALTERATION COMMERCIAL
INTERIOR REMODEL - ADDING 2 ECHO ROOMS AND EXPANDING WAITING ROOM
12/09/2015
12/15/2015
03/02/2016
Locations
Contacts
SAINT LUKES EAST HOSPITAL, Address:901 E 104TH ST MAILSTOP 900N  
MCCARTHY BUILDING COMPANIES INC, Address:12851 MANCHESTER RD, Phone:(314) 646-4179  
RAND CONSTRUCTION COMPANY, Address:1428 W 9TH ST, Phone:(816) 421-4143  
RAND CONSTRUCTION COMPANY, Address:1428 W 9TH ST, Phone:(816) 421-4143  
HEARTLAND ELECTRIC CORPORATION, Address:947 LOCUST HILL CIR, Phone:(816) 318-8500  
Reviews
Review Type Outcome Est. Completion Date Completed
Sprinkler Plan Review Released for Construction 12/22/2015
Joe Dir
Misc
Corrective Action Required
12/22/2015

SPRINKLER PROTECTION SHALL BE MAINTAINED THROUGHOUT ALL CONSTRUCTION PHASES
Building Plan Review Approved with Conditions 12/21/2015 12/15/2015
Joe Frogge
NEC - Patient Care - Grounding of receptacles
Corrective Action Required
12/15/2015

2011 NEC 517.13 Grounding of Receptacles and Fixed Electrical Equipment in Patient Care Areas. Wiring in patient care areas shall comply with 517.13(A) and (B).(A) Wiring methods. All branch circuits serving patient care areas shall be provided with an effective ground-fault current path by installation in a metal raceway system, or a cable having a metallic armor or sheath assembly. The metal raceway system, or metallic cable armor, or sheath assembly shall itself qualify as an equipment grounding conductor in accordance with 250.118.(B) Insulated Equipment Grounding Conductor.(1) General. The following shall be directly connected to an insulated copper equipment grounding conductor that is installed with the branch circuit conductors in the wiring methods as provided in 517.13(A).1. The grounding terminals of all receptacles.2. Metal Boxes and enclosures containing receptacles.3. All non-current-carrying conductive surfaces of fixed electrical equipment likely to become energized that are subject to personal contact, operating at over 100 volts.(refer code for exceptions)(2) Sizing. Equipment grounding conductors and equipment bonding jumpers shall be sized in accordance with 250.122. Action required: All circuits in patient care areas to comply with noted code section. To be field verified.
Fire Plan Review Approved with Conditions 12/21/2015 12/10/2015
Joe Dir
Misc
Corrective Action Required
12/10/2015

PROVIDE ADDRESSING IN THE CORRIDOR FOR NEW ROOMS/ SUITES CREATED BY THE RENNOVATION. INFORMATION PURPOSES.
Construction documents for fire alarm systems
Corrective Action Required
12/10/2015

2006 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. PROVIDE SHOP DRAWINGS FOR ANY ALTERATIONS TO THE ALARM SYSTEM. INFORMATION PURPOSES.
Construction documents - Fire protection systems
Corrective Action Required
12/10/2015

2012 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. PROVIDE SHOP DRAWINGS FOR ANY ALTERATIONS TO THE FIRE SPRINKLER SYSTEM. INFORMATION PURPOSES
Installation acceptance testing
Corrective Action Required
12/10/2015

2012 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. ANY ALTERATIONS TO THE ALARM SYSTEM WILL REQUIRE TESTING. TO SCHEDULE A TEST CONTACT THE FIRE DEPARTMENT AT 816-969-1300. INFORMATION PURPOSES.
Fire Plan Review Approved with Conditions 12/10/2015
Joe Dir
Licensed Contractors Approved 12/21/2015 12/09/2015
Joe Frogge
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for Alteration to Commercial $494.85 $494.85 Paid 12/15/2015
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
In-wall Inspection Partial 1/19/2016 01/19/2016
Misc
Partial Correction
01/19/2016
OK TO COVER WHEN READY LIGHT-GAUGE STEEL WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING SPACES: 1C125 SOUTH WALL;
Above Ceiling Inspection Partial 1/25/2016 1/25/2016 01/25/2016
Misc
Partial Correction
01/25/2016
OK TO COVER WHEN READY ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: 1C125;
In-wall Inspection Partial 2/16/2016 2/12/2016 02/12/2016
Misc
Partial Correction
01/19/2016
OK TO COVER WHEN READY LIGHT-GAUGE STEEL WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING SPACES: 1C125 SOUTH WALL; PHASE 2 SPACES [1D01A]; [1D02]; [1D03]; [1D03A]; [1D06];
Above Ceiling Inspection Partial 2/29/2016 2/29/2016 02/29/2016
Misc
Partial Correction
01/25/2016
OK TO COVER WHEN READY ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: 1C125; 1D01A; 01B; 02; 03; 03A; 06;
Alarm Test Passed 3/1/2016 03/02/2016
Occupancy Inspection - Fire Passed 3/2/2016 03/02/2016
Final Inspection - Commercial Passed 3/2/2016 3/2/2016 03/02/2016
In-wall Inspection Passed 2/12/2016 03/02/2016
Misc
Resolved
03/02/2016
OK TO COVER WHEN READY LIGHT-GAUGE STEEL WALL FRAMING + IN-WALL SYSTEMS AT FOLLOWING SPACES: 1C125 SOUTH WALL; PHASE 2 SPACES [1D01A]; [1D02]; [1D03]; [1D03A]; [1D06];
Above Ceiling Inspection Passed 2/29/2016 03/02/2016
Misc
Resolved
03/02/2016
OK TO COVER WHEN READY ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: 1C125; 1D01A; 01B; 02; 03; 03A; 06;
Documents & Images
Date Uploaded File Type Document Name
12/10/2015 Letter Fire Building Plan Review
12/15/2015 Letter Codes Plan Review Conditions
12/15/2015 Receipt Receipt for transaction: 2015-006413
12/15/2015 Letter Codes Building Permit
12/22/2015 Letter Fire (Sprinkler) Plan Review
01/19/2016 Letter Inspection Summary
01/25/2016 Letter Inspection Summary
02/12/2016 Letter Inspection Summary
02/29/2016 Letter Inspection Summary
03/02/2016 Letter Inspection Summary
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home