Permit Application Status

PRCOM20152366


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20152366
Building Permit - Commercial
Final Completion
SAINT LUKES EAST HOSPITAL
ALTERATION COMMERCIAL
MORGUE RENOVATIONS
10/13/2015
12/18/2015
02/10/2016
Locations
Contacts
TURNER CONSTRUCTION COMPANY, Address:1220 WASHINGTON STE 1000, Phone:(816) 283-0555  
P1 CONSTRUCTION LLC, Address:13605 W 96TH TERR, Phone:(913) 529-5000  
SHAW ELECTRIC COMPANY, Address:3600 FULLER, Phone:(816) 921-0033  
P1 CONSTRUCTION LLC, Address:13605 W 96TH TERR, Phone:(913) 529-5000  
ACI BOLAND, Address:1421 EAST 104TH ST; SUITE 100, Phone:(816) 763-9600  
SAINT LUKES EAST HOSPITAL, Address:901 E 104TH ST MAILSTOP 900N  
Reviews
Review Type Outcome Est. Completion Date Completed
Sprinkler Plan Review Released for Construction 12/04/2015
Joe Dir
IFGC - Inspection, testing and maintenance - alarm and extinguishing systems 901.6
Corrective Action Required
12/04/2015

2012 IFC 901.6- Inspection, testing and maintenance. Fire detection, alarm and extinguishing systems shall be maintained in an operative condition at all times, and shall be replaced or repaired where defective. Not required fire protection systems and equipment shall be inspected, tested and maintained or removed. SPRINKLER SYSTEM SHALL BE CURRENT WITH THE ANNUAL MAINT/SERVICE. VERIFIED AT INSPECTION.
Building Plan Review Approved with Conditions 10/23/2015 10/29/2015
Mike Weisenborn
Fire Plan Review Approved with Conditions 10/23/2015 10/16/2015
Joe Dir
Construction documents - Fire protection systems
Corrective Action Required
10/16/2015

20 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. PROVIDE AS BUILT PLANS FOR ANY ALTERATIONS TO THE SPRINKLER SYSTEM.
Installation acceptance testing
Corrective Action Required
10/16/2015

2012 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. TESTING OF ANY RELOACTED ALARM DEVICES IS REQUIRED. TO SCHEDULE A TEST CONTACT THE FIRE DEAPRTMENT AT 816-969-1300
Licensed Contractors Approved 10/23/2015 10/13/2015
Joe Frogge
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for Alteration to Commercial $243.23 $243.23 Paid 12/18/2015
$234.23
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Miscellaneous Inspection Partial 1/19/2016 01/19/2016
Misc
Partial Correction
01/19/2016
COURTESY VISIT TO DISCUSS SCOPE / SEQUENCE.
Miscellaneous Inspection Partial 1/19/2016 01/20/2016
Misc
Resolved
01/19/2016
COURTESY VISIT TO DISCUSS SCOPE / SEQUENCE.
Miscellaneous Inspection Partial 1/20/2016 01/20/2016
Rough Framing Inspection - Commercial Partial 1/21/2016 01/21/2016
Misc
Partial Correction
01/21/2016
ENLARGED WALL OPENING HAS BEEN CUT AND LINTEL INSTALLED.
Rough Framing Inspection - Commercial Partial 1/22/2016 01/22/2016
Misc
Partial Correction
01/21/2016
ENLARGED WALL OPENING AND ACCESS PANEL OPENING HAVE BEEN CUT AND LINTELS INSTALLED.
Miscellaneous Inspection Passed 1/25/2016 01/25/2016
Rough Framing Inspection - Commercial Partial 1/25/2016 01/25/2016
Misc
Partial Correction
01/22/2016
ENLARGED WALL OPENING AND ACCESS PANEL OPENING HAVE BEEN CUT AND LINTELS INSTALLED.
Rough Framing Inspection - Commercial Partial 1/25/2016 01/25/2016
Misc
Partial Correction
01/25/2016
ENLARGED WALL OPENING AND ACCESS PANEL OPENING HAVE BEEN CUT AND LINTELS INSTALLED. COOLER ENCLOSURE DELIVERED AND SUBSTANTIALLY INSTALLED.
Rough Mechanical Inspection - Commercial Partial 1/26/2016 01/26/2016
Misc
Partial Correction
01/26/2016
COOLER ENCLOSURE SUBSTANTIALLY INSTALLED; PANELS AT ENTRANCE TO BE COMPLETED.
Rough Mechanical Inspection - Commercial Partial 1/27/2016 01/27/2016
Misc
Partial Correction
01/26/2016
COOLER ENCLOSURE SUBSTANTIALLY INSTALLED; PANELS AT ENTRANCE TO BE COMPLETED.
Rough Mechanical Inspection - Commercial Partial 2/1/2016 02/01/2016
Misc
Partial Correction
01/27/2016
COOLER ENCLOSURE SUBSTANTIALLY INSTALLED; PANELS AT ENTRANCE TO BE COMPLETED.
Rough Mechanical Inspection - Commercial Partial 2/2/2016 02/02/2016
Misc
Partial Correction
02/01/2016
COOLER ENCLOSURE SUBSTANTIALLY INSTALLED; PANELS AT ENTRANCE TO BE COMPLETED.
Rough Mechanical Inspection - Commercial Partial 2/3/2016 02/03/2016
Misc
Partial Correction
02/02/2016
COOLER ENCLOSURE SUBSTANTIALLY INSTALLED; PANELS AT ENTRANCE TO BE COMPLETED.
Rough Mechanical Inspection - Commercial Passed 2/4/2016 02/04/2016
Misc
Resolved
02/04/2016
COOLER ENCLOSURE SUBSTANTIALLY INSTALLED; PANELS AT ENTRANCE TO BE COMPLETED.
Rough Framing Inspection - Commercial Passed 2/5/2016 02/05/2016
Misc
Resolved
02/05/2016
ENLARGED WALL OPENING AND ACCESS PANEL OPENING HAVE BEEN CUT AND LINTELS INSTALLED. COOLER ENCLOSURE DELIVERED AND SUBSTANTIALLY INSTALLED.
Occupancy Inspection - Fire Passed 2/9/2016 02/09/2016
Alarm Test Passed 2/9/2016 02/09/2016
Final Inspection - Commercial Passed 2/9/2016 02/09/2016
Documents & Images
Date Uploaded File Type Document Name
10/16/2015 Letter Fire Building Plan Review
10/20/2015 Letter Codes Plan Review Conditions
12/04/2015 Letter Fire (Sprinkler) Plan Review
12/18/2015 Receipt Receipt for transaction: 2015-006446
12/18/2015 Letter Codes Building Permit
02/09/2016 Letter Inspection Summary
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home