Summary
PRCOM20152054
Building Permit - Commercial
Voided
MMHK LLC
CHANGE OF TENANT
TENANT FINISH FOR NEW RESTAURANT - INCLUDES NEW TYPE I GREASE HOOD AND EXTERIOR WALK-IN COOLER voided per applicant
09/02/2015
03/08/2016
03/15/2016
Locations
Contacts
  
  
  
  
RSA ARCHITECTURE, Address:6335 W 110TH ST, Phone:(913) 341-5314  
MARVIN DUNCAN, Address:2101 VINE ST #209, Phone:(816) 830-3324  
MMHK LLC, Address:1511 NE COLBERN RD  
Reviews
Review Type Outcome Est. Completion Date Completed
Fire Plan Review Approved with Conditions 09/23/2015 09/18/2015
Joe Dir
Posting of occupant load
Corrective Action Required
09/16/2015

2012 IFC 1004.3- Posting of occupant load. Every room or space that is an assembly occupancy shall have the occupant load of the room or space posted in a conspicuous place, near the main exit or exit access doorway from the room or space. Posted signs shall be of an approved legible permanent design and shall be maintained by the owner or authorized agent. Post the occupant load of 45 in the area of the main entrance. verified at inspection. ACKNOWLEDGED IN LETTER SHEET T-1
Address numbers required
Corrective Action Required
09/16/2015

2012 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). Post the numeric address of 209 on the building. Verified at inspection. ACKNOWLDGED IN LETTER SHEET T-1
Type I hood - Where required
Corrective Action Required
09/16/2015

2012 IFC 609.2- Where required. A Type I hood shall be installed at or above all commercial cooking appliances and domestic cooking appliances used for commercial purposes that produce grease vapors. Provide Specs on the ansul supression system to be installed in the kitchen hood. Provide information on the kitchen hood to be intalled, make model.
Installation acceptance testing
Corrective Action Required
09/16/2015

2012 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. Acceptance test required for the kitchen hood ansul fire supression system. To schedule a test contact the fire department 816-969-1300. Information purposes.
Portable fire extinguishers for commercial cooking equipment.
Corrective Action Required
09/16/2015

2012 IFC 904.11.5- Portable fire extinguishers for commercial cooking equipment. Portable fire extinguishers shall be provided within a 30-foot (9144 mm) travel distance of commercial-type cooking equipment. Cooking equipment involving vegetable or animal oils and fats shall be protected by a Class K rated portable extinguisher. To be mounted under the manul pull station. Verified at inspection. ACKNOWLEDGED IN LETTER SHEET A-4
Portable fire extinguishers - conspicuous locations
Corrective Action Required
09/16/2015

2012 IFC 906.5- Conspicuous location. Portable fire extinguishers shall be located in conspicuous locations where they will be readily accessible and immediately available for use. These locations shall be along normal paths of travel, unless the fire code official determines that the hazard posed indicates the need for placement away from normal paths of travel. Provide one 2A-10BC (5lb) fire extinguisher. Verified at inspection ACKNOWLEDGED IN LETTER SHEET A-1
Building Plan Review Approved with Conditions 09/23/2015 09/17/2015
Joe Frogge
Health Dept Inspection
Corrective Action Required
09/16/2015

For the Health Department inspection contact Deb Sees with the Jackson County Public Works Department, Environmental Health Division at (816) 847-7070. Health Department approval is required prior to receiving any type of Occupancy from the City of Lee's Summit. Action required: Comment is for informational purposes.
Gen - Submittal documents 7-137
Resolved
09/17/2015

Lee's Summit Code Of Ordinances 7-137. - Submittal Documents. Construction documents, special inspection and structural observation programs, and other data shall be submitted in three (3) sets with each application for a permit. A registered design professional licensed by the State of Missouri shall prepare the construction documents. Where special conditions exist, the Building Official is authorized to require additional construction documents to be prepared by a registered design professional licensed by the State of Missouri. Action required: Provide 3 copies of the electrical design. (detailed scope of work from licensed electrician is a valid alternative)
Misc
Corrective Action Required
09/23/2015

Building is located in historic downtown area. Action required: Submit "exterior renovation permit" to Ron Seyl (816-969-1600). Approved exterior renovation permit required prior to issuance of construction permit. 9/23/15 - approved by Planning Department with the following conditions: 1. The rooftop mechanical unit must be totally screened from view per the design plans submitted on September 16, 2015. 2. The outside cooler must be painted the same color as the building.
Screening - Rooftop equipment
Resolved
09/17/2015

Planning and Development - Commercial businesses located along existing public streets shall be subject to the following design standards: a. buildings shall be designed with four (4) sided architecture, the same level of finish on all sides (no "back"); b. rooftop or ground-level mechanical equipment shall be totally screened from view by using either parapet walls at the same height of the mechanical units for rooftop mounts or by providing screening for ground mounted units acceptable to the Director; c. Wherever possible, parking areas and pedestrian walks shall connect internally to parking areas and pedestrian walks of existing adjoining businesses. Provisions shall be make for future connections to adjoining property not yet developed or redeveloped. Action required: Make needed correction to provide details as to how roof mounted mechanical equipment will be screened per UDO Article 7, Section 7.220.F
Miscellaneous Correction
Resolved
09/17/2015

2012 IPC 1003.1 Where required. Interceptors and separators shall be provided to prevent the discharge of oil, grease, sand and other substances harmful or hazardous to the public sewer, the private sewage system or the sewage treatment plant or processes. Action required: Either provide new grease interceptor or provide verification that existing grease interceptor is in place to protect sewer system from grease laden waste.
Licensed Contractors Rejected 09/16/2015 09/17/2015
Joe Frogge
LC - General Contractor
Corrective Action Required
09/16/2015

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor.
LC - MEP Subs
Corrective Action Required
09/16/2015

No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Excerpt from Sec. 7-130, Lees Summit Code of Ordinances. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Health Department Review Approved 11/17/2015 09/15/2015
Joe Frogge
Fire Plan Review Approved with Conditions 09/15/2015 09/09/2015
Joe Dir
Posting of occupant load
Corrective Action Required
09/09/2015

2012 IFC 1004.3- Posting of occupant load. Every room or space that is an assembly occupancy shall have the occupant load of the room or space posted in a conspicuous place, near the main exit or exit access doorway from the room or space. Posted signs shall be of an approved legible permanent design and shall be maintained by the owner or authorized agent. Post the occupant load of 45 in the area of the main entrance. verified at inspection.
Address numbers required
Corrective Action Required
09/09/2015

2012 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). Post the numeric address of 209 on the building. Verified at inspection.
Type I hood - Where required
Corrective Action Required
09/09/2015

2012 IFC 609.2- Where required. A Type I hood shall be installed at or above all commercial cooking appliances and domestic cooking appliances used for commercial purposes that produce grease vapors. Provide Specs on the ansul supression system to be installed in the kitchen hood. Provide information on the kitchen hood to be intalled, make model.
Installation acceptance testing
Corrective Action Required
09/09/2015

2012 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. Acceptance test required for the kitchen hood ansul fire supression system. To schedule a test contact the fire department 816-969-1300. Information purposes.
Portable fire extinguishers for commercial cooking equipment.
Corrective Action Required
09/09/2015

2012 IFC 904.11.5- Portable fire extinguishers for commercial cooking equipment. Portable fire extinguishers shall be provided within a 30-foot (9144 mm) travel distance of commercial-type cooking equipment. Cooking equipment involving vegetable or animal oils and fats shall be protected by a Class K rated portable extinguisher. To be mounted under the manul pull station. Verified at inspection.
Portable fire extinguishers - conspicuous locations
Corrective Action Required
09/09/2015

2012 IFC 906.5- Conspicuous location. Portable fire extinguishers shall be located in conspicuous locations where they will be readily accessible and immediately available for use. These locations shall be along normal paths of travel, unless the fire code official determines that the hazard posed indicates the need for placement away from normal paths of travel. Provide one 2A-10BC (5lb) fire extinguisher. Verified at inspection
Building Plan Review Rejected 09/15/2015 09/09/2015
Joe Frogge
Health Dept Review
Resolved
09/15/2015

For the Health Department review contact Deb Sees with the Jackson County Public Works Department, Environmental Services Division, at (816) 847-7070. Health Department approval is required prior to receiving any type of building permit from the City of Lee's Summit. Action required: Comment is for informational purposes.
Health Dept Inspection
Corrective Action Required
09/09/2015

For the Health Department inspection contact Deb Sees with the Jackson County Public Works Department, Environmental Health Division at (816) 847-7070. Health Department approval is required prior to receiving any type of Occupancy from the City of Lee's Summit. Action required: Comment is for informational purposes.
Gen - Submittal documents 7-137
Corrective Action Required
09/09/2015

Lee's Summit Code Of Ordinances 7-137. - Submittal Documents. Construction documents, special inspection and structural observation programs, and other data shall be submitted in three (3) sets with each application for a permit. A registered design professional licensed by the State of Missouri shall prepare the construction documents. Where special conditions exist, the Building Official is authorized to require additional construction documents to be prepared by a registered design professional licensed by the State of Missouri. Action required: Provide 3 copies of the electrical design. (detailed scope of work from licensed electrician is a valid alternative)
Misc
Corrective Action Required
09/09/2015

Building is located in historic downtown area. Action required: Submit "exterior renovation permit" to Ron Seyl (816-969-1600). Approved exterior renovation permit required prior to issuance of construction permit.
Screening - Rooftop equipment
Corrective Action Required
09/09/2015

Planning and Development - Commercial businesses located along existing public streets shall be subject to the following design standards: a. buildings shall be designed with four (4) sided architecture, the same level of finish on all sides (no "back"); b. rooftop or ground-level mechanical equipment shall be totally screened from view by using either parapet walls at the same height of the mechanical units for rooftop mounts or by providing screening for ground mounted units acceptable to the Director; c. Wherever possible, parking areas and pedestrian walks shall connect internally to parking areas and pedestrian walks of existing adjoining businesses. Provisions shall be make for future connections to adjoining property not yet developed or redeveloped. Action required: Make needed correction to provide details as to how roof mounted mechanical equipment will be screened per UDO Article 7, Section 7.220.F
Miscellaneous Correction
Corrective Action Required
09/09/2015

2012 IPC 1003.1 Where required. Interceptors and separators shall be provided to prevent the discharge of oil, grease, sand and other substances harmful or hazardous to the public sewer, the private sewage system or the sewage treatment plant or processes. Action required: Either provide new grease interceptor or provide verification that existing grease interceptor is in place to protect sewer system from grease laden waste.
Licensed Contractors Rejected 09/15/2015 09/09/2015
Joe Frogge
LC - General Contractor
Corrective Action Required
09/09/2015

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor.
LC - MEP Subs
Corrective Action Required
09/09/2015

No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Excerpt from Sec. 7-130, Lees Summit Code of Ordinances. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Inspections

There are no inspections for this permit application.

Documents & Images
Date Uploaded File Type Document Name
09/09/2015 Letter Fire Building Plan Review
09/10/2015 Letter Codes P/R Corrections Document
09/18/2015 Letter Fire Building Plan Review
09/23/2015 Letter Codes P/R Corrections Document
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home